This document contains details regarding utility relocation work required for the FKC Middle Reach Capacity Correction Project Phase 1. The project, solicited under solicitation number 140R2020R0009, is being conducted by the Department of the Interior Bureau of Reclamation and involves constructing capacity corrections to the Friant-Kern Canal between mile markers 53+10 and 58+40. The document lists over 60 locations where existing electrical, communication, and gas utilities will need to be relocated, including the specific utility owners, sizes of lines, whether they are overhead or buried, and the planned relocation schedule between August and December 2021 or October 2022. Relocations will involve removing and replacing poles and buried lines at road and canal crossings as well as locations running parallel to roads and the canal.
View the file
Other files for this federal contract opportunity
Show all 50
FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 29 Amendment No 0004 Solicitation No: 140R2020R0009 Specifications No. 20-C0907
STANTEC/184031016 CONSTRUCTION CONSTRAINTS AND SEQUENCING
FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 14 00-7980
UTILITY RELOCATION WORK BY OTHERS
Approx.
Station Utility (Type)
Approx.
Number of Poles to Relocate
Utility Size (in.)
Utility Owner Marker Dwg. No.
Location with
Respect to New Canal - Crossing or
Parallel
Road Relocation Schedule (Month
Ending Date)
5310+00 Electrical (Buried) 0 0 So Cal
Edison Distribution Powerunma rked C-22, C-23 Parallel
Ave 136 to Ave
August December
5322+43 Electrical (Overhead) 4 SoCal
Edison 12KV C-22 Parallel Ave 136 August
December
5361+71 Electrical (Overhead) 1 SoCal
Edison Distribution
Power C-23, C-203 Crossing Ave 128
August December
5483+25 Electrical (Overhead) 1 SoCal
Edison 66KV C-28, C-204 Crossing Ave 112
August December
5483+65 Communication (Buried) 4" AT&T Comms. C-28, C-204 Crossing Ave 112 August
December
5536+06 Electrical (Overhead) 1 SoCal
Edison 12KV C-30, C-100 Crossing
Deer Creek Check
August December
5542+98 Communication Friant Comms. C-30, C-100 Parallel
Deer Creek Check
August December
5563+78 Electrical (Overhead) 8 SoCal
Edison 12KV C-31 to C-32 Parallel
Deer Creek to
Terra Bella
August December
5588+00 Communication (Buried) AT&T Comms C-205 Crossing Terra
Bella August
December
5588+20 Gas 5.6” SoCal Gas High Pressure
C-32, C-205 Crossing Terra
Bella December
5588+40 Electrical
(Overhead)JPA
(AT&T)
2 SoCal Edison
Distribution Power
C-32, C-205 Crossing Terra
Bella August
December
5600+60 Electrical
(Overhead)JPA
(AT&T)
1 SoCal Edison
Distribution Power
C-33, C-206 Crossing Road
August
December
5663+50 Electrical
(Overhead)JPA
(AT&T)
1 SoCal Edison
Distribution Power
C-36, C-207 Crossing Ave 88
August December
5671+51 Electrical (Overhead) 2 SoCal
Edison 220 kV-HV C-36 Crossing South of Ave 88 October 2022
5672+56 Electrical (Overhead) 2 SoCal
Edison 220 kV-HV C-36 Crossing South of Ave 88 October 2022
5687+80 Electrical (Overhead) 2 SoCal
Edison Distribution
Power C-37 Parallel Terra Bella
December
5728+09 Electrical (Overhead) 1 SoCal
Edison 12KV C-38, C-208 Crossing Ave 80 December
5757+09 Electrical (Overhead) 1 SoCal
Edison 12KV C-39 Crossing Ave 74 December
5781+00.00 Communication (Buried) 2" Ducor
Telephone Comms. C-40 Crossing Road
August December
5781+00 Electrical (Overhead) 1 SoCal
Edison Distribution
Power C-40 Crossing Road
December
5800+00 Electrical (Overhead) 2 SoCal
Edison Distribution
Power C-41 Crossing Road
December
5827+00 (A) Electrical (Overhead) 1 SoCal
Edison 66kv C-42, C-209 Crossing Road
December
Attachment 29 Amendment No 0004 Solicitation No: 140R2020R0009 Specifications No. 20-C0907
STANTEC/184031016 CONSTRUCTION CONSTRAINTS AND SEQUENCING
FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 14 00-7980
Approx.
Station Utility (Type)
Approx.
Number of Poles to Relocate
Utility Size (in.)
Utility Owner Marker Dwg. No.
Location with
Respect to New Canal - Crossing or
Parallel
Road Relocation Schedule (Month
Ending Date)
5840+00 Electrical (Overhead) 1 SoCal
Edison Unmarked
Transmissio n Power
C-43 Crossing Ave 64 December
5841+00 Electrical (Overhead) 64 SoCal
Edison Distribution
Power C-43 to
C-44 Parallel South of Ave 64
December
A . Includes buried line and vault removal/replacement parallel to Road 192
| UTILITY RELOCATION WORK BY OTHERS |
| A . Includes buried line and vault removal/replacement parallel to Road 192 |