About this file
This drawing package is for the FKC Middle Reach Capacity Correction Project Phase 1, solicited by the Department of the Interior Bureau of Reclamation under solicitation number 140R2020R0009. The project involves excavating existing canal bank material as borrow for construction of new canal embankments along both sides of the existing FKC Canal. The contractor shall restore the existing canal O&M roads where bank material is removed in accordance with the typical grading plans and details. All costs for excavating existing bank material and restoring roads shall be included in the bid price for new canal embankment construction. The work must meet specifications for aggregate base, seal coat, compaction, and maximum 8% slopes.
View the file
Other files for this federal contract opportunity
Show all 50
FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINAL GRADE FINAL GRADE
M A
X
M A
X
EXISTING GRADE
Project No.:
Scale:
Revision:
Drawing No.
Title Dsgn. Chkd. YYYY.MM.DDDwn.
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
File Name: FKC_GC-15
ORIGINAL SHEET - ANSI D
c:
\u se rs\ rru ck er \d oc um en ts\ pr oj ec ts\ fri an t w at er a ut ho rit y\ dr aw in gs
\c ivi l\ w or kin g ca d\ fk c_ gc
-1
.0 5.
1:
:0
AM
Te l:
w w w .st an te c.
co m
St an te c
C S tre et
S ui te
Sa cr am en to , C
A
6.
4.
A
B
C
D
1 2 3 4 5
FR
IA
NT
-K
ER
N C
AN
AL
M
ID
DL
E
RE
AC
H
C
AP
AC
ITY
C
O
RR
EC
TIO
N
PR
O
JE
C T
PH
AS
E
Li nd sa y, C
A
YY
YY
.M
M .D
D Re vis io n By
Ap pd
Permit/Seal
Permit/Seal
YY
YY
.M M
.D D
Ac ce pt ed
: S co tt W ol fe rt
2021.02.05
184031016
.1 2.
Sheet: of 203
GC-15
EXISTING CANAL
BANK RESTORATION
1" = 20'
RUCKER RUCKER WEBER
AD
DE
ND
UM
RR
M C
.05 .25
0 20 40
SCALE IN FEET
SHEET KEYNOTES
A. EXISTING CANAL ROAD GATE, PROTECT IN PLACE.
B. 4" CLASS II AGGREGATE BASE WITH SEAL COAT PER SPECIFICATION SECTION
31 30 00. PROVIDE AT ALL EXISTING ROAD REPLACEMENT AREAS WHERE THE
EXISTING ALL WEATHER ROAD HAS BEEN REMOVED FOR BANK EXCAVATION.
FINISHED GRADE SHALL NOT EXCEED 8% MAX SLOPE AT ANY LOCATION.
COMPACT FINISHED SURFACE PER SPECIFICATION SECTION 31 30 00.
C. EXISTING CONCRETE LINER, SAW CUT AND REMOVE LINING AT ELEVATION OF
EXCAVATION DETERMINED BY CONTRACTOR.
D. PROVIDE MINIMUM 16-FT DRIVEABLE EARTH SURFACE IN AREAS WHERE
EXISTING BANK MATERIAL IS EXCAVATED. FINISHED GRADE OF DRIVEABLE
SURFACE SHALL NOT EXCEED 8% MAX SLOPE AT ANY LOCATION. COMPACT
FINISHED SURFACE PER SPECIFICATION SECTION 31 30 00.
E. DAYLIGHT EXCAVATION AT EXISTING EMBANKMENT SLOPE, TYPICAL BOTH
SIDES OF CANAL EMBANKMENT. WHERE THE APPROACH INTERSECTS THE
OUTSIDE CANAL EMBANKMENT CONSTRUCTION CONTINUE OUTSIDE SLOPE
AT 1.5:1 TO APPROACH RAMP EXCAVATION.
8% MAX
8% MAX
8% MAX
8% MAX
20.0'
MIN
B
VARIES
A
C
C
C
C
COUNTY ROW
G B
G B
G B
G B
G B
G B
G B
G B
A
A
A
FKC CONSTRUCTION CENTERLINE
EXISTING FKC CANAL CENTERLINE
GENERAL SHEET NOTES
1. THIS IS A TYPICAL GRADING PLAN THAT APPLIES TO ALL AREAS ALONG THE
EXISTING CANAL AND AT EXISTING ROAD CROSSINGS WHERE THE CONTRACTOR
CHOOSES TO REMOVE EXISTING BANK MATERIAL FOR CONSTRUCTION OF THE
NEW CANAL BANKS. THIS DOES NOT ONLY APPLY TO AREAS NEAR ROADS. THE
EXISTING CANAL O&M ROAD SHALL BE RESTORED AS SHOWN.
2. EXCAVATION LIMITS OF EXISTING BANK MATERIAL SHALL NOT BE LESS THAN THE
TYPICAL MINIMUM DISTANCES SHOWN FROM THE EXISTING CANAL BANK GATES
AND ROAD ROW.
3. REFER TO TYPICAL CANAL SECTION ON DRAWING GC-8 FOR FURTHER DETAILS
RELATED TO RESTORATION.
4. ALL COSTS FOR EXCAVATING THE EXISTING CANAL BANK MATERIAL AS BORROW
MATERIAL FOR THE NEW CANAL, INCLUDING RESTORATION OF EXISTING CANAL
O&M ROADS ALONG BOTH SIDES OF THE EXISTING CANAL SHALL BE INCLUDED IN
THE BID PRICE FOR THE NEW CANAL EMBANKMENT CONSTRUCTION. SEE
SPECIFICATION SECTION 01 29 00 MEASUREMENT AND PAYMENT FOR FURTHER
DETAILS.
B
D
E
D
E
E
E
EXISTING CANAL ROAD RAMP TRANSITION,
TYP AT ENDS OF ALL BANK REMOVAL ZONES
FINISHED GRADE AFTER
REMOVAL OF BANK MATERIAL
PAVEMENT
COUNTY ROW
A A
EXISTING BRIDGE (TYP)
EDGE OF PAVEMENT
B
A
INTERMEDIATE SECTION
SCALE: NOT TO SCALE
B
TYPICAL PROFILE
SCALE: NOT TO SCALE
A
E E
E
3.5%3.5%
EXIST
CANAL
Attachment 20 Amendment No. 0003
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text C77436
AutoCAD SHX Text C66888
| Sheets and Views |
| Plan |
File details come from the government source that posted it. Updated .