This document provides specifications for temporary environmental controls on a construction project. The contractor must implement dust abatement measures such as enclosing storage piles, watering active work areas, and applying soil stabilizers to inactive areas. Vehicle loads must be covered or maintain adequate freeboard when hauling materials, and installed wheel washers and street sweepers are required to control track-out. The project is the FKC Middle Reach Capacity Correction Project Phase 1 solicited by the Department of the Interior Bureau of Reclamation under solicitation number 140R2020R0009. The specifications detail the contractor's responsibility to prevent dust damage and comply with environmental mitigation requirements.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_14_Amendment_No__0004_0004.pdf PDF
Attachment_26_Amendment_No__0004_0004.pdf PDF
Attachment_18_Amendment_No__0004_0004.pdf PDF
Attachment_17_Amendment_No__0004_0004.pdf PDF
Attachment_11_Amendment_No_0004_0004.pdf PDF
Attachment_9_Amendment_No_0004_0004.pdf PDF
Attachment_4_Amendment_No_0004_0004.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
Drawing_C-302_Attachment_13_Amendment_No__0003_0003.pdf PDF
Drawing_C-208_Attachment_10_Amendment_No__0003_0003.pdf PDF
Drawing_C-207_Attachment_9_Amendment_No__0003_0003.pdf PDF
Drawing_C-206_Attachment_8_Amendment_No__0003_0003.pdf PDF
Sol_140R2020R0009_Amd_0003.pdf PDF
GC-09-REV-1_Att_4_Amendment_No__0002_0002.pdf PDF
Attachment_No__1_-_FKC_Pre-Proposal_Presentation_Slides_0002.pdf PDF
Solicitation No.140R2020R0009 Amendment No 0001_0001.pdf PDF
Sol_140R2020R0009_Amd_0001.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Attachment 1 - General Decision Number CA CA2021000.pdf PDF
Attachment B.1 Schedule of Prices.xlsx XLSX spreadsheet
Attachment 13 - Drawing Part 5 of 5.pdf PDF
Attachment 10 Electronic Proposal Submission.pdf PDF
Attachment 6 - RAC 15-13 Invoicing Documents.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

TEMPORARY ENVIRONMENTAL

STANTEC/184031016 CONTROLS

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 57 19 - 1

SECTION 01 57 19 - TEMPORARY ENVIRONMENTAL CONTROLS

PART 1 -- GENERAL

1.1 ENVIRONMENTAL MITIGATION AND COMPLIANCE

A. CONTRACTOR is hereby noticed that the WORK to be performed under this contract is subject to close environmental scrutiny from resource agencies. The CONTRACTOR must conform and comply with all environmental mitigation, permitting and compliance requirements.

B. This Section describes the temporary environmental controls for the project, and refers to Section 01 30 00 – Environmental Mitigation and Compliance. In the event there is a conflict in the specifications, the most stringent provision shall prevail.

1.2 DUST ABATEMENT

A. The CONTRACTOR shall prevent its operation from producing dust in amounts damaging to property, cultivated vegetation, or domestic animals, or causing a nuisance to persons living in or occupying buildings in the vicinity of the Site. The CONTRACTOR shall be responsible for any damage resulting from dust originating from its operations. Dust abatement measures shall be continued until the CONTRACTOR is relieved of further responsibility by the CONTRACTING

OFFICERS REPRESENTATIVE.

B. Storage Piles: Enclose, cover, water (as needed), or apply non-toxic soil binders according to manufacturer's specifications on material piles (i.e. gravel, sand, dirt) with a silt content of 5 percent or greater.

C. Active Areas of Site: Water active construction areas and unpaved roads as needed and as requested by CONTRACTING OFFICERS REPRESENTATIVE.

D. Inactive Areas of Site: Apply non-toxic soil stabilizers according to manufacturer's specifications to inactive construction areas, or water as needed to maintain adequate dust control.

E. Vehicle Loads: Cover or maintain at least 2-feet of freeboard vertical distance between the top of the load and the top of the trailer sides on trucks hauling dirt, sand, soil, or other loose materials off of the Site.

F. Roads: When there is visible track-out onto a paved public road, install wheel washers where the vehicles exit and enter onto the paved roads and wash the undercarriage of trucks and any equipment leaving the Site on each trip. Sweep the paved street at the end of each shift with a Mobil Athey or similar water spray pick-up broom-type street sweeper as necessary or as directed.

G. Vehicle Speeds: If watering of unpaved roads is not sufficient to control dust, reduce vehicle speeds to 15 mph or less on such roads.

Attachment 7 Amendment No 0004 swolfert Cross-Out swolfert Polygon

File details come from the government source that posted it. Updated .