Specifications_31_01_10_0003.pdf

PDF 183 KB Posted

Attached to
BROCK RESERVOIR GATE REPLACEMENT/REPAIRS Federal contract opportunity
Solicitation number
140R3026R0004
Issued by
Department of the Interior Bureau of Reclamation

About this file

This is a specification section (31 03 10 - Control of Water) for Amendment No. 003 of the Warren H. Brock Reservoir Gates Replacement project under the Colorado River Front Work and Levee System Project in California.

The section establishes requirements for temporary cofferdam installation and water leakage control at the Drop 1 gate in the All-American Canal, which leaks water when closed. The temporary cofferdam work is compensated on a lump-sum basis per Price Schedule A, with the price including replacement of stop log seals. The contractor must submit a water control plan (RSN 31 03 10-1) describing the proposed method for controlling leaks from the Drop 1 gate during construction and measures to meet permit requirements and water quality standards per Section 01 57 30. Key site conditions include coordinate requirements with the Government, notification 14 days prior to cofferdam installation, and work completion within an outage period defined in Section 01 14 00. The contractor must control leakage from the Drop 1 gate prior to removing and replacing slide gates and drain the Drop 2 Inlet Canal before installing leakage control measures. Pre-cofferdam preparations require removal of rock fragments, lumber, metal, and other debris to prevent washout through outlet works. Upon completion, the contractor must remove or level the temporary cofferdam and protective works in a manner approved by the Contracting Officer's Representative; removed materials remain contractor property and must be disposed of per Section 01 74 00.

View the file

Other files for this federal contract opportunity

Other files attached to BROCK RESERVOIR GATE REPLACEMENT/REPAIRS, newest first.
File Type Posted
Sol_140R3026R0004_Amd_0005.pdf PDF
Sol_140R3026R0004_Amd_0004.pdf PDF
140R3026R0004_-_Questions_from_Site_Visit_0004.pdf PDF
Revised_Page_L-15_0004.pdf PDF
Specifications_01_46_00_0003.pdf PDF
423-D-60247-Cell_1_Option_0003.pdf PDF
Rodney_Hunt_Shop_Drawings_0003.pdf PDF
Sol_140R3026R0004_Amd_0003.pdf PDF
Specifications_35_23_11_0003.pdf PDF
Revised_Page_L-12_0003.pdf PDF
140R3026R0004_-_Site_Visit_Sign-In_Sheet_0003.pdf PDF
SF_1442_0003.pdf PDF
Attachment_8_Key_Subcontractor_Specialized_Experience_0003.pdf PDF
Sol_140R3026R0004_Amd_0002.pdf PDF
Attachment_1A_Statement_of_Work_0002.pdf PDF
Sol_140R3026R0004_Amd_0001.pdf PDF
Solicitation_No__140R3026R0004_0001.pdf PDF
Attachment_5_Performance_Bond_SF25.pdf PDF
Attachment_9_Subcontracting_Plan_Template.pdf PDF
Attachment_6_DI-137_Release_of_Claims.pdf PDF
Attachment_5_Payment_Bond_SF25A.pdf PDF
Attachment_8_Subcontracting_Plan_Template.docx DOCX document
Attachment_7_-_Past_Performanc_Questionnaire.pdf PDF
Attachment_4_Bid_Bond_SF24.pdf PDF
Sol_140R3026R0004.pdf PDF
Attachment_2__Drawings.pdf PDF
Attachment_3_Wage_Determination_CA20260002.pdf PDF
Attachment_1_Specifications.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Warren H. Brock Reservoir Gates Replacement Amendment No.003 Colorado River Front Work and Levee System Project, California Solicitation No.

Revised Control of Water

31 03 10 -1

SECTION 31 03 10

CONTROL OF WATER

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Temporary Cofferdam

1. Payment: Lump-sum price offered in Price Schedule A.

a. Includes replacing stop log seals.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 31 03 10-1, Water control plan:

1. Describe proposed method controlling leaks from gate at Drop 1 during construction and measures to be taken to meet permit requirements and water quality standards required in Section 01 57 30 - Water Pollution Control.

1.03 SITE CONDITIONS

A. Gate at Drop 1 in the All-American Canal leaks water when closed.

1. See Drawing 423-D-60237 for location of Drop 1 gate.

2. Stay within limits shown on Drawing 423-D-60238.

3. Coordinate closing of gate with Government.

4. Notify Government 14 days prior to cofferdam installation.

5. Work to be completed in outage defined in Section 01 14 00 – Work Restrictions

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 PREPARATION

A. Control leakage from Drop 1 gate prior to removing and replacing slide gates.

B. Drain the Drop 2 Inlet Canal prior to installing Drop 1 leakage control measures.

Warren H. Brock Reservoir Gates Replacement Amendment No.003 Colorado River Front Work and Levee System Project, California Solicitation No.

Revised Control of Water

31 03 10 -2

3.02 PROTECTION

A. Remove rock fragments, lumber, metal, and other solid debris materials prior to cofferdam, and prevent such materials from being washed through the outlet works.

B. Approved protective works may be required at the entrance to keep the outlet works free of debris.

3.03 CLEANUP AND RESERVOIR REGULATION

A. Remove or level temporary cofferdam and protective works in a manner approved by the

COR.

1. Removed materials remain property of the Contractor.

2. Dispose of removed material in accordance with Section 01 74 00 – Cleaning and

Waste Management.

END OF SECTION