This is a Questions and Answers (Q&A) document from a federal solicitation for pavement work at Congaree Bus Parking Area. The document addresses five inquiries from contractors regarding project specifications and the proposal deadline.
The Q&A clarifies critical technical specifications: the mill and overlay requirement is 4 inches (resolving a discrepancy between documentation and bid schedule); pavement treatment materials are specified in Section 32 12 36 Seal Coat; pavement markings will be either Type H or Type B per Section 32 17 23; and the specified asphalt mixture must be bid as written, though substitutions of alternative materials such as Type C or B asphalt may be permitted upon submission of a Job Mix Formula (JMF), engineering justification, and potential cost credits for approval. The proposal due date has been extended to 27 August 2026 at 2:00 PM Mountain Time.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q1. Congaree Bus Parking Area: The documentation specifies a 3" mill and pave, but the bid schedule indicates 4". Could you please clarify the correct requirement?
A1. 4” Mill & Overlay .
Q2. Pavement Treatment: The terms "seal coat," "rejuvenation," and "slurry seal" are all used.
Could you please clarify the specific differences intended for this project?
A2. See Specification Section 32 12 36 Seal Coat for material as noted.
Q3. Pavement Marking: Could you please confirm whether the pavement marking should be fast-dry latex paint or thermoplastic?
A3. See Specification Section 32 17 23. Pavement Markings will either be Type H or Type B.
Q4. Asphalt Type: Can we use Type C or B asphalt if Superpave is unavailable?
A4. The Contractor must bid the specified mixture as part of the pricing. Substitutions may be permitted, but any substitution must be submitted for approval, accompanied by the alternate material's Job Mix Formula (JMF) for engineering review, justification for the proposed change, and any potential cost credit.
Q5. A contractor requested an extension to the proposal due date.
A5. The proposal due date is extended to 27 August 2026, 2PM MT.