Drawings_Amd_0006_0006.pdf

PDF 2 MB Posted

Attached to
Cle Elum Dam Fish Passage Facility Adult Facility
Solicitation number
140R1023R0003
Issued by

About this file

This document package includes drawings and specifications for a SCADA, security, and telephone system for the Cle Elum Dam Fish Passage Facility Adult Facility project. The drawings show equipment placement and network diagrams for the juvenile facility, dam gate house, and site. Notes provide requirements for fiber optic panels, future expansion capacity, and responsibility for components. The related federal contract opportunity is a solicitation from the Bureau of Reclamation for the Cle Elum Dam Fish Passage Facility Adult Facility project in the Yakima River Basin Water Enhancement Project in Washington. The solicitation number is 140R1023R0003.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAR M TA IOCE N

Master Station

Juvenile Facility

Level 3

Level 4

Level 6

Alarm Dialler

Level 7

Level 8

SCADA Cabinet

UPS

Level 5

Level 1

Cameras

24 Pair Fiber

Level 2

Dam Gate House

F.O.

Panel

Note 2 Note 2

Note 1

To Door Controllers

TO Telephone Media Converter

(33-D-60534)

Digital Video Recorder

To POE Switch (33-D-60534)

Facility Security Controllers

Level 1 Main PLC

Crest Gate Controller

Level 6 Remote I/O

To Site Security System

To Reservoir Level Interface

Remote Workstation

To Adult Facility (Future)

24 Pair Fiber (Future) Tunnel Output

F.O.

Panel

6 Pair Fiber (Future)

Network Switch

Network Switch Network

Switch

OIT

Panel

OIT

Panel

Serial to Fiber Converter

Flow Meter (Modbus)

Note 3

Fiber to Serial Converter

F.O.

Panel

PLC Programmable Logic Controller

Uninterruptible Power Supply

Fiber Optic

UPS

Single Mode Fiber Optic Cable Cat6 Ethernet Cable Serial Connection

LEGEND

LAR M TA IOCE N

NOTES

1. Additional fibers in multi-pair fiber optic cable intended for future use.

2. F.O. Patch Panels shall allow termination of all fibers in the multi-pair fiber optic cables which terminate there.

3. Components included in the cloud will be provided by Others in the future. The Flow Meter shall be provided by the Contractor.

4. Size F.O. panels to include sufficient space and termination points to terminate all cables marked as "Future".

5. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.

Contractor to update and complete design as required.

EXPLANATION

REFERENCE DRAWINGS

Electrical - SCADA SCADA, Security and Telephone Equipment Placement - Facility

33-D-60532

Electrical - SCADA Telephone System Riser Diagram 33-D-60534

Electrical - SCADA SCADA, Security and Telephone Cabinet Layouts

33-D-60537

Electrical - SCADA SCADA, Security and Telephone Equipment Placement - Site

33-D-60868

F.O.

R el ea se d

Juvenile Facility

Dam Gate House NOTES

1. Contractor to verify the location of the Demarcation Point of the POTS lines from the phone company.

2. Provide a life safety POTS line from the Gate House to the Juvenile Facility for 911 services to the Juvenile elevator emergency phones. Provide a POTS line from the Gate House to the Juvenile Facility for the Alarm Dialer. All other telephones shall have individual numbers connected through the IP PBX.

3. Phone communication system shall be Cat 6 Ethernet. All phone connections shall be through a central POE switch located in the Juvenile Facility SCADA Cabinet. Typical POE switch arrangement shown.

4. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.

Contractor to update and complete design as required.

AOR Area of Rescue PBX Private Branch Exchange POTS Plain Old Telephone System IP PBX Voice Over Internet Protocol

PBX

Single Data/Telephone Connection

Dual Data/Telephone Connection

LEGEND

Single Mode Fiber Optic Cable Cat6 Ethernet Cable Cat3 Cable

EXPLANATION

POE SWITCH

CAT6 HOMERUNS

F.O.Media Converter

To F.O. Panel (33-D-60533)

POTS Lines Note 1

Roof Deck Gate Chamber Exit Door

(Exterior)

(Exterior)

To F.O. Panel (33-D-60533)

Network Switch (33-D-60533)

Roof Deck Gate Chamber AOR

Level 1 Gate Chamber

Level 1 Gate Chamber AOR

Level 2 Gate Chamber AOR

Gate Elevator Helix Elevator Alarm Dialler

Level 3 Gate Chamber AOR

Level 4 Gate Chamber AOR

Level 5 Gate Chamber AOR

Level 6 Gate Chamber AOR

IP-PBX

Roof Deck Helix Chamber Exit Door

Roof Deck Helix Chamber AOR

Level 1 Helix Chamber AOR

Level 2 Helix Chamber AOR

Level 3 Helix Chamber AOR

Level 4 Helix Chamber AOR

Level 5 Helix Chamber AOR

Level 6 Helix Chamber AOR

Level 7 Helix ChamberAOR

Level 8 Helix Chamber AOR

REFERENCE DRAWINGS

Electrical - SCADA SCADA, Security and Telephone Equipment Placement - Facility

33-D-60532

Electrical - SCADA SCADA, Security and Telephone Networks Overview

33-D-60533

Electrical - SCADA SCADA, Security and Telephone Cabinet Layouts

33-D-60537

Electrical - SCADA SCADA, Security and Telephone Equipment Placement - Site

33-D-60868

R el ea se

R el ea se

REV NO

2016-03-31 D C.F.S.

FIXED OFFICIAL RENDITION, FONT SPACING AND OTHER VISUAL ONLY

ASPECTS.

R el ea se

File details come from the government source that posted it. Updated .