Site Visit Agenda FCC Butner - Powerhouse water treatment 2.pdf
PDF 251 KB Posted
- Attached to
- Powerhouse Water Treatment for FCC Butner, NC
- Solicitation number
- 15B10625Q00000023
About this file
These are Site Visit Conference Meeting Minutes for a Powerhouse Water Treatment contract (Solicitation 15B10625Q00000023) at the Federal Correctional Complex (FCC) Butner in North Carolina. The meeting occurred on July 22, 2025, with key details including a quote submission deadline of July 28, 2025, at 10:00 a.m. EST, and a base contract period beginning October 1, 2025, with four additional option years. The solicitation is a Total Small Business Set-Aside with NAICS code 221310 and a small business size standard of $41,000,000.
Critical contract requirements include work hours from 7:00 a.m. to 3:00 p.m. Monday through Friday, strict security protocols for a correctional facility setting, and specific submission guidelines. Contractors must be registered in the System for Award Management (SAM), submit electronic quotes only, provide valid photo identification, and adhere to extensive security restrictions such as no contact with inmates, no green or khaki clothing, and tool accountability. The Contracting Officer's Representative is Mr. Brenton Rains, and questions must be submitted to Ashley Harding and Broguen McKeown via email by July 24, 2025, at 12:00 p.m. EST.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE VISIT CONFERENCE MEETING MINUTES
15B10625Q00000023– POWERHOUSE WATER TREATMENT
FMC BUTNER
1 | P a g e
DATE: Tuesday, July 22, 2025, at 9:00 A.M. local time Place: Training Center
CONTRACTING OFFICER (Broguen McKeown):
I. INTRODUCTIONS:
Round table introduction of all attendees.
II. PURPOSE OF MEETING:
Indicate the purpose of this meeting is to familiarize the contractor with the unique circumstances and requirements surrounding a correctional setting. This meeting is also to explain the solicitation, as issued, and not to furnish additional information.
State - nothing said here shall be interpreted as a change to the solicitation without the issuance of a formal amendment through the Contracting Officer, Broguen McKeown
III. MINUTES:
Advised minutes will be recorded and distributed via www.sam.gov.
IV. SITE VISIT INFORMATION:
Walk to selected site for Powerhouse Water Treatment immediately following the meeting.
V. SPECIAL INSTRUCTIONS::
Special instructions pertaining to electronic quote submission *Submit: Submit Only Combined Synopsis with Attachment A. Please submit one (1) copy of your quote signed by an individual authorized to bind the contractor so as to be received no later that the date indicated
Quotes submitted by mail or hand carried will not be evaluated. It is the responsibility of the Quoter to confirm receipt of quote by contacting Ashley Harding by email a1huffman@bop.gov and Broguen McKeown by email bmckeown@bop.gov. All quotes received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR).
VI. TIME FRAMES AND LOCATION FOR SUBMISSION OF QUOTES:
Deadline for submission of quotes for this combined synopsis is July 28, 2025, by 10:00 a.m. EST. See Instruction to Quoters for electronic quote submission guidance.
VII. GENERAL TOPICS:
mailto:a1huffman@bop.gov
2 | P a g e
The following submission/completion items will be addressed:
1. From the combined synopsis, each quoter SHALL complete and submit the following forms, clauses, and statements with his/her quote. Failure to do so may cause your bid to be considered as non-responsive:
• QUOTE SUBMISSION Combined Synopsis: Please include Name of Company, UEI number, and e-mail address.
• REPRESENTATIONS AND CERTIFICATIONS: All contractors submitting a quote must be registered in the System for Award Management (SAM) at www.sam.gov with the North American Industry Classification Standard code (NAICS) 221310 which is applicable to this acquisition.
• FAR PROVISION 52.204-8: Pursuant to the section (b) (1) of this provision, provision 52.204-7 is included in this solicitation.
2. Other general items to be addressed:
• WORK HOURS: Work hours shall be between 7:00 am to 3:00 pm Monday through Friday excluding weekends and federal holidays.
• COR: The Contracting Officer’s Representative (COR) is Mr. Brenton Rains, General Foreman at FCC Butner.
• PERIOD OF PERFORMANCE: After issuance of award notice, this base year will begin October
1, 2025 with 4 option years.
• QUESTIONS: Oral questions asked at Site Visit of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. All questions shall be sent to Ashley Harding, Contract Specialist, via email at a1huffman@bop.gov and Broguen McKeown, Contract Specialist, via email at bmckeown@bop.gov In order to provide sufficient response time prior to the bid due date, the Government has establishing that questions be submitted no later than July 24, 2025, at 12:00, noon EST.
• ACCESS TO SITE/PARKING OF VEHICLES: Only public parking will be available for contractor work vehicles.
• STORAGE OF MATERIALS: Storage of materials will be coordinated with the COR.
• CONTRACTOR TEMPORARY OFFICE: No temporary office space will be provided.
mailto:a1huffman@bop.gov mailto:bmckeown@bop.gov
3 | P a g e
3. SAFETY POINTS:
• Please refer to the Combined Synopsis-Attachment A (Statement of Work)
4. SECURITY
• ADVERSE WEATHER: Depending upon the nature of the emergency, this normally will not affect any services outside of the secure perimeter. Access to the site will be available during normal working hours except during emergencies.
• SECURITY CLEARANCES: Contract workers are subject to security investigative procedures.
Please refer to the Combined Synopsis – Attachment A for details.
• EMPLOYEE IDENTIFICATION: Contractor personnel working on project site must bring valid photo identification to the institution each day. The identification will be surrendered upon entry to and returned upon exit from institution property.
• TOOL ACCOUNTABILITY: Strict accountability and control of all contractor tools and hazardous materials must be maintained at all times. The contractor should provide for enough time at the conclusion of the workday for the return and accounting of all tools issued during the workday. Lost or missing tools must be reported to the COR the Captain immediately. Please refer to Combined Synopsis - Attachment A
• ILLEGAL ITEMS ON FEDERAL PROPERTY: Firearms, ammunition, knives, other weapons, drugs, narcotics, and alcoholic beverages are not permitted inside/outside the secure perimeter or anywhere else on Federal property at any time. This includes the private vehicles of contract workers. Violators will be subject to criminal prosecution. All persons, vehicles, and equipment are subject to search by institution authorities at any time.
• NO CONTACT WITH INMATES: Contract workers are not to have any contact with inmates at any time. No photographs may be taken of inmates.
• CONTRACTOR EMPLOYEE WORK DRESS: Green or khaki‐colored clothing is not allowed, as inmates wear these colors.
• PHOTOGRAPHS: The institution’s Facilities Department maintains a digital camera that will be utilized by FBOP staff to document the project work. The Contractor may request copies of these photos and may request that photos be taken for specific conditions. Cellular telephones equipped with photographic capabilities are prohibited on the service site.
VIII. ADDITIONAL DISCUSSION:
None.
FMC BUTNER
4 | P a g e
Meeting minutes recorded by:
Ashley Harding, Contract Specialist FCI Butner
NOTICE:
MEETING MINUTES ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THEY ARE NOT
INTENDED TO CHANGE ANY SPECIFICATIONS, TERMS OR CONDITIONS OF THE
SOLICITATION. ANY AND ALL CHANGES TO THE SOLICITATION SHALL BE ISSUED IN
SUBSEQUENT AMENDMENTS ISSUED BY THE CONTRACTING OFFICER ON A STANDARD
FORM 30 (SF-30).
File details come from the government source that posted it. Updated .