This solicitation is for the Cle Elum Dam Fish Passage Facility Adult Facility project located in Washington. The solicitation seeks proposals to design and construct fish passage facilities at Cle Elum Dam including an adult collection facility, fish ladder, fish lock, outfall transition tunnel, and appurtenant features. The Bureau of Reclamation is the contracting agency. Offerors must submit proposals by the closing date of January 15, 2023. Award is expected to occur by March 15, 2023 with work to be completed by December 31, 2026. The solicitation includes drawings and specifications outlining the project scope and contractor requirements.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SERVICE CENTER

WRITTEN SPECIFICATIONS SIGNATURE SHEET

Specifications Title:

Project Title:

Region:

Prepared: P.E.

Technical Approval: P.E.

Certified: P.E.

CLE ELUM DAM FISH PASSAGE FACILITY

ADULT FACILITY

PACIFIC NORTHWEST

MICHAEL VON BUHR Digitally signed by MICHAEL VON BUHR Date: 2022.03.15 07:28:33 -06'00'

JASON WAGNER

Digitally signed by JASON

WAGNER

Date: 2022.03.15 09:06:48 -06'00'

AMD/MOD

No.

Technical Approval Signature:

Prepared By Signature:

Revised Sections:

AMD 0006 01 12 40, 01 14 12, 02 41

10, 26 20 10, 31 03 10, 31 03 15, 52 00 00

Digitally signed by

DEREK FOSTER

Date: 2023.06.07 08:36:09 -06'00'

Cle Elum Dam Fish Passage Facility Adult Facility Yakima River Basin Water Enhancement Project-Integrated Plan Amendment No. 0006

Construction Sequencing (Revised

01 12 40 - 3

E. Temporary Features shall be installed and removed during the In-River Work Period.

1. Including, but not limited to the following:

a. Complete cofferdam Closure.

b. Access roads and ramps.

c. Unwatering.

d. Dewatering below high water mark.

F. Once the In-River Work Period begins, the following activities must be completed before the end of the In-River Work Period, including, but not limited to the following:

1. All activities related to the construction of the splitter wall and jetty blocks.

2. Cleaning and repair of the stilling basin floor.

3. All activities related to construction of the Stage 1 concrete for the Adult

Collection Facility and Outfall.

4. Installation of the fish screens and any features within the stilling basin. Wet testing of the screens will occur later.

5. Placement of compacted backfill within the adult collection facility footprint to a minimum elevation of 2118 ft., or as required to complete Stage 1 concrete placements

6. In-river grading required near fish ladder entrance.

7. Riprap.

8. MSE Wall Lower Section.

G. Work after the Stage 1 features have been completed can be done at the contractor’s convenience.

H. Removal and control of water is required during construction, refer to Section 31 03 33 – Removal and Control of Water. The Government anticipates this work may be difficult.

I. Concrete work may require hot/cold weather protection, refer to Section 03 30 00 – Cast - in - Place Concrete.

Work Restrictions (Revised)

01 14 12 - 2

H. DELETED

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

END OF SECTION

Yakima River Basin Water Enhancement Project-Integrated Plan Amendment No. 0006

Demolition and Removal of Temporary Outfall (Revised)

02 41 10 - 1

SECTION 02 41 10

DEMOLITION AND REMOVAL OF TEMPORARY OUTFALL

PART 1 GENERAL

MEASUREMENT AND PAYMENT

A. Demolition and Removal of Temporary Outfall:

1. Payment: Lump-sum price offered in the Price Schedule.

a. Includes but is not limited to the following costs:

1) Removal and disposal of existing temporary outfall pipe.

2) Removal and disposal of existing pipe supports.

3) Removal and disposal of tunnel portal soil support system.

4) Excavate and remove outfall pipe bedding materials.

5) Demolition and disposal of any concrete pipe supports.

6) Excavate and stockpile soil placed on top of pipe.

7) Excavation, backfilling, compaction, and grading.

8) Removal and stockpiling of riprap.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 02 41 10-1, Removal and Demolition Plan:

1. Demolition of the temporary outfall shall not begin prior to July 15th.

a. Water will not be discharged through the tunnel during the in-river construction period for this project.

2. Site layout drawing of items to be removed including extents of removal and critical dimensions and elevations.

a. X-Y coordinates and elevations.

b. Tie into benchmark shown on the drawings.

c. Method for removal of outfall pipe near the tunnel portal, and methods to protect to the previously constructed portal.

3. Method to for removal of pipe supports.

4. Method for removal of concrete pipe supports.

Yakima River Basin Water Enhancement Project-Integrated Plan Amendment No. 0006

02 41 10 - 2

5. Method for removal of tunnel portal soil support system.

6. Method for removal of outfall pipe and the following:

a. Earthwork in area of removed pipe, whether the trench will be left open, or filled with compacted backfill.

b. Temporary outfall pipe, concrete, and appurtenances.

c. Details for salvage or disposal of outfall pipe.

d. Whether the trench left after pipe removal will be left open, or filled with compacted backfill.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 INSPECTION OF TEMPORARY OUTLET WORKS

A. Informational drawings are provided for reference.

B. Coordinate inspections and surveys of existing outlet works for investigation work in accordance with Section 01 14 20 – River Operations and Unwatering and Section 01 14 12 – Work Restrictions.

3.02 REMOVAL, RECYCLE, AND DISPOSAL

A. Remove and, recycle or dispose of the following items and materials shown on drawings from jobsite:

1. Temporary outfall pipe.

2. Pipe anchors and supports, including any grout blocks.

3. Outfall pipe bedding materials.

4. Concrete pipe supports or grade beams.

5. Soil placed on top of pipe.

6. Excavation, backfilling, compaction and grading.

7. Riprap located near outfall pool in areas where compacted fill or compacted backfill will later be placed above

8. Tunnel portal soil support system within a minimum of two feet below final grade. All portal soil support elements below this elevation are to remain intact.

Yakima River Basin Water Enhancement Project-Integrated Plan Amendment No. 0006

02 41 10 - 3

B. Dispose of these items and materials in accordance with Section 01 74 10 – Cleaning and Waste Management.

C. Any work in the river must be done during the time the site is dewatered unless a cofferdam is used.

D. Temporary storage locations to be approved by COR.

E. Any backfill of the pipe trench must comply with material and compaction requirements as stated in the specifications. Additionally, the interface between native materials and the interface between the compacted bedding must be clearly marked on progress and as-built drawings.

F. Pipe bedding shall be excavated and removed until native soils are reached.

G. Pipe bedding may be stockpiled for reuse.

H. Native materials removed from the top of the pipe may be stockpiled for reuse.

I. Compacted backfill around the remaining tunnel portal soil support system abandoned in place shall meet compaction requirements, as outlined in Section 31 23 02 – Compacting Earth Materials.

J. Riprap shall be stockpiled for reuse.

K. Stockpile locations to be approved by COR.

L. Upon completion of the temporary outfall removal activities, the site earthwork/ topography surface will be what is referred to as the Existing Grade for the balance of the construction activities.

M. The tunnel portal access road reinforcement at a 1:1 slope supported with strand anchors, welded wire mesh, and shotcrete shall not be disturbed, removed, or demolished.

Temporary Power (Revised

26 20 10 - 1

SECTION 26 20 10

TEMPORARY POWER

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Dewatering Power:

1. Payment: Lump-sum price offered in the Price Schedule.

a. Includes all power required for operation of the dewatering system starting September 1st.

b. Include the following additional items:

1) Instrumentation, equipment, and labor necessary for described work.

2) Chemicals, lubricants, gases, fuel, electricity, filters, and other consumables unless explicitly specified otherwise.

3) Maintenance of systems.

4) Include sufficient temporary power for installation and testing of the dewatering system prior to September 1st.

5) Includes providing power for the systems and components referenced in Section 31 03 33 – Removal and Control of Water.

B. Unwatering Power:

1. Payment: Lump-sum price offered in the Price Schedule.

a. Includes all power required for operation of the unwatering system starting September 1st.

1) Includes providing power for the systems and components referenced in Section 31 03 33 – Removal and Control of Water.

b. Include the following additional items:

1) Instrumentation, equipment, and labor necessary for described work.

2) Chemicals, lubricants, gases, fuel, electricity, filters, and other consumables unless explicitly specified otherwise.

3) Maintenance of systems.

C. All Other Temporary Power:

a. Payment: Lump-sum price offered in the Price Schedule.

Diversion and Care of Flows (Revised

31 03 10 - 4

C. Results of Subsurface Investigations:

1. Refer to Section 53 20 00 – Geologic Investigations, Section 53 30 00 – Records of Geologic and Subsurface Investigations and Section 53 10 00 - Geotechnical Baseline Conditions.

D. Construction Sequence:

1. The cofferdam and unwatering/dewatering system must be installed and operational for the minimum required amount of time outlined in Specification 31 03 33 – Removal and Control of Water prior to any excavation activities on-site below the Cle Elum River elevation.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Handle, load, haul, stockpile, and place materials to minimize segregation and breakdown.

B. Prevent contamination of backfill materials with other soil or vegetative matter.

C. If materials are stockpiled on site, clear and strip stockpile areas prior to stockpiling.

PART 2 PRODUCTS

2.01 COFFERDAM MATERIALS

A. In accordance with approved plan.

B. The cofferdam must be composed of (or a combination of): spawning gravel, water bladders, Super Sacks, Portadams, geomembrane, sheet piles, and/or equivalent having the same characteristics.

2.02 SPAWNING GRAVEL MATERIALS

A. Clean, hard, dense, durable, predominately rounded sand and gravel mixture free of organic and deleterious material processed from on-site material or commercially sourced.

B. Gradation: Well graded within limits specified in Table 31 03 10A – Spawning Gravel Gradation.

Table 31 03 10A – Spawning Gravel Gradation U.S. Standard Sieve Size

(Nominal) Percent Passing by

Weight

7 in. 90

No. 18 0 - 10

Diversion and Care of Flows (Revised

31 03 10 - 6

3. Contractor shall notify COR a minimum of seven days prior to removal of the cofferdam.

E. Restore existing features to pre-construction conditions after removal of the Temporary Outlet Works Diversion.

1. Inspect drainage outlets and clean as necessary.

2. If the nearby gauging station or river gauges are disturbed by the cofferdam all damages must be repaired.

If vegetation is disturbed, removed, or damaged, it shall be replaced in accordance with Section 01 57 50 – Tree and Plant Protection.

Temporary Outlet Works Diversion (Revised)

31 03 15 - 6

1. Dispose of removed material in accordance with Section 01 74 00 - Cleaning and Waste Management.

2. Regrade cofferdam footprint to preexisting condition.

3. Contractor shall notify COR a minimum of seven days prior to removal of the cofferdam.

E. Restore existing features to pre-construction conditions after removal of the Temporary Outlet Works Diversion.

1. Inspect drainage outlets and clean as necessary.

2. If the nearby gauging station or river gauges are disturbed by the cofferdam all damages must be repaired.

3. If vegetation is disturbed, removed, or damaged, it shall be replaced in accordance with Section 01 57 50 - Tree and Plant Protection.

Drawings (Revised)

52 00 00 - 1

SECTION 52 00 00

DRAWINGS

PART 1 GENERAL

1.01 DISCREPANCIES, ERRORS, OR OMISSIONS

A. Inform the CO of discrepancies discovered on drawings in accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction.

B. In accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction, in case of discrepancies, written specifications take precedence over drawings unless otherwise specified.

1.02 PROJECT CONDITIONS

A. Where there are differences as determined by the CO between details and dimensions shown on drawings and details and dimensions of existing features at jobsite, use details and dimensions of existing features at jobsite.

1.03 INFORMATION DRAWINGS

A. Drawings marked "For Information Only" in the drawing list are included to show existing features about which knowledge is required to perform work under this contract.

These drawings do not show work to be performed under this contract.

B. If there are differences as determined by the CO between details and dimensions shown on these drawings and those of existing features at jobsite, use details and dimensions of existing features at jobsite.

1.04 STANDARD DRAWINGS

A. Standard drawings may show details which are not a part of work under this contract.

Disregard details shown on these drawings which are not applicable to work under this contract.

1.05 COPIES OF DRAWINGS

A. One set of full-size (22 inches by 34 inches) drawings, except standard drawings, will be furnished to the Contractor.

B. Upon request, additional half-size (11 inches by 17 inches) copies of standard drawings will be furnished to the Contractor.

52 00 00 - 2

1.06 LIST OF DRAWINGS

A. Drawings listed in Table 52 00 00A - List of Drawings are made a part of Section C - Description/Specifications.

1.07 DRAWING NUMBERS IN NUMERICAL ORDER

A. Specification drawings are listed in numerical order in Table 52 00 00B - Drawings in Numerical Order.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

General:

1 33-D-61002 Drawing Index – Sheet 1 of 2

2 33-D-61003 Drawing Index – Sheet 2 of 2

3 33-D-61004 General – Key, Vicinity and Location Maps

4 33-D-61005 General – Existing Conditions – Plan

5 33-D-61006 General – Site Plan

5A 33-100-6148 General Geologic Explanation, Legend and Notes

5B 33-100-6149 Geologic Plan and Locations of Explorations

5C 33-100-6150 Geologic Section A-A

5D 103-D-347 Unified Soil Classification

5E 103-D-347 Unified Soil Classification (Revision 2)

Demolition:

52 00 00 - 3

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

6 33-D-61008 Stage 1 – Demolition for Juvenile Outfall – Plan, Isometric and Sections – Sheet 1 of 3

7 33-D-61009 Stage 1 – Demolition for Juvenile Outfall – Plan, Isometric and Sections – Sheet 2 of 3

8 33-D-61010 Stage 1 – Demolition for Juvenile Outfall – Plan, Isometric and Sections – Sheet 3 of 3

9 33-D-61011 Stage 1 – Demolition for Fish Screen Installation – Plan and Sections – Sheet 1 of 2

10 33-D-61012 Stage 1 – Demolition for Fish Screen Installation – Plan and Sections – Sheet 2 of 2

11 33-D-61013 Stage 1 – Splitter Wall Concrete Excavation Plan – Excavation Plan and Sections

Civil:

12 33-D-61015 Site Dewatering – Dewatering Plan – Sheet 1 of 3

13 33-D-61016 Site Dewatering – Sections and Details – Sheet 2 of 3

14 33-D-61017 Site Dewatering – Well Location Table – Sheet 3 of 3

15 33-D-61018 Stage 1 – Temporary Outlet Works Diversion – Plan and Sections – Sheet 1 of 2

16 33-D-61019 Stage 1 – Temporary Outlet Works Diversion – Plan and Sections – Sheet 2 of 2

17 33-D-61020 Adult Collection Facility – Excavation – Plan

18 33-D-61021 Adult Collection Facility – Excavation – Sections

19 33-D-61022 Stage 1 – Splitter Wall Excavation – Plan and Section

20 33-D-61023 Adult Collection Facility – River Wall – Excavation Sections

21 33-D-61024 Miscellaneous Excavation – Plan and Section

52 00 00 - 4

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

22 33-D-61025 Site Earthwork and Drainage – Plan and Sections – Sheet 1 of 6

23 33-D-61026 Site Earthwork and Drainage – Plan and Sections – Sheet 2 of 6

24 33-D-61027 Site Earthwork and Drainage – Plan and Sections – Sheet 3 of 6

25 33-D-61028 Site Earthwork and Drainage – Plan and Sections – Sheet 4 of 6

26 33-D-61029 Site Earthwork and Drainage – Plan and Sections – Sheet 5 of 6

27 33-D-61030 Site Earthwork and Drainage – Plan and Sections – Sheet 6 of 6

28 33-D-61031 Site Earthwork – Plan and Sections

29 33-D-61032 Site Earthwork – Plan and Sections

30 33-D-61034 Intake Pipe Earthwork – Plan, Sections and Details – Sheet 1 of 3

31 33-D-61035 Intake Pipe Earthwork – Plan, Sections and Details – Sheet 2 of 3

32 33-D-61036 Intake Pipe Earthwork – Plan, Sections and Details – Sheet 3 of 3

32A 33-D-61037 Adult Collection Facility – River Wall Excavation – Plan and Sections

Architectural:

33 33-D-61041 Architectural – Building Code – Summary and Abbreviations

34 33-D-61042 Architectural – Floor Plan, General Notes and Legend

35 33-D-61043 Architectural – Roof Plan and Details

36 33-D-61044 Architectural – Exterior Elevations - South and East

52 00 00 - 5

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

37 33-D-61045 Architectural – Exterior Elevations North and West

38 33-D-61046 Architectural – Enlarged Floor – Plans & Wall Types

39 33-D-61047 Architectural – Interior Elevations

40 33-D-61048 Architectural – Building Sections – North/South

41 33-D-61049 Architectural – Building Sections – East/West

42 33-D-61050 Architectural – Door, Window, and Louver Schedules

43 33-D-61051 Architectural – Details, Equipment & Room Finish Info

44 33-D-61052 Architectural – Signage

45 33-D-61053 Architectural – Reflected Ceiling Plan

46 33-D-61054 Entrance Sculpture Panel 1 – Sculpture Key and Detail

47 33-D-61055 Entrance Sculpture Panel 2 – Detail

48 33-D-61056 Entrance Sculpture Panel 3 – Detail

49 33-D-61057 Entrance Sculpture Panel 4 - Detail

Structural:

50 33-D-61058 General Notes – Concrete Structures

51 33-D-61059 Structural Design Data – General

52 33-D-61060 Special Inspections – Sheet 1 of 2

53 33-D-61061 Special Inspections – Sheet 2 of 2

54 33-D-61062 Stage 1 – Fish Ladder – 3D Isometric

55 33-D-61063 Stage 1 – Fish Ladder – 3D Isometric

56 33-D-61064 Stage 1 – Structural General Arrangement – Plan

57 33-D-61065 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 1 of 24

52 00 00 - 6

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

58 33-D-61066 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 2 of 24

59 33-D-61067 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 3 of 24

60 33-D-61068 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 4 of 24

61 33-D-61069 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 5 of 24

62 33-D-61070 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 6 of 24

63 33-D-61071 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 7 of 24

64 33-D-61072 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 8 of 24

65 33-D-61073 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 9 of 24

66 33-D-61074 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 10 of 24

67 33-D-61075 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 11 of 24

68 33-D-61076 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 12 of 24

69 33-D-61077 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 13 of 24

70 33-D-61078 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 14 of 24

71 33-D-61079 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 15 of 24

72 33-D-61080 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 16 of 24

52 00 00 - 7

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

73 33-D-61081 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 17 of 24

74 33-D-61082 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 18 of 24

75 33-D-61083 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 19 of 24

76 33-D-61084 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 20 of 24

77 33-D-61085 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 21 of 24

78 33-D-61086 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 22 of 24

79 33-D-61087 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 23 of 24

80 33-D-61088 Stage 1 – Fish Ladder Concrete Outline – Plans, Sections and Details – Sheet 24 of 24

81 33-D-61089 Stage 1 – Fish Lock Concrete Outline – Plan and Sections – Sheet 1 of 3

82 33-D-61090 Stage 1 – Fish Lock Concrete Outline – Plan and Sections – Sheet 2 of 3

83 33-D-61091 Stage 1 – Fish Lock Concrete Outline – Plan and Sections – Sheet 3 of 3

84 33-D-61092 Stage 1 – Outfall Transition Tunnel Concrete Outline – Plan, Sections and Details – Sheet 1 of 3

85 33-D-61093 Stage 1 – Outfall Transition Tunnel Concrete Outline – Plan, Sections and Details – Sheet 2 of 3

86 33-D-61094 Stage 1 – Outfall Transition Tunnel Concrete Outline – Plan, Sections and Details – Sheet 3 of 3

87 33-D-61095 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 1 of 25

52 00 00 - 8

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

88 33-D-61096 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 2 of 25

89 33-D-61097 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 3 of 25

90 33-D-61098 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 4 of 25

91 33-D-61099 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 5 of 25

92 33-D-61100 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 6 of 25

93 33-D-61101 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 7 of 25

94 33-D-61102 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 8 of 25

95 33-D-61103 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 9 of 25

96 33-D-61104 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 10 of 25

97 33-D-61105 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 11 of 25

98 33-D-61106 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 12 of 25

99 33-D-61107 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 13 of 25

100 33-D-61108 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheer 14 of 25

101 33-D-61109 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 14 of 25

102 33-D-61110 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 15 of 25

52 00 00 - 9

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

103 33-D-61111 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 17 of 25

104 33-D-61112 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 18 of 25

105 33-D-61113 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 19 of 25

106 33-D-61114 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 20 of 25

107 33-D-61115 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 21 of 25

108 33-D-61116 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 22 of 25

109 33-D-61117 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 23 of 25

110 33-D-61118 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 24 of 25

111 33-D-61119 Stage 1 – Fish Ladder Reinforcement Design – Plans, Sections and Details – Sheet 25 of 25

112 33-D-61120 Stage 1 – Fish Lock Reinforcement Design – Plans and Sections – Sheet 1 of 4

113 33-D-61121 Stage 1 – Fish Lock Reinforcement Design – Plan and Sections – Sheet 2 of 4

114 33-D-61122 Stage 1 – Fish Lock Reinforcement Design – Plans and Sections – Sheet 3 of 4

115 33-D-61123 Stage 1 – Fish Lock Reinforcement Design – Plans and Sections – Sheet 4 of 4

116 33-D-61124 Stage 1 – Outfall Transition Reinforcement Design – Plan, Sections and Details – Sheet 1 of 3

117 33-D-61125 Stage 1 – Outfall Transition Reinforcement Design – Plan, Sections and Details – Sheet 2 of 3

52 00 00 - 10

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

118 33-D-61126 Stage 1 – Outfall Transition Reinforcement Design – Plan, Sections and Details – Sheet 3 of 3

119 33-D-61127 Stage 1 – Fish Ladder Weirs Concrete Outline – Plan, Sections and Details

120 33-D-61128 Stage 1 – Fish Ladder Weirs Concrete Outline – Plan, Sections and Details

121 33-D-61132 Stage 1 – Splitter Wall – 3D Isometric

122 33-D-61133 Stage 1 – Splitter Wall Concrete Outline – Plan & Section – Sheet 1 of 2

123 33-D-61134 Stage 1 – Splitter Wall Concrete Outline – Sections & Details – Sheet 2 of 2

124 33-D-61135 Stage 1 – Splitter Wall Anchor Bar Layout – Plan & Sections

125 33-D-61136 Stage 1 – Splitter Wall Reinforcement – Plan & Section – Sheet 1 of 6

126 33-D-61137 Stage 1 – Splitter Wall Reinforcement – Plan & Section – Sheet 2 of 6

127 33-D-61138 Stage 1 – Splitter Wall Reinforcement – Section – Sheet 3 of 6

128 33-D-61139 Stage 1 – Splitter Wall Reinforcement – Sections – Sheet 4 of 6

129 33-D-61140 Stage 1 – Splitter Wall Jetty Block Reinforcement – Sections and Details – Sheet 5 of 6

130 33-D-61141 Stage 1 – Splitter Wall Reinforcement – Sections and Detail

– Sheet 6 of 6

131 33-D-61142 Stage 1 – River Wall Concrete – Plan, Sections and Table – Sheet 1 of 3

132 33-D-61143 Stage 1 – River Wall Reinforcement – Plan and Sections – Sheet 2 of 3

52 00 00 - 11

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

133 33-D-61144 Stage 1 – River Wall Concrete and Reinforcement – Details and Sections – Sheet 3 of 3

134 33-D-61145 General Arrangement – Plan – Sheet 1 of 10

135 33-D-61146 General Arrangement – Plan – Sheet 2 of 10

136 33-D-61147 General Arrangement – Sections – Sheet 3 of 10

137 33-D-61148 General Arrangement – Sections – Sheet 4 of 10

138 33-D-61149 General Arrangement – Sections – Sheet 5 of 10

139 33-D-61150 General Arrangement – Sections – Sheet 6 of 10

140 33-D-61151 General Arrangement – Sections – Sheet 7 of 10

141 33-D-61152 General Arrangement – Sections – Sheet 8 of 10

142 33-D-61153 General Arrangement – Sections – Sheet 9 of 10

143 33-D-61154 General Arrangement – Section and Legend – Sheet 10 of 10

144 33-D-61155 General Arrangement – Structure Key Plan

145 33-D-61156 Adult Fish Collection Facility – Isometric View

146 33-D-61157 Adult Fish Collection Facility – Isometric View

147 33-D-61158 Fish Ladder and Pump Deck – Concrete Outline – Plan and Key

148 33-D-61159 Pump Deck Concrete Outline – Plan and Key

149 33-D-61160 Fish Ladder – Concrete Outline – Plan, Key, Section and Detail

150 33-D-61161 Fish Ladder – Concrete Outline – Plan, Key and Details

151 33-D-61162 Fish Ladder and Pump Deck – Concrete Outline – Section and Detail – Sheet 1 of 2

152 33-D-61163 Fish Ladder and Pump Deck – Concrete Outline – Section and Detail – Sheet 2 of 2

52 00 00 - 12

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

153 33-D-61164 Fish Ladder and Pump Deck – Concrete Outline – Sections – Sheet 1 of 2

154 33-D-61165 Fish Ladder and Pump Deck – Concrete Outline – Sections – Sheet 2 of 2

155 33-D-61166 Fish Ladder – Concrete Outline – Sections – Sheet 1 of 2

156 33-D-61167 Fish Ladder – Concrete Outline – Sections – Sheet 2 of 2

157 33-D-61168 Fish Ladder – Concrete Outline – Section

158 33-D-61171 Fish Ladder – Reinforcement Design – Plan and Key

159 33-D-61172 Pump Deck – Reinforcement Design – Plan and Key

160 33-D-61173 Fish Ladder – Reinforcement Design – Plan, Key, Sections and Details

161 33-D-61174 Fish Ladder – Reinforcement Design – Plans and Key

162 33-D-61175 Fish Ladder and Pump Deck – Reinforcement Design – Section and Details

163 33-D-61176 Fish Ladder and Pump Deck – Reinforcement Design – Section – Sheet 1 of 3

164 33-D-61177 Fish Ladder and Pump Deck – Reinforcement Design – Section – Sheet 2 of 3

165 33-D-61178 Fish Ladder and Pump Deck – Reinforcement Design – Section – Sheet 3 of 3

166 33-D-61179 Fish Ladder and Pump Deck – Reinforcement Design – Sections and Detail

167 33-D-61180 Fish Ladder – Reinforcement Design – Sections – Sheet 1 of 2

168 33-D-61181 Fish Ladder – Reinforcement Design – Sections – Sheet 2 of 2

169 33-D-61182 Fish Ladder - Reinforcement Design – Section

52 00 00 - 13

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

170 33-D-61185 Fish Ladder Slab – Concrete Outline – Plan – El. 2132.67 – Sheet 1 of 5

171 33-D-61186 Fish Ladder Slab – Concrete Outline – Plan – El. 2131.00 – Sheet 2 of 5

172 33-D-61187 Fish Ladder Slab – Concrete Outline – Sections – Sheet 3 of 5

173 33-D-61188 Fish Ladder Slab – Concrete Outline – Sections – Sheet 4 of 5

174 33-D-61189 Fish Ladder Slab – Concrete Outline – Sections – Sheet 5 of 5

175 33-D-61190 Handling Facility Slab – Concrete Outline – Plan - El.

2137.67 – Sheet 1 of 6

176 33-D-61191 Handling Facility Slab – Concrete Outline – Plan El.

2136.00 – Sheet 2 of 6

177 33-D-61192 Handling Facility Slab – Concrete Outline – Sections – Sheet 3 of 6

178 33-D-61193 Handling Facility Slab – Concrete Outline – Sections – Sheet 4 of 6

179 33-D-61194 Handling Facility Slab – Concrete Outline – Sections – Sheet 5 of 6

180 33-D-61195 Handling Facility Slab – Concrete Outline – Section and Details – Sheet 6 of 6

181 33-D-61196 Typical Slab – Concrete Outline – Details

182 33-D-61197 Truck Loading Slab – Concrete Outline – Sections – Sheet 1 of 2

183 33-D-61198 Truck Loading Slab – Concrete Outline – Sections – Sheet 2 of 2

184 33-D-61200 Truck Ramp Concrete Outline – Plan, Key and Detail – Sheet 1 of 2

52 00 00 - 14

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

185 33-D-61201 Truck Ramp Concrete Outline – Sections – Sheet 2 of 2

186 33-D-61203 Entrance Slab – Concrete Outline – Plans and Sections

187 33-D-61204 Fish Ladder Slab – Reinforcement Design – Plan – El. 2132.67 – Sheet 1 of 5

188 33-D-61205 Fish Ladder Slab – Reinforcement Design – Plan – El. 2131.00 – Sheet 2 of 5

189 33-D-61206 Fish Ladder Slab – Reinforcement Design – Sections – Sheet 3 of 5

190 33-D-61207 Fish Ladder Slab – Reinforcement Design – Sections – Sheet 4 of 5

191 33-D-61208 Fish Ladder Slab – Reinforcement Design – Sections – Sheet 5 of 5

192 33-D-61209 Fish Ladder Slab – Reinforcement Design – Details – Sheet 1 of 2

193 33-D-61210 Handling Facility Slab – Reinforcement Design – Details – Sheet 2 of 2

194 33-D-61211 Handling Facility Slab – Reinforcement Design – Plan – Sheet 1 of 6

195 33-D-61212 Handling Facility Slab – Reinforcement Design – Plan – El. 2136.00 – Sheet 2 of 6

196 33-D-61213 Handling Facility Slab – Reinforcement Design – Sections – Sheet 3 of 6

197 33-D-61214 Handling Facility Slab – Reinforcement Design – Sections – Sheet 4 of 6

198 33-D-61215 Handling Facility Slab – Reinforcement Design – Sections – Sheet 5 of 6

199 33-D-61216 Handling Facility Slab – Reinforcement Design – Section – Sheet 6 of 6

52 00 00 - 15

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

200 33-D-61217 Truck Loading Slab – Reinforcement Design – Plans and Section – Sheet 1 of 2

201 33-D-61218 Truck Loading Slab – Reinforcement Design – Sections – Sheet 2 of 2

202 33-D-61220 Truck Ramp – Reinforcement Design – Plan – Sheet 1 of 2

203 33-D-61221 Truck Ramp – Reinforcement Design – Sections – Sheet 2 of 2

203A 33-D-61222 Concrete Outline and Reinforcement Design – Platform Foundation – Sections and Details

204 33-D-61223 Entrance Slab – Reinforcement Design – Plans and Sections

205 33-D-61224 Miscellaneous Slab – Concrete Outlines and Reinforcement

– Plans and Sections

206 33-D-61225 ADA Access Concrete – Outline and Reinforcement – Plan, Sections and Detail

206A 33-D-61225A Accessibility Sidewalks - Plan

207 33-D-61226 Transformer Slab – Concrete Outline and Reinforcement – Plan and Sections

208 33-D-61227 E-G Set Pad – Concrete Outline and Reinforcement – Plan and Sections

209 33-D-61228 Septic Waste Holding Tank Pad – Concrete Outline and Reinforcement – Plan and Sections

210 33-D-61229 JIB Crane – Foundation and Fish Screen Console Slab - Plans

Miscellaneous Metalwork:

211 33-D-61230 Miscellaneous Metalwork – General Plan – Part 1

212 33-D-61231 Miscellaneous Metalwork – General Plan – Part 2

213 33-D-61232 Miscellaneous Metalwork – Bulkhead Gate Platform – Plan, Sections and Details

52 00 00 - 16

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

214 33-D-61233 Miscellaneous Metalwork – Fish Ladder – Part 1 – Plan, Sections, and Details

215 33-D-61234 Miscellaneous Metalwork – Fish Ladder – Part 2 - Plan

216 33-D-61235 Miscellaneous Metalwork – Sump – Plan, Sections, and Detail

217 33-D-61236 Miscellaneous Metalwork – Chowder Platform – Plan and Sections

218 33-D-61237 Miscellaneous Metalwork – Lock Platform Supports – Plan, Details, and Section

219 33-D-61238 Miscellaneous Metalwork – Lock Platform Support – Plan and Section

220 33-D-61239 Miscellaneous Metalwork – Lock Platform – Access Stairs – Plans, Section, and Details

221 33-D-61240 Miscellaneous Metalwork – Lock Platform – Access Walkway – Plan, Sections, and Details

222 33-D-61241 Miscellaneous Metalwork – Stair S6 Landing – Plan, Sections, and Details

223 33-D-61242 Miscellaneous Metalwork – Connections – Sections and Details

224 33-D-61243 Miscellaneous Metalwork – Stair S1 and S3 – Plan and Sections

225 33-D-61244 Miscellaneous Metalwork – Stair S2 – Plan and Sections

226 33-D-61245 Miscellaneous Metalwork – Stairs S4.1, S4.2, S5.1, S5.2 and S6 – Plan, Sections, Details, and Table

227 33-D-61246 Miscellaneous Metalwork – Metal Guardrail – Typical Details and Sections

228 33-D-61247 Miscellaneous Metalwork – Metal Guardrail – Section and Detail

52 00 00 - 17

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

229 33-D-61248 Miscellaneous Metalwork – Pipe Guardrail – Typical Details and Sections

230 33-D-61249 Miscellaneous Metalwork – Pipe Handrail – Typical Details and Section

231 33-D-61250 Concrete Outline and Reinforcement Design – Platform Foundation – Sections and Details

Plumbing:

232 33-D-61260 Auxiliary Piping – Cover Sheet

233 33-D-61261 Auxiliary Piping – Domestic Water – Piping Schematic

234 33-D-61262 Auxiliary Piping – Service Water – Piping Schematic

235 33-D-61263 Auxiliary Piping – Domestic & Service – Water Plan

236 33-D-61264 Auxiliary Piping – Domestic & Service - Water Sections

237 33-D-61265 Auxiliary Piping – Alcove Partial Plan and Sections

238 33-D-61266 Auxiliary Piping – Process Drain – System Plan & Section

239 33-D-61267 Gravity Drainage System – Plan & Sections

240 33-D-61268 Sanitary Drain – Waste and Vent – Plan & Sections

Heating, Ventilating, and Air Conditioning:

241 33-D-61269 HVAC – Cover Sheet

242 33-D-61270 HVAC – Details, Schedules and Design Data

243 33-D-61271 HVAC – Floor Plan

Mechanical:

244 33-D-61129 Outlet Works – Deflector Panel – Assembly – List of Parts – Sheet 1 of 3

245 33-D-61130 Outlet Works – Defector Panel – Parts – Sections – Sheet 2 of 3

52 00 00 - 18

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

246 33-D-61131 Outlet Works – Deflector Panel – Parts – Sections – Sheet 3 of 3

247 33-D-61272 Oil/Water Separator Tank – Plan and Section

248 33-D-61273 Sanitary Waste Holding Tank – Plan and Section

249 33-D-61274 Oil/Water Separator – Tank & Sanitary Waste Holding Tank

– Plan

250 33-D-61275 Jib Crane – Installation

251 33-D-61276 Fish Screens – Installation – Plan – Elevation – Sheet 1 of 2

252 33-D-61277 Fish Screens – Sections – Sheet 2 of 2

253 33-D-61278 Diffuser Wall and Floor Panels – Installation Plan – Sheet 1 of 5

254 33-D-61279 Diffuser Wall and Floor Panels – Floor Diffusers – Sections

– Sheet 2 of 5

255 33-D-61280 Diffuser Wall and Floor Panels – Wall Diffusers – Sections

– Sheet 3 of 5

256 33-D-61281 Diffuser Wall and Floor Panels – Floor and Wall Diffuser Seats – Sheet 4 of 5

257 33-D-61282 Diffuser Wall and Floor Panels – Wall Diffuser Orifice Frame – Sheet 5 of 5

258 33-D-61283 Fish Ladder – Adjustable Weir Blade – Installation – Parts

259 33-D-61284 Stop-Planks and Seat Angles – Plan – Sections – Parts

260 33-D-61285 Stage 1 - Steel Intake and Discharge Pipes – Plan – Sheet 1

261 33-D-61286 Stage 1 - Steel Intake and Discharge Pipes – Plan, Section, and Details – Sheet 2

262 33-D-61287 Stage 1 - Steel Intake and Discharge Pipes – Sections and Details – Sheet 3

52 00 00 - 19

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

263 33-D-61288 Stage 1 - Steel Intake and Discharge Pipes – Plan, Sections and Details – Sheet 4

264 33-D-61289 Stage 1 - Steel Intake and Discharge Pipes – Sections and Details – Sheet 5

265 33-D-61290 Steel Intake and Discharge Pipes – Plan – Sheet 1

266 33-D-61291 Steel Intake and Discharge Pipes – Plan, Section, and Details

– Sheet 2

267 33-D-61292 Steel Intake and Discharge Pipes – Plan – Sheet 3

268 33-D-61293 Steel Intake and Discharge Pipes – Plan, Sections, and Details – Sheet 4

269 33-D-61294 Steel Intake and Discharge Pipes – Plan and Section – Sheet 5

270 33-D-61295 Steel Intake and Discharge Pipes – Plan, Sections, and Details – Sheet 6

271 33-D-61296 Steel Intake and Discharge Pipes – Sections and Details – Sheet 7

272 33-D-61297 Steel Intake and Discharge Pipes – Plan, Section, and Details

– Sheet 8

273 33-D-61298 Steel Intake and Discharge Pipes – Plan, Sections, and Detail

– Sheet 9

274 33-D-61299 Fish Ladder Bulkhead Gate – Installation – Assembly – Sheet 1 of 4

275 33-D-61300 Fish Ladder Bulkhead Gate – Sections – Sheet 2 of 4

276 33-D-61301 Fish Ladder Bulkhead Gate – Sections and Details – Sheet 3 of 4

277 33-D-61302 Fish Ladder Bulkhead Gate – Miscellaneous Parts – Sheet 4 of 4

278 33-D-61303 Fish Ladder Bulkhead Gate Seats and Guides – Installation – Assembly – List of Parts – Sheet 1 of 2

52 00 00 - 20

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

279 33-D-61304 Fish Ladder Bulkhead Gate Seats and Guides – Parts – Section – Sheet 2 of 2

280 33-D-61305 Slide Gate – Plan /Gate Table – Sheet 1

281 33-D-61306 Slide Gate – Entry Gate/Lock Drain Gate – Sheet 2

282 33-D-61307 Slide Gate – Drain and Lock Entrance Slide Gates – Sheet 3

283 33-D-61308 Slide Gate – Lock Entrance Gate – Sheet 4

284 33-D-61310 V-Gate – Assembly – Elevation – Plan – Sheet 1 of 3

285 33-D-61311 V-Gate – Parts – Sections – Sheet 2 of 3

286 33-D-61312 V-Gate – Parts – Sections – Sheet 3 of 3

287 33-D-61313 Horizontal Crowder – Elevation – Plan – List of Parts – Sheet 1 of 6

288 33-D-61314 Horizontal Crowder – Assembly – Installation – Sheet 2 of 6

289 33-D-61315 Horizontal Crowder – Assembly – Sheet 3 of 6

290 33-D-61316 Horizontal Crowder – Details – Parts – Sections – Sheet 4 of 6

291 33-D-61317 Horizontal Crowder – Details – Parts – Sections – Sheet 5 of 6

292 33-D-61318 Horizontal Crowder – Parts – Sheet 6 of 6

293 33-D-61319 Fish Lock False Floor and False Wall – Installation – Plan – Sheet 1 of 7

294 33-D-61320 Fish Lock False Floor and False Wall – Assembly – Installation – Sheet 2 of 7

295 33-D-61321 Fish Lock False Floor and False Wall – False Floor Assembly – Sheet 3 of 7

296 33-D-61322 Fish Lock False Floor and False Wall – Details – Parts – Sections – Sheet 4 of 7

52 00 00 - 21

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

297 33-D-61323 Fish Lock False Floor and False Wall – Parts – Sections – Sheet 5 of 7

298 33-D-61324 Fish Lock False Floor and False Wall – Parts – Sheet 6 of 7

299 33-D-61325 Fish Lock False Floor and False Wall – Parts – Sheet 7 of 7

300 33-D-61326 Hoist for Fish Lock False Floor

301 33-D-61327 Fish Lock Overflow – Elevation – Plan – List of Parts – Sheet 1 of 3

302 33-D-61328 Fish Lock Overflow – Details – Parts – Sections – Sheet 2 of 3

303 33-D-61329 Fish Lock Overflow – Parts – Sheet 3 of 3

304 33-D-61330 False Weir, Fish Transfer Flumes, and Fish Loading Pipes – Installation – Plan – Sheet 1 of 7

305 33-D-61331 False Weir, Fish Transfer Flumes, and Fish Loading Pipes – Section – Detail – Parts – Sheet 2 of 7

306 33-D-61332 False Weir, Fish Transfer Flumes, and Fish Loading Pipes – Section – Detail – Parts – Sheet 3 of 7

307 33-D-61333 False Weir, Fish Transfer Flumes, and Fish Loading Pipes – Section – Parts – Sheet 4 of 7

308 33-D-61334 False Weir, Fish Transfer Flumes, and Fish Loading Pipes – False Weir – Section – Detail – Sheet 5 of 7

309 33-D-61335 False Weir, Fish Transfer Flumes, and Fish Loading Pipes – Parts – Section – View – Sheet 6 of 7

310 33-D-61336 False Weir, Fish Transfer Flumes, and Fish Loading Pipes – Parts – Sheet 7 of 7

311 33-D-61337 Anesthesia Tank and Work Tables – Installation – Plan – Section – Sheet 1 of 2

312 33-D-61338 Anesthesia Tank and Work Tables – Parts – Section – Detail

– Sheet 2 of 2

52 00 00 - 22

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

313 33-D-61339 Water Level Measuring Devices – Plan View

Electrical:

314 33-D-61342 Single-Line Diagram – Facility Power Distribution

315 33-D-61343 480V Panel Schedules – DPA1 and DPA2

316 33-D-61344 208/120V Panel Schedules – LCA1, LCA2, LCA3 and

LCA4

317 33-D-61345 Schematic Diagram – Attraction Pumps 1 and 2

318 33-D-61346 Schematic Diagram – Facility Pump and Fish Ladder Pump

319 33-D-61347 Schematic Diagram – Lock Fill Pumps 1 and 2

320 33-D-61348 Schematic Diagram – Horizontal Crowder Gate and False Weir Pump

321 33-D-61350 Schematic Diagram – Main Control Panel CPL-1 – Sheet 1

322 33-D-61351 Schematic Diagram – Main Control Panel CPL-1 – Sheet 2

323 33-D-61352 Schematic Diagram –Control Panel CPL-2

324 33-D-61353 Schematic Diagram – Flipper Gates and CPL-3 Truck Fill Control Panel

325 33-D-61354 Schematic Diagram – Water Level Sensor – Control Panel

CPL-4

326 33-D-61355 Schematic Diagram – Miscellaneous Actuators – Sheet 1

327 33-D-61356 Schematic Diagram – Miscellaneous Actuators – Sheet 2

328 33-D-61358 Schematic Diagram – SCADA Interface – Sheet 1

329 33-D-61359 Schematic Diagram – SCADA Interface – Sheet 2

330 33-D-61360 Schematic Diagram – SCADA Interface – Sheet 3

331 33-D-61362 Electrical – SCADA – SCADA, Security, and Telephone Networks Overview

52 00 00 - 23

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

332 33-D-61363 Panel Layout – Main Control Panel – CPL-1

333 33-D-61364 Panel Layout – Main Control Panel – CPL-2

334 33-D-61365 Panel Layout – Main Control Panel – CPL-3

335 33-D-61366 Lighting Layout – Building

336 33-D-61367 Lighting and Receptacle Layout – Site Lighting

337 33-D-61368 Raceway and Equipment Layout - Notes

338 33-D-61369 Raceway and Equipment Layout – Interior

339 33-D-61370 Raceway and Equipment Layout – Exterior

340 33-D-61371 Site Grounding

Information Drawings:

340A 17-353B-01 Cle Elum Dam Fish Passage Facility Tunnel Shoring Design

– General Notes & Site Plan

340B 17-353B-02 Cle Elum Dam Fish Passage Facility Tunnel Shoring Design

– Section & Details

340C 17-353B-03 Cle Elum Dam Fish Passage Facility Tunnel Shoring Design

– Section & Details

341 32-D-205 Cle Elum Dam – Dam Spillway and Outlet Works – Plan and Sections

342 32-D-210 Cle Elum Dam – Spillway Chute Section

343 32-D-212 Cle Elum Dam – Spillway Stilling Basin – Wingwalls

344 32-D-213 Cle Elum Dam – Spillway Stilling Basin – Counterforts

345 32-D-300 Cle Elum Dam – Spillway Plan and Sections

346 32-D-301 Cle Elum Dam – Spillway Drainage System

347 32-D-302 Cle Elum Dam – Spillway Stilling Basin – Wall and Footings

52 00 00 - 24

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

348 32-D-303 Cle Elum Dam – Spillway Stilling Basin – Miscellaneous Details

349 32-D-304 Cle Elum Dam – Spillway Drainage Well – Plan and Section

350 32-D-306 Cle Elum Dam – Spillway Cantilever Walls – Reinforcement Bars

351 32-D-307 Cle Elum Dam – Spillway Stilling Basin Walls – Reinforcement

352 32-D-308 Cle Elum Dam – Spillway Counterforts and Footings – Reinforcement Bars

353 32-D-309 Cle Elum Dam – Spillway Floor and Drainage Well – Reinforcement

354 32-D-310 Cle Elum Dam – Spillway Stilling Basin – Steel Sheet Piling Cutoff

355 33-D-60053 Temporary Outfall – Plan, Profile and Section

356 33-D-60145 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel – Plan and Profile

357 33-D-60164 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel – Equipment Access Shaft Concrete Outline

358 33-D-60165 Cle Elum Dam Fish Passage Facility - Tunnel – Equipment Access Shaft Concrete Reinforcement

359 33-D-60518 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel Portal Access Road Excavation Plan and Profile

360 33-D-60519 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel Portal – Excavation Sections

361 33-D-60520 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel Portal Access Road Reinforcement Plan

362 33-D-60521 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Reinforcement – Elements and Details

52 00 00 - 25

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

363 33-D-60522 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel Portal Access Road Excavation Reinforcement Sections

364 33-D-60533 Juvenile Facility – Electrical - SCADA – SCADA, Security and Telephone Networks Overview (Revision 1)

365 33-D-60534 Juvenile Facility – Electrical - SCADA – Telephone System Riser Diagram (Revision 1)

366 33-D-60766 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Raceway Locations – Tunnel – Plan View

367 33-D-60767 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Raceway Locations – Tunnel – Elevation View

368 33-D-60792 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel – Site Plan

369 33-D-60808 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Raceway Locations – North Access Road

370 33-D-60809 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Raceway Locations – South Access Road

371 33-D-60810 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Raceway Locations – Notes and Sections

372 33-D-60829 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Single-Line Diagram – Access Road Power Distribution

372A 33-D-60148 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel – Dimensions, Excavation, and Downstream Portal

372B 33-D-60164 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel – Equipment Access Shaft Concrete Outline

372C 33-D-60165 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel – Equipment Access Shaft Concrete Reinforcement

372D 33-D-60518 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel Portal – Access Road Excavation – Plan and Profile

52 00 00 - 26

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

372E 33-D-60519 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel Portal – Excavation Sections

372F 33-D-60520 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel Portal – Access Road Reinforcement

372G 33-D-60521 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Reinforcement Elements and Details

372H 33-D-60522 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel – Access Road Excavation – Reinforcement Sections

372I 33-D-60766 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Raceway Locations – Tunnel – Plan View

372J 33-D-60767 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Raceway Locations – Tunnel – Elevation View

372K 33-D-60793 Cle Elum Dam Fish Passage Facility – Juvenile Facility – Tunnel Portal – Access Road Backfill – Plan and Profile

Standard Drawings:

373 40-D-4334 Electrical Installation – Typical Grounding Details – Sheet 1 of 2

374 40-D-4335 Electrical Installation – Typical Grounding Details – Sheet 2 of 2

375 40-D-4753 Electrical Installation – Typical Grounding Details for Switchyards and Substations

376 40-D-4874 Electrical Installation – Substation and Switchyard Platforms

– Grounding Details

377 40-D-5247 Buildings – Joints in Concrete Structures

378 40-D-5249 Construction Joint Keys

379 40-D-5370 Switchyards and Substations – Electrical Installation – Buried Insulated Cables – Typical Details

380 40-D-5599 Small Equipment Foundations

52 00 00 - 27

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

381 40-D-5732 Irrigation and Drainage Pumps – Laboratory and Field Testing – Measurement of Total Head

382 40-D-6032 Induction Motors – Design and Nameplate Data to be Furnished by Contractor

383 40-D-6182 Electrical Installation – Typical Cable Trench Grounding

384 40-D-6234 Standard Nameplates

385 40-D-6376 Transmission Lines – Fence Within Right-Of-Way – Typical Grounding Details

386 40-D-6571 Grout Agitator Used in Foundation and Grouting

387 40-D-6602 Miscellaneous Metalwork – Ladder – Type 3

388 40-D-6603 Miscellaneous Metalwork – Ladder – Type 4

389 40-D-7017 Chain Link Fencing – Chain Link Fencing Requirements – Concrete Installation

390 40-D-7018 Flange Support

391 40-D-7094 Electrical Installation – Conduit Clamp and Conduit Supports – Typical Details

391A 40-D-7095 Switchyards and Substations-Electrical Installation- Identification, Warning and Safety Signs

392 40-D-7100 Grout Manifold for Circulating Line System

393 40-D-7102 Standard and Typical Designs – Government Drawing Format – Drawing Border, Sample Title Bloc, and Signature Lines

394 40-D-60001 Standard and Typical Designs – Miscellaneous Metalwork – Electrical Equipment Support, Type I – Sections and Detail

395 40-D-60002 Standard and Typical Designs – Miscellaneous Metalwork – Typical Guard Posts – Non-Security Application

52 00 00 - 28

Table 52 00 00A - List of Drawings

Sheet No.

Drawing No. Title

396 40-D-60003 Standard and Typical Designs – Concrete Outline Reinforcement – General Notes for Concrete Outline and Reinforcement – Sheet 1 of 2

397 40-D-60004 Standard and Typical Designs – Concrete Outline Reinforcement – Minimum Requirements for Detailing Reinforcement – Sheet 2 of 2

398 104-D-254 Electrical Standards – Box Termination

399 104-D-286 Conduits

52 00 00 - 29

Table 52 00 00B - Drawings in Numerical Order

Drawing No. Sheet No.

17-353B-

17-353B-1 340A

17-353B-2 340B

17-353B-3 340C

32-D-

32-D-205 341

32-D-210 342

32-D-212 343

32-D-213 344

32-D-300 345

32-D-301 346

32-D-302 347

32-D-303 348

32-D-304 349

32-D-306 350

32-D-307 351

32-D-308 352

32-D-309 353

32-D-310 354

33-D-

33-D-60053 355

33-D-60145 356

33-D-60148 372A

33-D-60164 357

33-D-60164 For Information Only

372B

52 00 00 - 30

Table 52 00 00B - Drawings in Numerical Order

Drawing No. Sheet No.

33-D-60165 358

33-D-60165 For Information Only

372C

33-D-60518 359

33-D-60518 For Information Only

372D

33-D-60519 360

33-D-60519 For Information Only

372E

33-D-60520 361

33-D-60520 For Information Only

372F

33-D-60521 362

33-D-60521 For Information Only

372G

33-D-60522 363

33-D-60522 For Information Only

372H

33-D-60533 364

33-D-60534 365

33-D-60766 366

33-D-60766 For Information Only

372I

33-D-60767 367

52 00 00 - 31

Table 52 00 00B -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .