AMD0004_0005.pdf
PDF 103 KB Posted
- Solicitation number
- 140R1023R0003
About this file
This document contains drawings related to a solicitation for the Cle Elum Dam Fish Passage Facility Adult Facility project. The drawings depict electrical, structural, and site plans for the fish passage facility and include details such as identification and safety signage, concrete reinforcement requirements, electrical equipment supports, and conduit installation standards. The related federal contract opportunity is solicitation number 140R1023R0003 issued by the Department of the Interior Bureau of Reclamation for construction of the Cle Elum Dam Fish Passage Facility Adult Facility located on the Yakima River in Washington state. The solicitation seeks offers for construction of the adult fish passage facility to enhance water resources in the Yakima River Basin.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cle Elum Dam Fish Passage Facility Adult Facility Yakima River Basin Water Enhancement Project-Integrated Plan Amendment No. 0004
Drawings
52 00 00 - 27
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
391A 40-D-7095 Switchyards and Substations – Electrical Installation – Identification, Warning and Safety Signs
392 40-D-7100 Grout Manifold for Circulating Line System
393 40-D-7102 Standard and Typical Designs – Government Drawing Format – Drawing Border, Sample Title Bloc, and Signature Lines
394 40-D-60001 Standard and Typical Designs – Miscellaneous Metalwork – Electrical Equipment Support, Type I – Sections and Detail
395 40-D-60002 Standard and Typical Designs – Miscellaneous Metalwork – Typical Guard Posts – Non-Security Application
396 40-D-60003 Standard and Typical Designs – Concrete Outline Reinforcement – General Notes for Concrete Outline and Reinforcement – Sheet 1 of 2
397 40-D-60004 Standard and Typical Designs – Concrete Outline Reinforcement – Minimum Requirements for Detailing Reinforcement – Sheet 2 of 2
398 104-D-254 Electrical Standards – Box Termination
399 104-D-286 Conduits
Cle Elum Dam Fish Passage Facility Adult Facility Yakima River Basin Water Enhancement Project-Integrated Plan Amendment No. 0004
Drawings
52 00 00 - 44
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
40-D-7018 390
40-D-7094 391
40-D-7095 391A
40-D-7100 392
40-D-7102 393
40-D-60001 394
40-D-60002 395
40-D-60003 396
40-D-60004 397
104-D-
104-D-254 398
104-D-286 399
END OF SECTION
| 32A |
| 203A |
| 206A |
| 372A |
| 372B |
| 372C |
| 372D |
| 372E |
| 372F |
| 372G |
| 372H |
| 372I |
| 372J |
| 372K |
| 391A |
File details come from the government source that posted it. Updated .