GATE 318738 - Design Build - Rehab Wastewater
Solicitation number
140P2023R0063
Issued by

About this file

This amendment to a solicitation provides updated information for a two-phase design-build procurement to rehabilitate water, wastewater, and stormwater utility systems at Fort Wadsworth. Phase 2 of the solicitation process is beginning, with the final Program of Requirements and an updated DOL wage determination now available. Only firms selected to advance from Phase 1 may submit proposals for Phase 2, with a due date of April 22, 2024 at 5:00 PM ET. The National Park Service is the contracting agency. No other changes are made to the solicitation terms.

View the file

Other files

File Type Posted
Sol_140P2023R0063_Amd_0006.pdf PDF
Sol_140P2023R0063_Amd_0005.pdf PDF
Sol_140P2023R0063_Amd_0004.pdf PDF
Sol_140P2023R0063_Amd_0003.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_1A_0003.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_1B_0003.pdf PDF
B08_Attachment_04_Appendix_E_-_FtWadsworth_MH_Numbering_0002.pdf PDF
B08_Attachment_04_Appendix_A_-_Fort_Wadsworth_Drawing_Set_0002.pdf PDF
B08_Attachment_04_Appendix_D_-_Div_01_Specs_0002.pdf PDF
B08_Attachment_01_POR_100Final_-_Ft_Wads_27NOV23_Rev2401_0002.pdf PDF
B08_Attachment_04_Appendix_G_-_Cultural_Resources_0002.pdf PDF
B08_Attachment_04_Appendix_K_-_195150890-GATE_318738_Water_Options_0002.pdf PDF
B08_Attachment_03_Proposal_Submission_Package_GATE_0002.docx DOCX document
B08_Attachment_04_Appendix_J_-_Supplemental_Services_Compliance_Prep_20260605_0002.pdf PDF
B08_Attachment_04_Appendix_I_-_NAGPRA_Inadvertent_Discovery_on_Fed_Lands_0002.pdf PDF
B08_Attachment_04_Appendix_C_-_Soil_Borings_0002.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_2_0002.pdf PDF
B08_Attachment_04_Appendix_L_-_MiniVA-1_meeting_minutes_fnl_0002.pdf PDF
B08_Attachment_02_NY20240003_DOL_Wage_Determination_0002.pdf PDF
B08_GATE_318738_Solicitation_AM_002_0002.pdf PDF
B08_Attachment_04_Appendix_F_-_PAF_0002.pdf PDF
B08_Attachment_04_Appendix_H_Preservation_Briefs_0002.pdf PDF
AM_001_GATE_318738_Phase_1_Q_and_A_0001.pdf PDF
Sol_140P2023R0063_Amd_0001.pdf PDF
B08_Attachment_01_GATE318738_65_POR_Report_(1).pdf PDF
B08_140P2023R0063_GATE_318738.pdf PDF
B08_Attachment_02_DOL_Wage_Determination_NY20230003_(2).pdf PDF
B08_Attachment_03_Proposal_Submission_Package_GATE.docx DOCX document
Sol_140P2023R0063.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2023R0063 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

GATE 31873802/21/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/11/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 002 is to:

1. Begin Phase 2 of the solicitation process and post the final Program of Requirements package. The offerors that were selected to move forward from Phase 1 to Phase 2 have been notified via email. Only firms selected for Phase 2 are eligible to submit a proposal.

2. Post an updated DOL Wage Determination and Proposal Submission Package.

3. Due date for Phase 2 Proposals is April 22nd, 2024 at 5pm ET.

4. All other terms and conditions remain unchanged and in full force and effect.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Tony Jasper

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

File details come from the government source that posted it. Updated .