B08_Attachment_04_Appendix_J_-_Supplemental_Services_Compliance_Prep_20260605_0002.pdf

PDF 118 KB Posted

Attached to
GATE 318738 - Design Build - Rehab Wastewater
Solicitation number
140P2023R0063
Issued by

About this file

This document contains a survey compliance preparation form for work to be conducted at a national park. The form requests details on the planned survey such as equipment used, locations, and whether activities will involve ground clearing, vegetation removal, borings, loud noise, vibration or sampling. It also requires descriptions of resource monitoring, marking installation and removal, area restoration after completion, and measures to reduce harm to resources. An attachment with survey locations is referenced.

The related federal contract opportunity is a two-phase design-build solicitation from the National Park Service seeking proposals for rehabilitating water, wastewater and stormwater utility systems at Fort Wadsworth. Phase 1 proposals are requested by August 11, 2023 for pre-construction services with pricing not required at this time. A draft program of requirements and finalized version will be posted for Phases 1 and 2, respectively.

View the file

Other files

File Type Posted
Sol_140P2023R0063_Amd_0006.pdf PDF
Sol_140P2023R0063_Amd_0005.pdf PDF
Sol_140P2023R0063_Amd_0004.pdf PDF
Sol_140P2023R0063_Amd_0003.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_1A_0003.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_1B_0003.pdf PDF
B08_Attachment_04_Appendix_E_-_FtWadsworth_MH_Numbering_0002.pdf PDF
B08_Attachment_04_Appendix_A_-_Fort_Wadsworth_Drawing_Set_0002.pdf PDF
B08_Attachment_04_Appendix_D_-_Div_01_Specs_0002.pdf PDF
B08_Attachment_01_POR_100Final_-_Ft_Wads_27NOV23_Rev2401_0002.pdf PDF
B08_Attachment_04_Appendix_G_-_Cultural_Resources_0002.pdf PDF
B08_Attachment_04_Appendix_K_-_195150890-GATE_318738_Water_Options_0002.pdf PDF
B08_Attachment_03_Proposal_Submission_Package_GATE_0002.docx DOCX document
B08_Attachment_04_Appendix_I_-_NAGPRA_Inadvertent_Discovery_on_Fed_Lands_0002.pdf PDF
B08_Attachment_04_Appendix_C_-_Soil_Borings_0002.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_2_0002.pdf PDF
B08_Attachment_04_Appendix_L_-_MiniVA-1_meeting_minutes_fnl_0002.pdf PDF
B08_Attachment_02_NY20240003_DOL_Wage_Determination_0002.pdf PDF
B08_GATE_318738_Solicitation_AM_002_0002.pdf PDF
Sol_140P2023R0063_Amd_0002.pdf PDF
B08_Attachment_04_Appendix_F_-_PAF_0002.pdf PDF
B08_Attachment_04_Appendix_H_Preservation_Briefs_0002.pdf PDF
AM_001_GATE_318738_Phase_1_Q_and_A_0001.pdf PDF
Sol_140P2023R0063_Amd_0001.pdf PDF
B08_Attachment_01_GATE318738_65_POR_Report_(1).pdf PDF
B08_140P2023R0063_GATE_318738.pdf PDF
B08_Attachment_02_DOL_Wage_Determination_NY20230003_(2).pdf PDF
B08_Attachment_03_Proposal_Submission_Package_GATE.docx DOCX document
Sol_140P2023R0063.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLEMENTAL SERVICES COMPLIANCE PREP

Park Code:

Park Sub Code or Area:

PMIS Number:

Task Order Number:

Design Phase:

☐POR

☐Pre-Design

☐ Schematic Design

☐ Design Development

☐ Construction Drawings

Survey to be Conducted:

Survey to be conducted by Primary contractor, Sub-contractor or NPS?

☐ Primary contractor

☐ Sub-contractor

☐ NPS

Name of firm:

Anticipated Start Date:

Anticipated End Date:

Survey Purpose:

Description:

1. How will the survey be conducted? Include details such as depth and diameter of any borings, marking activities and the types of paint or other materials that will be used for markings?

2. What Equipment will be used? (include dimensions of any drills and footprint type of vehicles used)

3. Where will the survey be conducted (on roads or hard surfaces, vegetated areas, etc), Attach map showing locations of all activities (Attachment 1)

4. Who will be conducting the surveys (company and contact person)

Identify if any of the following will be part of the survey:

NOTE: The following survey activities may be considered intrusive and may require additional compliance activities.

☐Ground clearing and/or disturbance

☐Vegetation removal or cutting

☐Borings or other ground disturbance

☐Loud noise

☐Vibration

☐Acquisition of samples from buildings or other structures

Monitoring/Clean-up/mitigation:

1. Describe what resource monitoring will be included for the survey

2. Describe how any markings will be installed and removed

3. Describe how affected areas will be returned to prior conditions after survey is complete

4. Describe any additional measures that will be used to reduce or compensate for harm to resources.

Attachments Survey Map showing locations of all activities

File details come from the government source that posted it. Updated .