Extracted_Pages_from_JABA_Asbestos_Survey_Report_0003.pdf

PDF 2 MB Posted

Attached to
This project is located at Jacob Riis Park within Federal contract opportunity
Solicitation number
140P2026R0038
Issued by
Department of the Interior National Park Service National Office

About this file

This document is an asbestos-containing building material survey report prepared for the National Park Service's Gateway National Recreation Area, Jamaica Bay Unit, covering three facilities: Floyd Bennett Field, Fort Tilden, and Riis Park.

The survey was conducted in 2008 by GRB Environmental Services, Inc., under contract to PRIZIM, Inc., to estimate friable and non-friable asbestos-related cleanup costs in compliance with Federal Accounting Standards Advisory Board (FASAB) guidance, specifically Technical Bulletin 2006-1. A total of 74 buildings spanning approximately 600,000 square feet were surveyed using visual inspections and bulk sampling analysis. Materials presumed to contain asbestos that were not sampled included 9x9-inch floor tile, spray-on fire-proofing applied before 1980, and suspected transite wall board. Bulk samples were analyzed using Polarized Light Microscopy (PLM) with dispersion staining at a New York State certified laboratory, with confirmatory Transmission Electron Microscopy (TEM) analysis performed on 14 inconclusive samples from Hangar B.

The survey identified estimated total abatement costs of approximately $19.168 million across all three facilities. Cost estimates were developed by two independent contractors—GRB and Apex Companies LLC—with rates ranging from $4.50–$7.00 per square foot (Apex) to $15.00–$20.00 per square foot (GRB), reflecting different methodologies and market assumptions. Costs included mobilization and demobilization (15%), contractor fees, air monitoring, abatement design ($6,700 flat rate), and oversight ($9,800 flat rate). Individual building reports, facility maps, aerial photographs, surveyor accreditations, and GRB's New York State Asbestos License were included as appendices to support the financial recognition of environmental cleanup liabilities.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS CONTAINING BUILDING MATERIAL SURVEY

GATEWAY NATIONAL RECREATION AREA – JAMAICA BAY UNIT

210 NEW YORK AVENUE

STATEN ISLAND, NEW YORK 10305

Prepared for:

National Park Service Washington Area Service Office

1201 Eye Street, NW (2420) Washington, DC 20005

Prepared by:

PRIZIM, Incorporated The Granary

317 East Diamond Avenue Gaithersburg, Maryland 20877 www.prizim-inc.com

May 2009

Gateway National Recreation Area – Jamaica Bay Unit Table of Contents

Executive Summary

1.0 Introduction

2.0 Assessment of Existing Data

3.0 Survey, Sampling, and Analysis Activities

4.0 Recognition and Measurement of Asbestos-Related Cleanup Costs

5.0 Reporting

Jamaica Bay Asbestos Survey and Sampling Report

2.0 Objective

3.0 Methodology

4.0 Cost Estimation

5.0 Findings & Summary of Abatement Costs

6.0 Conclusions

Appendices

A. Facility Maps and Aerial Photographs

B. Individual Building Reports

C. Survey Team Members’ Accreditations

D. GRB Environmental Services, Inc. Asbestos License (NYSDOL)

EXECUTIVE SUMMARY

GATEWAY NATIONAL RECREATION AREA – JAMAICA BAY UNIT

Background Under Technical Bulletin 2006-1, Recognition and Measurement of Asbestos-Related Cleanup Costs, federal entities, including the National Park Service (NPS) are required to (1) estimate both friable and nonfriable asbestos-related cleanup costs, and (2) support recognition of liability and related expense for those costs that are both probable and reasonably estimable, consistent with the current guidance in Statement of Federal Financial Accounting Standards (SFFAS) 5, SFFAS 6, Chapter 4: Cleanup Costs, and Technical Release (TR) 2. This requirement will be effective for reporting periods beginning after September 30, 2009.

The NPS contracted PRIZIM, Inc. (PRIZIM) to (1) estimate both friable and nonfriable asbestos-related cleanup costs, and (2) support recognition of liability and related expense for those costs that are probable and reasonably estimable, consistent with the Federal Accounting Standards Advisory Board (FASAB) accounting guidance. Information obtained through this pilot project will be used by the NPS Washington Area Service Office (WASO) Environmental Management Program (EMP) to develop an Asbestos Assessment Program and by the WASO Environmental Cleanup Liability (ECL) Program to collect the necessary data to comply with Technical Bulletin 2006-1 (prior to the impending financial reporting deadline).

The NPS has initiated this effort as a pilot project at three parks including Gateway National Recreation Area (GATE). GATE has three units and this evaluation covers the Jamaica Bay (JABA) unit.

Project Scope The scope of this pilot project included the estimation of both friable and nonfriable asbestos-related cleanup costs at JABA. The pilot project efforts shall support recognition of liability and related expense for those costs that are probable and reasonably estimable, consistent with the current guidance in SFFAS 5; SFFAS 6; and TR 2, and as clarified by Technical Bulletin 2006-1.

The scope of work included obtaining available asbestos-related survey data, to the extent it existed, from selected structures within JABA. Available asbestos-related information (e.g., survey reports, abatement records) was requested from Ms. Kathleen Cuzzolino, GATE Environmental Protection Specialist, for a preliminary review to conduct a gap analysis with informational requirements. As a result of this gap analysis, PRIZIM concluded that it was necessary to conduct a site visit to obtain a comprehensive inventory of asbestos-containing materials (ACM) for JABA. PRIZIM subcontracted GRB Environmental Services, Inc. (GRB) to inventory confirmed or assumed ACM, interview site personnel, visually survey the interiors and exteriors of site structures, and collect and analyze bulk samples (where necessary) at the JABA unit.

Following identification, delineation, and quantification of ACM within the structures included within JABA, an estimation of associated removal costs was performed on an individual basis, by structure.

2.0 Assessment of Existing Data

Available asbestos-related information was reviewed to assess the possible extent of its use to support the recognition and measurement of asbestos-related cleanup costs consistent with FASAB requirements. The existing information underwent a preliminary review to evaluate the scope of previous efforts, associated findings, and whether the data is sufficient or shall require supplemental survey efforts. GRB reviewed and verified existing data to narrow the list of structures requiring sampling. Findings are listed in detail in the report prepared by GRB, included as an Appendix to this Executive Summary.

3.0 Survey, Sampling, and Analysis Activities

Scope Existing asbestos-related information was used to support measurement of ACM removal and disposal associated with ACM cleanup to the extent that adequate information was available.

Where asbestos-related information was inadequate, or unavailable, supplemental survey and sampling efforts were required.

After reviewing JABA’s existing asbestos-related information, GRB and the park identified a list of 74 buildings requiring a supplemental survey. These structures are located within three facilities, identified as Floyd Bennett Field, Fort Tilden, and Riis Park.

Appropriately accredited personnel from GRB performed the sample collection in accordance with applicable regulations and guidelines established by the United States Environmental Protection Agency (USEPA), Occupational Safety and Health Administration (OSHA), as well as State and local regulations as appropriate.

Survey and Sampling Procedures Building identification information for each park unit was obtained using the Facility Management Software System (FMSS). Bulk sampling and visual inspections were performed in all accessible areas of each identified building. The following materials were presumed to contain asbestos and were not sampled at any of the park units:

9 x 9-inch floor tile;

Spray on fire-proofing and decorative materials applied/installed prior to 1980; and Suspected transite wall board.

GRB and park staff identified 74 buildings which were to be evaluated for ACBM. GRB personnel conducted a visual survey of the interior and exterior of these identified structures, estimated quantities of suspect ACM observed, collected bulk samples of suspect ACM in designated buildings, documented the current condition of friable and non-friable suspect ACM observed; assessed friable suspect ACM, and used photographs to document each facility surveyed and each ACM identified. Where access to buildings was limited, GRB attempted to examine building interiors through accessible windows.

Analysis Procedures Bulk samples were delivered to EMSL’s New York State certified laboratory where they were analyzed for asbestos using Polar Light Microscopy (PLM) and dispersion straining. Pursuant to a discussion between GRB and PRIZIM, confirmatory Transmission Electron Microscopy (TEM) analyses were conducted on 14 samples from Hangar B to confirm/refute the presence of asbestos. TEM analyses are recommended for Non-friable Organically Bound (NOB) materials which reveal negative results by PLM methodology.

Data Management Survey data, analysis results, photographs, and surveyor qualifications are documented in the Final Asbestos Reports developed by GRB. Additionally, the following survey data was put into a spreadsheet to be uploaded into the Facility Management Software System (FMSS): Facility Data (e.g., park information), Building Data, Suspect Material Data, Room Detail, Bulk Sample Data, and ACM Data.

4.0 Recognition and Measurement of Asbestos-Related Cleanup Costs

Scope The recognition and measurement of asbestos-related cleanup costs consisted of: identification of cost elements to be considered, document of previous expense, computation of current expense, estimation of future expense, and a calculation of clean up costs using the NPS provided Cost Estimating Software System (CESS).

Measurement of Asbestos-Related Cleanup Costs JABA cost estimates have been developed by two independent contractors, GRB and Apex Companies LLC (Apex). The estimates provided by GRB are based on general rates according to the type of material. The estimates provided by Apex are based on general rates according to the type of material, and are tailored to account for the size and spaces where the materials are found. The estimates vary substantially and represent the range of estimates which may be returned if the work goes out for bid. The estimates have been created for each building and are presented in Sheet F of the Excel documents.

All estimates assume that buildings will be abated entirely, rather than by material or space.

Abating small areas alone raises cost substantially, due to required costs for mobilization and air monitoring which add substantially to small projects. The estimates are an approximation of overall abatement costs as many areas, such as roof membranes, could not be sampled directly and had to be assumed. Many of these assumed areas will not contain asbestos and so, the rates will ultimately be substantially lower. Details of the final costs relative to estimated costs are discussed in the Report.

Estimates vary by contractor and method of calculation. GRB is the engineering firm which conducted the asbestos survey. The cost estimates provided by GRB are based on rates between $15.00 per ft² (sf) for ceiling tile to $20.00/sf for roof shingles. Each building has been assessed an additional contractor mobilization fee of 15%, a flat rate for design of $6,700.00, and a flat rate for oversight, of $9,800.00.

In order to confirm the cost estimates provided by GRB, PRIZIM contracted Apex Companies LLC (Apex), an engineering and construction management firm based in Rockville, MD. Apex has been responsible for a wide range of asbestos abatement projects ranging from large factories to small offices, and has extensive experience contracting for government projects. The Apex rates for abatement are substantially lower than those stated by GRB and range between $4.50/sf for roofing shingle to $7.00/sf for ceiling tile. These rates are adjusted to account for worker efficiency when working in large and small areas. When calculating total project costs, Apex adds 20% for air clearance and monitoring, and 10% for abatement design to their rates for each project.

The estimates from GRB and Apex vary substantially. For instance, the cost estimates for abating the roof of Bay 1 are $48,700.00 (GRB) and $14,560.00 (Apex). The estimates for abating the variety of materials in Building 26 are $216,991.00 (GRB) and $68,198.00 (Apex).

GRB reports that their prices will be relevant into the future, and are consistent with abatement planning. Apex reports that their estimates represent costs for which they would complete work today, and are a reasonable expectation of current market prices. Because the Apex rates represent what it would cost to abate the materials now, the costs developed in CESS were designed to reflect the costs provided by Apex.

The following tables describe the estimated costs for abatement of asbestos-containing areas at

JABA:

Table 2. Cost Estimates for Abatement of ACM at JABA-Fort Tilden Building Number GRB Costs Apex Costs Building 1 $48,170.00 $9,360.00 BU-BPFT-18 Restroom/Bay 18 $0.00 $23,530.00 BU-BPFT-P102 Post office $65,053.00 $14,407.58 BU-BPFT-103 Sewage Lift Station $30,875.00 $4,671.88 Building 125 $59,349.00 $12,714.98 Building 133 $0.00 See note below $0.00 Building 134 $0.00 “ “ “ $0.00 Building 135 $0.00 “ “ “ $0.00 Building 136 $0.00 “ “ “ $0.00 BU-BPFT-204 Plumbers Shop $108,500.00 $27,300.00 BU-BPFT-215 Maintenance Storage $22,940.00 $7,280.00 BU-BPFT-216 Vehicle & Equipment Storage Bldg. $90,100.00 $23,920.00 BU-BPFT-217 Garage $105,027.00 $30,923.43 BU-BPFT-219 Maintenance Bldg. $187,183.00 $51,751.38 BU-BPFT-220 Riis Landing Main Coast Guard Bldg. $463,367.00 $138,033.35

BU-BPFT-221 CG BH $82,395.00 $24,797.50

BU-BPFT-222 CG Garages $63,190.00 $15,600.00 BU-BPFT-223 Coast Guard Power House $98,035.00 $25,317.50 BU-BPFT-302 Auto Shop $89,100.00 $12,824.50

BU-BPFT-306 Storage/Electric Bldg. $35,245.00 $13,650.00 BU-BPFT-307 Auto Storage $42,789.00 $15,990.00 BU-BPFT-P-T4 Theater $318,605.00 $72,604.35 Building T 6 $102,589.00 $25,545.98 BU-BPFT-T7 Storage Bldg. $0.00 $0.00 Building T 25 $91,020.00 $29,549.00 BU-BPFT-T149 Public Use Bldg. $98,380.00 $24,297.00 Little League Building $0.00 $0.00

TOTAL $2,201,912.00 $604,068.43

NOTE: Buildings 133-136 were occupied during the asbestos inspections. The roofs on these buildings appeared to be relatively new and did not consist of suspect ACM. Although the interiors of these buildings may have been abated during the roof renovations and replacement, this could not be verified. In the absence of interior inspections or other information, no abatements costs could be assigned for these structures.

Table 3. Cost Estimates for Abatement of ACM at JABA-Floyd Bennett Field

Building 26 $216,991.00 $68,198.33 BU-NSFB-H-30 Sewage Lift Station $29,380.00 $3,640.00 Building 50 $153,120.00 $40,540.50 Building 54 $262,025.00 $67,340.00 Building 62 $341,317.00 $85,555.60 Building 69 $496,579.00 $131,069.90 BU-NSFB-P 70 Tylunus $396,425.00 $113,517.95 BU-NSFB-P74 Education & Gymnasium $1,150,687.00 $614,679.00 BU-NSFB-74A JC Furnace Bldg $30,300.00 $4,095.00 BU-NSFB-85 NOAA Bldg $367,537.00 $87,506.25 BU-NSFB-86 Power Plant $235,460.00 $67,080.00 BU-NSFB-88A South Vault Bldg $28,230.00 $5,304.00 Building 95 $276,400.00 $94,185.00 Building 96 $115,515.00 $30,723.88 BU-NSFB-97 Warehouse $216,887.00 $76,131.25 Building 98 $744,128.00 $299,842.40 BU-NSFB-100 Hangar B $4,240,214.00 $1,155,262.55 BU-NSFB-106 Barn Owl Bldg $94,470.00 $33,540.00 BU-NSFB-117 North Vault Bldg $29,012.00 $7,072.00 BU-NSFB-130 Dormitory $276,400.00 $78,081.25 BU-NSFB-131 Dormitory $217,520.00 $59,650.50 BU-NSFB-132 Laundry Bldg $39,960.00 $6,961.50 BU-NSFB-132A JC Utilities Bldg $55,600.00 $13,361.40 Building 135 – Visitor Center $18,340.00 $2,080.00 BU-NSFB-154 Sewage Plant Lift Station Bldg $126,348.00 $26,531.70 BU-NSFB-258 Auto Shop $183,250.00 $55,561.35 BU-NSFB-P272 Gateway Environmental Center $742,437.00 $199,343.30 BU-NSFB-273 Radar Bldg $57,900.00 $14,040.00 BU-NSFB-274 Generator Bldg $25,700.00 $7,800.00 BU-NSFB-275 Park Police $212,322.00 $57,304.65

Hangar 1 $1,570,472.00 $475,965.95 Hangar 2 $630,485.00 $186,865.25 Hangar 3 $1,268,045.00 $394,072.25 Hangar 4 $1,143,960.00 $334,561.50

TOTAL $15,993,416.00 $4,897,464.21

Table 4. Cost Estimates for Abatement of ACM at JABA-Riis Park

BU-BPRP-H-603 JRP West Mall Bldg $0.00 $0.00 BU-BPRP-H-604A JRP Boiler Room West Mall $74,000.00 $17,062.50 BU-BPRP-H-605 JRP – Ball Field Electrical Bldg $23,745.00 $8,190.00 BU-BPRP-609 Parking Lot Office $62,868.00 $15,650.70 Bathhouse Complex $333,371.00 $89,490.70 Bay 1 $48,700.00 $14,560.00 Bay 6 $25,700.00 $4,160.00 Bay 14 $24,918.00 $4,520.10 East Wing $23,400.00 $7,800.00 East Mall Concession Building $117,700.00 Golf Starter Building $0.00 $0.00 Life Guard Facility $113,100.00 $28,665.00 West Wing $124,876.00 $32,159.40

TOTAL $972,378.00 $222,258.40

5.0 Reporting

A Final Asbestos Report consistent with the requirements of the Scope of Work was developed by GRB for JABA. The Report has been included with this Executive Summary as an appendix.

Draft Asbestos Survey and Sampling Report Gateway Jamaica Bay

August 19, 2008

Prepared by:

GRB Environmental Services, Inc.

One Penn Plaza – 25th Floor New York, New York 10119

Prepared For:

PRIZIM INC.

317 East Diamond Avenue

Olde Towne Gaithersburg, MD 20877

GRB Environmental Services, Inc. i

GRB Environmental Services, Inc. ii

TABLE OF CONTENTS

SECTION TITLE PAGE

1.0 .........................................................................................................................................1 INTRODUCTION

2.0 ..................................................................................................................................................1 OBJECTIVE

3.0 ........................................................................................................................................1 METHODOLOGY

4.0 ............................................................................4 FINDINGS & SUMMARY OF ABATEMENT COSTS

5.0 COST ESTIMATION………………………………………………………………….…………………...5

6.0 CONCLUSIONS

LIST OF TABLES

TABLE 3-1 LIST OF SURVEYED BUILDINGS

TABLE 5-1 SUMMARY OF ABATEMENT COSTS – Fort Tilden TABLE 5-2 SUMMARY OF ABATEMENT COSTS – Floyd Bennett Field TABLE 5-3 SUMMARY OF ABATEMENT COSTS – Riss Park

LIST OF FIGURES

FIGURE 2-1 AREA MAP OF SURVEYED FACILITIES

APPENDICES

A FACILITY MAPS AND AERIAL PHOTOGRAPHS

B INDIVIDUAL BUILDING REPORTS

C SURVEY TEAM MEMBERS’ ACCREDATIONS

D GRB ASBESTOS LICENSE (NYSDOL)

GRB Environmental Services, Inc. 1

1.0 INTRODUCTION

On behalf of the National Parks Service (NPS), PRIZIM Inc. (PRIZIM) is working with Gateway National Recreation Area (Park) to estimate (order-of-magnitude) the potential liability and related expense of asbestos-containing material (ACM) abatement and disposal, consistent with the Federal Accounting Standards Advisory Board (FASAB) accounting guidance. The scope of the work is the Jamaica Bay Unit of the Park. Facility Maps and Aerial Photographs are provided in Appendix A of this report.

PRIZIM’s responsibility is to coordinate data gathering, and organize the ACM data for input into a NPS cost-estimating software tool. GRB Environmental Services, Inc. (GRB) was retained by PRIZIM to collect ACM data from selected sites while following accepted standards of practice.

2.0 OBJECTIVE

The primary objective was the estimation of both friable and non-friable asbestos-related cleanup costs at the Park. The project efforts support the recognition of liability and related expense for those costs that are probable and reasonably estimable, consistent with the Federal Accounting Standards (SFFAS) 5; SFFAS 6; and Technical Release (TR)2, and as clarified by Technical Bulletib 2006-1. Using data provided by Park staff, PRIZIM developed an initial list of 70 buildings to be surveyed for asbestos. A subsequent meeting was held on June 19, 2008 between GRB and Park facility staff wherein the list of 70 structures was modified by adding several buildings and deleting other buildings to the original list to arrive at a revised total of 74 structures. The revised list of 74 buildings is presented in Section 3 of this report. The 74 structures are located within three separate facilities designated as Floyd Bennett Field, Fort Tilden, and Riis Park. Figure 2-1 provides an area map of the facilities surveyed.

3.0 METHODOLOGY

Pursuant to the solicitation dated May 16, 2008, GRB commenced the field surveys on Monday June 22, 2008. The GRB Field Manager provided coordination of the field teams and QA/QC support during the entire field effort which lasted approximately three weeks. The following general activities were performed during the field effort:

Survey and Sampling

Conducted a visual survey of the interior and exterior of the identified structure to identify suspect ACM;

Verified existing data, to the extent information was available, to reduce, or eliminate supplemental sampling (e.g., age of buildings, structures, etc.);

Estimated quantities of suspect ACM observed;

Collected bulk samples of suspect ACM in designated buildings;

Documented the current condition of friable and non-friable suspect ACM observed;

Assessed friable suspect ACM observed; and Used photographs to document each facility surveyed and each suspect asbestos-containing material identified.

FIGURE 2-1

AREA MAP OF SURVEYED FACILITIES

GRB Environmental Services, Inc. 2

Limitations Appropriately accredited GRB personnel performed bulk sample collection for suspect building materials. In several instances, access to buildings was severely limited due to safety reasons (unknown structural integrity, boarded up windows and doors, overgrowth of shrubs/trees, etc.).

Occasionally, no keys were available to unlock the doors, and since several buildings were occupied, no access to the interior was feasible for several of the structures. Under these circumstances, GRB personnel attempted to examine the building interiors through accessible windows and take photographs of interior areas. Additional information was also compiled through interviews of available facility personnel.

Asbestos surveys were performed in accordance with applicable regulations and guidelines established by the U.S. Environmental Protection Agency (EPA), the Occupational Safety and Health Administration (OSHA), as well as, State and local regulations as appropriate. To support future demolition, renovation, or construction work, the asbestos surveys were performed in a manner consistent with the requirements of the EPA existing National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations. Accordingly, ACM identified by the survey efforts was categorized according to NESHAP regulations as Regulated Asbestos- Containing Material (RCAM), Category I Non-Friable ACM, or Category II Non-Friable ACM.

The following general procedures were employed by GRB personnel during the course of the field surveys:

General Procedures

Interviewed appropriate site personnel to obtain information regarding current facility operations, as well as planned modifications to the facilities.

Walk-throughs of accessible interior and exterior areas of the facility to identify suspect

ACM;

Field verification and assessment of data;

Collection of bulk samples of suspect ACM for subsequent PLM analyses;

Documentation of:

- Building information;

- Suspect homogenous materials observed;

- Bulk sample collection locations;

- Functional space information;

- Condition of friable & non-friable suspect ACM observed (i.e., poor, fair);

- Assessment of friable suspect homogenous materials observed; and

- Dimensions and quantification of areas identified.

Photo Documentation In addition, digital photographs were taken of the exterior of each building or structure which was surveyed. Photographs were properly identified, logged, and filed to support the reference between the identified ACM and estimated elements of removal and disposal cost. When GRB was able to gain access to building interiors, photographs were also acquired.

Sample Analysis Bulk samples were collected in accordance with NESHAP regulations by AHERA accredited inspectors. As per the RFP, destructive sampling was not performed. Additionally, the following materials were presumed to contain asbestos and accordingly, were not be sampled:

GRB Environmental Services, Inc. 3

9 x 9-inch floor tile Spray on fire-proofing and decorative materials applied/installed prior to 1980 Suspected transite wall board.

Bulk samples were delivered to a EMSL’s New York State certified laboratory wherein they were analyzed for asbestos. All samples were analyzed using Polarized Light Microscopy (PLM) coupled with dispersion staining. Samples were analyzed with a 4 day turn around time (TAT).

Consistent with industry practice, PLM analytical results of resilient floor tile or other organically bound materials indicating less than 1 percent (%) asbestos present.

Please note that pursuant a discussion between GRB and PRIZIM, a decision was made to perform confirmatory TEM analyses on several samples which were inconclusive for asbestos using PLM. Specifically, 14 inconclusive bulk samples collected from Hangar B (Floyd Bennett Field facility) were subsequently analyzed using TEM to confirm/refute the presence of asbestos.

Reporting GRB developed a template for a datasheet that was used in the field to document relevant technical information and observations for each of the 74 facilities. Specifically, the datasheets for the facilities provided estimated quantity take-offs of ACM, order-of-magnitude abatement cost estimates, photo-documentation of the sites, and back-up information as deemed appropriate. The individual building reports (datasheets) are compiled in this report (Appendix B) in a format that provides the information requested in the RFP.

As previously indicated, a total of 74 units/structures (total in excess of 600,000 square feet) were surveyed from three separate facilities to determine the existence of ACM. The three facilities were Floyd Bennett Field, Fort Tilden, and Riis Park. A list of the buildings that were surveyed is provided below in Table 3-1.

Table 3-1 List of Surveyed Buildings/Structures

# Site Structure # Site Structure # Site Structure

1. FT Building 1 28. FB Building 26 55. FB BU-NSFB-273 Radar Bldg

2. FT

BU-BPFT-18

Restroom/Bay 18 29. FB

BU-NSFB-H-30 Sewage Lift Station 56. FB

BU-NSFB-274

Generator Bldg

3. FT BU-BPFT-P102 Postoffice 30. FB Building 50 57. FB BU-NSFB-275 Park Police

4. FT

BU-BPFT-103 Sewage Lift Station 31. FB Building 54 58. FB Hangar 1

5. FT Building 125 32. FB Building 62 59. FB Hangar 2

6. FT Building 133 33. FB Building 69 60. FB Hangar 3

7. FT Building 134 34. FB BU-NSFB-P 70 Tylunus 61. FB Hangar 4

8. FT Building 135 35. FB BU-NSFB-P74 Education & Gymnasium 62. RP

BU-BPRP-H-603 JRP

West Mall Bldg

9. FT Building 136 36. FB

BU-NSFB-74A JC

Furnace Bldg 63. RP

BU-BPRP-H-604A JRP

Boiler Room West Mall

10. FT

BU-BPFT-204 Plumbers Shop 37. FB BU-NSFB-85 NOAA Bldg 64. RP

BU-BPRP-H-605 JRP -

Ball Field Electrical Bldg

11. FT

BU-BPFT-215

Maintenance Storage 38. FB BU-NSFB-86 Power Plant 65. RP

BU-BPRP-609 Parking Lot Office

GRB Environmental Services, Inc. 4

12. FT

BU-BPFT-216 Vehicle & Equipment Storage Bldg 39. FB

BU-NSFB-88A South Vault Bldg 66. RP Bathhouse Complex

13. FT BU-BPFT-217 Garage 40. FB Building 95 67. RP Bay 1

14. FT

BU-BPFT-219

Maintenance Bldg 41. FB Building 96 68. RP Bay 6

15. FT

BU-BPFT-220 Riis Landing Main Coast Guard Bldg 42. FB BU-NSFB-97 Warehouse 69. RP Bay 14

16. FT BU-BPFT-221 CG BH 43. FB Building 98 70. RP East Wing

17. FT

BU-BPFT-222 CG

Garages 44. FB BU-NSFB-100 HangarB 71. RP

East Mall Concession Building

18. FT

BU-BPFT-223 Coast Guard Power House 45. FB

BU-NSFB-106 Barn Owl Bldg 72. RP Golf Starter Building

19. FT BU-BPFT-302 Auto Shop 46. FB BU-NSFB-117 North Vault Bldg 73. RP Life Guard Facility

20. FT

BU-BPFT-306

Storage/Electric Bldg 47. FB BU-NSFB-130 Dormitory 74. RP

West Wing

21. FT

BU-BPFT-307 Auto Storage 48. FB BU-NSFB-131 Dormitory

22. FT BU-BPFT-P-T4 Theater 49. FB BU-NSFB-132 Laundry Bldg

23. FT Building T 6 50. FB

BU-NSFB-132A JC

Utilities Bldg

24. FT BU-BPFT-T7 Storage Bldg 51. FB Building 135 – Visitor Center

25. FT Building T 25 52. FB BU-NSFB-154 Sewage Plant Lift Station Bldg

26. FT

BU-BPFT-P-T149 Public Use Bldg 53. FB BU-NSFB-258 Auto Shop

27. FT Little League Building 54. FB BU-NSFB-P272 Gateway Environmental Center

4.0 COST ESTIMATION

The following information and assumptions were utilized in calculating the estimated asbestos abatement costs:

Mobilization and Demobilization that include containment materials and labor associated with containment construction, health and safety supplies, equipment, waste bags, power, etc.

Abatement Unit costs include labor, abatement, waste transportation, and disposal.

Third party air monitoring Filing fees Abatement design, drawings, inspection, and contract specifications Abatement oversight and final report

Individual unit costs are found within Tab 8 of each facility spreadsheet. Quantities were estimated in the field based on observations and/or past experience. Unless the asphaltic roofs on the structures appeared to be new, it was assumed that they contained asbestos and required abatement. In most cases, the roofs were considered to contain asbestos and represent a majority of the costs. During the final design phase, it is recommended that the roofing materials be sampled and analyzed to confirm or refute the presence of ACM in an effort to minimize expenditures. Costs presented are order-of-magnitude and should be refined during the final

GRB Environmental Services, Inc. 5 design phase. However, the estimated costs presented herein are based upon reasonable assumptions and professional judgment and should be acceptable for budgetary purposes.

5.0 FINDINGS AND SUMMARY OF ABATEMENT COSTS

As previously indicated, a total of 74 units/structures (total of approximately 600,000 square feet) were surveyed to determine the existence of ACM. A list of the buildings that were surveyed as well as the estimated abatement cost is provided below in Tables 5-1, 5-2, and 5-3.

Table 5-1 Estimated Asbestos Abatement Costs – Fort Tilden

Building No. Estimated Asbestos Abatement Cost ($) Building 1 $48,170 BU-BPFT-18 Restroom/Bay 18 $0 BU-BPFT-P102 Postoffice $65,053 BU-BPFT-103 Sewage Lift Station $30,875 Building 125 $59,349 Building 133 $0 see note #1 below Building 134 $0 “ “ “ “ Building 135 $0 “ “ “ “ Building 136 $0 “ “ “ “ BU-BPFT-204 Plumbers Shop $108,500 BU-BPFT-215 Maintenance Storage $22,940 BU-BPFT-216 Vehicle & Equipment Storage Bldg $90,100 BU-BPFT-217 Garage $105,027 BU-BPFT-219 Maintenance Bldg $187,183 BU-BPFT-220 Riis Landing Main Coast Guard Bldg $463,367

BU-BPFT-221 CG BH $82,395

BU-BPFT-222 CG Garages $63,190 BU-BPFT-223 Coast Guard Power House $98,035 BU-BPFT-302 Auto Shop $89,100 BU-BPFT-306 Storage/Electric Bldg $35,245 BU-BPFT-307 Auto Storage $42,789 BU-BPFT-P-T4 Theater $318,605 Building T 6 $102,589 BU-BPFT-T7 Storage Bldg $0 Building T 25 $91,020 BU-BPFT-P-T149 Public Use Bldg $98,380 Little League Building $0

Notes:

1. Buildings 133-136 were occupied during the asbestos inspections. The roofs on these buildings appeared to be relatively new and did not consist of suspect ACM. Although the interiors of these buildings may have been abated during the roof renovations and replacement, this could not be verified. In the absence of interior inspections or other information, no abatements costs could be assigned for these structures.

Review of the information for Fort Tilden in Table 5-1 indicates that estimated asbestos abatement costs are anticipated to be approximately $2,200,000 +/- $220,000 (10%).

GRB Environmental Services, Inc. 6

Table 5-2 Estimated Asbestos Abatement Costs – Floyd Bennett Field

Building No. Estimated Asbestos Abatement Cost ($)

Building 26 $216,991 BU-NSFB-H-30 Sewage Lift Station $29,380 Building 50 $153,120 Building 54 $262,025 Building 62 $341,317 Building 69 $496,579 BU-NSFB-P 70 Tylunus $396,425 BU-NSFB-P74 Education & Gymnasium $1,150,687 BU-NSFB-74A JC Furnace Bldg $30,300 BU-NSFB-85 NOAA Bldg $367,537 BU-NSFB-86 Power Plant $235,460 BU-NSFB-88A South Vault Bldg $28,230 Building 95 $276,400 Building 96 $115,515 BU-NSFB-97 Warehouse $216,887 Building 98 $744,128 BU-NSFB-100 HangarB $4,240,214 BU-NSFB-106 Barn Owl Bldg $94,470 BU-NSFB-117 North Vault Bldg $29,012 BU-NSFB-130 Dormitory $276,400 BU-NSFB-131 Dormitory $217,520 BU-NSFB-132 Laundry Bldg $39,960 BU-NSFB-132A JC Utilities Bldg $55,600 Building 135 – Visitor Center $18,340 BU-NSFB-154 Sewage Plant Lift Station Bldg $126,348 BU-NSFB-258 Auto Shop $183,250 BU-NSFB-P272 Gateway Environmental Center $742,437 BU-NSFB-273 Radar Bldg $57,900 BU-NSFB-274 Generator Bldg $25,700 BU-NSFB-275 Park Police $212,322 Hangar 1 $1,570,472 Hangar 2 $630,485 Hangar 3 $1,268,045 Hangar 4 $1,143,960

Review of the information for Floyd Bennett Field in Table 4-2 indicates that estimated asbestos abatement costs are anticipated to be $16,000,000 +/- $1,600,000 (10%).

Table 5-3 Estimated Asbestos Abatement Costs – Riis Park

Building No. Estimated Asbestos Abatement Cost ($)

BU-BPRP-H-603 JRP West Mall Bldg $0 BU-BPRP-H-604A JRP Boiler Room West Mall $74,000 BU-BPRP-H-605 JRP - Ball Field Electrical Bldg $23,745 BU-BPRP-609 Parking Lot Office $62,868 Bathhouse Complex $333,371 Bay 1 $48,700 Bay 6 $25,700 Bay 14 $24,918

GRB Environmental Services, Inc. 7

East Wing $23,400 East Mall Concession Building $117,700 Golf Starter Building $0 Life Guard Facility $113,100 West Wing $124,876

Review of the information for Riis Park in Table 5-3 indicates that estimated asbestos abatement costs for these buildings are anticipated to be $970,000 +/- $97,000 (10%).

If the information from Tables 5-1, 5-2, and 5-3 are tabulated, the total estimated asbestos abatement cost for the three facilities (74 buildings) is $19,168,000 +/- $1,900,000 (10%). For budgetary purposes, $20 million should be set aside.

Abatement cost estimates, abatement design, and contract specifications were developed on a per building basis. Unit costs are based on costs associated with asbestos abatement within New York City. A 15% mobilization and demobilization cost was added to the total abatement cost for each building. Such costs took into consideration of filing fees, materials, and equipment.

Non-destructive inspections were performed and no design drawings and/or specifications for each building were provided to GRB. Therefore, when final design and bid documents are develop verification of quantities and thorough inspections will be required to capture any ACM that might be found behind walls, in ceilings, or attics. Access to these areas was not possible at each building due to a variety of reasons (e.g., safety, residential homes occupied by families, no key, etc.).

As previously indicated, specific information on each building is found in Appendix B.

Appendix C contains inspector’s credentials and Appendix D presents a copy of GRB’s corporate New York State Asbestos License.

6.0 CONCLUSIONS

GRB believes that the costs developed and presented herein, represent a reasonable order-of-magnitude estimate of the anticipated abatement costs in 2008 dollars. However, should a contract be issued that would cover all sites, it is anticipated that a savings may be incurred in response to economies of scale.

GRB Environmental Services, Inc. 8

APPENDIX A

FACILITY MAPS AND AERIAL PHOTOGRAPHS

AERIAL PHOTOGRAPH OF FLOYD BENNETT FIELD

Source: Google Earth: View from 7,467 feet.

AERIAL PHOTOGRAPH OF FORT TILDEN

Source: Google Earth; View from 5953 feet.

AERIAL VIEW OF RISS PARK

Source: Google Earth, View from 3287 feet rbarbour Oval

Line

Na vy

Tr aile rs

Hangars 3 & 4

Hangars 1 & 2

Hangars 7 & 8

Hangars 5 & 6

Former CG Hangar

Visitor Center

Building 26

Utility Vault

Electrical Vault

Building 30

Park Police

Envir. Study Center

Visitor Contact Station

Building 29

National Historic Landmark

Education & Gym

NOAA

Maintenance Facility

Barracks

Barracks

Ecology Village

Building 54

Warehouse

Building 50

Administration Building

Barracks 11 & 13, Heater

Sewage Treatment Plants

Air Force Reserve Center

Building 90

TBTA

Administration & Dormitory

Building 258

Quarters A

Navy Shack Navy Shack

Quarters B

Housing C Housing D

Fuel Storage Tank

Navy Shack

Camp Marshhawk

Navy Shack

Pump House Navy Shacks

Building 96 Cement & Glass Building Tyluhas Hall

Hangar Ademolished

[demolished hangar]demolished

Navy trailerdemolished Navy trailerdemolished

Navy trailerdemolished

FLATBUSH AV

FLOYD BENNETT FIELD

MARINE PY BR

RANGER RD

FLOYD BENNETT BLVD

AVIATION RD

NO NAME

ENTERPRISE AVE

NO NAME

FLOYD BENNETT BLVD

NO NAME

NO

NA

ME

AVIATION RD

NO

NA

ME

NO NAME

c center entr trail

Legend Dead_Horse_trails jbu_centerlines park boundaries demobldgs fbf_bunkers runways_nr Non Contributing Possible Contributors Status to be determined National Historic Landmark Buildings National Register hydro_utm µ0 250 500 750 1,000125 Meters

Jamaica Bay

Rockaway Inlet Dead Horse Bay

Marina

Raptor Point

Mill Basin Inlet

Pond

Sports Concession

Flatbush Avenue

Hangar Row Historic District

Ryan Visitor Center

North Forty

Natural Area

M odel Flying Field

S hore

P arkw ay

Shore Parkway Bikew ay / R ockaw ay

G atew ay G reenw ay

Archery Range

Gateway Environmental Study Center

(New York City Board of Education)

Park Nursery

Armed Forces Reserve Center

US Park Police NY Field Office

Ecology Village

Park Administration

Visitor Contact Station

Aviation Rd

Gil Hodges Memorial Bridge

Ranger Road

Enterprise Road

Fl oy d B en ne tt B lv d

Permit

Permit

Permit

Permit

Permit

Rockaway Gateway Greenway

Shore� Parkway� Bikeway

Permit

North

0 0.25 Mile

0 0.25 Kilometer

Parking

Campground

Fishing

Bus stopCar-top boating

Picnic area

Wildlife viewing

Park area

Grasslands Management Area (no access)

U.S. NATIONAL PARK SERVICE

GATEWAY NATIONAL RECREATIONAL AREA - JAMAICA BAY UNIT

ASBESTOS SURVEY DATA

Building Location: Riis Park Estimated Abatement Cost: 62,868.00$

Building/Structure Name: Parking Lot Office

Building Number: 609

Asset Code: 42394

Date of Construction: 1968

Data to be Collected

A Building Structure Data

1 Asset Code 42394

2 Building Use PARKING LOT OFFICE

3 Construction Date 1968

4 Renovation Date(s) N/A

5 Square Footage MEASURED 1,836 SQUARE FEET / NPS 2,014 SQUARE FEET

6 Date of Inspection 7/3/2008

7 No. of Floors 1

8 Construction Type Cinder Block Wood Frame Metal Building Brick Stucco Other:

9 Architectural Finishes Vinyl Tile Paint Finish Gypsum Board Concrete Floor Plaster Concrete Block Ceramic Tile Wood Panel MASONRY WALLS

10 Previously Existing Asbestos Data Yes No If "Yes", what type of data?

rbarbour Typewritten Text

STRUCTURE NO. 65

Typewritten Text

PHOTOGRAPH NO. 1 - FRONT PHOTOGRAPH NO. 2 - FRONT

ASBESTOS SURVEY DATA

B Room Detail Information Room/Area ID Functional Space Description Room Size Homogenous Material Present Quantity Condition Friable

1 OFFICE (REAR) OFFICE 2 X 2 DROP CEILING TILES - PIPE INSULATION No Yes 260 SF Good Fair Poor Yes No

2 KITCHEN KITCHEN 12 X 12 BROWN FLOOR TILES No Yes 120 SF Good Fair Poor Yes No

3 No Yes Good Fair Poor Yes No

4 No Yes Good Fair Poor Yes No

5 No Yes Good Fair Poor Yes No

6 No Yes Good Fair Poor Yes No

7 No Yes Good Fair Poor Yes No

8 No Yes Good Fair Poor Yes No

9 No Yes Good Fair Poor Yes No

10 No Yes Good Fair Poor Yes No

11 No Yes Good Fair Poor Yes No

12 No Yes Good Fair Poor Yes No

13 No Yes Good Fair Poor Yes No

14 No Yes Good Fair Poor Yes No

15 No Yes Good Fair Poor Yes No

16 No Yes N/A Good Fair Poor Yes No

17 No Yes Good Fair Poor Yes No

18 No Yes Good Fair Poor Yes No

19 No Yes Good Fair Poor Yes No

Room No.: OFFICE Room No.: OFFICE Description: PIPES IN CEILING Description: DROP CEILING

ASBESTOS SURVEY DATA

C ACM Data

Sample No. Type and % of ACM Category

(SP/TSI/MISC) Estimated Quantity Recommendations

1 609-01 Chrysotile 12.5% TSI 60 LF ABATE

2 609-02 Chrysotile 1.1% MISC 120 SF TOTAL ABATE

3 609-03 Chrysotile 1.7% MISC ABATE

ASBESTOS SURVEY DATA

D Suspected ACM Material

Room Number Suspected Material Associated Building

Material Estimated Quantity Recommendations

ROOF

ASPHALTIC

ROOFING

MATERIALS ROOFING SYSTEM 1836 SF Note: could not inspect or see roof. Assumed to be asphaltic - ABATE

GRB ENVIRONMENTAL SERVICES, INC

One Penn Plaza, Suite 2509, New York, NY 10119

Phone # 212 564-8640 Fax # 212 564-8651 Bulk Sample Chain of Custody

Project: NATIONAL PARK SERVICE

Client : PRIZM Date : 2-Jul-08

Address: GATEWAY PARK JAMAICA BAY

Inspector : DIPO AKA-BASHORUN Building No.: 609

Sample Type: Asbestos Bulk Sample

Turn Around Time : (1) 12 hrs (2) 24 hrs (3) 72 hrs (4) 5 days

Sample ID Sample Location Material Description Friable

(Yes/No) Condition (Good-

Fair-Poor) 609-01 Locker Room Elbow Insulation Yes Fair 609-02 Front Kitchen 12 x 12 Floor Tile No Fair 609-03 Locker Room 12 x 12 Floor Tile No Fair

Lab Instructions : Perform PLM Analysis - e-mail data to: dvanvoorhis@grbenv.com

Relinquished by : Received by :

Israel Zondo EMSL ANALYTICAL, INC.

ASBESTOS SURVEY DATA

F Estimated Potential Abatement Costs ACM Material Estimated ACM Quantity Unit Cost Subtotal

THERMAL INSULATED PIPING 60 $20.00 LF 1,200.00$

VINYL ASBESTOS FLOOR TILE 120 $20.00 SF 2,400.00$

TRANSITE PANELING $25.00 SF

ASPHALTIC ROOFING MATERIALS 1836 $20.00 SF 36,720.00$

SPRAY-ON ASBESTOS FIRE PROOFING $22.00 SF

CEILING TILES $15.00 SF

WINDOW CAULKING $15.00 LF

Sub-Total 40,320.00$ Operational Impacts

Contractor Mob/Demo(15%) 6,048.00$ Building use should be either restricted or closed to the public during abatement.

Abatement Design 6,700.00$

Abatement Oversight/Air Monitoring 9,800.00$

Total 62,868.00$

Analyzed Date Sample Description Asbestos Fibrous Non-FibrousTest CommentsColor

Asbestos Analysis of Bulk Material

Non Asbestos

030822778

Attn: GRB Environmental Inc One Penn Plaza, Suite 2509 New York, NY 10119

Customer PO:

Received: 07/13/08 10:10 PM

NATIONAL PARK SERVICE/ RIIS PARK/ PRIZM/

BUILDING NO. 609

Customer ID: GRBE50

Fax: (212) 564-8651 Phone: (212) 564-8640 Project:

EMSL Order:

EMSL Proj:

Report Date: 7/16/2008

EMSL Analytical, Inc.

307 West 38th Street, New York, NY 10018

609-01 030822778-0001

LOCKER ROOM/ ELBOW INSULATION

PLM NYS 198.1 Friable 7/16/2008

PLM NYS 198.6 NOB

TEM NYS 198.4 NOB

Not Analyzed

Not Analyzed

N/A

N/A

Gray 63.5%Min. Wool24.00% Chrysotile12.50%

609-02 030822778-0002

FRONT KITCHEN/ 12 X 12 FLR TILE

PLM NYS 198.1 Friable

PLM NYS 198.6 NOB

TEM NYS 198.4 NOB

7/16/2008

Not Analyzed

Not Analyzed

N/A

N/A

Brown 1.1% Chrysotile 1.1% Total

609-03 030822778-0003

FRONT KITCHEN/ 12 X 12 FLR TILE

PLM NYS 198.1 Friable

PLM NYS 198.6 NOB

TEM NYS 198.4 NOB

7/16/2008

Not Analyzed

Not Analyzed

N/A

N/A

Gray 1.7% Chrysotile 1.7% Total

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. The above test report relates only to the items tested.

This test report must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government. EMSL bears no responsibility for sample collection activities or analytical method limitations. The results in this report meet all requirements of the NELAC Standards unless otherwise noted. The laboratory is not responsible for the accuracy of results when requested to physically separate and analyze layered samples. PLM is not consistently reliable in detecting asbestos in floor coverings and similar NOB's. Quantitative TEM is currently the only method that can be used to determine if a NOB material can be considered or treated as non-asbestos containing.

James Hall, Laboratory Manager or other approved signatory

ACCREDITATIONS: NVLAP #101048-9 and NY STATE ELAP #11506

NOB = Non Friable Organically Bound N/A = Not Applicable

Analyst(s)

Williams John Steve Jusczuk

Page 1THIS IS THE LAST PAGE OF THE REPORT.NYS198-7.4