This is a Design Standards document issued by Utah Valley University (UVU) in conjunction with the State of Utah Division of Facilities and Construction Management (DFCM) for the Life Safety Division (Section 28 40 00) applicable to the Student Athletic Center project with a construction budget of $3,100,000. The document establishes mandatory design and installation standards for fire alarm systems and related life safety components, specifying that all systems must utilize the Honeywell Gamewell FCI platform interconnected to the main supervisor system. Key requirements include the use of new materials only (no refurbished equipment), with all work performed by certified installers under the direction of a UVU Construction Project Manager and UVU Fire Marshal. The standards address gas detection alarms, refrigerant detection alarms, water detection alarms, and fire detection alarms, with specific provisions for audible and visual notification appliances, conduit installation (minimum 3/4" EMT only), Class A wiring systems, device labeling, and panel locations. Interruption of existing life safety system service requires advance written notification (40 working days for multi-building outages, 20 days for single building, 10 days for partial building disruptions) and is limited to Sundays and weekdays between 10:00 PM and 6:00 AM, with a comprehensive fire watch plan required.

The standards require compliance with NFPA 70 (National Electrical Code), NFPA 72 (National Fire Alarm and Signaling Code), the International Building Code, and the International Fire Code. All deviations from the standards require written approval from both the UVU Construction Project Manager and UVU Fire Marshal (Justin Sprague, 801-863-8021, justin.sprague@uvu.edu). The approved manufacturer is Honeywell-Gamewell-Fire Control Instruments, with Nelson Fire Systems designated as the approved installer. Supplementary material provisions require furnishing spare components including smoke detectors, heat detectors, pull stations (10 percent quantity, minimum 2 units each), detector bases (2 percent quantity, minimum 2 units each), one spare of each specialty detector type, extra keys and tools, two spare audible and visual notification appliances of each type, and four spare fuses of each type installed. The document references the Uni-Net interface device (NION) for campus central station notification and mandates LCD displays with English annotation for alarm status identification, with all alarms and troubles logged in archive memory accessible to qualified service personnel.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIFE SAFETY DIVISION 28 40 00

The UVU Standards are provided in CSI format for ease of locating requirements from UVU.

These requirements are in addition to the State of Utah Division of Facilities and Construction Management (DFCM) Design Requirements. In the event of any discrepancy between the DFCM Design and UVU Standards requirements, the Architectural/Engineering Team shall use the UVU Standards over the DFCM Design Requirements.

Items below are not intended to be fully encompassing of all the requirements needed to be specified for the completion of a project and the Engineer of Record shall provide their expertise for full completion. Items below that UVU does not intend to currently give direction on are left to the discretion of the Engineer of Record.

SECTIONS

Section 28 42 00 Gas Detection Alarm

Section 28 44 00 Refrigerant Detection Alarm

Section 28 45 00 Water Detection Alarm

Section 28 46 00 Fire Detection Alarm

SECTION 28 40 00 LIFE SAETY

1. GENERAL

1.1. Campus Life Safety System Description

1.1.1 The campus life safety system is Honeywell Gamewell FCI system. The system is interconnected to the main supervisor system.

1.2. Workmanship

1.2.1 Life Safety work performed for Utah Valley University must be executed in a professional manner. Careful consideration should be taken to minimize the disruption of campus operations while performing work during normal operating hours.

1.2.2 Life Safety contractors hired to perform work for Utah Valley University are always required to have at least one certified installer on site while work is being performed

1.3. Deviations for Standards

1.3.1 Any deviation from these standards can be allowed if written permission is obtained from ALL of the following individuals:

(A) UVU Construction Project Manager – Changes per Project

(B) UVU Fire Marshall

(i) 801.863.8021

(ii) justin.sprague@uvu.edu

1.4. Materials and Equipment

1.4.1 All life safety system materials and equipment must be NEW. Re-furbished or re-purposed materials and equipment of any kind is not acceptable. Utilization of existing, unused materials and equipment must be approved by a representative of UVU.

1.5. Applicable Codes and Standards

1.5.1 The most recent of any code adopted by the state of Utah shall be followed.

The most recent handbook of the standards referenced here-in shall be followed.

(A) NFPA 70 – National Electrical Code

(B) NFPA 72 – National Fire Alarm and Signaling Code

(C) IBC – International Building Code

(D) International Fire Code

1.6. Interruption of Existing Life Safety System Service

1.6.1 Do not interrupt life safety systems service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electric service according to requirements indicated:

1.6.2 Notify Owner no fewer than 40 working days’ notice for outages involving two or more buildings, 20 working days’ notice for outages involving one building, and 10 days’ notice for outages involving a portion of one building in advance of proposed interruption of Fire Alarm.

1.6.3 Do not proceed with interruption of electric service without Owner's written permission.

1.6.4 To gain permission please provide the following to the UVU Construction Project Manager, and UVU Fire Marshall (contact information is outlined under Deviation of Standards):

(A) Date and Time of interruption

(B) Duration of Interruption

(C) Equipment associated with the interruption

(D) Fire Watch Plan

1.6.5 Interruptions shall only be approved for Sundays and during the week between 10:00 PM and 6:00 AM. M-TH during normal hours is allowed if only affects small areas and with approval.

2. PRODUCTS

2.1. None

3. EXECUTION

3.1. None

Section 28 42 00 Gas Detection Alarm

1.1. None

2. PRODUCTS

2.1. Carbon Monoxide (CO) devices shall be compatible with the Honeywell Gamewell FCI System.

3. EXECUTION

3.1. (CO) sensor shall be tied to Fire Alarm System.

Section 28 44 00 Refrigerant Detection Alarm

Per Engineer

Section 28 45 00 Water Detection Alarm

Per Engineer

Section 28 46 00 Fire Detection Alarm

1.1. None

2. PRODUCTS

2.1. Approved Manufacturer: Honeywell- Gamewell-Fire Control Instruments

2.2. Approved Installer: Nelson Fire Systems

3. EXECUTION

3.1. The system alarm operation subsequent to the alarm activation of any manual station automatic detection device or sprinkler flow switch shall be as follows:

3.1.1 All audible alarm-indicating appliances shall sound until silenced by the alarm silence switch at the control panel.

3.1.2 All visual alarm-indicating appliance strobes shall display a continuous pattern until a System is silenced or Reset.

3.1.3 A supervised signal to notify the Campus Central Station shall be activated via the “Uni-Net” interface device (NION.)

3.1.4 Alarm status shall be displayed on an LCD display consisting of point address label and device type identifier with English annotation. It shall not be necessary to translate zone numbers or address numbers to identify the exact unit in alarm. LED annunciation is not considered equivalent to LCD. All alarms and troubles shall be logged into archive memory that may be called up by technically competent service personnel at any time. The system alarm shall be visible on the control panel and remote annunciator(s).

3.1.5 A pulsing alarm tone shall occur within the control panel until acknowledged.

3.1.6 The activation of any initiating devices shall be processed immediately.

3.2. Raceways

3.2.1 All conduit is to be minimum 3/4" conduit and all junction boxes shall be 4" sq x 2-1/8" deep or 4 11/16” x 2 1/8” when needed using blank covers plaster rings etc. as required unless otherwise approved. Look at deep plus extension.

3.2.2 Fire Alarm shall only be in Hard Conduit (EMT) only. MC Cable is not allowed throughout the system.

(A) An exception is a remodel where the remodel portion of the building does not exceed 50% and the area under remodel already contains MC Fire Alarm Cabling throughout area being remodeled.

3.2.3 Couplings for Conduit shall be painted red.

3.3. Wiring

3.3.1 All wiring shall be a Class A system.

3.4. Cleanliness

3.4.1 Shipping Caps or Covers shall remain on until 3 days before Fire Marshall testing and after all (final clean) dust has been removed from the area.

3.4.2 Fire Alarm Panels interior control boards shall not be installed until all dust is removed from the area.

3.5. Devices

3.5.1 Only use speaker strobes. All new systems shall use voice annunciation.

3.5.2 Use horn strobes in buildings with existing horn strobe device.

3.6. Labeling

3.6.1 Every device shall have an address label on it.

3.7. Locations of Panels

3.7.1 Main Fire Alarm Panel in an electrical room, IDF, MDF.

3.7.2 Annunciator shall in a public space within 20’ of a main entrance as approved by the UVU Fire Marshal.

3.8. Extra Material

3.8.1 Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

(A) Smoke Detectors Heat Detectors and Pull Stations:

(i) Quantity equal to 10 percent of amount of each type installed but no less than 2 units of each type.

(B) Detector Bases:

(i) Quantity equal to 2 percent of amount of each type installed but no less than 2 unit of each type.

(C) Smoke Beam Detectors Flame detectors etc:

(i) One of each type installed.

(D) Keys and Tools:

(i) One extra set for access to locked and tamper proofed components.

(E) Audible and Visual Notification Appliances:

(i) Two of each type installed. 6. Fuses: Four of each type installed in the system.