This document contains questions and responses related to a solicitation for stabilizing and rehabilitating the birth home of Martin Luther King Jr. The solicitation involves replacing deteriorated wood, repairing exterior mortar, maintaining accessibility, addressing issues as they arise, using wood lath from an on-site shop if needed, addressing active squirrel activity, handling traffic control and materials storage, protecting the structure during exterior work, and submitting required forms and a price schedule. The National Park Service is the contracting agency, with an anticipated contract award in summer 2023 and work to begin late summer 2023. Contractors are responsible for addressing risks and providing required documentation in their proposals.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# Question Response
Amendment 6
When replacing deteriorated wood on the birth home, we often use a mahogany or cedar product that is sometimes superior in regards to longevity compared to Douglas fir or Heart Pine. When replacing ‘in kind’ this can be discretionary, what would NPS prefer? We have sources to old growth, reclaimed, as well as new cedar and mahogany which are very stable and rot/insect resistant. This would be in regards to post bases, window sashes, and millwork. We would assume that flooring would be vertical grain Douglas fir and replaced with the same species.
Contractor proposals shall comply with the requirements of the drawings and specifications. Any proposed substitutions will be considered following contract award.
If the requirements are unclear, submit a specific question.
Posted on 5/1/2023
For exterior historic mortar repair, we usually use a product from Limeworks.us, a family owned small business in Bucks County, PA.
They sell color matched, lime‐based mortars that allow us to add in oyster shells, slag flecks etc. for the added detail when needed for exact matches. Is this something that would be requested or allowed for mortar repairs on the birth home or would you prefer a special recipe of lime, sand and mortar?
Contractor proposals shall comply with the requirements of the drawings and specifications. Any proposed substitutions will be considered following contract award.
If the requirements are unclear, submit a specific question.
As we assemble our scheduling, overall logistics are important to us, especially maintaining handicap accessibility. Do we have an idea of when work would begin? In what season?
Anticipate construction contract award during Summer, 2023, and Notice to proceed late Summer, 2023.
As we find any rotted wood or issues that need to be addressed, how quickly can we get a response to proceed and keep a timely schedule? Who do we ask?
Site conditions that vary from the contract requirements will be reviewed at the time of discovery by the NPS Contracting Officer. Technical proposals should respond to established requirements.
We generally keep some wood lath reserves in shop. Would it be okay to use wood lath from our shop if needed on a small scale or does the park keep any in reserve?
Construction contractors shall supply all products and materials necessary to meet the requirements of the contract.
On our walk‐through, we noticed and took pictures of active squirrel activity in the attic. It has been our experience that squirrels can wreak havoc in a home, oftentimes eating the outer, protective layers off of wiring. These can be hard to find, diagnose and repair if/when it occurs. It would be our recommendation that the vents in the gables be repaired before starting this restoration as this is where we saw squirrels entering. In the event we find such damage during the restoration, is there a plan/protocol in place to deal with it?
Noted. Contractor proposals shall comply with the requirements of the drawings and specifications. Site conditions that vary from the contract requirements will be reviewed at the time of discovery by the NPS Contracting Officer. Technical proposals should respond to the established requirements.
Is there any conflict of interest in contacting the latest engineers or architects associated with the plans currently being reviewed for this project?
Do not contact the project architect or engineers. Submit questions directly to the NPS Contracting Officer only.
8 Is there funds in the budget to support travel/lodging/etc?
All project related costs shall be part of the proposed price. Travel, lodging, etc. will not be reimbursed separately.
Is the gift shop renovation going to be done at the same time as this renovation? Performed in parallel? Separate award?
Refer to the solicitation documents including drawings and specifications for the requirements of this contract.
Is there currently any work being performed on the property that we should be aware of or that will continue during construction or post award?
No.
Will the door remain open to the public throughout the project? Will we have opportunities to close down if necessary?
NPS will close the building to the public prior to the start of construction for the duration of the construction contract period of performance.
Will traffic control be handled by the govt? Is it the contractors responsibility?
Traffic control is the responsibility of the contractor.
When it comes to storage of materials or existing FFE in the building…is that all handled by the general or prime contractor? Can we use government property or buildings for said storage? If not is an off‐site option applicable?
Refer to the solicitation documents including a previous amendment that establishes requirements for the moving and storage of furniture, artifacts, etc.
During demo of exterior impervious services there is a potential for disturbance to house foundation including potential water infiltration. Is that something that has been/should be included in the scope?
Protection of the historic structure is a requirement of the project. Construction means and methods are the responsibility of the contractor. The contractor's technical proposal should identify perceived risk and propose an approach that addresses the risk.
Are shoring and prevention of water infiltration into the structure included in the scope?
Protection of the historic structure is a requirement of the project. Construction means and methods are the responsibility of the contractor. The contractor's technical proposal should identify perceived risk and propose an approach that addresses the risk.
On page 49, under Factor 4 – Past Performance, the Government states:
OTHER SUBMITTALS: Include the following submittals not related to any evaluation factors in Volume I.
Proposed Equals: Complete and submit the attached “Proposed Equals” form. Provide a list of any proposed equals anticipated to be used in performing this construction contract or state "none."
The Proposed Equals document will be attached to Amendment 00006 and referenced in Section J as
Hazardous Materials: Complete and submit the attached "Hazardous Materials Identification Listing" form. Pursuant to FAR 52.223‐3, Hazardous Material Identification and Material Safety Data, to be eligible for contract award, provide a listing of hazardous materials anticipated to be used in performing this construction contract. We do not see the “Proposed Equals” form or the “Hazardous Materials Identification Listing” form in the solicitation package. Where can those be found?
On page 49, under Contents for Volume II, the Government states:
SUBCONTRACTING PERCENTAGE WORKSHEET: Complete and submit the attached "Report on Limitation on Subcontracting" form. The form itself requests input of amounts paid; however, for solicitation purposes, input projected amounts based on your proposed pricing and that of your anticipated subcontractors. Refer to Clause 52.219‐ 14 for associated information. We also do not see this attachment in the solicitation package.
The Contract Price Schedule Template is not mentioned in either Volume. Is that a requirement for submission, and if so, should it be included with the files for Volume II?
Please see Section B in the solicitation document. This is page seven (7) of the SF 1442 + Clauses document labeled as:
“B08_Solit_Clauses_Construction_Final_03.28.23.doc.pdf” and can be located as an attachment in Amendment 00002.
Is there another version, that is editable of the Project Experience Questionnaire?
A word form of the Project Experience Questionnaire has been attached to this amendment 00006.
Attachment #10. The Hazardous Materials Identification Listing document will be attached to Amendment 00006 and referenced in Section J as Attachment #11.
This document will be attached in Amendment 00006.