This document contains questions and answers related to the solicitation for stabilizing and rehabilitating the birth home of Martin Luther King Jr. in Atlanta, Georgia. The solicitation seeks to fully replace existing wallcoverings to match original patterns that may be archived by Bradbury & Bradbury Art Wallpapers. Concrete specifications are provided for outside work and foundations. Renovations at the birth home were last completed in January 1993 according to historical records, though the date of any prior work is irrelevant to current requirements. Limited parking and storage will be allowed on site behind the fire station and birth home, with additional parking three blocks away.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 8
We usually use metal detectors and scopes to identify locations of wiring and plumbing to minimize wall and ceiling holes on a project like this. As we remove wallpaper, plaster and lath to run wires, pipes, etc is it preferred to replace wallpaper in vertical sheets, squares patches or wall to wall?
The intent is for the existing wallcoverings to be fully replaced. New wallcoverings should match existing in every respect. Existing wallcovering are installed as vertical sheets, GC to match the existing widths. The patterns are to be digitized so that new wallcovering patterns match existing. Bradbury & Bradbury Art Wallpapers may have some patterns already digitized and in their archive.
21 Do you have a PSI rating for concrete work outside?
PSI for conrete paving is called out on details 1,2 and 3/C5.0., 3/L Note 3 on S1.1 also addresses PSIs for foundation and basement walls.
Posted on 5/18/2023 22 When was the previous renovation performed?
According to the HSR, the preservation efforts started in 1988. Renovations at the Birth Home were completed by January 1993.
Was the last renovation performed by “in‐house” or WG NPS employees only?
Unknown. Question has no bearing on the current contract requirements.
Was the last renovation completed in 1974? Did that renovation include any/all recognition of restoring it in kind?
The date of prior work has no bearing on the contract requirements. All NPS work is required to comply with the Secretary of the Interior's Standards.
25 When was the handicap lift installed? Gift shop? Original lift was installed in 1989.
Might the National Park Service have any available facilities available where we can store the furnishings of the MLK Birth House? Alternately, if the NPS doesn’t have any facilities to store the furnishings, does such a storage facility have to be sprinklered?
NPS does not have storage space available. Requirements for moving and storage are clearly stated in Amendment 3, Attachment 01 35 92 Collection Moving and Storage Procedures and attachments.
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6dcff9778019460cbdb a1147ca10e8f2/download?&token=
Can the parking area behind the firehouse be used for parking or storing pallets for work on site? If so, how many parking spots and what limitations? Are there any other on‐park‐site areas that are safe to park a trailer or store materials or should we plan for that off‐site?
Three parking spots behind the fire station will be dedicated for contractor's use. Some materials may be staged behind the birth home on the paved area at the end of the driveway but it will not be secured by the park. Additional parking will be available at the visitor parking lot three blocks from the site.