15-Part G - Attachment E - Subcontractor List.pdf
PDF 172 KB Posted
- Attached to
- Transportation Stipend Card Management Services
- Solicitation number
- 2017
- Issued by
- Alexandria City, Virginia
About this file
This is a Subcontractor List Attachment form for the City of Alexandria, Virginia's Transportation Stipend Card Management Services solicitation. The form is designed to document the Prime Contractor and all first-tier subcontractors who will perform work on the resulting contract. Bidders are required to identify each subcontractor, designate their Small, Women-owned, and Minority-owned (SWaM) or Disadvantaged Business Enterprise (DBE) status, specify the general type of work to be performed, and indicate the approximate percentage of total work to be allocated to each entity. The Prime Contractor must also designate the percentage of work to be performed with their own forces, with all percentages totaling 100 percent of the bid amount.
The form requires completion by the bidder or offeror, including signature and authorization verification by an authorized signatory with name and title. The document serves as a critical compliance and transparency tool for the City of Alexandria to track subcontracting participation, monitor small and disadvantaged business utilization, and ensure that the proposed team structure aligns with solicitation requirements. This attachment is standard practice for public sector procurements to promote equitable business participation and verify contractor capacity.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Alexandria
Attachment E
Subcontractors List
The following list provides the name of the Prime Contractor and their 1st Tier Sub-Contractors who shall perform the Work in reference to the Solicitation referenced at the top of this page and its resulting Contract. The general type of work to be performed and the approximate percentage of the total work per Prime and 1st Tier Sub-Contractor shall be annotated. (Note: The Prime Contractor may be required to perform a percentage of the total work with their own forces as required in the bid documents).
Vendor Name SWaM/DBE
Select & Enter Number
Type of Work % of Total Work
Prime Contractor
1st Tier Subcontractors
Total % of Bid Amount 100%
Bidder/Offeror Name:_________________________Date: _____________________________
Signature of Authorized Signatory: _________________________________________________
Name & Title of Authorized Signatory: ______________________________________________
No.:
| SWaMDBE Select Enter NumberPrime Contractor: |
| Prime ContractorRow1: |
| SWaMDBE Select Enter NumberRow2: |
| Type of WorkRow2: |
| of Total WorkRow2: |
| 1st Tier SubcontractorsRow1: |
| SWaMDBE Select Enter NumberRow4: |
| Type of WorkRow4: |
| of Total WorkRow4: |
| 1st Tier SubcontractorsRow2: |
| SWaMDBE Select Enter NumberRow5: |
| Type of WorkRow5: |
| of Total WorkRow5: |
| 1st Tier SubcontractorsRow3: |
| SWaMDBE Select Enter NumberRow6: |
| Type of WorkRow6: |
| of Total WorkRow6: |
| 1st Tier SubcontractorsRow4: |
| SWaMDBE Select Enter NumberRow7: |
| Type of WorkRow7: |
| of Total WorkRow7: |
| 1st Tier SubcontractorsRow5: |
| SWaMDBE Select Enter NumberRow8: |
| Type of WorkRow8: |
| of Total WorkRow8: |
| 1st Tier SubcontractorsRow6: |
| SWaMDBE Select Enter NumberRow9: |
| Type of WorkRow9: |
| of Total WorkRow9: |
| BidderOfferor Name: |
| Date: |
| Signature10_es_:signer:signature: |
| Signature11_es_:signer:signature: |
| Text13: RFP |
| Text11: Request for Proposals |
| Text15: RFP |
| Text14: 2017 |
| Text12: Transportation Stipend Card Management Services |
File details come from the government source that posted it. Updated .