WBR_1452_232-80_Limitation_of_Funds___Bureau_of_Reclamation_(Mar_2022)_0003.pdf
PDF 231 KB Posted
- Solicitation number
- 140R1023R0003
About this file
This document is a solicitation for a federal construction contract to build the Cle Elum Dam Fish Passage Facility Adult Facility in Washington state. The Bureau of Reclamation is seeking proposals to construct the adult fish passage facility as part of the Yakima River Basin Water Enhancement Project. Offerors must submit proposals by the closing date of March 15, 2023. Evaluation will be based on technical approach and past performance. The contract will be a firm fixed-price contract with performance required by October 2026. The contractor will be paid on a schedule linked to project milestones. There is a limitation of funds clause with incremental funding allotted through the period of performance.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cle Elum Dam Fish Passage Facility Adult Facility Yakima River Basin Water Enhancement Project-Integrated Plan Solicitation No. 140R1023R0003
I-41
I.107. WBR 1452.232-80 Limitation of Funds – Bureau of Reclamation (Mar 2022)
(a) Pursuant to Section 12 of the Reclamation Project Act of 1939 (43 U.S.C. 388) incremental funding for this contract will be made available in accordance with this clause. This statute permits the Secretary of the Interior to enter into contracts which will cover such periods as the Secretary may consider necessary but in which liability of the United States shall be contingent upon appropriations being made therefore. For purposes of this clause, the term "appropriations" includes the Bureau of Reclamation’s subsequent allocation of funds for this contract.
(b) Incremental funding in the amount of 10% is presently available for payment and allotted under this contract. This present funding allotment is contemplated to cover the work to be performed until FY2026 or until the contractor hits a limitation of funds. A schedule for anticipated future funding allotments is as follows. This information is for planning purposes only and may not be fully representative of the funds actually allotted under this contract:
FISCAL YEAR FUNDING AMOUNT
On award of contract 15%
FY 2024 50%
FY 2025 25%
FY 2026 10%
(c) For work identified in paragraph (b) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of specified work for the Government's convenience, approximates the total amount currently allotted to the contract. The Contractor shall not be obligated to continue performance of this work beyond that point. The Government shall not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for this work
Yakima River Basin Water Enhancement Project-Integrated Plan Solicitation No. 140R1023R0003
I-42 notwithstanding any contrary provisions of the Termination for Convenience of the Government clause of this contract.
(d) Notwithstanding the date specified in paragraph (b) of this clause, the Contractor shall notify the Contracting Officer in writing at least sixty days prior to the date when, in the Contractor's best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 75 percent of the total amount then allotted to the contract for performance of work identified in paragraph (b) of this clause. The notification shall state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of the work up to the next scheduled date for allotment of funds identified in paragraph (b) of this clause, or to a mutually agreed upon substitute date. The notification shall also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of work funded pursuant to this clause, for a subsequent period as may be specified in the allotment schedule in paragraph (b) of this clause, or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor's notification, or by an agreed substitute date, the Contracting Officer shall terminate any work for which additional funds have not been allotted, pursuant to the Termination for Convenience of the Government clause of this contract.
(e) When additional funds are allotted for continued performance of the work identified in paragraph (b) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraph (c) through (e) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly through revision of paragraph (b) of this clause. The Contracting Officer is the only person authorized to provide notice, communication, or other form of representation to increase or decrease the amount of funds allotted by the Government to this contract. . If agreement cannot be reached, the Contracting Officer will make a final decision as to the period of contract performance that will be covered by the funds. This decision may be appealed by the Contractor under the Disputes clause of the contract.
(f) If, solely by reason of failure of the Government to allot additional funds in amounts sufficient for timely performance of the work identified in paragraph (b) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of work, or in
Yakima River Basin Water Enhancement Project-Integrated Plan Solicitation No. 140R1023R0003
I-43 the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder shall be a dispute concerning a question of fact within the meaning of the Disputes clause of this contract.
(g) The Government may at any time prior to termination allot additional funds for the performance of the work identified in paragraph (b) of this clause.
(h) The termination provisions of this clause do not limit the rights of the Government under the Default clause of this contract. The provisions of this clause are limited to the work and allotment of funds as set forth in paragraph (b) of this clause. This clause is inapplicable once the contract is fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (e) or (f) of this clause.
(i) Change orders shall not be considered authorization to exceed the amount allotted by the Government as specified in paragraph (b) of this clause unless the amount is increased by inclusion of a statement contained in the change order.
(j) Nothing in this clause affects the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.
| PART I THE SCHEDULE |
| SECTION A SOLICITATION/CONTRACT FORM |
| SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS |
| SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| SECTION D PACKAGING AND MARKING |
| SECTION E INPSECTION AND ACCEPTANCE |
| E.1. 52.236-5 Material and Workmanship (Apr 1984) |
| E.2. 52.246-12 Inspection of Construction (Aug 1996) |
| E.3. 52.246-21 Warranty of Construction (Mar 1994), Alternate I (Apr 1984) |
| SECTION F Section F Deliveries and Performance |
| F.1. 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) |
| F.2. 52.211-12 Liquidated Damages — Construction (Sep 2000) |
| F.3. 52.211-18 Variation in Estimate Quantities (Apr 1984) |
| F.4. 52.242-14 Suspension of Work (Apr 1984) |
| SECTION G Contract Administration |
| G.1. Government Point of Contact |
| G.2. 1452.201-70 Authorities and Delegations (Sep 2011) |
| G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (Apr 2013) |
| G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation (May 2018) |
| SECTION H Special Contract Requirements |
| H.1. Key Personnel Requirements – Bureau of Reclamation – C-PN Region (Feb 1995) |
| H.2. Advance Notice of Deliveries or Visits to Reclamation Facilities by Foreign Nationals – Bureau of Reclamation – C-PN Region (Feb 2007) |
| H.3. DOI-AAAP-0050 Contractor Performance Assessment Reporting System (Dec 2015) |
| PART II Contract Clauses |
| SECTION I Contract Clauses |
| I.1. 52.252-2 Clauses Incorporated by Reference (Feb 1998) |
| I.2. 52.202-1 Definitions (Jun 2020) |
| I.3. 52.203-3 Gratuities (Apr 1984) |
| I.4. 52.203-5 Covenant Against Contingent Fees (May 2014) |
| I.5. 52.203-6 Restriction on Subcontractor Sales to the Government (Jun 2020) |
| I.6. 52.203-7 Anti-Kickback Procedures (Jun 2020) |
| I.7. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) |
| I.8. 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) |
| I.9. 52.203-12 Limitations on Payments to Influence Certain Federal Actions (Oct 2010) |
| I.10. 52.203-13 Contractor Code of Business Ethics and Conduct (Jun 2020) |
| I.11. 52.203-14 Display of Hotline Poster(s) (Nov 2021) |
| I.12. 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (Jun 2020) |
| I.13. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) |
| I.14. 1452.203-70 Restrictions on Endorsements – Department of Interior (Jul 1996) |
| I.15. 52.204-4 Printed or Copied Doubled-Sided on Postconsumer Fiber Content Paper (May 2011) |
| I.16. DOI-AAAP-0081 Security Requirements: Facility Access Information Technology (Aug 2016) |
| I.17. 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) |
| I.18. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) |
| I.19. 52.204-12 Unique Entity Identifier Maintenance (Oct 2016) |
| I.20. 52.204-13 System for Award Management (Oct 2018) |
| I.21. 52.204-14 Service Contract Reporting Requirements (Oct 2016) |
| I.22. 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) |
| I.23. 52.204-19 Incorporation by Reference Representations and Certifications (Dec 2014) |
| I.24. 52.204-21 Basic Safeguarding of Covered Contract Information Systems (Nov 2021) |
| I.25. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) |
| I.26. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services and Equipment (Nov 2021) |
| I.27. 1452.204-70 Release of Claims – Department of Interior (Jul 1996) |
| I.28. 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Nov 2021) |
| I.29. 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) |
| I.30. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) |
| I.31. 52.210-1 Market Research (Nov 2021) |
| I.32. 52.215-2 Audit and Records – Negotiation (Jun 2020) |
| I.33. 52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997) |
| I.34. 52.215-10 Price Reduction Defective Cost or Pricing Data (Aug 2011) |
| I.35. 52.215-11 Price Reduction Defective Cost or Pricing Data – Modifications (Jun 2020) |
| I.36. 52.215-12 Subcontractor Cost or Pricing Data (Jun 2020) |
| I.37. 52.215-13 Subcontractor Cost or Pricing Data – Modifications (Jun 2020) |
| I.38. 52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997) |
| I.39. 1452.215-70 Examination of Records by the Department of Interior (Apr 1984) |
| I.40. 52.215-21 Requirements for Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data – Modifications (Jun 2021) |
| I.41. 52.215-23 Limitations on Pass-Through Charges (Jun 2020) |
| I.42. WBR 1452.215-87 Incorporation of Technical Proposal (MAR 2021) |
| I.43. 52.219-4 Notice of Price Evaluation for HUBZone Small Business Concerns (Oct 2022) |
| I.44. 52.219-8 Utilization of Small Business Concerns (Oct 2022) |
| I.45. 52.219-9 Small Business Subcontracting Plan (Oct 2022), Alternate II (Nov 2016) |
| I.46. 52.219-16 Liquidated Damages – Subcontracting Plan (Sep 2021) |
| I.47. 52.219-28 Post Award Small Business Program Rerepresentation (Mar 2023) |
| I.48. 52.222-3 Convict Labor (Jun 2003) |
| I.49. 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation (May 2018) |
| I.50. 52.222-6 Construction Wage Rate Requirements (Aug 2018) |
| I.51. 52.222-7 Withholding of Funds (May 2014) |
| I.52. 52.222-8 Payrolls and Basic Records (Jul 2021) |
| I.53. 52.222-9 Apprentices and Trainees (Jul 2005) |
| I.54. 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) |
| I.55. 52.222-11 Subcontracts (Labor Standards) (May 2014) |
| I.56. 52.222-12 Contract Termination – Debarment (May 2014) |
| I.57. 52.222-13 Compliance with Construction Wage Rate Requirements and Relation Regulations (May 2014) |
| I.58. 52.222-14 Disputes Concerning Labor Standards (Feb 1988) |
| I.59. 52.222-15 Certification of Eligibility (May 2014) |
| I.60. 52.222-21 Prohibition of Segregated Facilities (Apr 2015) |
| I.61. 52.222-26 Equal Opportunity (Sep 2016) |
| I.62. 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) |
| I.63. 52.222-35 Equal Opportunity for Veterans (Jun 2020) |
| I.64. 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) |
| I.65. 52.222-37 Employment Reports on Veterans (Jun 2020) |
| I.66. 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) |
| I.67. 52.222-50 Combating Trafficking of Persons (Nov 2021) |
| I.68. 52.222-54 Employment Eligibility Verification (May 2022) |
| I.69. 52.222-55 Minimum Wages Under Executive Order 13658 (Jan 2022) |
| I.70. 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) |
| I.71. 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep 2013) |
| I.72. 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021), Alternate I (Jul 1995) |
| I.73. 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) |
| I.74. 52.223-6 Drug Free Workplace (May 2001) |
| I.75. 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-designated Items (May 2008) |
| I.76. 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (Aug 2018) |
| I.77. 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) |
| I.78. 52.223-20 Aerosols (Jun 2016) |
| I.79. 52.223-21 Foams (Jun 2016) |
| I.80. WBR 1452.223-80 Asbestos Free Warranty – Bureau of Reclamation (Aug 2021) |
| I.81. WBR 1452.223-81 Safety and Health – Bureau of Reclamation (Oct 2022) |
| I.82. WBR 1452.223-82 Ensuring Adequate Covid-19 Safety Protocols in Federal Buildings and Federally Controlled Facilities – Bureau of Reclamation (Nov 2022) |
| I.83. 52.225-11 Buy American – Construction Materials Under Trade Agreements (Oct 2019) |
| I.84. 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) |
| I.85. 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises (Jun 2000) |
| I.86. 52.227-1 Authorization and Consent (Jun 2020) |
| I.87. 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) |
| I.88. 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) |
| I.89. 52.227-17 Rights in Data – Special Works (Dec 2007) |
| I.90. 52.228-2 Additional Bond Security (Oct 1997) |
| I.91. 52.228-5 Insurance – Work on a Government Installation (Jan 1997) |
| I.92. 52.228-11 Pledges of Assets (Feb 2021) |
| I.93. 52.228-12 Prospective Subcontract Requests for Bonds (Dec 2022) |
| I.94. 52.228-14 Irrevocable Letter of Credit (Nov 2014) |
| I.95. 52.228-15 Performance and Payment Bonds – Construction (Jun 2020) |
| I.96. 1452.228-70 Liability Insurance – Department of Interior (Jul 1996) |
| I.97. 52.229-3 Federal, State, and Local Taxes (Feb 2013) |
| I.98. 52.229-12 Tax on Certain Foreign Procurements – Notice and Representation (Feb 2021) |
| I.99. Notice of Washington State Sales and Use Tax – Bureau of Reclamation – C-PN Region (Feb 1995) |
| I.100. 52.232-5 Payment Under Fixed-Price Construction Contracts (May 2014) |
| I.101. 52.232-17 Interest (May 2014) |
| I.102. 52.232-23 Assignment of Claims (May 2014) |
| I.103. 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) |
| I.104. 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018) |
| I.105. 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) |
| I.106. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) |
| I.107. WBR 1452.232-80 Limitation of Funds – Bureau of Reclamation (Mar 2022) |
| I.108. WBR 1452.232-81 Payment for Mobilization and Preparatory Work – Bureau of Reclamation (Mar 2022), Alternate I (Mar 2022) |
| I.109. 52.233-1 Disputes (May 2014), Alternate I (Dec 1991) |
| I.110. 52.233-3 Protest After Award (Aug 1996) |
| I.111. 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) |
| I.112. 52.236-1 Performance of Work by the Contractor (Apr 1984) |
| I.113. 52.236-2 Differing Site Conditions (Apr 1984) |
| I.114. 52.236-3 Site Investigation and Conditions Affecting Work (Apr 1984) |
| I.115. 52.236-4 Physical Data (Apr 1984) |
| I.116. 52.236-5 Material and Workmanship (Apr 1984) |
| I.117. 52.236-6 Superintendence by the Contractor (Apr 1984) |
| I.118. 52.236-7 Permits and Responsibilities (Nov 1991) |
| I.119. 52.236-8 Other Contracts (Apr 1984) |
| I.120. 52.236-9 Protecting Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) |
| I.121. 52.236-10 Operation and Storage Areas (Apr 1984) |
| I.122. 52.236-11 Use and Possession Prior to Completion (Apr 1984) |
| I.123. 52.236-12 Cleaning Up (Apr 1984) |
| I.124. 52.236-13 Accident Prevention (Nov 1991), Alternate I (Nov 1991) |
| I.125. 52.236-14 Availability and Use of Utility Services (Apr 1984) |
| I.126. 52.236-16 Quantity Surveys (Apr 1984), Alternate I (Apr 1984) |
| I.127. 52.236-17 Layout of Work (Apr 1984) |
| I.128. 52.236-21 Specifications and Drawings for Construction (Feb 1997), Alternate II (Apr 1984) |
| I.129. 52.236-26 Preconstruction Conference (Feb 1995) |
| I.130. WBR 1452.236-84 Preservation of Cultural Resources – Bureau of Reclamation (Mar 2022) |
| I.131. WBR 1452.237-80 Security Requirements – Bureau of Reclamation (Mar 2022) |
| I.132. Implementation of Security Requirements – Construction Contract – Bureau of Reclamation – C-PN Region (Aug 2010) |
| I.133. 52.242-5 Payments to Small Business Subcontractors (Jan 2017) |
| I.134. 52.242-13 Bankruptcy (Jul 1995) |
| I.135. 52.243-4 Changes (Jun 2007) |
| I.136. 52.243-6 Change Order Accounting (Apr 1984) |
| I.137. WBR 1452.243-80, Modification Proposals – Bureau of Reclamation (Mar 2022) – Alternate II (Mar 2022) |
| I.138. 52.244-2 Subcontracts (Jun 2020) |
| I.139. 52.244-6 Subcontracts for Commercial Items (Mar 2023) |
| I.140. 52.248-3 Value Engineering – Construction (Oct 2020), Alternate I (Apr 1984) |
| I.141. 52.249-2 Termination for Convenience of the Government (Fixed Price) (Apr 2012), Alternate I (Sep 1996) |
| I.142. 52.249-10 Default (Fixed-Price Construction) (Apr 1984) |
| I.143. 52.252-6 Authorized Deviation in Clauses (Nov 2020) |
| I.144. 52.253-1 Computer Generated Forms (Jan 1991) |
| PART III List of Documents, Exhibits, and Other Attachments |
| SECTION J list of attachments |
| J.1. Department of Labor, General Wage Decision No. WA20230049, 02/03/2023, Heavy Construction, Kittitas County, WA (8 pages) |
| J.2. Bid Bond, Standard Form 24, OMB Control Number 9000-0045, Exp Date 8/31/2025 (2 pages) https://www.gsa.gov/forms-library/bid-bond |
| J.3. 140R1023R0003 Drawings (Separate Attachment, 413 pages) |
| J.4. Department of the Interior Bureau of Reclamation Subcontracting Plan (11 pages) |
| J.5. Permits (Separate Attachments, Numbering J.5.a through J.5.d) |
| J.6. Past Performance Questionnaire (6 pages) |
| PART IV Representations and Instructions |
| SECTION K Representations, Certifications, and Other Statements of Offerors or Respondents |
| K.1. 52.203-2 Certificate of Independent Price Determination (Apr 1985) |
| K.2. 52.204-8 Annual Representations and Certifications (Mar 2023) |
| K.3. 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) |
| K.4. 52.209-5 Certification Regarding Responsibility Matters (Aug 2020) |
| K.5. 52.209-7 Information Regarding Responsibility Matters (Oct 2018) |
| K.6. 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (Nov 2021) |
| K.7. 52.223-1 Biobased Product Certification (May 2012) |
| K.8. 52.229-11 Tax on Certain Foreign Procurements – Notice and Representation (Jun 2020) |
| SECTION L Instructions, Conditions, and Notices to Offerors |
| L.1. 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) |
| L.2. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) |
| L.3. 52.204-7 System for Award Management (Oct 2018) |
| L.4. 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) |
| L.5. 52.204-22 Alternative Line Item Proposal (Jan 2017) |
| L.6. 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 (Aug 1998) |
| L.7. 52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisitions Streamlining and Standardization Information System (ASSIST) (Jul 2021) |
| L.8. 52.211-6 Brand Name or Equal (Aug 1999) |
| L.9. 52.215-1 Instructions to Offerors – Competitive Acquisitions (Nov 2021) |
| L.10. 52.215-16 Facilities Capital Cost of Money (Jun 2003) |
| L.11. 52.215-20 Requirement for Cost or Pricing Data Information Other than Cost or Pricing Data (Nov 2021) |
| L.12. 1452.215-71 Use and Disclosure of Proposal Information – Department of Interior (Apr 1984) |
| L.13. WBR 1452.215-80 Source Evaluation and Selection Procedures – Bureau of Reclamation (Mar 2021) |
| L.14. WBR 1452.215-81 General Proposal Instructions – Bureau of Reclamation (Mar 2021) |
| L.15. W BR 1452.215-86 Intent to Incorporate Technical Proposal – Bureau of Reclamation (Mar 2021) |
| L.16. Facsimile Acknowledgement of Amendments, Modifications to Offers, and Withdrawals of Offers |
| L.17. 52.216-1 Type of Contract (Apr 1984) |
| L.18. 52.222-5 Construction Wage Requirements – Secondary Site of Work (May 2014) |
| L.19. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) |
| L.20. Non-Discrimination Notice to U.S. DOI Contractors, Subcontractors, and Lessors – Bureau of Reclamation - C-PN Region (Jan 2000) |
| L.21. 52.225-12 Notice of Buy American Requirement – Construction Materials Under Trade Agreements (May 2014) |
| L.22. 52.228-1 Bid Guarantee (Sep 1996) |
| L.23. 1452.233-2 Service of Protest – Department of Interior (Deviation) (Jul 1996) |
| L.24. 52.236-27 Site Visit (Construction) (Feb 1995), Alternate I (Feb 1995) |
| L.25. 52.236-28 Preparation of Offers – Construction (Oct 1997) |
| L.26. WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line Item – Bureau of Reclamation (Mar 2022) |
| L.27. Site Visit Attendance Restriction – Bureau of Reclamation – C-PN Northwest Region (May 2004) |
| L.28. 52.252-3 Alterations in Solicitation (Apr 1984) |
| L.29. 52.252-5 Authorized Deviation in Provisions (Nov 2020) |
| SECTION M EVALUATION FACTORS FOR AWARD |
| M.1. WBR 1452.215-82 Evaluation Factors for Award – Quality Predominance – Bureau of Reclamation (Mar 2021) |
File details come from the government source that posted it. Updated .