B08_Attachment_04_Appendix_A_-_Fort_Wadsworth_Drawing_Set_0002.pdf
PDF 34 MB Posted
- Attached to
- GATE 318738 - Design Build - Rehab Wastewater
- Solicitation number
- 140P2023R0063
About this file
This solicitation seeks proposals for the first phase of a two-phase design-build procurement for the rehabilitation of water, wastewater, and stormwater utility systems at Fort Wadsworth. The National Park Service is the contracting agency. Proposals are due by August 11th, 2023 for phase one only, which does not involve pricing. A draft program of requirements is attached, with the final version to be provided in phase two. The attached file appears to contain drawing sets but no other content is listed. The opportunity aims to rehabilitate critical utility infrastructure at the Fort Wadsworth National Historic Site.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL PARK SERVICE
PROGRAM OF REQUIREMENTS
NOVEMBER 2023
N111 GATE 318738
O
RI
G
IN
AL
S
HE
ET
AN
SI
D us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-C ov er .d w g
/1 1/
0:
P M B y:
O ste r, M at t
REHABILITATE WATER, WASTEWATER, AND
STORMWATER UTILITY SYSTEMS AT FT. WADSWORTH
VICINITY MAP
1" = 3000'
VERRAZZANO NARROWS
BRIDGE
INTERSTATE 278
NEW YORK AVENUE
HYLAN BOULEVARD
PROJECT AREA
BATTERY ROAD
MONT SEC AVENUE
STATEN ISLAND
BROOKLYN
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_
.1
G en
N ot es .d w g
/1 1/
1:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_01.1 - GEN NOTES
2023.05.12
GENERAL NOTES, LEGEND,
AND ABBREVIATIONS
NO SCALE
G-002 2
SERVICES
W: 1*
SS: 1
SD: (0)
SERVICES (SEE WATER NOTE #8 AND
SEWER AND STORM DRAIN NOTE #9)
DC
EOP
LSA
EOC
DIP
MC
(TYP)
SYL
SWL
DAWL
DYL
NVP
SB
TOD
BOS
EXISTING CONTOUR
EXISTING SPOT ELEVATION
EXIST. TOP OF CURB ELEVATION
EXIST. BOTTOM OF CURB ELEVATION
EXIST. TOP OF WALL ELEVATION
EXIST. BOTTOM OF WALL ELEVATION
EXIST. FINISHED FLOOR ELEVATION
EXIST. DOOR SILL ELEVATION
OVERHEAD WIRES
APPROX. LOC. UNDERGROUND ELECTRIC LINE
APPROX. LOC. UNDERGROUND NATURAL GAS LINE
APPROX. LOC. UNDERGROUND WATER LINE
DEPRESSED CURB
HYDRANT
FIRE DEPARTMENT CONNECTION (F.D.C.)
WATER VALVE
GAS VALVE
STORM DRAIN
SEWER MANHOLE
CON. ED. MANHOLE
TELECOMMUNICATIONS MANHOLE
ELECTRIC MANHOLE
UNKNOWN MANHOLE
WATER MANHOLE
GAS MANHOLE
CLEAN OUT
DRAIN
VENT & NUMBER OF VENTS
DETECTABLE WARNING PAD
UTILITY POLE
GUY WIRE
TRAFFIC SIGNAL
SIGN
DOUBLE SIGN
MAIL BOX
BOLLARD
SECURITY CAMERA
AREA LIGHT
DUCTILE IRON PIPE
DEPRESSED CURB
EDGE OF CONC.
EDGE OF PAVEMENT
LANDSCAPED AREA
METAL COVER
TYPICAL
SOLID WHITE LINE
SOLID YELLOW LINE
DOUBLE YELLOW LINE
DASHED WHITE LINE
STOP BAR
NO VISIBLE PIPE
TOP OF DEBRIS
BOTTOM OF STRUCTURE
UNKNOWN TERMINUS
LEGEND
PAINTED ARROWS
LIGHT POLE
PAINTED HANDICAPPED
PAINTED BIKE LANE ARROW
PAINTED BIKE LANE
METAL COVERS
CATCH BASINS
STEAM MANHOLE
CABLE BOX
ELECTRIC BOX
TELECOMMUNICATIONS BOX
UTILITY & LIGHT POLE
TELECOMMUNICATIONS PEDESTAL
POST INDICATOR VALVE
ROOF DRAIN
AREA LIGHT ON BUILDING
UNK
APPROX. LOC. UNDERGROUND CABLE LINE
APPROX. LOC. UNDERGROUND SEWER
APPROX. LOC. UNDERGROUND STORM DRAIN
APPROX. LOC. UNDERGROUND TELEPHONE LINE
APPROX. LOC. UNDERGROUND
UNKNOWN UTILITY LINE
TRENCH DRAIN (TD)
CIP
CPP
RCP REINFORCED CONCRETE PIPE
CAST IRON PIPE
CORRUGATED PLASTIC PIPE
VCP VITRIFIED CLAY PIPEWATER METER
GAS METER
ELECTRIC METER
FWD FILLED WITH DEBRIS
APPROX. LOC. UNDERGROUND CABLE LINE
CB CATCH BASIN
CLF CHAIN LINK FENCE
CMP CORRUGATED METAL PIPE
DBE DESIGN BUILD ENTITY
HDPE HIGH DENSITY POLYETHYLENE
INV INVERT
NPS NATIONAL PARK SERVICE
PVC POLYVINYL CHLORIDE
TOW TOP OF WALL
SURVEY NOTES:
1. THE PURPOSE OF THIS SURVEY IS TO DEPICT SITE TOPOGRAPHIC CONDITIONS ONLY. PROPERTY BOUNDARIES AND TITLE/EASEMENT CONDITIONS HAVE NOT BEEN INVESTIGATED OR EXAMINED AS PART OF THIS SURVEY. THE SURVEYOR MAKES NO REPRESENTATIONS
AS TO THE PRESENCE OR ABSENCE OF EASEMENTS OR ENCUMBRANCES ON THE PROPERTY.
2. SURVEYED AREA IS A PORTION OF PROPERTY KNOWN AS LOT 1, BLOCK 3128, AS SHOWN ON THE NEW YORK CITY DIGITAL TAX MAP
OF THE BOROUGH OF STATEN ISLAND, CITY AND STATE OF NEW YORK.
3. LOCATION OF UNDERGROUND UTILITIES ARE APPROXIMATE. LOCATIONS AND SIZES ARE BASED ON UTILITY MARK-OUTS, ABOVE GROUND STRUCTURES THAT WERE VISIBLE & ACCESSIBLE IN THE FIELD, AND THE MAPS AS LISTED IN THE REFERENCES AVAILABLE AT THE TIME OF THE SURVEY. AVAILABLE ASBUILT PLANS AND UTILITY MARKOUT DOES NOT ENSURE MAPPING OF ALL UNDERGROUND UTILITIES AND STRUCTURES. BEFORE ANY EXCAVATION IS TO BEGIN, ALL UNDERGROUND UTILITIES SHOULD BE VERIFIED AS TO THEIR LOCATION, SIZE AND TYPE BY THE PROPER UTILITY COMPANIES. CONTROL POINT ASSOCIATES, INC. DOES NOT GUARANTEE THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA EITHER IN SERVICE OR ABANDONED.
A QUALITY LEVEL SYSTEM IS UTILIZED TO IDENTIFY THE SOURCE OF THE UNDERGROUND UTILITY INFORMATION. THE METHOD OF DETERMINATION IS BASED ON CONTRACTUAL AGREEMENT WITH THE CLIENT AND IS DEPICTED ON THE SURVEY BY THE LINE TYPES
SHOWN IN THE DRAWING LEGEND. FOR REFERENCE, THE QUALITY LEVELS ARE AS FOLLOWS:
QUALITY LEVEL C - LOCATION OF UTILITY SURFACE FEATURES SUPPLEMENTS REFERENCE MAPPING. INCLUDES MARKOUT BY
OTHERS.
QUALITY LEVEL B - UTILITY LOCATION DATA IS COLLECTED THROUGH GEOPHYSICAL SENSING TECHNOLOGY TO SUPPLEMENT SURFACE FEATURES AND OR REFERENCE MAPPING. INCLUDES MARKOUT BY CONTROL POINT ASSOCIATES, INC.
4. THIS PLAN IS BASED ON INFORMATION PROVIDED BY CLIENT, A SURVEY PREPARED IN THE FIELD BY CONTROL POINT ASSOCIATES, INC., AND OTHER REFERENCE MATERIAL AS LISTED HEREON.
5. TRADITIONAL GROUND SURVEY MAPPING WAS SUPPLEMENTED BY PLANIMETRIC AND TOPOGRAPHIC FEATURES COMPILED BY CONTROL POINT ASSOCIATES, INC. UTILIZING PHOTOGRAMMETRIC METHODS FROM AERIAL PHOTOGRAPHY. AERIAL PHOTOGRAPHY PERFORMED BY ROBINSON AERIAL SURVEYS, INC ON 03-26-2023. THIS DATA SET WAS PRODUCED TO COMPLY WITH THE AMERICAN SOCIETY OF PHOTOGRAMMETRY AND REMOTE SENSING (ASPRS) CLASS 1 STANDARD FOR A HORIZONTAL MAPPING SCALE OF 1"=30'.
6. PHOTOGRAMMETRIC MAPPING HAS BEEN COMPILED IN ACCORDANCE WITH PROCEDURES THAT HAVE BEEN DEMONSTRATED TO COMPLY WITH THE AMERICAN SOCIETY OF PHOTOGRAMMETRY AND REMOTE SENSING (ASPRS) CLASS 1 STANDARD FOR A
HORIZONTAL MAPPING SCALE OF 1"=30' AND A CONTOUR INTERVAL OF 1'.
7. FEATURES ARE LIMITED TO THOSE VISIBLE AT TIME OF THE PHOTOGRAPHY AND ARE SUBJECT TO FIELD VERIFICATION BY THE END
USER.
8. AERIAL CONTROL PROVIDED BY CONTROL POINT ASSOCIATES, INC. ON 04-04-2023.
9. THE EXISTENCE OF UNDERGROUND STORAGE TANKS, IF ANY, WAS NOT KNOWN AT THE TIME OF THE FIELD SURVEY.
10. ELEVATIONS REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88). WHICH IS 2.09 FEET BELOW THE BOROUGH OF RICHMOND HIGHWAY DATUM. ELEVATIONS ARE BASED UPON GPS OBSERVATIONS UTILIZING THE KEYSTONE KEYNET NETWORK.
TO CONVERT TO RICHMOND HIGHWAY DATUM SUBTRACT 2.09 FROM THE ELEVATIONS SHOWN.
TO CONVERT TO NGVD 1929 ADD 1.10 FEET TO ELEVATIONS SHOWN.
TEMPORARY BENCHMARKS SET:
TBM-A: X-CUT SET IN CONCRETE CURB ON THE WESTERLY SIDE OF COAST GUARD DRIVE.
ELEVATION=102.96'
TBM-B: X-CUT SET IN CONCRETE CURB ON THE SOUTHERLY SIDE OF COAST GUARD DRIVE.
ELEVATION=95.94'
TBM-C: X-CUT SET IN CONCRETE CURB ON THE SOUTHERLY SIDE OF SOUTH ROAD.
ELEVATION=96.68'
TBM-D: X-CUT SET IN CONCRETE CURB ON THE SOUTHERLY SIDE OF MARSHAL ROAD.
ELEVATION=104.19'
TBM-E: X-CUT SET IN CONCRETE SIDEWALK ON THE EASTERLY SIDE OF NEW YORK AVENUE.
ELEVATION=101.92'
TBM-F: X-CUT SET IN CONCRETE CURB ON THE WESTERLY SIDE OF HUDSON ROAD.
ELEVATION=116.45'
TBM-G: X-CUT SET IN CONCRETE CURB ON THE SOUTHERLY SIDE OF MARSHAL ROAD.
ELEVATION=103.12'
TBM-H: X-CUT SET IN CONCRETE CURB ON THE WESTERLY SIDE OF TOMPKINS STREET.
ELEVATION=115.64'
TBM-I: X-CUT SET IN CONCRETE SIDEWALK ON THE WESTERLY SIDE OF NEW YORK AVENUE.
ELEVATION=99.33'
TBM-J: X-CUT SET IN CONCRETE CURB ON THE NORTHERLY SIDE OF BATTERY ROAD.
ELEVATION=101.99'
TBM-K: MAG NAIL SET IN CONCRETE SIDEWALK ON THE WESTERLY SIDE OF USS NEW MEXICO COURT.
ELEVATION=86.32'
TBM-L: MAG NAIL SET IN ASPHALT ON THE SOUTHERLY SIDE OF HUDSON ROAD.
ELEVATION=64.32'
TBM-M: MAG NAIL SET IN ASPHALT ON THE NORTHERLY SIDE OF RANGE ROAD.
ELEVATION=13.27'
TBM-N: MAG NAIL SET IN ASPHALT ON THE WEST SIDE OF HUDSON ROAD.
ELEVATION=86.36'
TBM-O: MAG NAIL SET IN ASPHALT ON THE WEST SIDE OF SOUTH WEED ROAD.
ELEVATION=31.53'
TBM-P: PK NAIL SET IN ASPHALT ON THE WEST SIDE OF NORTH WEED ROAD.
ELEVATION=32.35'
TBM-Q: MAG NAIL SET IN ASPHALT ON THE EAST SIDE OF NORTH WEED ROAD.
ELEVATION=77.80'
PRIOR TO CONSTRUCTION IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THAT THE BENCHMARKS ILLUSTRATED ON THIS SKETCH HAVE NOT BEEN DISTURBED AND THEIR ELEVATIONS HAVE BEEN CONFIRMED. ANY CONFLICTS MUST BE REPORTED PRIOR
TO CONSTRUCTION.
11. THERE WERE NO NATURAL STREAMS OR WATERCOURSES VISIBLE AT THE TIME OF THE FIELD SURVEY.
12. WATER LINE HAS BEEN FIELD VERIFIED UNLESS NOTED OTHERWISE. UNKNOWN IF WATER IS ACTIVE OR ABANDONED.
REFERENCES:
1. MAP ENTITLED "STRATEGIC HOMEPORTING SURFACE ACTION GROUP, TOPOGRAPHICAL SURVEY, NAVAL STATION, STATEN ISLAND, NY" PREPARED BY ETTLINGER & ETTLINGER P.C. CONSULTING ENGINEERS & CITY SURVEYORS. DATED SEPTEMBER 17, 1985.
2. MAP ENTITLED "GATE_646_60927_FOWA_PLAN - FORT WADSWORTH STORM/ SANITARY SEWERS", U.S. ARMY ENGINEER DISTRICT:
NEW YORK, CORPS OF ENGINEERS, DATED MAY 21, 1971.
3. MAP ENTITLED "FORT WADSWORTH, STATEN ISLAND, NY, FORT WADSWORTH DOMESTIC AND FIRE WATER SYSTEM, SHEET 1 OF 1".
DATED JUNE 29, 1994.
4. MAP ENTITLED "GATE 17689 DATED MARCH 11, 1965, RECEIVED 08-17-2023.
WATER BASE/OPTION PARTITION BOUNDARY
LF LINEAR FEET
GENERAL NOTES
1. INFORMATION SHOWN HEREON COMPILED BY CONTROL POINT ASSOCIATES, INC. FROM A FIELD SURVEY, AERIAL SURVEY, AND RECORD INFORMATION RECEIVED NOVEMBER 15, 2023. THERE HAVE BEEN KNOWN CHANGES TO THE SITE SINCE THE INITIAL FIELD SURVEY, INCLUDING RESURFACING OF THE PARADE GROUNDS IN FORT TOMPKINS AND PLANTING OF NEW TREES THROUGHOUT THE SITE. THE DBE SHALL VERIFY CURRENT CONDITIONS IN THE FIELD WHEN IDENTIFYING IMPACTS BASED ON PROPOSED DESIGN.
2. THE LOCATION OF UTILITIES IS APPROXIMATE ONLY, AND THE EXACT LOCATION SHOULD BE DETERMINED BY THE DESIGN BUILD ENTITY (DBE). THE DBE SHOULD SATISFY THEMSELVES AS TO THE ACTUAL LOCATION AND THE DEPTH OF ANY UTILITY. THE EXISTENCE OF ADDITIONAL UTILITIES INCLUDING IRRIGATION SYSTEMS NOT SHOWN ON THE PLANS SHALL BE ANTICIPATED.
3. ALL EXISTING UTILITIES ARE TO BE PROTECTED DURING CONSTRUCTION AND THE DBE SHALL BE LIABLE FOR ANY AND ALL DAMAGE.
DAMAGES SHALL BE EXPEDITIOUSLY REPAIRED OR RECONSTRUCTED AT THE DBE'S EXPENSE WITHOUT ADDITIONAL COMPENSATION.
4. PRIOR TO STARTING WORK IN EACH STREET, THE DBE SHALL GIVE SUFFICIENT NOTIFICATION TO ALL PRIVATE AND PUBLIC UTILITY COMPANIES TO PERMIT STREET MARKING OF THEIR FACILITIES. MARKING OF NPS FACILITIES IS THE RESPONSIBILITY OF THE DBE.
5. THE DBE SHALL CONSIDER THE INDIVIDUAL SERVICE LINES TO EACH BUILDING FROM ALL UTILITIES, WHETHER MARKED OUT OR NOT, WHEN PROCEEDING WITH EXCAVATION.
6. THE DBE IS FOREWARNED THAT UTILITY SERVICES EXIST IN THESE STREETS. IF THE DBE CUTS OR DAMAGES THESE SERVICES THEY SHALL IMMEDIATELY REPLACE THEM AT THEIR OWN EXPENSE OR PAY FOR THEIR REPLACEMENT AT THE OPTION OF THE THIRD-PARTY
UTILITY COMPANY.
7. ALL PUBLIC AND PRIVATE UTILITIES SHALL BE CONTINUOUSLY MAINTAINED DURING CONSTRUCTION.
8. EVERY REASONABLE PRECAUTION SHOULD BE TAKEN TO ENSURE THE PROTECTION OF EXISTING BUILDINGS, STRUCTURES, UTILITIES, AND OTHER IMPROVEMENTS DURING CONSTRUCTION.
9. THE DBE'S ATTENTION IS DIRECTED TO THE POSSIBLE PRESENCE OF STEEL RAILS AND WOOD TIES BELOW THE SURFACE OF THE ROADWAY. WORK UNDER THIS CONTRACT MUST PROTECT THESE HISTORIC FEATURES IF THEY ARE ENCOUNTERED. NO WORK TO
REMOVE SUCH TRACKS IS PERMISSIBLE.
10. HISTORICAL STRUCTURES SUCH AS CISTERNS MAY BE PRESENT ON SITE AND UNMAPPED.
11. ALL ELEVATIONS ON THESE PLANS, UNLESS OTHERWISE NOTED, ARE BASED UPON THE NAVD 1988 DATUM.
12. ABANDONMENT OF ALL UTILITIES SHALL BE IN ACCORDANCE WITH THE PROGRAM OF REQUIREMENTS (POR).
13. ALL EXCAVATION, BEDDING, AND BACKFILL OPERATIONS SHALL BE DONE IN ACCORDANCE WITH THE POR.
14. ACCESS AND TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE POR. ALL STREET OPENINGS SHALL BE SECURELY COVERED AT
THE END OF EACH DAYS' OPERATION TO ENSURE SAFE PASSAGE.
15. THE DBE IS TO MATCH EXISTING GRADES. REGRADING IS OUT OF THE SCOPE OF THIS CONTRACT.
16. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE POR. ALL MATERIALS SHALL BE NEW UNLESS OTHERWISE APPROVED
BY NPS.
17. THE DBE IS RESPONSIBLE FOR DESIGN AND IMPLEMENTATION OF TREE PROTECTION AND EROSION & SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE POR. THE DBE IS RESPONSIBLE FOR OBTAINING ALL PERMITS AND APPROVALS REQUIRED FOR PERFORMING THE WORK. NPS WILL SUPPORT DURING THE COMPLIANCE PROCESS. NO WORK CAN BEGIN BEFORE COMPLIANCE APPROVAL AND
PERMITS ARE IN PLACE.
18. THE FEMA 100-YEAR FLOODPLAIN AND 500-YEAR FLOODPLAIN SHOWN ON THESE PLANS IS THE BEST AVAILABLE FLOOD HAZARD DATA RELEASED BY FEMA ON 1/30/2015. THE DATA WAS DOWNLOADED FROM THE FEMA MAP SERVICE CENTER ON 8/22/23.
WATER NOTES
1. WATER SYSTEM SHOWN IS THE BEST REPRESENTATION OF EXISTING CONDITIONS. DBE TO DESIGN NEW LAYOUT OF THE WATER
SYSTEM.
2. THE PROJECT’S INTENT IS TO REPLACE THE ENTIRE WATER SYSTEM; HOWEVER, NPS HAS DECIDED TO ORGANIZE THE WATER SYSTEM INTO BASE BID COMPONENTS AND OPTION AREAS BASED ON GEOGRAPHICAL AREA. THE WATER BASE BID AND OPTION AREAS ARE
PRESENTED IN THE MAPPING IN APPENDIX K OF THE POR.
3. THE SIZES OF EXISTING WATER MAINS AND SERVICES, WHERE PROVIDED, ARE NOMINAL DIAMETERS SHOWN BASED ON RECORD PLANS.
ALL PIPE DIMENSIONS ARE SHOWN IN INCHES UNLESS OTHERWISE INDICATED. MATERIALS COULD NOT BE VERIFIED. DBE TO VERIFY SIZE
AND MATERIALS, ESPECIALLY AT PROPOSED CONNECTIONS TO THE EXISTING SYSTEM.
4. THE DBE SHALL GIVE ADEQUATE NOTICE TO AND PROVIDE CLOSE COOPERATION WITH NPS DURING THE ENTIRE CONSTRUCTION PERIOD, INCLUDING APPROVAL OF ALL VALVE OPERATION, HYDRANT AND VALVE REMOVALS, AND ALL NEW INSTALLATION AS REQUIRED.
5. DEPTH OF EXISTING WATER MAINS IS GENERALLY NOT KNOWN BUT MEASUREMENTS TO TOP OF NUT HAVE BEEN PROVIDED FOR SELECT VALVES. NORMAL DEPTH OF COVER ON ALL NEW WATER MAINS AND SERVICES SHALL BE FOUR FEET.
6. WHERE KNOWN, WATER SERVICES HAVE BEEN SHOWN ON THE PLANS. ADDITIONAL SERVICES MAY BE FOUND IN THE COURSE OF
CONSTRUCTION AND SHOULD BE ANTICIPATED.
7. THE EXACT LOCATION OF WATER SERVICES TO BE REPLACED WILL BE DETERMINED AS THEY ARE ENCOUNTERED IN THE WORK.
LOCATION MAY BE VARIED IN THE FIELD AND SERVICES ARE TO BE RELAID TO CONNECT TO THE EXISTING SERVICE NEAR THE BUILDING
WALL.
8. EXPECTED WATER SERVICES ARE DENOTED PER BUILDING ON THE PLANS. DBE IS REQUIRED TO VERIFY ALL WATER SERVICE QUANTITIES AND LOCATIONS. WHERE AN ASTERISK IS USED, SERVICE IS REQUIRED BUT LOCATION OF SERVICE(S) IS UNKNOWN. WHERE
PARENTHESES ARE USED, DBE TO VERIFY WHETHER SERVICE IS REQUIRED.
9. TEMPORARY WATER BYPASS DURING CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE POR.
10. THE DBE SHALL KEEP NPS INFORMED OF THE STATUS OF ALL HYDRANTS AFFECTED BY WORK UNDER THIS CONTRACT.
SEWER & STORM DRAIN NOTES
1. SEWER SYSTEM SHOWN IS THE BEST REPRESENTATION OF EXISTING CONDITIONS. DBE TO DESIGN NEW LAYOUT OF THE SEWER
SYSTEM.
2. STORM DRAIN SYSTEM SHOWN IS THE BEST REPRESENTATION OF EXISTING CONDITIONS. DBE TO REHABILITATE OR REPLACE STORM
DRAIN INFRASTRUCTURE AS NOTED ON THE PLANS.
3. THE FULL REPLACEMENT OF THE SANITARY SEWER SYSTEM IS INCLUDED UNDER THE BASE BID. HOWEVER, THERE IS A SINGULAR SANITARY SEWER OPTION FOR THE PIPE SEGMENT AT THE MOST NORTHWEST CORNER OF THE SITE AS DESCRIBED IN DETAIL UNDER
SANITARY SEWER OPTION 1 SHOWN ON SHEET C-107.
4. THERE ARE CERTAIN FEATURES OF THE STORM DRAIN SYSTEM THAT ARE CONTRACT OPTIONS. THESE OPTIONS ARE NOTED BY
CALLOUTS ON THE PLANS.
5. THE SIZES AND MATERIAL OF EXISTING SEWER MAINS, STORM DRAINS, AND SERVICES ARE PROVIDED BASED ON FIELD SURVEY AND RECORDS. SIZES AND MATERIALS SHOULD BE VERIFIED BY THE DBE, ESPECIALLY AT PROPOSED CONNECTIONS TO THE EXISTING
SYSTEM.
6. THE SIZES AND MATERIAL OF EXISTING MANHOLES ARE NOT SHOWN ON THE DRAWINGS AND SHOULD BE VERIFIED BY THE DBE, ESPECIALLY AT PROPOSED CONNECTIONS TO THE EXISTING SYSTEM.
7. WHERE KNOWN, SEWER AND STORM DRAIN SERVICES HAVE BEEN SHOWN ON THE PLANS. ADDITIONAL SERVICES MAY BE FOUND IN THE
COURSE OF CONSTRUCTION AND SHOULD BE ANTICIPATED.
8. WHERE COMBINED, SANITARY AND STORM LINES SHALL BE SEPARATED. HOWEVER, WORK WITHIN THE BUILDINGS IS OUT OF THE SCOPE
OF THIS CONTRACT.
9. EXPECTED SEWER AND STORM DRAIN SERVICES ARE DENOTED PER BUILDING ON THE PLANS. DBE IS REQUIRED TO VERIFY ALL UTILITY SERVICE QUANTITIES AND LOCATIONS. WHERE AN ASTERISK IS USED, SERVICE IS REQUIRED BUT LOCATION OF SERVICE(S) IS UNKNOWN.
WHERE PARENTHESES ARE USED, DBE TO VERIFY WHETHER SERVICE IS REQUIRED.
10. THE DBE SHALL VERIFY EXISTING INVERT ELEVATIONS IN ADVANCE OF CONSTRUCTION AND REDESIGN TO ADDRESS ANY
DISCREPANCIES.
11. THE DBE SHALL BE RESPONSIBLE FOR ADEQUATELY HANDLING ALL FLOW IN EXISTING SEWER AND STORM DRAIN LINES. TEMPORARY
BYPASS, AS REQUIRED, SHALL BE IN ACCORDANCE WITH THE POR.
12. RIM ELEVATIONS FOR MANHOLES AND CATCH BASINS ARE FOR INFORMATION ONLY. THE DBE SHALL SET FINAL RIM ELEVATIONS TO
MEET EXISTING GRADES.
13. ALL ACTIVE SEWER SERVICES ARE TO BE REPLACED FROM THE NEW MAIN TO EXISTING CONNECTION NEAR BUILDING WALL, EXCEPT AS
NOTED ON THE DRAWINGS.
14. ALL ACTIVE STORM DRAIN SERVICES ARE TO BE RECONNECTED TO NEW, EXISTING, OR REHABILITATED STORM DRAINS.
15. DBE TO PERFORM INVESTIGATIONS, SUCH AS SMOKE TESTING, DYE TESTING, OR CCTV INSPECTIONS, AS REQUIRED TO DETERMINE
ACTIVE STATUS OR CONNECTIVITY OF SERVICES.
16. UNLESS OTHERWISE NOTED, STORM DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED IN THE POR PHASE
UNLESS OTHERWISE NOTED.
17. AS A CONTRACT OPTION, DBE TO PERFORM A CONDITION ASSESSMENT ON ALL STORM DRAINS AND STRUCTURES THAT WERE NOT INSPECTED DURING THE POR. ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION ASSESSMENT IS TO BE ADMINISTERED
THROUGH A POTENTIAL CONTRACT MODIFICATION.
18. DBE IS RESPONSIBLE FOR ASSIGNING IDENTIFICATION NUMBERS FOR STORM STRUCTURES IN ACCORDANCE WITH THE EXISTING NUMBERING SCHEME, AS DETAILED IN THE POR. DBE IS ALSO RESPONSIBLE FOR ASSIGNING IDENTIFICATION NUMBERS FOR THE SEWER SYSTEM IN A SIMILAR NUMBERING SCHEME. THIS NUMBERING IS REQUIRED TO BE SHOWN ON DRAWINGS.
EOI END OF INFORMATION
N
Y AVE
N
Y AVE
BATTERY RD
ARTILLERY RD
MARSHALL RD
M
ALO
N
EY D
R DRUM RD
TOMPKINS ST
MONT SEC AVE
N. RD
S. RD
H U
D
SO
N R
D
HUDSON RD
COAST GUARD DR
N . W
EED
R
D
VERRAZZANO-NARROWS BRIDGE
USS NC RD
U
SS
T N
R D
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 0.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_0
2023.05.12
N
KEY PLAN
C-100 3
Feet 0 20 40
C-101 C-102 C-105 C-106
C-107 C-108 C-109 C-110 C-111
C-118C-117C-116C-115C-114
C-119 C-120 C-121 C-122 C-123
C-127C-126C-125C-124
C-128 C-129 C-130 C-131
C-136C-135C-134C-133
C-140
C-141
C-103
C-112
C-113
C-132
C-137
C-138
C-142
C-104
C-139
APPROX EDGE OF SITE
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 1.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_1
2023.05.12
N
UTILITY PLAN 1
C-101 4
Feet 0 20 40
M
ATC
H
LIN
E C -102
M
ATC
H
LIN
E C -102
MATCH LINE C-107MATCH LINE C-107
4. NO UTILITY WORK IS IDENTIFIED ON THIS SHEET.
CONFIRM CONNECTIVITY
STMH 632
STMH 633
STMH 634
CLEAN
APPROX 173 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
CLEAN APPROX 105 LF OF SD
(MEDIUM PRIORITY - SD OPT 1)
CONFIRM CONNECTIVITY
AS REQUIRED
REPLACE FRAME AND
GROUT DEFECT (LOW
PRIORITY - SD OPT 2)
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 2.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_2
2023.05.12
N
UTILITY PLAN 2
C-102 5
Feet 0 20 40
M
ATC
H
LIN
E C -103
M
ATC
H
LIN
E C -103
M
ATC
H
LIN
E C -101
M
ATC
H
LIN
E C -101
MATCH LINE C-108MATCH LINE C-108
CONFIRM CONNECTIVITY
AND ABANDON IF NO
ACTIVE CONNECTION
CONFIRM CONNECTIVITY
AND ABANDON IF NO
ACTIVE CONNECTION
REPLACE
APPROX 145 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
REPLACE
APPROX 206 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
STMH 943
STMH 630
STMH 631 STMH 630A
STMH 944
GROUT DEFECT (LOW
PRIORITY - SD OPT 2)
RAISE BURIED
STRUCTURE (LOW
PRIORITY - SD OPT 2)
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 3.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_3
2023.05.12
N
UTILITY PLAN 3
C-103 6
Feet 0 20 40
M
ATC
H
LIN
E C -104
M
ATC
H
LIN
E C -104
M
ATC
H
LIN
E C -102
M
ATC
H
LIN
E C -102
MATCH LINE C-109MATCH LINE C-109
MONT SEC AVENUE
(ASPHALT ROADWAY)
(TWO WAY TRAFFIC)
N
EW
Y O
R K
A
VE
N U
E (A
SP
H
A
LT
R O
A D
W A
Y) (T
W O
W A
Y
TR
A
FF
IC
NORTH ROAD
(ASPHALT ROADWAY)
(TWO WAY TRAFFIC)
SERVICES
W: 1
SS: 1*
SD: (0)
SERVICES
W: 1
SS: 1*
SD: (0) SERVICES
W: 1
SS: 1
SD: (0)
SERVICES
W: 1
SS: 1
SD: (0)
RECONNECT TO
EXISTING WATER
CONFIRM CONNECTIVITY
AND ABANDON IF NO
ACTIVE CONNECTION
REHABILITATE
APPROX 119 LF SD
(MEDIUM PRIORITY - SD
OPT 1)
STMH 015
STMH 501
STMH 941
STMH 942
STMH 940
REPLACE WATER METER AND
BACKFLOW PREVENTER IN
ACCORDANCE WITH NYC DEP
REQUIRMENTS
CONNECTION POINT OF WATER
BASE BID 1 AND WATER BASE BID 2
REHABILITATE
APPROX 45 LF SD (LOW
PRIORITY - SD OPT 2)
APPROX EDGE OF SITE
CONFIRM CONNECTIVITY AND
ABANDON IF NO ACTIVE
CONNECTION
CONFIRM CONNECTIVITY AND
ABANDON IF NO ACTIVE
CONNECTION
ABANDON
INACTIVE
SPUR
REHABILITATE
MANHOLE AND
REPLACE FRAME AND
COVER (MEDIUM
PRIORITY - SD OPT 1)
GROUT DEFECT
(MEDIUM PRIORITY -
SD OPT 1)
RAISE BURIED STRUCTURE
(LOW PRIORITY - SD OPT 2)
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 4.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_4
2023.05.12
N
UTILITY PLAN 4
C-104 7
Feet 0 20 40
M
ATC
H
LIN
E C -105
M
ATC
H
LIN
E C -105
M
ATC
H
LIN
E C -103
M
ATC
H
LIN
E C -103
MATCH LINE C-110MATCH LINE C-110
MONT SEC AVENUE
(TWO WAY TRAFFIC)
NORTH ROAD
(ASPHALT ROADWAY)
(TWO WAY TRAFFIC)
SERVICES
W: 1
SS: 1*
SD: (0)
SERVICES
W: 1
SS: 1*
SD: (0)
SERVICES
W: 2*
SS: 1*
SD: (0)
REHABILITATE
APPROX 442 LF OF SD (MEDIUM PRIORITY - SD OPT 1)
APPROX EDGE OF SITE
SUSPECTED
COMBINED SEWER
SUSPECTED
COMBINED SEWER
STMH 502
CONFIRM CONNECTIVITY
CONFIRM CONNECTIVITY
AS REQUIRED
CONFIRM CONNECTIVITY
AS REQUIRED
LOCATE UTILITY IN
VICINITY AS REQUIRED
CONFIRM CONNECTIVITY
AS REQUIRED
LOCATE GAS UTILITY
IN VICINITY AS REQUIRED
CONFIRM CONNECTIVITY
AS REQUIRED
LOCATE GAS UTILITY
IN VICINITY AS REQUIRED
CONFIRM CONNECTIVITY
AND ABANDON IF NO
ACTIVE CONNECTION
REHABILITATE
STRUCTURE (LOW
PRIORITY - SD OPT 2)
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 5.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_5
2023.05.12
N
UTILITY PLAN 5
C-105 8
Feet 0 20 40
M
ATC
H
LIN
E C -106
M
ATC
H
LIN
E C -106
M
ATC
H
LIN
E C -104
M
ATC
H
LIN
E C -104
MATCH LINE C-111MATCH LINE C-111
TH
E N
A R
R O
W S
SERVICES
W: 1
SS: 1*
SD: (0)
100-YEAR FLOODPLAIN
STMH 503
CLEAN AND INSPECT FROM STMH
503 TO OUTFALL (SEE NOTE 4)
APPROX EDGE OF SITE
APPROX OUTFALL LOCATION
APPROX EDGE OF SITE
REHABILITATE
STRUCTURE (LOW
PRIORITY - SD OPT 2)
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 6.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_6
2023.05.12
N
UTILITY PLAN 6
C-106 9
Feet 0 20 40
M
ATC
H
LIN
E C -105
M
ATC
H
LIN
E C -105
MATCH LINE C-112MATCH LINE C-112
4. CONTRACT STORM DRAIN OPTION 3 - THE STORM DRAIN SEGMENTS
DOWNSTREAM OF STMH 503 AT THE NORTHEAST LOCATION OF THE
PROJECT SITE WAS NOT INSPECTED AS PART OF THIS POR DUE TO
THE STEEP SLOPE. CREWS ALSO DID NOT LOCATE TWO
DOWNSTREAM STRUCTURES. THERE IS A CONTRACT OPTION TO
CLEAN AND INSPECT STORM DRAIN TO POTENTIALLY SUBMERGED
OUTFALL.
MARSHALL ROAD
COAST GUARD DRIVE
(ASPHALT ROADWAY)
(TWO WAY TRAFFIC)
MARSHALL ROAD
(ASPHALT ROADW
AY)
(TW
O W
AY TRAFFIC)
(ASPHALT ROADW
AY)
(TW
O W
AY TRAFFIC)
SERVICES
W: 1
SS: 1
SD: (0)
APPROX EDGE OF SITE
REDIRECT CB TO SD
REDIRECT CB TO SD
REDIRECT CB TO SD
REDIRECT CB TO SD
STMH 691
STMH 692
STMH 693
SSMH 690
STMH 690C
CLEAN, INSPECT AND REPLACE
AS REQUIRED (SEE NOTE 4)
CONFIRM CONNECTIVITY
AS REQUIRED
REHABILITATE
APPROX 59 LF OF SD IF REMAINING AFTER
SEWER SEPARATION (LOW PRIORITY - SD
OPT 2)
REHABILITATE
APPROX 57 LF OF SD IF REMAINING
AFTER SEWER SEPARATION
(MEDIUM PRIORITY - SD OPT 1)
REPLACE
APPROX 6 LF OF SD IF REMAINING
AFTER SEWER SEPARATION (HIGH
PRIORITY - BASE BID)
STMH 690B
REHABILITATE
STRUCTURE IF
REMAINING AFTER
SEWER SEPARATION
(LOW PRIORITY - SD
OPT 2)
REHABILITATE
STRUCTURE IF
REMAINING AFTER
SEWER SEPARATION
(LOW PRIORITY - SD
OPT 2)
REPLACE FRAME AND
COVER IF REMAINING
AFTER SEWER
SEPARATION (MEDIUM
PRIORITY - SD OPT 1)
REHABILITATE STRUCTURE IF
REMAINING AFTER SEWER SEPARATION
(MEDIUM PRIORITY - SD OPT 1)
REDIRECT CB TO SD
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 7.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_7
2023.05.12
N
UTILITY PLAN 7
C-107 10
Feet 0 20 40
M
ATC
H
LIN
E C -108
M
ATC
H
LIN
E C -108
MATCH LINE C-101MATCH LINE C-101
MATCH LINE C-113MATCH LINE C-113
4. SEWER CONTRACT OPTION 1 - THE SEWER PIPE SEGMENT
DOWNSTREAM OF SSMH 690 AT THE NORTHWEST LOCATION OF THE
PROJECT SITE WAS NOT INSPECTED AS PART OF THIS POR. CREWS
DID NOT LOCATE DOWNSTREAM STRUCTURE WHICH MAY BE ONSITE
OR OFFSITE. THE DBE SHALL CLEAN AND TELEVISE THIS SEGMENT
AND LOCATE THE DOWNSTREAM STRUCTURE AS PART OF THE BASE
BID. IF THE CONDITION OF THE SEWER WARRANTS REPLACEMENT,
SEWER OPTION 1 INCLUDES THE REPLACEMENT OF THE SEWER TO
THE NPS PROJECT BOUNDARY.
COAST GUARD DRIVE
M A
LO
N
EY
D
R
IV
E (F
O R
M
ER
LY
K
N O
W N
A S
LI
G
ET
T
R O
A D
(A
SP
H
A
LT
R O
A D
W A
Y) (T
W O
W A
Y
TR
A
FF
IC
(TWO WAY TRAFFIC)
(ASPHALT ROADWAY)
M A
LO
N
EY
D
R
IV
E (F
O R
M
ER
LY
K
N O
W N
A S
LI
G
ET
T
R O
A D
(A
SP
H
A
LT
R O
A D
W A
Y) (T
W O
W A
Y
TR
A
FF
IC
SERVICES
W: 1
SS: 1*
SD: (0)
SERVICES
W: 2
SS: 1
SD: 4
SERVICES
W: 1
SS: 1*
SD: (1)
REPLACE
APPROX 111 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
REPLACE
APPROX 25 LF OF CMP
(LOW PRIORITY - SD
OPT 2)
CLEAN
APPROX 58 LF OF SD (LOW
PRIORITY - SD OPT 2)
CLEAN
APPROX 53 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
STMH 409
STMH 605STMH 606
STMH 656
STMH 657
STMH 658
STMH 671
(NOT INSPECTED)
STMH 681
STMH 682
STMH 683
STMH 684
LOCATE WATER UTILITY
IN VICINITY
LOCATE ELECTRICAL UTILITY
IN VICINITY AS REQUIRED
PERFORM CONDITION
ASSESSMENT
AND CONFIRM CONNECTIVITY
(SD OPT 5)
CONNECTION POINT OF WATER
BASE BID 3 AND WATER OPTION 2
SOUTH OF WATER VALVE
CONNECTION POINT OF WATER
BASE BID 3 AND WATER OPTION 2
NEAR CURBLINE
CLEAN
APPROX 114 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
SD NOT
INSPECTED.
PERFORM
CONDITION
ASSESSMENT (SD
OPT 5)
SD NOT INSPECTED.
PERFORM CONDITION
ASSESSMENT (SD OPT 5)
SD NOT INSPECTED.
PERFORM CONDITION
ASSESSMENT (SD
OPT 5)
CONFIRM SOURCE AND
ASSESS WHETHER
REPLACEMENT IS REQUIRED
CONFIRM
CONNECTIVITY
STMH 680
CONFIRM
CONNECTIVITY AND
ABANDON IF NO
ACTIVE
CONNECTIONS
SEE NOTE 4
CLEAN STRUCTURE
(LOW PRIORITY - SD
OPT 2)
REPLACE FRAME AND
COVER (MEDIUM
PRIORITY - SD OPT 1)
REPLACE FRAME AND COVER
(MEDIUM PRIORITY - SD OPT 1)
GROUT DEFECT (LOW
PRIORITY - SD OPT 2)
CLEAN STRUCTURE
(LOW PRIORITY - SD
OPT 2)
CLEAN STRUCTURE
(LOW PRIORITY - SD
OPT 2)
GROUT DEFECT (LOW
PRIORITY - SD OPT 2)
GROUT DEFECT (LOW
PRIORITY - SD OPT 2)
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 8.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_8
2023.05.12
N
UTILITY PLAN 8
C-108 11
Feet 0 20 40
M
ATC
H
LIN
E C -109
M
ATC
H
LIN
E C -109
M
ATC
H
LIN
E C -107
M
ATC
H
LIN
E C -107
MATCH LINE C-102MATCH LINE C-102
MATCH LINE C-114MATCH LINE C-114
4. METER WATER USE IN FENCED US COAST GUARD AREA. EXACT
METER LOCATIONS TO BE DETERMINED BY DBE.
(TWO WAY TRAFFIC)
COAST GUARD DRIVE
SERVICES
W: 4
SS: 1
SD: 7
SERVICES
W: 3
SS: 1
SD: 4
SEE NOTE 4
PERFORM
CONDITION
ASSESSMENT AND
CONFIRM
CONNECTIVITY (SD
OPT 5)
REPLACE
APPROX 51 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
REPLACE
APPROX 58 LF OF SD
(LOW PRIORITY - SD
OPT 2)
REPLACE
APPROX 105 LF OF SD
(LOW PRIORITY - SD
OPT 2)
REPLACE
APPROX 10 LF OF SD (HIGH
PRIORITY - BASE BID)
REPLACE
APPROX 8 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
REHABILITATE
APPROX 48 LF OF SD (MEDIUM
PRIORITY - SD OPT 1)
REHABILITATE
APPROX 150 LF OF
SD
(MEDIUM PRIORITY
- SD OPT 1)
REHABILITATE
APPROX 250 LF OF SD
(MEDIUM PRIORITY - SD OPT 1)
STMH 601
STMH 602STMH 603
STMH 604
STMH 650 (NOT
INSPECTED)
STMH 651
STMH 652
STMH 653STMH 654
STMH 655
(NOT INSPECTED)
STMH 670 (NOT
INSPECTED)
STMH 670A
(NOT INSPECTED)
STMH 933
(NOT INSPECTED)
STMH 918B
CONFIRM CONNECTIVITY
AS REQUIRED
CONNECTION POINT OF WATER
BASE BID 3 AND WATER OPTION 2
18 LF FROM HYDRANT TEE
REHABILITATE
APPROX 156 LF OF SD
(LOW PRIORITY - SD
OPT 2)
GROUT DEFECT (LOW
PRIORITY - SD OPT 2)REPLACE FRAME AND
COVER (MEDIUM
PRIORITY - SD OPT 1)
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER
TO APPENDIX K AND THE POR FOR ADDITIONAL INFORMATION.
EXACT WATER CONNECTION LIMITS BETWEEN OPTION/BASE BID
LOCATIONS ARE DISPLAYED ON THE DRAWINGS.
3. REPLACE OR REHABILITATE STORM DRAINS AND STRUCTURES BASED
ON INDIVIDUAL CALLOUTS ON THE SHEET. ADDITIONALLY, STORM
DRAIN OPTION 5 REQUIRES A CONDITION ASSESSMENT ON ALL
STORM DRAINS AND STRUCTURES NOT INSPECTED DURING THE POR
ANY WORK THAT IS RECOMMENDED AS PART OF THE CONDITION
ASSESSMENT IS TO BE ADMINISTERED THROUGH A POTENTIAL
CONTRACT MODIFICATION. UNLESS OTHERWISE NOTED, STORM
DRAIN STRUCTURES THAT WERE INSPECTED DURING THE POR PHASE
FEATURE IDENTIFICATION NUMBERS. STORM DRAINS CONNECTING
STRUCTURES WITH IDENTIFICATION NUMBERS WERE ALSO INSPECTED
IN THE POR PHASE UNLESS OTHERWISE NOTED.
Drawing No.
Scale
Revision
Title
Client/Project
Project No.
Sheet of
Permit-Seal Chkd.Dwn. Dsgn. YY.MM.DD
File Name:
ByIssued Appd. YY.MM.DD
FINAL POR MRO HB 23.11.27
ByRevision Appd. YY.MM.DD
ORIGINAL SHEET - ANSI D
us
-p pf ss
\s ha re d_ pr oj ec ts\
0\ 5_ de sig n\ _c ivi l\ dr aw in gs
\p lo t\
-G
AT
E
-P lo t_ 9.
dw g
/1 1/
0:
P M B y:
O ste r, M at t
NATIONAL PARK SERVICE
GATE 318738 - REHABILITATE WATER,
WASTEWATER, AND STORMWATER
UTILITY SYSTEMS AT FT. WADSWORTH
STATEN ISLAND, NY
195150890
45 0 www.stantec.com Tel.
Stantec 475 Fifth Avenue, 12th Floor New York, NY 10017
212.366.5600
MRO NG HB
1951150890-GATE 318738-PLOT_9
2023.05.12
N
UTILITY PLAN 9
C-109 12
Feet 0 20 40
M
ATC
H
LIN
E C -110
M
ATC
H
LIN
E C -110
M
ATC
H
LIN
E C -108
M
ATC
H
LIN
E C -108
MATCH LINE C-103MATCH LINE C-103
MATCH LINE C-115MATCH LINE C-115
EW
Y O
R K
A
VE
N U
E (T
W O
W A
Y
TR
A
FF
IC
(A
SP
H A
LT
R
O A
D W
A Y)
SOUTH ROAD
(ASPHALT ROADWAY)
(TWO WAY TRAFFIC)
C
LI
FT
O
N R
O A
D (A
SP
H
A
LT
R O
A D
W A
Y) (T
W O
W A
Y
TR
A
FF
IC
SERVICES
W: 1
SS: 1*
SD: (0)
SERVICES
W: 1
SS: 1
SD: (0)
SERVICES
W: 1
SS: 1*
SD: (0)
SERVICES
W: 1
SS: 2
SD: (1)
SERVICES
W: 1
SS: 1*
SD: (0)
SERVICES
W: 1
SS: 1
SD: (0)
REHABILITATE
APPROX 226 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
REHABILITATE
APPROX 212 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
CLEAN
APPROX 17 LF OF SD
(LOW PRIORITY - SD
OPT 2)
REPLACE
APPROX 187 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
REHABILITATE
APPROX 110 LF OF SD
(MEDIUM PRIORITY -
SD OPT 1)
REHABILITATE
APPROX 86 LF OF SD (MEDIUM
PRIORITY - SD OPT 1)
REHABILITATE
APPROX 14 LF OF
SD (MEDIUM
PRIORITY - SD OPT
1)
STMH 013
STMH 014
STMH 030
STMH 031
STMH 032
STMH 033
STMH 034
STMH 035
STMH 919
STMH 918
(NOT INSPECTED)
STMH 030A
STMH 930STMH 931
(NOT INSPECTED)
STMH 918A
STMH 932
(NOT INSPECTED)
CONFIRM
CONNECTIVITY AND
ABANDON IF NO ACTIVE
CONNECTION
CONFIRM CONNECTIVITY
AS REQUIRED
LOCATE GAS UTILITY
IN VICINITY AS REQUIRED
CONFIRM CONNECTIVITY AND ABANDON
IF NO ACTIVE CONNECTION
PERFORM
CONDITION
ASSESSMENT AND
CONFIRM
CONNECTIVITY (SD
OPT 5)
PEFORM CONDITION
ASSESSMENT AND
CONFIRM CONNECTIVITY
CONNECTION POINT OF WATER
BASE BID 3 AND BASE BID 2
8 LF FROM WATER VALVE
CONNECTION POINT OF WATER
BASE BID 1 AND BASE BID 2
8 LF FROM WATER VALVE
REHABILITATE
APPROX 36 LF OF SD (MEDIUM
PRIORITY - SD OPT 1)
CONNECTION POINT OF WATER
BASE BID 1 AND BASE BID 2
18 LF FROM WATER VALVE CONFIRM CONNECTIVITY AND
ABANDON IF NO ACTIVE
CONNECTION
CONFIRM CONNECTIVITY AND
ABANDON IF NO ACTIVE
CONNECTION
REHABILITATE
STRUCTURE (MEDIUM
PRIORITY - SD OPT 1)
REHABILITATE
STRUCTURE (LOW
PRIORITY - SD OPT 2)
REHABILITATE
STRUCTURE
(LOW
PRIORITY -
SD OPT 2)
REHABILITATE
STRUCTURE
(LOW PRIORITY
- SD OPT 2)
RAISE BURIED
STRUCTURE (LOW
PRIORITY - SD OPT 2)
RAISE BURIED
STRUCTURE (LOW
PRIORITY - SD OPT 2)
CLEAN STRUCTURE
(LOW PRIORITY - SD
OPT 2)
RAISE BURIED
STRUCTURE
(LOW PRIORITY
- SD OPT 2)
RAISE BURIED STRUCTURE
(LOW PRIORITY - SD OPT 2)
Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to
The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden.
Stantec without delay.
Stantec. Reproduction or use for any purpose other than that
NOTES
1. REPLACE EXISTING SEWER MAINS, MANHOLES, AND SERVICES IN
SAME TRENCH OR RELOCATE UNLESS AS NOTED.
2. REPLACE EXISTING WATER MAINS, SERVICES, HYDRANTS, VALVES,
AND OTHER APPURTENANCES IN SAME TRENCH OR RELOCATE
UNLESS AS NOTED. DBE SHALL NOTE THAT THE WATER SYSTEM IS
SEPARATED INTO A BASE BID AND MULTIPLE OPTIONS, AS DESCRIBED
IN THE POR, SECTION 9. OPTIONS. THE CONTRACTOR SHALL REFER