This is an Individual NPDES Permit for Discharges of Stormwater Associated with Construction Activities issued by the Pennsylvania Department of Environmental Protection to the National Park Service – Delaware River National Recreation Area for the DEWA Route 209 MM 13-20 project located in Delaware Township and Dingman Township, Pike County. The permit authorizes stormwater discharge to Conashaugh Creek (HQ-CWF, MF), Unnamed Tributary to Delaware River (HQ-CWF, MF), and Delaware River (WWF, MF).

The permit became effective January 22, 2026, and expires January 21, 2031. The permittee must implement approved Erosion and Sediment Control (E&S) Plans and Post-Construction Stormwater Management (PCSM) Plans containing best management practices (BMPs) and stormwater control measures (SCMs) to minimize pollutant discharge. Key requirements include temporary and permanent site stabilization, construction dewatering management with turbidity limits of 50 NTUs or approved alternatives, pollution prevention measures addressing equipment washing and material storage, prohibition of concrete washout and construction waste discharges, weekly visual site inspections with post-storm event inspections within 24 hours, qualified personnel conducting inspections beginning December 8, 2025, licensed professional oversight of critical PCSM SCM construction stages, annual reporting to the County Conservation District by December 7, and annual permit fees of $500. The permittee must record legal instruments with the Recorder of Deeds identifying PCSM SCM locations and long-term operation and maintenance (O&M) responsibilities, conduct infiltration capacity confirmation testing for infiltration-based SCMs, and maintain records for three years following Notice of Termination approval.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3800-PM-BCW0408d Rev. 1/2025 COMMONWEALTH OF PENNSYLVANIA Permit DEPARTMENT OF ENVIRONMENTAL PROTECTION

BUREAU OF CLEAN WATER

- 1 -

AUTHORIZATION TO DISCHARGE UNDER THE

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

INDIVIDUAL PERMIT FOR DISCHARGES OF

STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITIES

NPDES PERMIT NO: PAD520062

In compliance with the provisions of the Clean Water Act, 33 U.S.C.A. §§ 1251--1387 and the Clean Streams Law, as amended, 35 P.S. §§ 691.1--691.1001, National Park Service – Delaware River National Recreation Area 1978 River Road

Bushkill, PA 18324

(permittee) is authorized to discharge from a project site known as DEWA Route 209 MM 13-20, located in Delaware Township and Dingman Township, Pike County to Conashaugh Creek (HQ-CWF, MF), Unnamed Tributary to Delaware River (HQ-CWF, MF), and Delaware River (WWF, MF) in accordance with the effluent limitations, monitoring and reporting requirements, best management practices (BMPs), stormwater control measures (SCMs) and other conditions set forth in Parts A, B, and C herein.

THIS PERMIT SHALL BECOME EFFECTIVE ON JANUARY 22, 2026

THIS PERMIT SHALL EXPIRE AT MIDNIGHT ON JANAUARY 21, 2031

The authority granted by this permit is subject to the following further qualifications:

1. If there is a conflict between the application, its supporting documents and/or amendments and the terms and conditions of this permit, the terms and conditions shall apply.

2. Failure to comply with the terms, conditions or effluent limitations of this permit is grounds for enforcement action;

for permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application. (40 CFR 122.41(a))

3. A complete application for renewal of this permit, or notice of intent to cease discharging by the expiration date, must be submitted to DEP at least 180 days prior to the above expiration date (unless permission has been granted by DEP for submission at a later date), using the appropriate NPDES permit application form. (40 CFR 122.41(b), 122.21(d))

In the event that a timely and complete application for renewal has been submitted and DEP is unable, through no fault of the permittee, to reissue the permit before the above expiration date, the terms and conditions of this permit will be automatically continued and will remain fully effective and enforceable against the discharger until DEP takes final action on the pending permit application. (25 Pa. Code §§ 92a.7(b), (c))

ISSUANCE DATE: Pamela R. Kania, P.E.

Environmental Program Manager

JANUARY 22, 2026 Northeast Regional Office

3800-PM-BCW0408d Rev. 1/2025 Permit

- 2 -

PART A

EFFLUENT LIMITATIONS, MONITORING AND REPORTING REQUIREMENTS

I. DEFINITIONS

Antidegradation Best Available Combination of Technologies (ABACT) means environmentally sound and cost-effective treatment, land disposal, pollution prevention and stormwater re-use BMPs that individually or collectively manage the difference in the net change in stormwater volume, rate, and quality for storm events up to and including the 2 year/24 hour storm when compared to the stormwater rate, volume, and quality prior to the earth disturbance activities to maintain and protect the existing quality of the receiving surface waters of this Commonwealth. (25 Pa. Code § 102.1)

Accelerated Erosion means the removal of the surface of the land through the combined action of human activities and the natural processes, at a rate greater than would occur because of the natural process alone.

(25 Pa. Code § 102.1)

Best Management Practices (BMPs) means activities, facilities, measures, planning, or procedures used to minimize accelerated erosion and sedimentation and manage stormwater to protect, maintain, reclaim, and restore the quality of waters and the existing and designated uses of waters of this Commonwealth before, during, and after earth disturbance activities. (25 Pa. Code § 102.1)

Clean Fill means uncontaminated, nonwater-soluble, nondecomposable, inert solid material used to level an area or bring an area to grade. The term does not include materials placed in or on the waters of the Commonwealth.

Although the placement of clean fill in or on waters of the Commonwealth cannot be managed under this policy, placement of clean fill in or on waters of the Commonwealth may be approved under a separate DEP authorization.

The term includes only those materials that are identified as “fill,” as the term is defined in this policy. The term does not include fill that has been blended, mixed or treated with the purpose of meeting the definition of “clean fill” and that without being blended, mixed or treated would fail to meet the numeric limits identified in the definition of “uncontaminated material” contained in this policy.

Clean Streams Law means the Act of June 22, 1937, P.L. 1987, No. 394, as amended.

(35 P.S. §§ 691.1--691.1001)

Clean Water Act means the Federal Water Pollution Control Act, as amended. (33 U.S.C.A. §§ 1251--1387)

Combined Sewer System means a sewer system that has been designed to serve as both a sanitary sewer and a storm sewer. (25 Pa. Code § 92a.2)

Co-Permittee means a person identified on the Authorization to Discharge page of this permit as responsible for the discharges of stormwater associated with construction activity who is jointly and individually responsible together with the permittee for compliance with all terms and conditions of this permit and applicable laws.

County Conservation District (CCD) means a conservation district, as defined in Section 3(c) of the Conservation District Law (3 P.S. § 851(c)), which has the authority under a delegation agreement executed with DEP to administer and enforce all or a portion of the erosion, sediment, and stormwater management program in this Commonwealth. (25 Pa. Code § 102.1)

Critical Stages means the installation of underground treatment BMPs, structurally engineered BMPs, or other BMPs or components thereof as deemed appropriate by DEP or a CCD and that require the oversight of a licensed professional or designee.

DEP means the Department of Environmental Protection.

Designated uses means those uses specified in 25 Pa. Code §§ 93.4(a) and 93.9a--93.9z for each water body or segment, whether or not they are being attained, to be achieved as part of Pennsylvania’s water quality standards.

(25 Pa. Code § 93.1)

Designee means a licensed professional as defined in this permit or someone acting on behalf of a licensed professional who has knowledge, skill, experience, training and education in the field of engineering, landscape

- 3 -architecture, geology, or land surveying that is beyond that possessed by a layperson and upon which a licensed professional can rely upon to provide oversight of critical stages of PCSM Plan implementation. A designee must be independent from the operator co-permittee(s) responsible for the construction or installation of SCMs on a project site.

Dewatering means the act of draining accumulated stormwater and/or groundwater from building foundations, vaults, and trenches, or other similar points of accumulation.

Disturbed area means unstabilized land area where an earth disturbance activity is occurring or has occurred.

(25 Pa. Code § 102.1)

Earth Disturbance Activity means a construction or other human activity which disturbs the surface of the land, including land clearing and grubbing, grading, excavations, embankments, land development, agricultural plowing or tilling, operation of animal heavy use areas, timber harvesting activities, road maintenance activities, oil and gas activities, well drilling, mineral extraction, and the moving, depositing, stockpiling, or storing of soil, rock, or earth materials. (25 Pa. Code § 102.1)

Environmental Due Diligence means investigative techniques, including visual property inspections, electronic database searches, review of ownership and use history of property, Sanborn maps, environmental questionnaires, transaction screens, analytical testing, and environmental assessments or audits.

EPA means the United States Environmental Protection Agency.

Erosion means the natural process by which the surface of the land is worn away by water, wind, or chemical action. (25 Pa. Code § 102.1)

Erosion and Sediment Control Plan (E&S Plan) – A site-specific plan consisting of both drawings and a narrative that identifies BMPs to minimize accelerated erosion and sedimentation before, during, and after earth disturbance activities. (25 Pa. Code § 102.1)

Exceptional Value Waters means surface waters of high quality which satisfy 25 Pa. Code § 93.4b(b) (relating to antidegradation). (25 Pa. Code § 93.1)

Existing uses means those uses actually attained in the water body on or after November 28, 1975, whether or not they are included in Pennsylvania’s water quality standards. (25 Pa. Code § 93.1)

Impaired Waters means surface waters that fail to attain one or more of its designated uses under 25 Pa. Code Chapter 93 and is listed in Categories 4 and 5 of Pennsylvania’s Integrated Report.

Integrated Water Quality Monitoring and Assessment Report (Integrated Report) means DEP’s report on the conditions of Pennsylvania’s surface waters to satisfy Sections 305(b) and 303(d) of the Clean Water Act when approved by EPA.

Intermittent stream means a body of water flowing in a channel or bed composed primarily of substrates associated with flowing water which, during periods of the year, is below the local water table and obtains its flow from both surface runoff and groundwater discharges. (25 Pa. Code § 102.1)

High Quality Waters means surface waters having quality which exceeds levels necessary to support propagation of fish, shellfish, and wildlife and recreation in and on the water by satisfying 25 Pa. Code § 93.4b(a).

(25 Pa. Code § 93.1)

Infiltration-based SCM means an SCM that principally functions by allowing stormwater to infiltrate through the bottom and/or sides of the SCM to the subsurface environment.

Licensed Professional means professional engineers, landscape architects, geologists, and land surveyors licensed to practice in the Commonwealth. (25 Pa. Code § 102.1)

Long-Term Operation and Maintenance (O&M) means the routine inspection, maintenance, repair, or replacement of a BMP to ensure proper function for the duration of time that the BMP is needed. (25 Pa. Code § 102.1)

- 4 -

Municipal Separate Storm Sewer System (MS4) means all separate storm sewers that are defined as “large” or “medium” or “small” municipal separate storm sewer systems pursuant to 40 CFR §§ 122.26(b)(4), (b)(7), and (b)(16), respectively, or designated under 40 CFR § 122.26(a)(1)(v). (25 Pa. Code § 92a.32(a) and 40 CFR § 122.26(b)(18))

Municipality means a county, city, borough, town, township, school district, institution, or authority, or another public body created by or pursuant to State Law. For the purposes of this definition, town includes an incorporated town.

(25 Pa. Code § 102.1)

Notice of Termination (NOT) – A request, on a form provided by DEP, to terminate coverage under a General NPDES Permit for Discharges of Stormwater Associated with Construction Activities. (25 Pa. Code § 102.1)

Non-discharge alternative – Environmentally sound and cost effective BMPs that individually or collectively eliminate the net change in stormwater volume, rate, and quality for stormwater events up to and including the 2-year/24-hour storm when compared to the stormwater rate, volume, and quality prior to the earth disturbance activities to maintain and protect the existing quality of the receiving surface waters of this Commonwealth.

(25 Pa. Code § 102.1)

Non-Stormwater Discharges means discharges that do not originate from storm events, which may include, but are not limited to, discharges of air conditioner condensate, non-contact cooling water, pavement wash water, external building washdown, irrigation water, or uncontaminated ground water or spring water.

Off-Site Construction Support Activities or Off-Site Support Activities means activities providing support for construction and earth disturbance activities covered by this permit, including but not limited to concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas (spoil), borrow areas, stockpiling of topsoil, transfer of topsoil to other locations, and turnaround areas.

Operator or Operator Co-Permittee means a person who has one or more of the following: (i) oversight responsibility of earth disturbance activity on a project site or a portion thereof who has the ability to make modifications to the E&S Plan, PCSM Plan or site specifications, (ii) day-to-day operational control over earth disturbance activity on a project site or a portion thereof to ensure compliance with the E&S Plan or PCSM Plan.

(25 Pa. Code § 102.1)

Owner means a person who holds the legal title to the land subject to construction activity. This term also includes the person who held legal title to the land subject to construction activity at the time such activity was commenced on a site.

PCSM SCM means an SCM that is designed and implemented to satisfy the requirements of 25 Pa. Code § 102.8(g).

Perennial stream means a body of water flowing in a channel or bed composed primarily of substrates associated with flowing waters and capable, in the absence of pollution or other manmade stream disturbances, of supporting a benthic macro-invertebrate community which is composed of two or more recognizable taxonomic groups of organisms which are large enough to be seen by the unaided eye and can be retained by a United States Standard No. 30 sieve (28 meshes per inch, 0.595 mm openings) and live at least part of their life cycles within or upon available substrates in a body of water or water transport system. (25 Pa. Code § 102.1)

Permittee means a person who has coverage under this permit.

Permanent Stabilization means long-term protection of soil and water resources from accelerated erosion.

(25 Pa. Code § 102.1)

Person – Any operator, individual, public or private corporation, partnership, association, municipality or political subdivision of this Commonwealth, institution, authority, firm, trust, estate, receiver, guardian, personal representative, successor, joint venture, joint stock company, fiduciary; Department, agency or instrumentality of state, federal, or local government, or an agent or employee thereof; or any other legal entity. Whenever used in any clause prescribing and imposing a penalty, or imposing a fine or imprisonment or both, the term "person" may not exclude the members of an association and the directors, officers, or agents of a corporation.

(25 Pa. Code § 102.1)

- 5 -

Point Source means any discernable, confined, and discrete conveyance, including, but not limited to, any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, Concentrated Aquatic Animal Production Facility (CAAP), Concentrated Animal Feeding Operation (CAFO), landfill leachate collection system, or vessel, or other floating craft, from which pollutants are or may be discharged. (25 Pa. Code § 92a.2)

Post-Construction Stormwater means stormwater associated with a project site after the earth disturbance activity has been completed and the project site is permanently stabilized.

Post-Construction Stormwater Management Plan (PCSM Plan) means a site-specific plan consisting of both drawings and a narrative that identifies BMPs to manage changes in stormwater runoff volume, rate, and water quality after earth disturbance activities have ended and the project site is permanently stabilized.

(25 Pa. Code § 102.1)

Preparedness, Prevention, and Contingency Plan (PPC Plan) means a written plan that identifies an emergency response program, material and waste inventory, spill and leak prevention and response, inspection program, housekeeping program, security and external factors, and that is developed and implemented at the construction site to control potential discharges of pollutants other than sediment into waters of this Commonwealth.

(25 Pa. Code § 102.1)

Project Site means the entire area of activity, development, lease, or sale including: (i) the area of the earth disturbance activity; (ii) the area planned for the earth disturbance activity; and (iii) Other areas which are not subject to earth disturbance activity. (25 Pa. Code § 102.1)

Record Drawings means drawings that wholly and accurately depict as-built conditions of a project site following completion of an earth disturbance activity including but not limited to land covers, structures, grades, and SCMs and components thereof.

Regulated Fill means fill, as the term is defined in DEP’s Management of Fill Policy (DEP ID No. 258-2182-773), that has been affected by release of a regulated substance and is not “uncontaminated material,” as the term is defined in this policy. The term does not include fill that has been blended, mixed or treated with the purpose of meeting the definition of “regulated fill” and that without being blended, mixed or treated would fail to meet the regulated fill concentration limits, as the term is defined in this policy.

Snowmelt means the conversion of snow into overland stormwater and ground water flow as a result of warmer temperatures.

Stabilization means the proper placing, grading, constructing, reinforcing, lining, and covering of soil, rock, or earth to ensure their resistance to erosion, sliding, or other movement. (25 Pa. Code § 102.1)

Stormwater means runoff from precipitation, snowmelt, surface runoff, and drainage. (25 Pa. Code § 102.1)

Stormwater Control Measure (SCM) means any natural feature or manmade structure designed or utilized to reduce or manage the volume, pollutant load, and/or the peak rate of stormwater runoff. SCMs are BMPs that are implemented to treat stormwater from impervious surfaces and/or post-construction stormwater.

Structural PCSM SCM means a PCSM SCM that is a manmade structure used to manage post-construction stormwater, including but not limited to infiltration-based SCMs.

Surface Waters means perennial and intermittent streams, rivers, lakes, reservoirs, ponds, wetlands, springs, natural seeps, and estuaries, excluding water at facilities approved for wastewater treatment such as wastewater treatment impoundments, cooling water ponds, and constructed wetlands used as part of a wastewater treatment process. (25 Pa. Code § 102.1)

Total Maximum Daily Load (TMDL) means the sum of the individual wasteload allocations for point sources, load allocations for nonpoint sources and natural quality, and a margin of safety expressed in terms of mass per time, toxicity, or other appropriate measures. (25 Pa. Code § 96.1)

Toxic Pollutant (Toxics) means those pollutants, or combinations of pollutants, including disease-causing agents, which after discharge and upon exposure, ingestion, inhalation or assimilation into any organism, either directly

- 6 -from the environment or indirectly by ingestion through food chains may, on the basis of information available to DEP cause death, disease, behavioral abnormalities, cancer, genetic mutations, physiological malfunctions, including malfunctions in reproduction, or physical deformations in these organisms or their offspring.

(25 Pa. Code § 92a.2)

Wasteload Allocation (WLA) means the portion of a surface water’s loading capacity that is allocated to existing and future point source discharges. (25 Pa. Code § 96.1)

Waters of this Commonwealth means rivers, streams, creeks, rivulets, impoundments, ditches, watercourses, storm sewers, lakes, dammed water, wetlands, ponds, springs, and other bodies or channels of conveyance of surface and underground water, or parts thereof, whether natural or artificial, within or on the boundaries of this Commonwealth. (25 Pa. Code § 102.1)

Wetlands means areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions, including swamps, marshes, bogs, and similar areas.

(25 Pa. Code § 105.1)

II. EFFLUENT LIMITATIONS

A. This permit establishes effluent limitations through the implementation of BMPs, including E&S BMPs and PCSM SCMs, to reduce the discharge of pollutants in stormwater discharges associated with construction activities. All stormwater discharges must comply with all applicable requirements established in accordance with 25 Pa. Code Chapters 91-96, 102, and 105 of DEP's rules and regulations. Permittees must implement BMPs exceeding those identified in approved E&S and PCSM Plans to protect and maintain water quality when notified in writing to do so by DEP/CCD.

B. BMPs and SCMs.

1. The permittee must design, install, and maintain E&S BMPs and PCSM SCMs, as identified in the approved E&S and PCSM Plans, respectively, to minimize the discharge of pollutants. At a minimum, such BMPs and SCMs must be designed, installed, and maintained to: (25 Pa. Code § 102.11(c) and 40 CFR § 450.22(c))

a. Control stormwater volume and velocity to minimize soil erosion in order to minimize pollutant discharges.

b. Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize channel and streambank erosion and scour in the immediate vicinity of discharge points.

c. Minimize the amount of soil exposed during construction activity.

d. Minimize the disturbance of slopes exceeding 15%.

e. Minimize sediment discharges from the site. The design, installation and maintenance of E&S BMPs must address factors such as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soil particle sizes expected to be present on the site.

f. Provide and maintain natural buffers around surface waters of the Commonwealth, direct stormwater to vegetated areas and maximize stormwater infiltration to reduce pollutant discharges, unless infeasible.

g. Avoid or minimize soil compaction in all areas where SCMs utilizing infiltration to manage stormwater is proposed. If the areas planned for infiltration SCMs are compromised through compaction or other means, the permittee must conduct soil testing to verify that the SCM will perform as designed and implement measures to decompact the soils, as applicable.

h. Preserve topsoil unless the intended function of a specific area of the project site dictates that the topsoil be disturbed or removed.

- 7 -

2. Site Stabilization. (25 Pa. Code § 102.22)

a. Temporary Stabilization.

(i) Upon temporary cessation of an earth disturbance activity or any stage or phase of an activity where a cessation of earth disturbance activities will exceed four (4) days, the site must be immediately seeded, mulched, or otherwise protected from accelerated erosion and sedimentation pending future earth disturbance activities.

(ii) For an earth disturbance activity or any stage or phase of an activity to be considered temporarily stabilized, the disturbed areas must be covered with one of the following:

(1) A minimum uniform coverage of mulch and seed, with a density capable of resisting accelerated erosion and sedimentation.

(2) An acceptable BMP which temporarily minimizes accelerated erosion and sedimentation.

b. Permanent Stabilization – Upon final completion of an earth disturbance activity or any stage or phase of an activity, the site must immediately have topsoil restored, replaced, or amended, seeded, mulched or otherwise permanently stabilized and protected from accelerated erosion and sedimentation.

(i) E&S BMPs must be implemented and maintained until the permanent stabilization is completed.

Once permanent stabilization has been established, the temporary E&S BMPs must be removed or converted to PCSM SCMs. Any areas disturbed in the act of removing temporary E&S BMPs must be permanently stabilized upon completion of the temporary E&S BMP removal or conversion activity.

(ii) For an earth disturbance activity or any stage or phase of an activity to be considered permanently stabilized, the disturbed areas must be covered with one of the following:

(1) A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation.

(2) An acceptable BMP which permanently minimizes accelerated erosion and sedimentation.

c. The permittee may not utilize seed mixtures containing invasive species or species that may be harmful to native plant communities.

3. Discharges from dewatering activities, including discharges from dewatering of trenches and excavations, are prohibited unless managed as follows: (25 Pa. Code § 102.11(c) and 40 CFR § 450.22(e))

a. The permittee must utilize upland vegetated areas of the project site to infiltrate construction dewatering water prior to discharge, to the extent feasible.

b. For construction dewatering water that cannot be infiltrated in accordance with paragraph 3.a, above, construction dewatering water must be treated by an approved series of two or more BMPs prior to discharge to surface waters to reduce discharges with visual turbidity, unless the permittee can document that the outflow from a single BMP will achieve a turbidity of 50 Nephelometric Turbidity Units (NTUs) or less and receives written approval from DEP/CCD.

c. The permittee must notify in writing DEP/CCD at least seven (7) days prior to discharges if the permittee has reason to believe that dewatering water may contain pollutants other than sediment.

The permittee must collect sample(s) of the dewatering water and analyze the water for the pollutants specified by DEP/CCD when notified by DEP/CCD in writing. If the dewatering water is found by the permittee or DEP/CCD to contain concentrations of pollutants exceeding numeric water quality criteria under Chapter 93 or may otherwise adversely affect surface waters, DEP/CCD may require the permittee to cease discharging and submit an application for an individual permit.

- 8 -

d. The permittee must use an oil-water separator or suitable filtration device that is designed to remove oil, grease, or other products if dewatering water is found to contain those materials.

e. The permittee must collect and dispose of materials and substances collected by filtration devices and backwash from these devices off-site unless otherwise authorized by DEP/CCD.

4. The permittee must design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. At a minimum, such measures must be designed, installed, implemented, and maintained to: (25 Pa. Code § 102.11(c) and 40 CFR § 450.22(f))

a. Prevent the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated or otherwise controlled prior to discharge.

b. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the project site to precipitation and to stormwater. Minimization of exposure is not required in cases where the exposure to precipitation and to stormwater will not result in a discharge of pollutants, or where exposure of a specific material or product poses little risk of stormwater contamination (such as final products and materials intended for outdoor use).

c. Prevent the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures. The permittee must prepare and implement a Preparedness, Prevention, and Contingency (PPC) Plan when storing, using, or transporting materials including:

fuels, chemicals, solvents, pesticides, fertilizers, lime, petrochemicals, wastewater, wash water, core drilling wastewater, cement, sanitary wastes, solid wastes, or hazardous materials onto, on, or from the project site during earth disturbance activities. The PPC Plan must be available upon request by DEP/CCD. (25 Pa. Code § 102.5(l))

5. The permittee may not discharge the following:

a. Wastewater from washout of concrete. (25 Pa. Code § 102.11(c))

b. Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials. (25 Pa. Code § 102.11(c))

d. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance.

(25 Pa. Code § 102.11(c))

e. Soaps or solvents used in vehicle and equipment washing. (25 Pa. Code § 102.11(c))

f. Floating solids, scum, sheen or substances that result in observed deposits in the receiving water, and foam or substances that produce an observable change in the color, taste, odor or turbidity of the receiving water. (25 Pa. Code § 92a.41(c))

g. Substances in concentration or amounts sufficient to be inimical or harmful to the water uses to be protected or to human, animal, plant or aquatic life. (25 Pa. Code § 93.6(a))

6. The permittee shall utilize outlet structures that withdraw water from the surface when discharging from basins and impoundments, unless infeasible. (25 Pa. Code § 102.11(c) and 40 CFR § 450.22(h))

- 9 -

III. MONITORING, REPORTING, AND RECORDKEEPING

A. When stormwater samples are collected and analyzed or measurements are taken under this permit, the permittee must ensure:

1. Samples and measurements taken for the purpose of monitoring are representative of the monitored activity. (25 Pa. Code § 92a.3(c) and 40 CFR § 122.41(j)(1))

2. Records of monitoring information includes: (25 Pa. Code § 92a.3(c) and 40 CFR § 122.41(j)(3))

a. The date, exact place, and time of sampling or measurements.

b. The individual(s) who performed the sampling or measurements.

c. The date(s) analyses were performed.

d. The individual(s) who performed the analyses.

e. The analytical techniques or methods used.

f. The results of such analyses.

3. Monitoring is conducted according to test procedures approved under 40 CFR Part 136 unless another method is required under 40 CFR Subchapters N or O. (25 Pa. Code § 92a.3(c) and 40 CFR § 122.41(j)(4))

4. Sampling and analysis of samples meet proper quality assurance and quality control (QA/QC) procedures.

(25 Pa. Code §§ 92a.3(c), 92a.41(a), 92a.61(i) and 40 CFR §§ 122.41(e), 122.41(i)(3), 122.41(i)(4))

B. Records Retention.

1. The permittee must retain all records of monitoring activities and results, copies of all plans and reports required by this permit, and records of all data used to complete the application for this permit for at least three (3) years from the date of the Notice of Termination (NOT) approval. The permittee must submit such records to DEP/CCD or EPA upon request. (25 Pa. Code § 92a.3(c) and 40 CFR § 122.41(j)(2))

2. The permittee must retain a physical or electronic copy of the following documents on-site during earth disturbance activities at all times, and must make this information available for review and inspection by DEP/CCD or EPA during all stages of the earth disturbance activity: this permit, the application submitted for permit coverage, all attachments to the application, and the E&S Plan, PCSM Plan, and PPC Plan, as applicable.

C. Inspection and Oversight Requirements. (25 Pa. Code § 102.4(b)(5)(x))

1. Site Inspections – The permittee must conduct visual site inspections throughout the duration of construction and until the NOT has been approved by DEP/CCD (unless otherwise approved in writing by DEP/CCD), at the following frequencies:

- Routine Inspections must be conducted weekly.

- Post-Storm Event Inspections must be conducted within 24 hours after the conclusion of each measurable storm event (i.e., precipitation in an amount of 0.25 inch or greater over a 24-hour period) or the occurrence of snowmelt sufficient to cause a discharge.

- Corrective Action Inspections must be conducted anytime the permittee observes a deficiency in implementation of the E&S or PCSM Plans.

a. The permittee must document each site inspection on DEP’s Chapter 102 Visual Site Inspection

Report (3800-FM-BCW0271d) or alternative document or electronic form that collects and retains identical information. All requested information on the Visual Site Inspection Report must be completed as instructed. The permittee must take color photographs of E&S BMPs and PCSM SCMs on the project site at least monthly, unless otherwise approved in writing by DEP/CCD, and when deficiencies in BMPs and SCMs are identified. The photographs must have a date and time stamp and be made available for DEP/CCD review upon request.

b. The permittee must make Visual Site Inspection Reports available upon request during inspections, submit and provide copies of Visual Site Inspection Reports to DEP/CCD upon request, and submit

- 10 -

Visual Site Inspection Reports to DEP/CCD as part of the notification requirements identified in Paragraph III.D.3, below.

c. Effective December 8, 2025, site inspections must be performed and Visual Site Inspection Reports must be completed by qualified personnel that are trained and experienced in E&S BMP and PCSM SCM construction, function, and maintenance and are familiar with the E&S and PCSM Plans for the project site. A person is qualified when one or more of the following conditions are satisfied:

(i) They have completed the Qualified Site Inspector Training Program in DEP’s Clean Water

Academy initially and every two years thereafter;

(ii) They hold active certification as a Certified Professional in Erosion and Sediment Control (CPESC) or as a Certified Erosion, Sediment, and Stormwater Inspector (CESSWI) from a recognized organization; or

(iii) They can demonstrate to the satisfaction of DEP/CCD that they have qualifications equivalent to or exceeding those identified in Paragraphs (i) or (ii). If this option is selected, the person must submit documentation of their training and experience to DEP/CCD and receive written approval from DEP/CCD prior to conducting site inspections, unless waived by DEP/CCD.

For site inspectors satisfying Paragraph (i) or (ii), the permittee must provide documentation (e.g., completion certificate) of the inspector’s qualifications upon the request of DEP/CCD.

d. To determine if a storm event of 0.25 inch or greater has occurred on a project site, the permittee must either maintain a rain gauge on-site or obtain storm event information from a weather station that is representative of the project site location.

2. Licensed Professional Oversight of Critical Stages (25 Pa. Code § 102.8(k))

a. The permittee must ensure that a licensed professional or a designee is present on-site and is responsible for oversight of critical stages of implementation of approved PCSM SCMs, unless the project meets the requirements of 25 Pa. Code § 102.8(n) and does not include PCSM SCMs. The critical stages that must receive licensed professional oversight are identified in the approved PCSM Plan.

b. The permittee must document the implementation of each structural PCSM SCM using DEP’s SCM Construction Certification Form (3800-FM-BCW0271j) and submit the completed form to DEP/CCD within 30 days of the completion of SCM construction, as determined by a licensed professional. The form must be signed by the licensed professional responsible for oversight of critical stages.

D. Reporting and Fee Requirements.

1. Annual Report.

a. The permittee shall submit a complete Annual Report to the CCD by December 7 each year using DEP's Annual Report template (3800-PM-BCW0405e). The Annual Report must address activities under this permit for the reporting period of October 1 – September 30.

b. The first annual report is due on December 7, 2027, and shall cover the period from permit issuance to December 2026. Following the first annual report, the reporting period shall thereafter be October 1 – September 30, and the report shall be due by December 7.

c. The permittee must submit the Annual Report to DEP/CCD in electronic format upon receipt of written notification from DEP/CCD.

2. Annual Fee. (25 Pa. Code § 92a.62)

a. Permittees shall pay an annual fee in accordance with 25 Pa. Code § 92a.62. As of the effective date of this permit, the facility covered by the permit is classified in the Chapter 102 Individual NPDES Permit fee category, which has an annual fee of $500.

- 11 -

b. Invoices for annual fees will be mailed to permittees approximately three months prior to the due date. In the event that an invoice is not received, the permittee is nonetheless responsible for payment.

Permittees may contact DEP’s Bureau of Clean Water at 717-787-6744 with questions related to annual fees. The fee identified above is subject to change if DEP publishes changes to 25 Pa. Code § 92a.62.

c. Payment for annual fees shall be remitted to DEP at the address below or through DEP’s electronic payment system (www.depgreenport.state.pa.us/NPDESpay) by the due date specified on the invoice.

Checks, if used for payment, should be made payable to the Commonwealth of Pennsylvania.

PA Department of Environmental Protection Bureau of Clean Water Re: Chapter 92a Annual Fee P.O. Box 8466 Harrisburg, PA 17105-8466

d. This section does not apply to any Federal or State agency or independent State commission that provides funding for program administration by DEP through terms and conditions of a mutual agreement and is exempt from fees in accordance with 25 Pa. Code § 102.6(b)(4).

3. Unanticipated Non-Compliance or Potential Pollution Reporting

a. Immediate Reporting – The permittee must immediately report any incident causing or threatening pollution in accordance with the requirements of 25 Pa. Code §§ 91.33 and 92a.41(b) listed below:

(i) If, because of an accident or other activity or incident, a toxic substance or another substance is discharged which would endanger downstream users of the water receiving the discharge or would otherwise result in pollution or create a danger of pollution or would damage property, the permittee must immediately notify DEP by telephone of the location and nature of the danger.

Verbal notification to DEP is required as soon as possible, but no later than four (4) hours after the permittee becomes aware of the incident causing or threatening pollution. Emergency response phone numbers for DEP are available on DEP’s website (www.dep.pa.gov, select “Report an Incident”).

(ii) The permittee must immediately notify known downstream users of the waters of the

Commonwealth to which the substance was discharged if notice is reasonably possible. Notice must include the location and nature of the danger.

(iii) The permittee must immediately take or cause to be taken steps necessary to prevent injury to property and downstream users of the waters from pollution or a danger of pollution and, in addition, within 15 days from the incident, must remove the residual substances contained thereon or therein from the ground and from the affected waters of this Commonwealth to the extent required by applicable law.

b. The permittee must report any non-compliance to DEP/CCD which may endanger health or the environment in accordance with the requirements of 40 CFR § 122.41(l)(6) (incorporated by 25 Pa.

Code § 92a.3(c)). These requirements include the following obligations:

(i) 24-Hour Reporting – The permittee must verbally report any non-compliance with this permit to

DEP/CCD that may endanger health or the environment within 24 hours from the time the permittee becomes aware of the circumstances.

(ii) Written Report – A written submission must also be provided to DEP/CCD within five (5) days of the time the permittee becomes aware of any non-compliance that may endanger health or the environment. The written submission must contain a description of the non-compliance and its cause; the period of non-compliance, including exact dates and times, and if the non-compliance has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the non-compliance. The written submission must include a Visual Site Inspection Report that documents the incident.

http://www.depgreenport.state.pa.us/NPDESpay http://www.dep.pa.gov/

- 12 -

(iii) Waiver of Written Report – DEP/CCD may waive the written report on a case-by-case basis if the associated verbal report has been received within 24 hours from the time the permittee becomes aware of the circumstances that may endanger health or the environment. Unless such a waiver is expressly granted in writing by DEP/CCD, the permittee must submit a written report in accordance with this paragraph.

3. Other Non-Compliance

The permittee must identify all instances of non-compliance not reported under paragraph D.3.b of this section on the Visual Site Inspection Report. The reports must contain the information listed in paragraph D.3.b.(ii) of this section. (25 Pa. Code § 92a.3(c) and 40 CFR § 122.41(l)(7))

E. Signatory Requirements.

1. Applications, reports, and other information submitted to DEP/CCD must be signed and certified by either of the following applicable persons, in accordance with 40 CFR § 122.22 (incorporated by 25 Pa. Code § 92a.22):

- For a corporation – by a president, secretary, treasurer, or vice president in charge of a principal business function of the corporation or a duly authorized representative.

- For a partnership or sole proprietorship – by a general partner or the proprietor, respectively.

- For a municipality, state, federal, or other public agency – by a principal executive officer or ranking elected official.

2. If signed on behalf of a corporation by a duly authorized representative of the permittee, the authorization must meet the following:

- The authorization must be made in writing by a person described in Paragraph 1, above, consistent with the corporation’s delegation procedures and must be attached to the application or otherwise be submitted to DEP/CCD.

- The authorization must specify either an individual or a position having responsibility for the operation of the regulated system, facility, or activity consistent with the corporation’s delegation procedures, such as the position of manager, operator, superintendent, or position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the corporation.

3. Changes in Signatory Authorization – If an authorization is no longer accurate because a different individual or position has responsibility for the overall operation of the project site, a new authorization satisfying the requirements of Paragraphs 1 and 2, above, must be submitted to DEP/CCD prior to or together with any reports or information to be signed by an authorized representative.

F. Planned Changes to Physical Facilities – The permittee must give notice to DEP/CCD as soon as possible but no later than 30 days prior to planned physical alterations or additions to the permitted project site or activity.

An application or other written submission to DEP/CCD providing equivalent information can be used to satisfy the notification requirements of this section.

Notice is required when:

1. The alteration or addition to a permitted facility or activity may meet one of the criteria for determining whether a facility or activity is a new source in 40 CFR § 122.29(b). (25 Pa. Code § 92a.41(a) and 40 CFR § 122.41(l)(1)(i))

2. The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. (25 Pa. Code § 92a.41(a) and 40 CFR § 122.41(l)(1)(ii))

This may include:

a. The construction of additional impervious surfaces not reported in the application.

b. Increases in earth disturbance compared to the original planned limit of disturbance.

- 13 -

c. Modifications to the design standards, BMPs, or SCMs used for the project.

d. Proposals to eliminate structural or non-structural BMPs or SCMs planned for in the original design or reduce the dimensions and/or capacities of structural BMPs or SCMs that may affect performance of those BMPs or SCMs.

e. Proposed site alterations that would allow new stormwater flows from off-site to flow onto the site.

3. The planned change may result in non-compliance with permit requirements. (25 Pa. Code § 92a.41(a) and 40 CFR § 122.41(l)(2))

G. Monitoring

DEP/CCD may require additional monitoring where an increased risk of potential water pollution is present, or water pollution is suspected to be occurring from a construction activity subject to this permit, or for any reason in accordance with 25 Pa. Code § 92a.61 (relating to monitoring). The permittee or co-permittee must commence such monitoring upon notification from DEP/CCD. (25 Pa. Code § 92a.61(b))

- 14 -

PART B

STANDARD CONDITIONS

I. MANAGEMENT REQUIREMENTS

A. Compliance

The permittee must comply with all conditions of this permit. Any permit non-compliance constitutes a violation of the Act and Clean Streams Law and is grounds for enforcement action, for permit termination, revocation and reissuance, or modification, or denial of a permit renewal application. (25 Pa. Code §§ 92a.3(c), 92a.41(a) and 40 CFR § 122.41(a))

B. Permit Modification, Termination, or Revocation and Reissuance

1. DEP may modify, terminate, or revoke and reissue this permit during its term. (25 Pa. Code §§ 92a.3, 92a.41(a), 92a.72 – 92a.75 and 40 CFR § 122.41(f))

2. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated non-compliance, does not stay any permit condition.

(25 Pa. Code §§ 92a.3, 92a.41(a) and 40 CFR § 122.41(f))

3. In the absence of DEP action to modify or revoke and reissue this permit, the permittee must comply with effluent standards or prohibitions established under Section 307(a) of the Clean Water Act for toxic pollutants within the time specified in the regulations that establish those standards or prohibitions. (25 Pa.

Code §§ 92a.3(c), 92a.41(a) and 40 CFR § 122.41(a)(1))

4. DEP may terminate coverage under this permit for the reasons specified at 40 CFR § 122.64(a). (25 Pa.

Code §§ 92a.74(c) and 40 CFR § 122.64(a))

C. Requirement to Submit NOT (25 Pa. Code §§ 102.7, 92a.74(c), 92a.76 and 40 CFR § 122.64(c))

The permittee or a co-permittee must submit a complete NOT form to the DEP/CCD office that approved coverage, utilizing DEP’s NOT for Chapter 102 Permits form (3800-PM-BCW0229b), when the project site has been permanently stabilized, all temporary E&S BMPs have been removed, and construction of all approved PCSM SCMs have been completed, in accordance with 25 Pa. Code § 102.7. An operator co-permittee may submit the NOT only when documentation is provided with the NOT that the permittee or co-permittee is unable or unwilling to sign the NOT.

1. The permittee or co-permittee must submit the NOT electronically when required by DEP in writing.

2. The permittee and co-permittee must continue complying with the terms and conditions of this permit until the NOT is approved by DEP/CCD.

3. Until the permittee or co-permittee has received written approval of the NOT from DEP/CCD, the permittee and co-permittee remains responsible for compliance with the terms and conditions of this permit, including the submission of annual reports and long-term operation and maintenance (O&M) of all PCSM SCMs on the project site in accordance with 25 Pa. Code § 102.8(m).

4. The permittee must retain a copy of record drawings required by 25 Pa. Code § 102.8(l) as part of the approved PCSM Plan and must provide a copy of the record drawings to the persons identified as responsible for the long-term O&M of PCSM SCMs.

D. Duty to Provide Information

1. The permittee must provide to DEP/CCD, within a reasonable time, any information which DEP/CCD may request to determine whether cause exists for modifying, revoking and reissuing, or terminating coverage under this permit, or to determine compliance with this permit. (25 Pa. Code §§ 92a.3(c), 92a.41(a) and 40 CFR § 122.41(h))

- 15 -

2. The permittee must provide to DEP/CCD copies of records required to be kept by this permit upon request.

(25 Pa. Code §§ 92a.3(c), 92a.41(a) and 40 CFR § 122.41(h))

3. Other Information – Where the permittee becomes aware that it failed to submit any relevant facts in an application or submitted incorrect information in an application or in any report to DEP/CCD, it must promptly submit the correct and complete facts or information. (25 Pa. Code §§ 92a.3(c), 92a.41(a) and 40 CFR § 122.41(l)(8))

E. Proper Operation and Maintenance (25 Pa. Code §§ 92a.3(c), 92a.41(a) and 40 CFR § 122.41(e))

1. The permittee must at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), including BMPs, which are installed or used by the permittee to achieve compliance with the terms and conditions of this permit. Proper operation and maintenance includes adequate laboratory controls such as appropriate quality assurance procedures. The permittee must properly operate and maintain backup or auxiliary facilities or similar systems installed by the permittee, as necessary to achieve compliance with the terms and conditions of this permit.

2. Removed Substances – Solids, sediments, and other pollutants removed in the course of treatment or control of stormwater must be disposed of in accordance with federal and state law and regulations, to prevent any pollutant in these materials from adversely affecting public health or the environment.

3. Reduction, Loss, or Failure of BMP or SCM – Upon the reduction, loss, or failure of any E&S BMP or PCSM SCM, the permittee and co-permittee(s) must initiate the repair or replacement of the BMP or SCM as follows:

• Immediately upon discovery if the reduction, loss, or failure of a BMP or SCM has resulted in or is likely to result in sediment or other pollutants flowing off the project site and/or discharging to surface waters.