Attachment 3 - Past Performance Questionnaire.pdf

PDF 124 KB Posted

Attached to
FKC Middle Reach Capacity Correction Project Phase Federal contract opportunity
Solicitation number
140R2020R0009
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document is a past performance questionnaire template for a federal solicitation. It requests completion of a past performance evaluation for Offerors to send to references for contracts not listed in the Contractor Performance Assessment Reporting System. Responses are due to the contracting officer Clinton Lowery at the Bureau of Reclamation by June 17, 2021. The solicitation number is 140R2020R0009 for the FKC Middle Reach Capacity Correction Project Phase 1 opportunity. The questionnaire contains six past performance factors to rate: quality, schedule, cost control, management, small business participation, and regulatory compliance. Definitions for rating levels of exceptional, very good, satisfactory, marginal, and unsatisfactory are provided. Space for comments supports each rating.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_7_Amendment_No_0004_0004.pdf PDF
Attachment_14_Amendment_No__0004_0004.pdf PDF
Attachment_26_Amendment_No__0004_0004.pdf PDF
Attachment_18_Amendment_No__0004_0004.pdf PDF
Attachment_17_Amendment_No__0004_0004.pdf PDF
Attachment_11_Amendment_No_0004_0004.pdf PDF
Attachment_9_Amendment_No_0004_0004.pdf PDF
Attachment_4_Amendment_No_0004_0004.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
Drawing_C-302_Attachment_13_Amendment_No__0003_0003.pdf PDF
Drawing_C-208_Attachment_10_Amendment_No__0003_0003.pdf PDF
Drawing_C-207_Attachment_9_Amendment_No__0003_0003.pdf PDF
Drawing_C-206_Attachment_8_Amendment_No__0003_0003.pdf PDF
Sol_140R2020R0009_Amd_0003.pdf PDF
GC-09-REV-1_Att_4_Amendment_No__0002_0002.pdf PDF
Attachment_No__1_-_FKC_Pre-Proposal_Presentation_Slides_0002.pdf PDF
Solicitation No.140R2020R0009 Amendment No 0001_0001.pdf PDF
Sol_140R2020R0009_Amd_0001.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Attachment 1 - General Decision Number CA CA2021000.pdf PDF
Attachment B.1 Schedule of Prices.xlsx XLSX spreadsheet
Attachment 13 - Drawing Part 5 of 5.pdf PDF
Attachment 10 Electronic Proposal Submission.pdf PDF
Attachment 6 - RAC 15-13 Invoicing Documents.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 140R2020R0009 Attachment: 3

Source Selection Information

Send Completed Questionnaire to Contract Specialist, Clinton Lowery no later than June 17, 2021, 2:00 pm PST: clowery@usbr.gov

PAST PERFORMANCE QUESTIONNAIRE

This Past Performance Questionnaire is provided for Offerors to send to clients and customers for whom work has been performed and that Past Performance records are not listed in the Contractor Performance Assessment Reporting System (CPARS).

The evaluation criteria ratings and ratings definitions mirror the ratings utilized in CPARS for:

1. Quality

2. Schedule

3. Cost Control

4. Management

5. Small Business

6. Regulatory

Each Rating factor listed above has a rating table that correlates with the factor. Mark the rating box next to the adjectival rating assigned for the contract/project under review/evaluation.

Each Rating factor has additional space under the rating table to include a narrative that supports the assigned rating.

REFERENCE CONTRACT #:

(the contract the evaluation is based on)

Evaluator’s Name: __________________________

Evaluator’s email:______________________________________________________

Evaluator’s Phone Number: __________________________

Evaluator’s Agency or Company Name: _____________________________________

Send Completed Questionnaire to Contract Specialist, Clinton Lowery no later than June 17, 2021, 2:00 pm PST: clowery@usbr.gov

1. QUALITY. Quality reflects the Contractor's management of the quality control program, as well as the quality of the work itself. Questions which should be addressed are as follows: Has a quality product been provided?

Specifically describe the Contractor's quality control system responsible for it. For example:

- Ability to maintain quality control

- Performance of accessory testing

- Implementation of 3-phase inspection process

- CQC (Contractor Quality Control) documentation

- Identification and correction of deficient work

- Reviews of materials and shop drawings

- Whether there was incorporation of unspecified materials

(Check the appropriate rating box.)

RATING ADJECTIVAL

RATING

DEFINITION

EXCEPTIONAL

Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

VERY GOOD

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

SATISFACTORY

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

MARGINAL

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

UNSATISFACTORY

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Comments:

1. SCHEDULE

Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g. efforts that contribute to or affect the schedule variance). Instances of adverse actions such as the evaluation of liquidated damages or issuance of Cure Notices, Show Cause Notices, and Delinquency Notices are indicators of problems which may have resulted in variance to the contract/order schedule and should, therefore, be noted in the evaluation.

Government’s benefit. The contractual performance of the element or sub-

Government’s benefit. The contractual performance of the element or sub-element performance of the element or sub-element contains some minor performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the

2. COST CONTROL

Assess the contractor’s effectiveness in forecasting, managing, and controlling cost. If the contractor is experiencing cost growth or underrun, discuss the causes and contractor-proposed solutions for the cost overruns or underruns. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources, in each work effort should be assessed.

Government’s benefit. The contractual performance of the element or sub-

Government’s benefit. The contractual performance of the element or sub-element performance of the element or sub-element contains some minor performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The is not likely in a timely manner. The contractual performance of the

3. MANAGEMENT

Assess the integration and coordination of all activities needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts. Consider Management Responsiveness, Subcontract Management, and Program Management.

Government’s benefit. The contractual performance of the element or sub-

Government’s benefit. The contractual performance of the element or sub-element performance of the element or sub-element contains some minor performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The is not likely in a timely manner. The contractual performance of the

4. SMALL BUSINESS SUBCONTRACTING

Assess compliance with all terms and conditions in the contract/order relating to Small Business participation (including FAR 52.219-8, Utilization of Small Businesses and FAR 52.219-9, Small Business Subcontracting Plan (when required). Assess any small business participation goals which are stated separately in the contract/order. Assess achievement on each individual goal stated within the contract/order or subcontracting plan including good faith effort if the goal was not achieved.

Government’s benefit. The contractual performance of the element or sub-

Government’s benefit. The contractual performance of the element or sub-element performance of the element or sub-element contains some minor performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The is not likely in a timely manner. The contractual performance of the

5. REGULATORY COMPLIANCE

Assess compliance with all terms and conditions in the contract/order relating to regulatory clauses, terms and conditions (e.g. failure to report in accordance with contract terms and conditions, late or nonpayment to subcontractors, trafficking violations, tax delinquency, defective cost or pricing data, terminations, suspension and debarments) Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes, using the Evaluation Ratings Definitions in FAR Part 42.1503(h)(4) Table 42-1. Consider aspects of performance such as compliance with financial, environmental (example: Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.

(Check the appropriate rating box.)

RATING ADJECTIVAL

Government’s benefit. The contractual performance of the element or sub-

Government’s benefit. The contractual performance of the element or sub-element performance of the element or sub-element contains some minor performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The is not likely in a timely manner. The contractual performance of the

ADDITIONAL COMMENTS, IF ANY:

Rater’s Name:

Rater’s Signature:

Date:

Send Completed Questionnaire to Contract Specialist, Clinton Lowery no later than June 17, 2021, 2:00 pm PST:

clowery@usbr.gov

File details come from the government source that posted it. Updated .