C05_01_Revised_Pricing_Schedule_HH_Elevator_0003.docx
DOCX document 29 KB Posted
- Attached to
- HH ELEVATOR MAINTENANCE AND REPAIRS Federal contract opportunity
- Solicitation number
- 140R1726Q0007
About this file
This is a Revised Pricing Schedule for elevator maintenance and repair services covering a base year and four option years. The contract involves preventative maintenance, inspections, and repair services for three elevators at a Department of the Interior Bureau of Reclamation facility, with an estimated period of performance from August 1, 2026, through July 31, 2031.
The pricing structure includes four line item types recurring across each contract period: Category 1 or Category 5 inspections (firm fixed price), monthly, quarterly, and semiannual preventative maintenance (firm fixed price), labor for repairs on a time and materials basis with a ceiling price that increases modestly over the contract term (ranging from $52,000.00 in the base year to $57,426.00 in option year four), and materials for repairs on a time and materials basis with a consistent $15,000.00 ceiling price across all periods. Each twelve-month period requires pricing submissions for these four categories, with contractors assuming all financial risk if ceiling prices are exceeded. The schedule also references FAR 52.217-8 regarding option extension terms, with pricing to be calculated on a prorated basis at the time of exercise.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C05_01_Revised_RFO_Provisions_0003.pdf | ||
| C05_01_Revised_RFO_Clauses_0003.pdf | ||
| Sol_140R1726Q0007_Amd_0003.pdf | ||
| C05_Revised_RFQ_PWS_0003.pdf | ||
| Sol_140R1726Q0007_Amd_0002.pdf | ||
| Sol_140R1726Q0007_Amd_0001.pdf | ||
| C05_01_Block_14___19_Elevator_Photos.pdf | ||
| C05_01_Control_Bay_Elevator_Photos.pdf | ||
| C05_01_FIST_1-1.pdf | ||
| C05_01_FIST_5-14.pdf | ||
| C05_01_Pricing_Schedule_HH_Elevator_Revised.docx | DOCX document | |
| Sol_140R1726Q0007.pdf | ||
| C05_01_FIST_2-10.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule 1 – Base Year Estimated Period of Performance August 1, 2026 through July 31, 2027
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 10 |
| Conduct Category 1 Inspections For 3 Elevators Per PWS |
Preventative Maintenance shall be conducted in concurrence with the CAT 1 Inspections and billed separately against CLIN 20 (Firm Fixed Price Line Item)
| 1 |
| Job |
| $ |
| $ |
| 20 |
| Conduct Monthly, Quarterly, Semiannual Preventative Maintenance for 3 Elevators Per PWS. |
(Firm Fixed Price Line Item)
| 12 |
| Months |
| $ |
| $ |
| 30 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $52,000.00 The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| Hourly Rate |
| $ |
| $52,000.00 |
| 40 |
| Materials for Repair of 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 1
Schedule 2 – Option Year 1
August 1, 2027, through July 31, 2028
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 50 |
| Conduct Category 1 Inspections for 3 Elevators. Per PWS. |
Preventative Maintenance shall be conducted in concurrence with the CAT 1 Inspections and billed separately against CLIN 60 (Firm Fixed Price Line Item)
| 1 |
| Job |
| $ |
| $ |
| 60 |
| Conduct Monthly, Quarterly, Semiannual Preventative Maintenance for 3 Elevators Per PWS. |
(Firm Fixed Price Line Item)
| 12 |
| Months |
| $ |
| $ |
| 70 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $53,526.00. The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| Hourly Rate |
| $ |
| $53,526.00 |
| 80 |
| Materials for Repair for 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 2
Schedule 3 – Option Year 2
August 1, 2028, through July 31, 2029
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 90 |
| Conduct Category 5 Inspections for 3 Elevators. Per PWS. |
Preventative Maintenance shall be conducted in concurrence with the CAT 5 Inspections and billed separately against CLIN 100 (Firm Fixed Price Line Item)
| 1 |
| Job |
| $ |
| $ |
| 100 |
| Monthly, Quarterly, Semiannual Requirements For 3 Elevators, Per PWS |
(Firm Fixed Price Line Item)
| 12 |
| Months |
| $ |
| $ |
| 110 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $54,526.00 The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| Hourly Rate |
| $ |
| $54,526.00 |
| 120 |
| Materials for Repair of 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 3
Schedule 4 – Option Year 3
August 1, 2029, through July 31, 2030
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 130 |
| Conduct Category 1 Inspections for 3 Elevators. Per PWS. |
Preventative Maintenance shall be conducted in concurrence with the CAT 1 Inspections and billed separately against CLIN 140 (Firm Fixed Price Line Item)
| 1 |
| Job |
| $ |
| $ |
| 140 |
| Monthly, Quarterly, Semiannual Requirements For 3 Elevators, Per PWS |
(Firm Fixed Price Line Item)
| 12 |
| Months |
| $ |
| $ |
| 150 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $55,826.00. The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| Hourly Rate |
| $ |
| $55,826.00 |
| 160 |
| Materials for Repair of 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 4
Schedule 5 – Option Year 4
August 1, 2030, through July 31, 2031
| CLIN |
| Description |
| Quantity |
| Unit of Issue |
| Unit Cost |
| Total Cost |
| 170 |
| Conduct Category 1 Inspections for 3 Elevators. Per PWS. |
Preventative Maintenance shall be conducted in concurrence with the CAT 1 Inspections and billed separately against CLIN 180 (Firm Fixed Price Line Item)
| 1 |
| Job |
| $ |
| $ |
| 180 |
| Monthly, Quarterly, Semiannual Requirements For 3 Elevators, Per PWS |
(Firm Fixed Price Line Item)
| 12 |
| Months |
| $ |
| $ |
| 190 |
| Labor for Repair of 3 Elevators as needed, Per PWS. |
Standard Shop Rate Rates shall include direct labor hours at fixed hourly rates, including wages, overhead general and administrative expenses and profit.
(Time & Materials Line Item) The ceiling price for this line item is $55,826.00. The contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| Hourly Rate |
| $ |
| $57,426.00 |
| 200 |
| Materials for Repair, of 3 Elevators as needed, Per PWS. |
(Time & Materials Line Item) The ceiling price for this line item is $15,000.00 the contractor assumes the risk if the ceiling price is exceeded.
| N/A |
| N/A |
| N/A |
| $15,000.00 |
TOTAL SCHEDULE 5
Total for all Schedules
Total Base Year From: August 1, 2026, to July 31, 2027
Total Option Year 1 From: August 1, 2027, to July 31, 2028
Total Option Year 2 From: August 1, 2028, to July 31, 2029
Total Option Year 3 From: August 1, 2029, to July 31, 2030
Total Option Year 4 From: August 1, 2030, to July 31, 2031
If FAR 52.217-8 is exercised, the prices for the Option to Extend Service’s term will be calculated based on the prorated term and prices that are in effect at the time the option is exercised.
File details come from the government source that posted it. Updated .