Attachment_5_Amendment_No_0004_0004.pdf

PDF 629 KB Posted

Attached to
FKC Middle Reach Capacity Correction Project Phase Federal contract opportunity
Solicitation number
140R2020R0009
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document outlines payment terms for construction items under Solicitation Number 140R2020R0009 from the Department of the Interior Bureau of Reclamation for the FKC Middle Reach Capacity Correction Project Phase 1. Key construction items to be paid lump sum include new canal tie-ins, a new deer creek check structure and associated wasteway and siphon, and seven new siphon structures. Payment will cover all structural, mechanical and civil work for these items along with compliance with environmental mitigation requirements and relocation of water pipelines and roads impacted by construction. Temporary traffic control and road improvements for detours are included in pricing for some siphon structures. No measurement method is provided for these construction line items, which will be paid out upon completion of the specified work.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_7_Amendment_No_0004_0004.pdf PDF
Attachment_14_Amendment_No__0004_0004.pdf PDF
Attachment_26_Amendment_No__0004_0004.pdf PDF
Attachment_18_Amendment_No__0004_0004.pdf PDF
Attachment_17_Amendment_No__0004_0004.pdf PDF
Attachment_11_Amendment_No_0004_0004.pdf PDF
Attachment_9_Amendment_No_0004_0004.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
Drawing_C-302_Attachment_13_Amendment_No__0003_0003.pdf PDF
Drawing_C-208_Attachment_10_Amendment_No__0003_0003.pdf PDF
Drawing_C-207_Attachment_9_Amendment_No__0003_0003.pdf PDF
Drawing_C-206_Attachment_8_Amendment_No__0003_0003.pdf PDF
Sol_140R2020R0009_Amd_0003.pdf PDF
GC-09-REV-1_Att_4_Amendment_No__0002_0002.pdf PDF
Attachment_No__1_-_FKC_Pre-Proposal_Presentation_Slides_0002.pdf PDF
Solicitation No.140R2020R0009 Amendment No 0001_0001.pdf PDF
Sol_140R2020R0009_Amd_0001.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Attachment 1 - General Decision Number CA CA2021000.pdf PDF
Attachment B.1 Schedule of Prices.xlsx XLSX spreadsheet
Attachment 13 - Drawing Part 5 of 5.pdf PDF
Attachment 10 Electronic Proposal Submission.pdf PDF
Attachment 6 - RAC 15-13 Invoicing Documents.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

STANTEC/184031016 MEASUREMENT AND PAYMENT

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 29 00 - 7

1.20 CONSTRUCT NEW CANAL TIE-INS TO EXISTING CANAL (CLINS 32 THROUGH

33)

A. No measurement shall be made for this item.

B. Payment for canal tie-in WORK will be made at the lump sum price named in the Price Schedule under the following CLINs, which price shall constitute full compensation for, and shall include, dewatering the existing FKC within a planned outage period, excavation and compacting embankments, prewetting, trimming earth foundations, 3.5-inch concrete canal lining, including joints, demolition, and all items identified in the Contract Documents. This item includes compliance with Specification Section 01 30 00 – Environmental Mitigation and Compliance.

1. Avenue 136 Tie-In (STA. 5308+52.85 to STA. 5314+31.35) (CLIN 32)

2. Avenue 64 Tie-In (STA. 5848+71.99 to STA. 5854+32.07) (CLIN 33)

1.21 CONSTRUCT NEW DEER CREEK CHECK STRUCTURE, WASTEWAY TURNOUT

AND SIPHON (CLIN 34)

A. No measurement shall be made for this item.

B. Payment for new check structure, wasteway turnout, and connecting pipeline to existing wasteway outlet, siphon, inlet and outlet transitions, and control building WORK will be made at the lump sum price named in the Price Schedule under the CLIN 34, which price shall constitute full compensation for all structural, mechanical and civil WORK, inclusive of dewatering and demolition of the existing FKC during a planned outage to make the connection to the existing wasteway, and shall include all items identified by the Contract Documents. The cost for electrical, instrumentation and control systems are not included in this item (inclusive of the upstream and downstream stilling well installation). The cost for over-excavation/ground improvement is not included in this item. This item includes compliance with Specification Section 01 30 00 – Environmental Mitigation and Compliance.

1.22 CONSTRUCT NEW SIPHON STRUCTURES (CLINS 35 THROUGH 41)

A. No measurement shall be made for this item.

B. Payment for new siphon structure WORK will be made at the lump sum price named in the Price Schedule under the following CLINs, which price shall constitute full compensation for all structural and civil WORK and shall include all pavement removal and restoration of road structure including base course, asphalt pavement and striping, road improvements for detours as described below for specific locations and as identified by the Contract Documents. This item includes compliance with Specification Section 01 30 00 – Environmental Mitigation and Compliance. Temporary and permanent water pipeline relocations and associated appurtenances for Water Districts are included in this item; any other utility relocations are not included. Cost for traffic control is not included in this item. Payment for Tulare County road improvements for detours are included in the following items: Siphon 4, Avenue 128 Siphon includes road detour improvements for Avenue 112 and Road 224; Siphon 7, Road 208 Siphon includes road detour improvements for Avenue 88; and Siphon 10, Attachment 5 Amendment No 0004 swolfert Text Box construction of operation and maintenance roads, swolfert Line swolfert Polygon

File details come from the government source that posted it. Updated .