About this file

This document contains specifications for a federal construction contract solicitation. The solicitation is for the FKC Middle Reach Capacity Correction Project Phase 1 being issued by the Department of the Interior Bureau of Reclamation. The contractor will be responsible for dewatering activities during construction including lowering the groundwater level below structure subgrades, maintaining groundwater levels during backfilling, preventing canal structures from floating, draining any remaining water in the existing canal after gravity draining by the government, and draining existing irrigation ponds in conflict with the work. The contractor must drain water left in the existing canal as the maximum anticipated depth is approximately 8 feet of standing water at the low point near Station 5700+00.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment__0006_0006.pdf PDF
Attachment_3_Amendment_0006_0006.pdf PDF
Attachment_44_Amendment_0005_0005.pdf PDF
Attachment_41_Amendment_0005_0005.pdf PDF
Attachment_40_Amendment_No_0005_0005.pdf PDF
Attachment_30_Amendment_No__0005_0005.pdf PDF
Attachment_27_Amendment_No__0005_0005.pdf PDF
Attachment_17_Amendment_No__0005_0005.pdf PDF
Attachment_15_Amendment_No__0005_0005.pdf PDF
Attachment_9_Amendment_No_0005_0005.pdf PDF
Attachment_12_Amendment_No__0005_0005.pdf PDF
Attachment_1_Amendment_No_0005_0005.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_29_Amendment_No_0004_0004.pdf PDF
Attachment_28_Amendment_No__0004_0004.pdf PDF
Attachment_23_Amendment_No__0004_0004.pdf PDF
Attachment_22_Amendment_No__0004_0004.pdf PDF
Attachment_20_Amendment_No__0004_0004.pdf PDF
Attachment_16_Amendment_No__0004_0004.pdf PDF
Attachment_13_Amendment_No__0004_0004.pdf PDF
Attachment_6_Amendment_No_0004_0004.pdf PDF
Attachment_5_Amendment_No_0004_0004.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_7_Amendment_No_0004_0004.pdf PDF
Drawing_GC-15_Attachment_20_Amendment_No__0003_0003.pdf PDF
Drawing_G-13_Attachment_17__Amendment_No__0003_0003.pdf PDF
Drawing_C-506_Attachment_15_Amendment_No__0003_0003.pdf PDF
Drawing_C-215_Attachment_12_Amendment_No__0003_0003.pdf PDF
Drawing_C-214_Attachment_11_Amendment_No__0003_0003.pdf PDF
Drawing_C-204_Attachment_7_Amendment_No__0003_0003.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
FKC_31_30_00-12_Att_7_Amendment_0002_0002.pdf PDF
FKC_01_14_00-12_Att_6__Amendment_0002_0002.pdf PDF
GC-10-REV-1_Att_5_Amendment_No__0002_0002.pdf PDF
Attachment_No__2_-_FKC_Pre-Proposal_Presentation_Sign_in_Sheet_0002.pdf PDF
Attachment 13 - Drawing Part 1 of 5.pdf PDF
Attachment 9 - Experience and Management.pdf PDF
Attachment 4 - Offeror Responsibility Information.pdf PDF
Attachment 2 - Subcontracting Plan.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

STANTEC/184031016 DEWATERING

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 31 23 19 - 5

3.3 DEWATERING FOR STRUCTURES

A. Before excavating to final grade at structure locations that require dewatering, the groundwater level shall be lowered to a depth below the structure subgrade sufficient to prevent rutting or other damage to the foundation; provided that, the groundwater level shall be a minimum of 2 feet below the working level or final grade at all times.

The water level shall be maintained at that level until the backfill work has been completed to a point 2 feet above the groundwater level or if necessary, until the canal is filled, except that in all cases, the CONTRACTOR is responsible for preventing floatation of the structures.

3.4 DEWATERING THE EXISTING CANAL

A. The CONTRACTOR will be responsible to drain water that is left in the existing canal during canal outages after the GOVERNMENT has drained all water out of the existing canal that can be drained by gravity, as they typically would for a normal canal outage.

B. Refer to the Hydraulic Profile Drawings GC-6 and GC-7 for the existing canal invert and low points where canal water will accumulate after the GOVERNMENT has drained the existing canal by gravity. A maximum depth of approximately 8 feet of standing water is anticipated to remain for CONTRACTOR removal at the existing canal low point near Station 5700+00. This water depth will reduce depending on location along the existing canal and distance from the low point at Sta 5700+00.

Refer to Specification Section 01 14 00 – Construction Constraints and Sequencing for further requirements.

3.5 DEWATERING EXISTING IRRIGATION PONDS

A. The CONTRACTOR will be responsible to drain the existing irrigation ponds in conflict with the WORK as shown on Drawings C-17, C-18, C-22, C-23, C-40, and C- 44, unless otherwise indicated.

END OF SECTION

Attachment 12 Amendment No 0004 swolfert Cross-Out swolfert Cross-Out swolfert Polygon swolfert Polygon swolfert Cross-Out swolfert Cross-Out