This document outlines construction constraints and sequencing for a federal construction project. The project involves capacity corrections to the FKC Middle Reach canal and includes replacing irrigation district pipelines at roadway siphon sites, modifying pipelines at new canal conflicts, and addressing pipelines crossing the existing canal assumed to be abandoned. Contractors must conduct exploratory excavations to locate existing underground facilities and prepare submittals detailing temporary piping connections for maintaining water supply during work on siphons. Submittals are also required for the permanent pipeline designs at each siphon site. The project specifications identify six drainage culvert locations and two storm drain pump stations that are part of the work. Close coordination will be required with irrigation districts to address conflicts and ensure uninterrupted water delivery during construction.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_7_Amendment_No_0004_0004.pdf PDF
Attachment_14_Amendment_No__0004_0004.pdf PDF
Attachment_27_Amendment_No__0004_0004.pdf PDF
Attachment_24_Amendment_No__0004_0004.pdf PDF
Attachment_10_Amendment_No_0004_0004.pdf PDF
Attachment_8_Amendment_No_0004_0004.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_B_1_Amendment_No_0003_0003.xlsx XLSX spreadsheet
Drawing_C-100_Attachment_5_Amendment_No__0003_0003.pdf PDF
Drawing_C-23_Attachment_4_Amendment_No__0003_0003.pdf PDF
Drawing_C-22_Attachment_3_Amendment_No__0003_0003.pdf PDF
Attachment_2_Amendment_No_0003_0003.pdf PDF
Attachment_5_-_PPI_Data_Revised_0002.xlsx XLSX spreadsheet
Attachment_B_1_Amendment_No_0002_0002.xlsx XLSX spreadsheet
General_Decision_Number_CA20210020_0002.pdf PDF
Attachment_No__3_-_FKC_Site_Visit_Agenda_and_Sign_in_Sheet_0002.pdf PDF
Sol_140R2020R0009_Amd_0002.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Attachment 13 - Drawing Part 4 of 5.pdf PDF
Attachment 13 - Drawing Part 2 of 5.pdf PDF
Attachment 11 - Geotechnical Data Report Friant-Kern Canal Middle Reach Capacity Correction Project.pdf PDF
Attachment 8 - Key Personnel.pdf PDF
Attachment 7- Release of Claims.pdf PDF
Sol_140R2020R0009.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

CONSTRUCTION CONSTRAINTS

STANTEC/184031016 AND SEQUENCING

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 14 00 - 16

a. Turnout pipeline trench crossings of the existing FKC:

1) LTRID-Casa Blanca Ditch – STA 5321+94 (DWG C-505)

b. Irrigation and Drainage Siphon Extensions per Detail C-901 (DWG GC-3):

1) FWA Drainage Culvert Siphon – STA 5379+97 (DWG C-24)

2) FWA Drainage Culvert Siphon – STA 5618+65 (DWG C-34)

c. Drainage Culverts to Old Canal per Detail C-916 (DWG GC05)

1) Drainage Culvert – STA 5670+32 (DWG C-36)

2) Drainage Culvert – STA 5708+33 (DWG C-37)

3) Drainage Culvert – STA 5760+18 (DWG C-39)

4) Drainage Culvert – STA 5782+00 (DWG C-40)

d. Storm Drain Pump Station Inlet Structure and Precast Manhole

1) Storm Drain Pump Station #1 - 5534+50 (DWG C-600)

2) Storm Drain Pump Station #2 - 5721+75 (DWG C-601)

D. Irrigation District Pipelines – There are several locations where existing Irrigation Districts’ delivery system pipelines are in conflict with the WORK. The CONTRACTOR shall be responsible for temporary, or permanent relocations, or both, or abandonment of existing Irrigation Districts pipelines. These pipelines can be grouped into three main categories; a) pipelines to be replaced at roadway siphon sites, b) pipelines to be modified, replaced, and relocated at canal conflicts at the new canal, and c) irrigation pipelines (assumed to be abandoned) that cross the existing FKC and are assumed to continue east and may be in conflict with the WORK. The CONTRACTOR is responsible for all exploratory excavations in order to assess locations of existing facilities and appropriate connection locations based upon the location of existing facilities. CONTRACTOR shall prepare a pothole plan submittal showing planned locations of all exploratory excavations, and a pothole report submittal providing the details of all exploratory excavations performed.

Pothole report data shall include dates, locations excavated, materials of construction, surface elevations, facility elevations, sizes, and dimensioned sketches

1. Irrigation District delivery system pipelines to be replaced at roadway siphon sites. No disruption to the water supply being conveyed by these water pipelines shall be allowed (unless noted otherwise below). The CONTRACTOR shall design and provide any temporary piping connections needed during construction of the roadway siphons that conflict with these existing facilities.

The CONTRACTOR shall prepare a submittal for each temporary piping connection (grouped by Irrigation District ownership) that details the materials of construction, locations and types of connections (based upon exploratory excavations). The CONTRACTOR shall provide a permanent pipeline submittal

Attachment 1 Amendment No 0003 swolfert Typewritten Text 5)Drainage Culvert - STA 5577+16 (DWG C-31)

6) Drainage Culvert - STA 5648+30 (DWG C-35) swolfert Line swolfert Polygon swolfert Cross-Out swolfert Typewritten Text

GC-17

swolfert Polygon

File details come from the government source that posted it. Updated .