About this file

This document contains specifications for a federal contract solicitation for joint sealants and waterstops on the FKC Middle Reach Capacity Correction Project Phase 1. The solicitation requires the contractor to furnish and install joint sealants meeting specified requirements for composition, curing time, and gap width maintenance. It also requires low-pressure testing of expansion joints used in submerged applications. The contractor must provide a five-year warranty against defects in materials and workmanship for the entire sealant installation. Acceptable waterstop products are specified as PVC strips meeting defined composition, strength, and flexibility properties for use in canal linings and structures. The contractor must submit manufacturer certifications verifying product properties.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_7_Amendment_No_0004_0004.pdf PDF
Attachment_14_Amendment_No__0004_0004.pdf PDF
Attachment_29_Amendment_No_0004_0004.pdf PDF
Attachment_28_Amendment_No__0004_0004.pdf PDF
Attachment_23_Amendment_No__0004_0004.pdf PDF
Attachment_22_Amendment_No__0004_0004.pdf PDF
Attachment_20_Amendment_No__0004_0004.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
Drawing_GC-15_Attachment_20_Amendment_No__0003_0003.pdf PDF
Drawing_G-13_Attachment_17__Amendment_No__0003_0003.pdf PDF
Drawing_C-506_Attachment_15_Amendment_No__0003_0003.pdf PDF
Drawing_C-215_Attachment_12_Amendment_No__0003_0003.pdf PDF
Drawing_C-214_Attachment_11_Amendment_No__0003_0003.pdf PDF
Drawing_C-204_Attachment_7_Amendment_No__0003_0003.pdf PDF
FKC_31_30_00-12_Att_7_Amendment_0002_0002.pdf PDF
FKC_01_14_00-12_Att_6__Amendment_0002_0002.pdf PDF
GC-10-REV-1_Att_5_Amendment_No__0002_0002.pdf PDF
Attachment_No__2_-_FKC_Pre-Proposal_Presentation_Sign_in_Sheet_0002.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Attachment 13 - Drawing Part 1 of 5.pdf PDF
Attachment 9 - Experience and Management.pdf PDF
Attachment 4 - Offeror Responsibility Information.pdf PDF
Attachment 2 - Subcontracting Plan.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

STANTEC/184031016 JOINTS IN CONCRETE

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 03 32 00 - 7

d. The sealant shall be cast and cured in accordance with the manufacturer's recommendations, except that the curing period shall be not less than 24 hours.

e. Following the curing period, the gap between the blocks shall be widened to 1-1/2 inches, and spacers shall be used to maintain this gap for 24 hours prior to inspection for failure.

E. Expansion Joint Testing for Structures

1. Provide low-pressure testing of structural expansion joints to be used in submerged applications in accordance with the requirements of Section 01 74 40 – Concrete Structure Testing.

1.6 SPECIAL CORRECTION OF DEFECTS REQUIREMENT

A. The CONTRACTOR shall furnish a 5-year written warranty of the entire sealant installation against faulty and/or incompatible materials and workmanship, together with a statement that the CONTRACTOR agrees to repair or replace, to the satisfaction of the GOVERNMENT, any defective areas which become evident within the 5-year period.

PART 2 -- PRODUCTS

2.1 WATERSTOPS

A. PVC Waterstops for Canal Lining

1. The PVC strips shall be manufactured with the weights specified on the drawings and shapes conforming to the dimensions shown on the drawings, and shall be extruded from virgin, pigmented, plasticized PVC.

2. The PVC shall be designed, fabricated, and packaged to facilitate automatic installation.

3. The PVC shall be as manufactured by Vinylex Corp., of Knoxville, TN or Greenstreak Plastic Products, St. Louis, MO., or approved equal. The finished PVC strip shall meet the following minimum requirements:

Tensile strength (lb/in2) 1,400 Ultimate elongation (%) 280 Stiffness in flexure, 1/2-inch span (lb/in2) 400

4. The CONTRACTOR shall submit a manufacturer's certification for the PVC compound used for fabricating the strip. The certification shall include material identification, reel number, quantity represented, and certified physical property test results performed by the manufacturer or other laboratory covering all of the test requirements for the PVC compound. The CONTRACTOR shall be responsible for the accuracy of the manufacturer's certification.

B. PVC Waterstops for Structures

Attachment 6 Amendment No 0005 swolfert Cross-Out swolfert Polygon