This document is a solicitation for a two-phase design-build procurement to rehabilitate water, wastewater, and stormwater utility systems at Fort Wadsworth. Phase 1 proposals are due by August 11, 2023 to rehabilitate approximately 31,600 feet of water pipes, 11,200 feet of wastewater pipes, and 26,100 feet of stormwater pipes. A final Program of Requirements document will provide additional details for Phase 2. The National Park Service is the contracting agency seeking proposals to replace aging infrastructure and improve utilities at the Fort Wadsworth site in order to ensure reliable service and protect public health and safety.

View the file

Other files

File Type Posted
Sol_140P2023R0063_Amd_0006.pdf PDF
Sol_140P2023R0063_Amd_0005.pdf PDF
Sol_140P2023R0063_Amd_0004.pdf PDF
Sol_140P2023R0063_Amd_0003.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_1A_0003.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_1B_0003.pdf PDF
B08_Attachment_04_Appendix_E_-_FtWadsworth_MH_Numbering_0002.pdf PDF
B08_Attachment_04_Appendix_A_-_Fort_Wadsworth_Drawing_Set_0002.pdf PDF
B08_Attachment_04_Appendix_D_-_Div_01_Specs_0002.pdf PDF
B08_Attachment_04_Appendix_G_-_Cultural_Resources_0002.pdf PDF
B08_Attachment_04_Appendix_K_-_195150890-GATE_318738_Water_Options_0002.pdf PDF
B08_Attachment_03_Proposal_Submission_Package_GATE_0002.docx DOCX document
B08_Attachment_04_Appendix_J_-_Supplemental_Services_Compliance_Prep_20260605_0002.pdf PDF
B08_Attachment_04_Appendix_I_-_NAGPRA_Inadvertent_Discovery_on_Fed_Lands_0002.pdf PDF
B08_Attachment_04_Appendix_C_-_Soil_Borings_0002.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_2_0002.pdf PDF
B08_Attachment_04_Appendix_L_-_MiniVA-1_meeting_minutes_fnl_0002.pdf PDF
B08_Attachment_02_NY20240003_DOL_Wage_Determination_0002.pdf PDF
B08_GATE_318738_Solicitation_AM_002_0002.pdf PDF
Sol_140P2023R0063_Amd_0002.pdf PDF
B08_Attachment_04_Appendix_F_-_PAF_0002.pdf PDF
B08_Attachment_04_Appendix_H_Preservation_Briefs_0002.pdf PDF
AM_001_GATE_318738_Phase_1_Q_and_A_0001.pdf PDF
Sol_140P2023R0063_Amd_0001.pdf PDF
B08_Attachment_01_GATE318738_65_POR_Report_(1).pdf PDF
B08_140P2023R0063_GATE_318738.pdf PDF
B08_Attachment_02_DOL_Wage_Determination_NY20230003_(2).pdf PDF
B08_Attachment_03_Proposal_Submission_Package_GATE.docx DOCX document
Sol_140P2023R0063.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i

PROGRAM OF REQUIREMENTS TO REHABILITATE

WATER, WASTEWATER, AND STORMWATER

UTILITY SYSTEMS AT FORT WADSWORTH

January 18, 2024

National Park Service Denver Service Center

12795 West Alameda Parkway Denver, CO 80225 ii

Table of Contents

EXECUTIVE SUMMARY ........................................................................................................... V

1 BACKGROUND

1.1 PROJECT ANALYSIS

1.2 PROGRAM ANALYSIS

1.3 EXISTING DOCUMENTATION

1.4 NPS CONTACTS

1.5 IMPLEMENTATION STRATEGY

1.6 DELIVERABLES

2 SCHEDULE

3 CODES AND STANDARDS

4 PROJECT ELEMENT 1 – REPLACE WATER SYSTEM

4.1 STANDARDS

4.2 WATER MAINS

4.3 WATER SERVICE CONNECTIONS

4.4 WATER FITTINGS

4.5 WATER VALVES

4.6 WATER METERS

4.7 FIRE HYDRANTS

4.8 UTILITY CROSSINGS

4.9 ABANDONMENT

5 PROJECT ELEMENT 2 – REPLACE WASTEWATER (SEWER) SYSTEM

5.1 STANDARDS

5.2 SEWER MAINS

5.3 SEWER SERVICE CONNECTIONS

5.4 SEWER MANHOLES

5.5 UTILITY CROSSINGS

5.6 ABANDONMENT

6 PROJECT ELEMENT 3 – REPLACE/REHABILITATE STORMWATER SYSTEM

6.1 STANDARDS

6.2 STORM DRAINS

6.3 STORM STRUCTURES

6.4 STORM DRAIN SERVICE CONNECTIONS

7 PROJECT ELEMENT 4 – TEMPORARY WORKS

7.1 EXCAVATION

7.2 BYPASS/FLOW MANAGEMENT

7.3 TRAFFIC CONTROL/PEDESTRIAN SAFETY

7.4 ACCESS

7.5 TREE PROTECTION

7.6 UTILITY COORDINATION & PROTECTION

7.7 TEMPORARY STORMWATER POLLUTION PREVENTION

8 PROJECT ELEMENT 5 – RESTORATION

8.1 PAVEMENT RESTORATION

iii

8.2 CURB & SIDEWALK RESTORATION

8.3 GRASS RESTORATION

8.4 OTHER SURFACE RESTORATION

8.5 TREE PLANTING

9 BID OPTIONS

9.1 WATER OPTIONS

9.2 SEWER OPTIONS

9.3 STORM DRAIN OPTIONS

9.4 MISCELLANEOUS OPTIONS

10 GENERAL SITE ENVIRONMENTAL

11 COMPLIANCE

11.1 NATIONAL HISTORIC PRESERVATION ACT

11.2 EXISTING CONDITIONS

11.3 NATIONAL ENVIRONMENT POLICY ACT

11.4 ADDITIONAL COMPLIANCE NEEDS

12 PERMITTING

LIST OF APPENDICES

APPENDIX A DRAWINGS

APPENDIX B STORM SYSTEM INSPECTIONS

APPENDIX C SOIL BORING LOGS

APPENDIX D DIVISION 1 SPECIFICATIONS

APPENDIX E MANHOLE NUMBERING GUIDELINES

APPENDIX F PERMITTING ASSESSMENT FORM

APPENDIX G CULTURAL RESOURCES

APPENDIX H PRESERVATION BRIEFS

APPENDIX I INADVERTENT DISCOVERIES PLAN

APPENDIX J SUPPLEMENTAL SERVICES COMPLIANCE PREP

APPENDIX K BID OPTION MAPPING

APPENDIX L MINI VALUE ANALYSIS FORM

iv

LIST OF TABLES

Table 1: Deliverable Document Requirements

Table 2: Scope of Water Base Bid Areas

Table 3: Scope of Water Option 1

Table 4: Scope of Water Option 2

Table 5: Scope of Water Option 3

Table 6: Scope of Water Option 4

Table 7: Scope of Sewer Base Bid

Table 8: Scope of Sewer Option 1

Table 9: Scope of Storm Drain Base Bid – Pipes

Table 10: Scope of Storm Drain Base Bid – Structures

Table 11: Scope of Storm Drain Option 1 – Pipes

Table 12: Scope of Storm Drain Option 1 – Structures

Table 13: Scope of Storm Drain Option 2 – Pipes

Table 14: Scope of Storm Drain Option 2 – Structures

Table 15: Scope of Storm Drain Option 5

Table 16: General Compliance Requirements for Pre-Construction Activities

Table 17: Clearance Status for Project Compliance

LIST OF FIGURES

Figure 1: Project Site Boundary (Excludes MTA Maintained Area)

Figure 2: Blocked outfall downstream of STMH706

Figure 3: Floodplain per FEMA FIRM Map 3604970331F v

Executive Summary

Fort Wadsworth (Ft. Wadsworth) is a former United States military installation located on the eastern shore of Staten Island at the Narrows of New York Harbor. The fort served as a line of defense for Manhattan and beyond during war times. It is comprised of multiple fortifications, including Fort Tompkins and Battery

Weed. It is currently now part of the Staten Island Unit of Gateway National Recreation Area.

The goal of this project is to renew the water, wastewater, and stormwater utility systems at Ft. Wadsworth.

Each of these utility systems have exceeded their design life. Failure to address the water, wastewater, and stormwater deficiencies would affect the infrastructure reliability and could result in impacts to public and environmental health and safety. To address the systems’ needs, this Program of Requirements (POR) report provides minimum performance requirements for improvements that the Design Build Entity (DBE) selected in the subsequent phase must meet as part of the final design and implementation of improvements. This POR provides information about five elements, which include the water system, wastewater system, stormwater system, temporary works, restoration requirements, and associated information pertaining to compliance and permitting requirements. While general layouts have been provided for guidance, NPS is seeking creative design approaches to create low-maintenance improvements to the existing systems. The DBE shall design to optimize the required improvements. The DBE shall complete an evaluation of the design criteria during detailed programming within the DBE’s contract.

The objective of Project Element 1 is to replace the water system, including service connections, serving the area of Ft. Wadsworth. The length of water pipes, including service connections, is estimated at 31,600’ and water mains range in size from 4” to 12” in diameter. The DBE shall replace the identified water mains, services connections (to building wall), and associated appurtenances present on-site. Project Element 1 outlines standards, technical requirements, and NPS preferences for completion of the water system replacement.

The objective of Project Element 2 is to replace the wastewater (sewer) system, estimated at 11,200’ including service connections and sewer mains ranging in pipe size from 6” to 18” in diameter. The DBE shall replace all sewer mains, sewer service connections (to building wall), and manholes. Project Element

2 outlines standards, technical requirements, and NPS preferences for the completion of the work.

The objective of Project Element 3 is to rehabilitate or replace the existing stormwater (storm drain) system, as identified herein. The total length of the storm system is estimated at 26,100’, including service connections, and ranges in pipe size from 6” to 54” in diameter. The main components of Element 3 include the storm drains, building service connections (to building wall), catch basins, catch basin connections, and manholes. Requirements for the storm drain system include full replacement of assets, spot repair

(replacement), rehabilitation, and storm structure repair work. Project Element 3 outlines standards, technical requirements, and NPS preferences for completion of the storm system work as outlined on project drawings.

The objective of Project Element 4 covers temporary construction activities such as excavation work, bypass/flow management, traffic control/pedestrian safety, site access, tree protection, utility coordination and protection, and temporary stormwater pollution protection. Project Element 4 outlines standards, technical requirements, and NPS preferences for the completion of the work.

vi

The objective of Project Element 5 covers work regarding the restoration of pavement, curbs, sidewalks, grass, and tree plantings. Project Element 5 outlines standards and technical requirements the DBE shall follow for work pertaining to temporary and permanent restorative surface work in areas disturbed by construction activities. Unless otherwise indicated, the DBE shall match the restored surface to the existing surface.

NPS has decided to organize the project work into base bid areas and bid option areas in an effort to complete the most critical work within budget. Base bid will include the replacement of approximately 65% of the water system based on the estimated linear footages, full replacement of the sewer system, and high priority items in the storm system based on the storm infrastructure condition assessments completed as part of this POR. The remaining work items are to be bid as separate options, pending availability of funds.

A preliminary evaluation of the environmental conditions and associated compliance effort has been completed during the POR phase. However, compliance is not complete and the limits of the environmental evaluation is based upon the identified disturbance. During the Design/Build phase of the project, final environmental compliance will be needed prior to the construction Notice to Proceed. This may include the need for additional coordination with external and internal stakeholders and additional clearances as needed for any surveys during detailed design.

This project is within the boundaries of the Ft. Wadsworth Historic District. The DBE shall provide compliance staff who have knowledge of the National Environmental Policy Act (NEPA), National Historic

Preservation Act (NHPA) Section 106, and other environmental compliance laws, NPS policies, and execution of compliance documents; the compliance staff shall be involved in both design and construction phases, as warranted to ensure that compliance issues are taken into account while making decisions and that environmental compliance and permitting is complete prior to initiating work, which could result in impacts to regulated resources. This includes conducting additional surveys as well as construction activities. Table 16 in Section 11.4 outlines anticipated lead times needed for NPS to conclude compliance associated with surveys and field investigations.

The Permit Assessment Form (PAF) has been developed for the base bid project as part of this POR and is provided as a reference within Appendix F. Based on the project limits and project elements defined in this POR, the following permits are anticipated to be required as part of construction for this project:

National Park Service Wastewater Collection System and Wastewater Pump / Lift Station Permits, and

New York City Private Sewer and Water Main Construction Permits. U.S. Environmental Protection

Agency/ U.S. Army Corps of Engineers Clean Water Act Permits and multiple other approvals would be required if project activities extend to the outfalls at New York Harbor.

The DBE will establish a detailed design, compliance and permitting documentation, construction schedule, and budget in alignment with the requirements set forth herein. Deliverable milestones include 50% and

100% Design Build Design Development Documents, 100% Design Build Construction Documents, Complete Stamped and Signed Design Build Construction Documents, and As-Constructed Drawings.

Additionally, the DBE will provide bi-weekly updates to NPS’s Project Manager during design and weekly updates during construction.

1 BACKGROUND

Fort Wadsworth (Ft. Wadsworth), located on the northeastern shore of the Narrows of New York Harbor in Staten Island, New York, is one of the oldest military installations in the nation. The park contains fortifications that were built for protection of New York City for over two centuries. The site remains active for US military and National Park Service (NPS) employees, as well as for visitors to enjoy. Ft. Wadsworth is comprised of National Register Historic Districts and contains critical cultural resources.

Archaeological and historical accounts document Staten Island and the immediate area of Ft. Wadsworth was inhabited by native populations as early as 10,000 – 12,000 years ago during the Paleoindian period up until contact with Europeans. After multiple failed attempts, the first sustained European colony of

Oude Dorp was established south of Ft. Wadsworth on Staten Island. After gaining control of the region, British forces began using Staten Island as a staging area during the Revolutionary War in 1776. The

Narrows provided a strategic location for defense and military development and use continued through historic times having served as state and federal military reservations by various agencies. The area that eventually became Ft. Wadsworth was later transferred to NPS in 1995 as part of the Gateway National

Recreational Area. Over the next few decades, the US Coast Guard and US Army Reserve occupied several buildings within Ft. Wadsworth and still do to this day.

This document is the Program of Requirements (POR) to rehabilitate the water, wastewater, and stormwater utility systems at Ft. Wadsworth. The project is known by NPS as N111 GATE 318738. The project boundary was identified by NPS and is shown in Figure 1. The project covers the majority of the

Ft. Wadsworth property, namely all areas where NPS is responsible for maintaining the utilities. The area shown in Figure 1 as maintained by the Metropolitan Transportation Authority (MTA) is not included in the project area.

The original utility systems at Ft. Wadsworth (northwest section) were constructed during the 1920s

(water and wastewater) and portions of the storm system in the 1970s, per available record plans. Most of the original systems are still in place with only limited rehabilitation or repair over the years on specific components, and all of these utilities have exceeded their design life.

Figure 1: Project Boundary (Excludes MTA Maintained Area)

1.1 PROJECT ANALYSIS

The goal of this project is to design and construct the rehabilitation of the water, sewer, and storm systems at Ft. Wadsworth based on the existing age of the systems. This POR encompasses elements 1 through 5 that provide information about the water system, wastewater (sewer) system, stormwater

(storm drain) system, temporary works, and restoration requirements. This is followed by information pertaining to permitting and compliance requirements. While general layouts have been provided for guidance, NPS is seeking creative design approaches to create low-maintenance improvements to the existing systems.

The occupied buildings and cultural resources on the site that require water service for fire protection and/or domestic use. NPS has decided that a complete replacement of the water system is required based on the age of the system. The components include the water mains, service connections, fittings, valves, meters, and fire hydrants.

Any occupied buildings with domestic water use or floor drains require wastewater service. NPS has decided that a complete replacement of the wastewater (sewer) system is required based on the age of the system and the maintenance issues that NPS has experienced. The main components include the sewer mains, service connections, and manholes.

It is understood that the existing stormwater (storm drain) system provides adequate drainage of building roofs and roadways. These assets have generally been inspected for defects by visual inspection to recommend where rehabilitation, replacement, or no action is required. The main components include the storm drains, building service connections, catch basins, catch basin service connections, and manholes.

Failure to address the water, wastewater, and stormwater deficiencies would affect the infrastructure reliability and could result in impacts to public and environmental health and safety.

In addition to the engineering needs, this POR has reviewed and assessed the environmental and cultural considerations for the improvements. This review has established the compliance and permitting needs based on a general understanding of the implementation of the project and sought to identify changes that would trigger additional compliance or permitting needs. Compliance is required in accordance with federal programs, such as the National Environmental Policy Act (NEPA), the National Historic

Preservation Act of 1966, as amended (NHPA), and the Archaeological Resource Protection Act of 1979

(ARPA).

See each Project Element for the specific minimum program analysis requirements. This POR is provided for guidance only. The Design-Build Entity (DBE) shall design to optimize the required improvements. The

DBE shall complete an evaluation of the design criteria during detailed programming within the DBE’s contract.

1.2 PROGRAM ANALYSIS

See each Project Element for the specific minimum program analysis requirements. This POR is provided for guidance only. The Design-Build Entity (DBE) shall design to optimize the required improvements. The

DBE shall complete an evaluation of the design criteria during detailed programming within the DBE’s contract.

1.3 EXISTING DOCUMENTATION

The existing utility locations are shown on Drawings in Appendix A, which were prepared using information from field investigations and records. Site investigations included visual observations, aerial photography and survey, topographic survey, utility survey, closed-circuit television (CCTV) inspection data of storm system infrastructure as provided in Appendix B, and soil borings as provided in Appendix

C. Record drawings were used to confirm field information where they were available. Approximations were made in the case where existing information conflicted or was not available. The General Notes in the Drawings in Appendix A detail limitations to existing information and callouts on the plan sheets identify locations where the DBE must investigate or confirm specific items, such as utility connectivity or active status. A survey file, available record drawings, and the video files from the CCTV inspections of the storm system will be provided to the selected bidder.

Natural and cultural resource information for the project area has been reviewed to identify the requirements of this POR. Cultural resource documents are provided in Appendix G. Additional reports and documentation are available at the request of NPS. Natural and cultural resources are further described in Sections 10 through 12 of this POR.

1.4 NPS CONTACTS

Contractual:

Contracting Officer (CO): Tony Jasper, 303-969-2789, tony_jasper@nps.gov

1.5 IMPLEMENTATION STRATEGY

The delivery model for this project is expected to be Best Value Design-Build/Fixed Price procurement.

This requires the DBE to provide a price and technical proposal for the improvements. The technical proposal shall include the scope of services for design by licensed engineering and environmental professionals in the State of New York.

All standard practices for design and construction shall comply with requirements of federal projects as outlined by the NPS Denver Service Center (DSC) at the following site:

https://www.nps.gov/orgs/1804/dscdandc.htm.

The DBE shall conduct bi-weekly progress update meetings to the NPS project team from the time of design Notice to Proceed through delivery of the Construction Documents. The DBE shall conduct weekly progress update meetings to the NPS team from construction Notice to Proceed through to final completion. The DBE is required to prepare the agendas, the minutes, and lead these meetings.

The DBE shall coordinate with NPS to identify temporary needs during construction, as all locations to satisfy temporary needs shall be approved by NPS prior to implementation. Such needs may include, but not be limited to, access routes, vehicular and pedestrian traffic management, storage, staging, and stockpile (refuse and demolition materials included) locations. These shall be stated during the design process for review and approval by NPS. If additional storage, staging, and stockpile areas are required beyond that allowed by NPS, the DBE shall locate and maintain an off-site location(s) at no additional cost to NPS. The DBE shall not assume that temporary utility hook-ups to support construction will be allowed, including for water, electric, and communications.

The DBE is responsible for preparing and providing to NPS information and project documents required for legally mandated compliance processes to protect environmental and cultural resources. Compliance is required for any survey or field investigation work during design as well as for the final construction project, as further discussed in later sections. Coordination with the compliance team should be initiated as soon as possible to determine data needs and compliance schedules to minimize impacts on the design and construction schedules. No work at the site shall begin prior to receiving compliance approvals. Construction Notice to Proceed (NTP) will not be issued until compliance is completed for both design and construction. NPS is committed to providing collaborative assistance throughout the compliance process.

In addition, the DBE is responsible for determining applicable permits and obtaining them before the start of any work at the site.

This POR document outlines the requirements to be followed in order to complete the project. If any conflicts between this POR document and the Division 01 specifications, the POR shall take precedence.

1.6 DELIVERABLES

The DBE is required to submit the following deliverables for NPS Review:

50% DB Design Development Documents

• Draft Design Build (DB) Design Development Drawings

• Draft Division 1 Construction Specifications (Construction Specifications Institute (CSI) Master

Format 04 Edition). The DBE shall utilize and modify DSC Division 1 Construction Specifications templates (as included in Appendix D).

• Draft Divisions 2 through 49 Construction Specifications (Construction Specifications Institute

(CSI) Master Format 04 Edition).

• Initial design calculations for the water, sewer, and storm systems and model of the water system

• Information and documentation required for NPS to submit Categorical Exclusion, Endangered

Species Act (ESA) consultation document, and Wetland/Waterway Identification and Delineation

• Updated Permit Assessment Form (PAF). The DBE shall utilize and modify the draft template included in Appendix F.

• Checklists for internal review of drawings, specifications, and calculations. Required documents shall go through a Quality Control (QC) review for each submission to confirm required documents are included and complete per contract requirements. NPS requires documentation and submittal of QC work performed.

100% DB Design Development Documents

• 100% DB Design Development Drawings

• Updated Division 1 Construction Specifications (Construction Specifications Institute (CSI) Master

Format 04 Edition).

• Updated Divisions 2 through 49 Construction Specifications (Construction Specifications Institute

(CSI) Master Format 04 Edition)

• Updated design calculations of the water, sewer, and storm systems and model of the water system

• Updates to information and documentation required for compliance permitting , as directed by

NPS.

• Updated Permit Assessment Form (PAF) and/or Permit Tracking List.

• Draft permit applications, if not previously submitted.

• Checklists for internal review of drawings, specifications, and calculations. Required documents shall go through a Quality Control (QC) review for each submission to confirm required documents are included and complete per contract requirements. NPS requires documentation and submittal of QC work performed.

• NPS Review form with responses to 50% DB Design Development Documents review comments.

100% DB Construction Documents

• 100% DB Construction Drawings

• Geographic Information Systems (GIS) Shapefiles of project utilities with MH numbering per the guideline provided in Appendix E.

• Final Division 1 Construction Specifications

• Final Divisions 2 through 49 Construction Specifications

• Final design calculations of the water, sewer, and storm systems and model of the water system

• All remaining required compliance and permitting documentation for approvals

• Updated Permit Assessment Form (PAF) and/or Permit Tracking List.

• Finalized permit applications, if not previously submitted.

• Checklists for internal review of drawings, specifications, and calculations. Required documents shall go through a Quality Control (QC) review for each submission to confirm required documents are included and complete per contract requirements. NPS requires documentation and submittal of QC work performed.

• NPS Review form with responses to 100% DB Design Development Documents review comments, including from compliance and permitting.

Complete Stamped and Signed DB Construction Documents (CD)

Upon final approval of 100% DB Construction Documents and once all compliance tasks have been complete, submit Complete Stamped and Signed DB Construction Documents per Table 1 on the following page for construction, NPS archiving, and general use. Documents shall be signed and sealed by a Professional Engineer licensed in New York State. For format and media submission requirements, see Design Deliverables – Content and Format Requirements DB Hard Copy and Electronic Submittal

Requirements.

The DBE shall provide all supplemental documentation and design reports including but not limited to:

permits, survey, and geotechnical reports, including soil testing reports and drilling logs.

As-Constructed Drawings

Upon construction Substantial Completion, submit As-Constructed Drawings and updated GIS files which reflect as-constructed conditions to the Project Team.

Table 1: Deliverable Document Requirements

COMPLETE STAMPED AND SIGNED

DB CONSTRUCTION DOCUMENTS (CD)

ELECTRONIC

FORMATS *

HARD COPY FORMATS

DB Construction Drawings ** AutoCAD, BIM, or

Revit & PDF

Full-Size Paper (ANSI D) 3 copies;

Tabloid (11x17) size paper

Division 1 Construction Specifications

PDF &

MS (Microsoft)-Word 3-copies

Divisions 2 through 49 Construction

Specifications

PDF &

MS (Microsoft)-Word 3-copies

Product File PDF 1-copy

Supplemental Design Reports (if applicable) PDF 1-copy

Design Calculations PDF & native formats N/A

Geographic Information Systems (GIS)

Shapefiles ***

Shapefiles or

Geodatabase N/A

Checklists for internal review of drawings, specifications, calculations, and cost estimates PDF & MS-Excel N/A

NPS Review form with responses to 100%

Complete DB CD review comments PDF & MS-Excel N/A

* Electronic files should be sent to the TIC (Technical Information Center). Email etic@nps.gov for details.

** DB Construction Drawings shall be printed from the native software (e.g., AutoCAD .dwg, BIM .bim, or Revit .rvt).

DB Construction Drawings printed from secondary software (e.g., Adobe .pdf) are not acceptable as they often result in off-scale product. AutoCAD/BIM files shall follow NPS Construction Drawing Standards as provided at the following link: https://www.nps.gov/dscw/ds-cad-bim-drafting.htm

*** GIS files shall follow NPS Geospatial Data Standards as provided at the following link:

https://www.nps.gov/subjects/gisandmapping/tools-and-data.htm

2 SCHEDULE

The DBE shall establish a detailed design and construction schedule, including permitting and compliance timelines in alignment with the requirements set forth herein. Scheduling considerations shall be made as required in the Specifications included in Appendix D. Substantial completion for the project shall occur no later than December of 2026.

SURVEY AND FIELD INVESTIGATION COMPLIANCE

The DBE is made aware that any survey or field investigations activities that are deemed necessary for the project design will require environmental review and clearance prior to being conducted. The

Supplemental Services Compliance Prep form (Appendix J) has been designed to streamline this process and must be completed by the DBE for each survey of field investigation. The DBE shall be aware that compliance reviews for survey activities that do not involve ground or vegetation alterations, such as topographic surveys, require a minimum of 10 working days, but as many as 20 working days to complete. Compliance reviews for surveys that may disturb ground, structure, or vegetation, such as geotechnical borings, require a minimum of 45 working days, but as many as 60 working days to complete. See Table 16 in Section 11.4 for general compliance requirements and timeframes. The determination of what compliance processes and approvals are required for each survey or field investigation lies solely with the NPS.

Additional approval time will be required for activities where environmental/cultural resource surveys are needed to assess the potential effects of the activity. Completion of the Supplemental Services

Compliance Prep form and coordination with the compliance team should be initiated as soon as possible to determine data needs and compliance schedules to minimize impacts on the design schedule.

The compliance review processes and timeframes will not begin until sufficient detail is provided to NPS.

Incomplete or partial submittals will delay the approval process.

50% DB DESIGN DEVELOPMENT (DD) DOCUMENTS

Submit 50% DB DD Documents no later than 120 working days after Contract Award.

Conduct Submission Review Meeting, to familiarize NPS personnel with the submission contents, within

10 days of submission.

Allow 20 working days for NPS review.

Upon receipt of submission comments from NPS, the DBE shall organize meetings by subject matter and/or discipline to discuss the submission and comments and issues that require further clarification.

100% DB DD DOCUMENTS

After receiving the 50% DB DD review comments, the DBE shall address and incorporate comments in the 100% DB DD Documents.

Submit 100% DB DD Documents and NPS Review Form with responses to 50% DB DD Documents no later than 70 working days after receiving all client review comments.

Conduct Submission Review Meeting, to familiarize NPS personnel with the submission contents, within

10 days of submission.

Allow 20 working days for NPS review.

Upon receipt of submission comments from NPS, the DBE shall organize meetings by subject matter and/or discipline to discuss the submission and comments and issues that require further clarification.

100% DB CONSTRUCTION DOCUMENTS (CD)

After receiving the 100% DB Design Development review comments, the DBE shall address and incorporate comments in 100% Draft DB CD.

Submit 100% Draft DB CD and NPS Review Form with responses to the 100% DB DD Documents no later than 20 working days after receiving the client review comments.

Submit all remaining required compliance and permitting documentation. NPS will initiate Section 106 compliance and will prepare the NEPA document based on 100% CD. NEPA approval will not be issued until Section 106 consultation is completed. The completion of compliance activities may take as much as

120 days based upon the anticipated impacts of the base bid option of the POR. DBE to also consider permitting timelines.

Conduct NPS Review Meeting 15 working days after submitting the 100% Draft DB CD.

COMPLETE STAMPED AND SIGNED DB CD

After receiving the 100% Draft DB Construction Documents review comments, the DBE shall address and incorporate comments in the Complete DB CD.

Submit Complete DB CD and NPS Review form with responses to 100% Draft DB CD review comments no later than 20 workings days after receiving NPS review comments and once compliance has been met. Complete DB CD shall be Stamped and Signed by a Professional Engineer licensed in the State of

New York. Notice to Proceed will not be granted until the Complete DB CD is Stamped and Signed by a

Professional Engineer licensed in the State of New York, all compliance tasks have been completed and approved by NPS, and all permits have been obtained.

CONSTRUCTION SUBSTANTIAL COMPLETION

Complete substantial completion no later than 360 working days after Construction Notice to Proceed.

Conduct a punch list site walk with Contracting Officer Representative (COR) at substantial completion.

All punch list items shall be completed within 30 days of substantial completion.

CONSTRUCTION FINAL COMPLETION

Complete construction (final completion) no later than 390 working days from Construction Notice to

Proceed.

AS-CONSTRUCTED DRAWINGS

Complete As-Constructed Drawings no later than 45 working days after Substantial Completion.

Submit As-Constructed Drawings and updated GIS files which reflect as-constructed conditions to the

Project Team.

3 CODES AND STANDARDS

The DBE shall comply with all applicable codes and standards, including but not limited to those listed below. The DBE shall comply with latest versions. Specific standard sections are indicated in subsequent sections of this POR.

• Denver Service Center Design-Build (DB) Workflows website

• NPS Sustainability Design Standards

• NPS 7 Principles of Universal Design

• NPS Climate Change and Natural Hazards, Addressing Climate Change and Natural Hazards

Level 3 Handbook January 2015

• 10 States Standards

• American Society for Testing and Materials (ASTM)

• American National Standards Institute (ANSI)

• American Water Works Association (AWWA)

• Manual on Uniform Traffic Control Devices (MUTCD)

• National Environmental Policy Act (NEPA)

• National Historic Preservation Act (NHPA) Section 106

• Archaeological Resource Protection Act of 1979 (ARPA)

• Native American Graves Protection and Repatriation Act

• New York State Department of Environmental Conservation (NYSDEC)

• Occupational Safety and Health Administration (OSHA)

• New York City Department of Environmental Protection (NYCDEP) Standard Sewer and Water

Main Specifications

• International Building Code (IBC)

• International Plumbing Code (IPC)

• International Fire Code (IFC)

• New York City Plumbing Code

• Federal Highway Administration Paving Standards

4 PROJECT ELEMENT 1 – REPLACE WATER SYSTEM

Ft. Wadsworth has approximately 31,600’ of water pipes, including service connections. The water mains range in size from 4” to 12” in diameter, and the primary material is assumed to be cast iron based on records but it is likely other materials are present. The service connections are in most cases unknown size and material. The site also contains approximately 46 fire hydrants.

The water is supplied to the site by NYCDEP. Ft. Wadsworth receives water from NYCDEP at two 8” city water meter and valve pits: one is located on the north side of the site at New York Avenue and North

Road and the other is located on the southwest side of the site, on McClean Avenue at Lily Pond Avenue.

NPS has decided that due to the age of the infrastructure, the water system is in need of repair. The scope of the water system replacement will be identified by geographical areas, as discussed in Section

9. Within each area, the DBE is expected to perform complete replacements of the water system. The components include the water mains, service connections, fittings, valves, meters, and fire hydrants.

The DBE should explore alternatives to current system layout. The following criteria must be met:

Connections to NYCDEP’s system remain at the same location.

Service is provided to all required buildings.

Hydrants are properly spaced to provide fire protection.

Adequate capacity is provided to convey anticipated flows, including fire flow requirements.

4.1 STANDARDS

The DBE shall comply with applicable codes and standards during design and replacement of the water system, including but not limited to:

• NYCDEP Standard Sewer and Water Main Specifications

• ANSI/AWWA C151/A 21.51 – Ductile Iron Pipe Centrifugally Cast for Water

• ANSI/AWWA C104/A21.4 – Cement Mortar Lining for Ductile Iron Pipe & Fittings for Water,

• ANSI/AWWA C115/A21.15 – Flanged Ductile Iron Pipe with Ductile Iron

• ANSI/AWWA C110/A21.10 – Ductile-Iron & Gray-Iron Fittings, 3- inch through 48-inch for Water

• ANSI/AWWA C111/A21.11 – Rubber Gasket Joints for Ductile Iron Pressure Pipe & Fittings

• ANSI/AWWA C105/A21.5 – Polyethylene Encasement for Ductile Iron Pipe Systems.

• AWWA C116/A21.16-15 – Protective Coatings for the Interior and Exterior Surfaces of Ductile-

Iron and Gray-Iron Fittings for Water Supply Service

• AWWA C502 – Dry-Barrel Fire Hydrants

• AWWA C509 – Resilient-Seated Gate Valves for Water Supply Service.

• AWWA C550 – Protective Interior Coatings for Valves and Hydrants.

• AWWA C600 - Installation of Ductile- Iron Mains and Their Appurtenances

• AWWA C651 – Disinfecting Water Mains

• AWWA C655 – Field Dechlorination

• AWWA 800 – Underground Service Line Valves and Fittings.

• ASTM B88 – Standard Specification for Seamless Copper Water Tube.

• NSF 61 – Drinking Water System Components-Health Effects

• ASTM C478 – Standard Specification for Circular Precast Reinforced Concrete Manhole

Sections.

• ASTM C443 – Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber

Gaskets.

• AWWA M6 Manual – Water Meters – Selection, Installation, Testing, and Maintenance

• International Plumbing Code (IPC)

• National Fire Protection Association Code (NFPA)

4.2 WATER MAINS

4.3 The DBE should analyze construction methods for the

replacement of the water system that are efficient and minimize potential impacts to the project area, including recently paved roadways, trees, and the historical landscape. The DBE can consider relocation of existing water mains or utilizing the same trench for replacement. Same trench replacement includes removal and disposal of existing water mains, and relocation includes abandonment of existing water mains in-place per Section 4.10UTILITY CROSSINGS

Per Ten State Standards, new sewer mains shall be installed below water mains and shall have a minimum of 10’ horizontal separation and 18” vertical separation measured between the edge of pipes or structures. If minimum separations cannot be met, take precautions in accordance with the Ten State

Standards. Per NYC Plumbing Code 2022 603.2, water service connections and sewer or storm drain service connections shall have a minimum of 5’ horizontal separation and 12” vertical separation if feasible. Clearances from other utilities shall meet owner’s requirements, or a 5’ horizontal separation and

12” vertical separation measured between the outside edge of pipes or structures where possible. If minimum separations cannot be met, the DBE shall identify these locations on the design drawings.

ABANDONMENT. Where relocation is required outside of the existing utility corridor, the DBE shall provide justification for the proposed deviation. Bypass and shutdown requirements are provided in

Section 7.2.

Buried water main pipe shall be ductile iron per ANSI/AWWA C151/A 21.51 with push-on joint or mechanical joint (MJ) ductile iron with rubber gaskets per ANSI/AWWA C111/A21.11. The pipe shall be lined internally with cement mortar per ANSI/AWWA C104/A21.4. External protection shall be polyethylene encasement per ANSI/AWWA C105/A21.5. Additional protection may be required depending on soil conditions. Connections to the existing water mains shall be designed to accommodate the condition and material of the existing water mains.

The class of pipe shall be appropriate for depth of cover and anticipated pressures. The water main pipe shall be buried with a minimum of 4’ of cover. If 4’ of cover is unable to be maintained, a design shall be developed for the insulation of the pipe.

Minimum water main size shall be 8” in diameter but 6” diameter pipes may be used for branches to hydrants. Water main dead ends should be minimized to the extent possible and hydrants should be installed at any dead ends to allow for flushing.

Pipe bedding and backfill to be determined based on soil conditions and manufacturer’s recommendations.

The new water mains shall be pressure tested per AWWA C600, disinfected per AWWA C651, and dechlorinated per AWWA C655 prior to being placed into service. Chlorination injection points and blow off assemblies are required for disinfection.

4.4 WATER SERVICE CONNECTIONS

Water services are to be provided to all occupied buildings. There are 40 buildings that require a water service, and the number of water service connections for each building are shown on the Drawings in

Appendix A. It is assumed that the DBE is to replace all existing water services to the building wall unless outside the project boundary. The DBE can consider utilizing the same trench for replacement or relocation of existing water service connections. The number of service connections and the existing service connection locations at the building wall shall be maintained, as work within buildings is not included in the scope of the project. Same trench replacement includes removal, and disposal of existing water service connections and relocation includes abandonment of existing water service connections in-place per Section 4.10.

Water service connections shall be replaced with the same size or larger than existing. Domestic service connections shall be a minimum of 1” in diameter for a single domestic water connection, a minimum of 1-

1/2” in diameter for connections to duplexes, and 4” in diameter for fire connections. Where meters are not installed, curb stops or shut-off valves should be installed outside of roadway travel limits within sidewalks or walkways where possible.

Water service connections that are 2” and smaller shall be Type K copper per ASTM B88 and installed per AWWA C800. Larger water service connections (4” and larger) shall be ductile iron and follow the requirements in Section 4.2. Connections to the existing water service connections shall be designed to accommodate the condition and material of the existing water service connections.

Pipe bedding and backfill to be determined based on soil conditions and manufacturer’s recommendations.

4.5 WATER FITTINGS

The locations and types of fittings, such as bends, tees, and crosses are to be determined by the DBE based on the proposed water main alignment.

Ductile iron fittings for water mains and 4” and larger water service connections shall be in accordance with ANSI/AWWA C110/A21.10. Joint connecting hardware shall comply with C 111/A21.11. The fittings shall be rated for the depth of cover and anticipated pressures.

Fittings with unbalanced forces (e.g., bends and tees) shall be restrained joints per DBE calculations.

Thrust blocks are not preferred. Restrained joints shall be labeled for notification to future contractors.

The fittings shall be lined internally with cement mortar per ANSI/AWWA C104/A21.4 or epoxy coated per

AWWA C116/A21.16-15. External protection shall be polyethylene encasement per ANSI/AWWA

C105/A21.5 and/or epoxy coating per AWWA C116/A21.16-15. Additional protection may be required depending on soil conditions.

4.6 WATER VALVES

Valves on the water system should be installed at minimum at the following locations:

At existing valve locations unless otherwise directed by NPS.

On the branch side of all tees, including for service connections and fire hydrants.

Recommended maximum spacing of valves is 1,000’.

Water valves for ductile iron pipe (4” and larger) shall be resilient-seated gate valves in accordance with

AWWA C509. The valves shall be rated for the depth of cover and anticipated pressures. The valves shall be manually operated with Non-Rising Stem (NRS). Valve stems shall be operable with valve key available on-site.

Valve boxes for gate valves to be cast iron with cast iron covers. Covers shall be marked as “Water” and match the style of existing covers on-site as approved by NPS.

Gate valves should be located as close as possible to fittings and the valves should be restrained to the fittings to facilitate future shutdowns.

Gate valves shall be internally and externally protected in accordance with AWWA C550. External protection shall also be polyethylene encasement per ANSI/AWWA C105/A21.5. Additional protection may be required depending on soil conditions.

4.7 WATER METERS

The existing 8” water meter at the connection to NYCDEP’s system, located on the north side of the site at New York Avenue and North Road, shall be replaced. A backflow preventer shall also be replaced in accordance with NYCDEP’s requirements. The existing 8” water meter located on the southwest side of the site, on McClean Avenue at Lily Pond Avenue is out of scope.

Additional water meters on the water system should be installed, at minimum, to meter the following areas:

The fenced US Coast Guard area between Coast Guard Drive and Drum Road west of New York

Avenue, The US Coast Guard housing area south of project boundary that are fed by water mains on USS

Tennessee Road and USS New Mexico Court.

The United States Army Reserve Center on the south side of Drum Road west of New York

Avenue.

The United Stated Army Reserve Center on the north side of Battery Road west of New York

Avenue.

Unless otherwise directed by NPS, each service connection (for buildings not listed above) behind the curb (in grass or sidewalk) per NPS Staff Directive 78-10.

DBE to assess exact locations for these water meters to balance accessibility for meter readings with the limitations to looping the water system and reducing capacity for fire flow.

Water meters should be selected and installed in accordance with AWWA Manual M6.

Water meters for ductile iron pipe (4” and larger) should be set in a meter vault. Pipe in structure must be supported and may be flanged joints per ANSI/AWWA C115/A21. Valves and bypass shall be provided per meter manufacturer’s recommendations.

Structures shall be precast concrete in accordance with ASTM C478 and joints per ASTM C443. Non-circular structures, where required, shall be designed by a structural engineer.

A minimum 27” diameter frame and cover shall be provided for access. The frame will rest on a minimum of 3 courses of brick or 6” concrete grade ring to allow for future grade adjustments. Covers shall be cast iron, marked as “Water”, and match the style of existing covers on-site as approved by NPS. Manhole steps are not required or preferred.

Structure bedding and backfill to be determined based on soil conditions and manufacturer’s recommendations.

4.8 FIRE HYDRANTS

The DBE is expected to replace the existing hydrants. However, the DBE shall ensure that fire hydrant spacing complies with the International Fire Code (as adopted by New York State).

All fire hydrant parts shall be dry-barrel in accordance with AWWA C502 and applicable local codes. The style, including color, should match the existing fire hydrants on-site as approved by NPS.

Fire hydrant connections shall be ductile iron in accordance with Section 4.2 and 6” in diameter. Fire hydrant fittings and valves shall meet the minimum requirements in the previous sections.

Fire hydrants shall be internally and externally protected in accordance with AWWA C550. External protection for buried fire hydrant barrels shall also be polyethylene encasement per ANSI/AWWA

C105/A21.5. Additional protection may be required depending on soil conditions.

4.9 UTILITY CROSSINGS

Per Ten State Standards, new water mains shall be installed above the sewer and shall have a minimum of 10’ horizontal separation and 18” vertical separation from sewer measured between the edge of pipes or structures. If minimum separations cannot be met, take precautions in accordance with the Ten State

Standards. Per NYC Plumbing Code 2022 603.2, water service connections and sewer or storm service connections shall have a minimum of 5’ horizontal separation and 12” vertical separation if feasible.

Clearances from other utilities shall meet owner’s requirements, or a 5’ horizontal separation and 12” vertical separation measured between the edge of pipes or structures where possible. If minimum separations cannot be met, the DBE shall identify these locations on the design drawings.

4.10 ABANDONMENT

There are several buildings which are known to be previously demolished. Any service connections not currently connected to a building or other infrastructure shall be capped at the limits of the excavation for the new water main. The DBE to perform testing to confirm connectivity and verify with NPS before proceeding with abandonment of service connections.

Additionally, there are locations where changes to the water system have left capped spurs. Once it is confirmed that they are not currently connected to a building or other infrastructure, they are not to be replaced and shall be abandoned in-place along with any associated water service connections. Known locations have been identified in the Drawings in Appendix A for further investigation, but additional locations shall be anticipated. The DBE to verify with NPS before proceeding with abandonment work.

The ends of all abandoned pipes shall be capped or plugged. Abandoned pipes 12” in diameter or greater shall be filled with controlled low strength material, such as grout, as pipes will continue to degrade over time and potentially collapse causing disturbances at the finished grade.

For abandoned valves or water manholes, the asset shall be removed to a minimum of 3’ below grade, filled with a controlled low strength material, such as grout, and pavement restored to match existing grade. No cover or other surface features should remain visible.

5 PROJECT ELEMENT 2 – REPLACE WASTEWATER (SEWER)

SYSTEM

There are approximately 11,200’ of gravity sewer pipes, including service connections. The sewer mains range in size from 6” to 18” in diameter, though some of the service connections may be smaller. The pipe materials include vitrified clay pipe (VCP), polyvinyl chloride (PVC), and cast iron, but it is likely that other materials are present. The manholes vary in size and are either constructed of concrete or brick.

There are approximately 72 existing manholes on the site. On the southwest area of the site, the United

States Coast Guard housing area is serviced by a pumping station and force main; these components are not included in the scope of work.

The on-site wastewater (sewer) system drains into NYCDEP’s system and discharges must meet the sewer use by-law. The systems connect at 3 locations: on the north side of the site at New York Avenue, on the northwest side of the site on Coast Guard Drive, and on the southwest side of the site on McClean

Avenue. Sewers north of the Verrazzano-Narrows Bridge flow to the Port Richmond Wastewater

Treatment Plant and sewers south of the bridge flow to the Oakwood Beach Wastewater Treatment Plant.

NPS has decided that a complete replacement of the sewer system is required based on the age of the system and maintenance issues experienced. The main components include the sewer mains, service connections, and manholes.

It was assumed that the size of the sewer system will generally be replaced in-kind; however, the DBE may explore alternatives to the current system layout if the following criteria are met:

Connections to NYCDEP’s system remain at the same location.

Service is provided to all required buildings.

Adequate capacity is provided to convey anticipated flows.

Adequate, positive slopes are provided to achieve flushing velocities.

In order to validate a new system layout, the DBE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .