AM_001_GATE_318738_Phase_1_Q_and_A_0001.pdf

PDF 134 KB Posted

Attached to
GATE 318738 - Design Build - Rehab Wastewater
Solicitation number
140P2023R0063
Issued by

About this file

This document contains questions and answers regarding solicitation number 140P2023R0063 for a design-build project to rehabilitate wastewater facilities at Fort Hancock, issued by the National Park Service. The solicitation requires bidders to submit resumes for key personnel including a Quality Control Manager and Safety Manager in their initial Phase 1 proposal. It clarifies that the On-site Quality Control Specialist and On-site Safety Specialist positions referred to later are considered equivalent to the Manager roles. Additionally, the National Park Service will evaluate projects currently in progress for the experience requirement in Phase 1 Factor 3 but they are likely to be rated lower than completed projects.

View the file

Other files

File Type Posted
Sol_140P2023R0063_Amd_0006.pdf PDF
Sol_140P2023R0063_Amd_0005.pdf PDF
Sol_140P2023R0063_Amd_0004.pdf PDF
Sol_140P2023R0063_Amd_0003.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_1A_0003.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_1B_0003.pdf PDF
B08_Attachment_04_Appendix_E_-_FtWadsworth_MH_Numbering_0002.pdf PDF
B08_Attachment_04_Appendix_A_-_Fort_Wadsworth_Drawing_Set_0002.pdf PDF
B08_Attachment_04_Appendix_D_-_Div_01_Specs_0002.pdf PDF
B08_Attachment_01_POR_100Final_-_Ft_Wads_27NOV23_Rev2401_0002.pdf PDF
B08_Attachment_04_Appendix_G_-_Cultural_Resources_0002.pdf PDF
B08_Attachment_04_Appendix_K_-_195150890-GATE_318738_Water_Options_0002.pdf PDF
B08_Attachment_03_Proposal_Submission_Package_GATE_0002.docx DOCX document
B08_Attachment_04_Appendix_J_-_Supplemental_Services_Compliance_Prep_20260605_0002.pdf PDF
B08_Attachment_04_Appendix_I_-_NAGPRA_Inadvertent_Discovery_on_Fed_Lands_0002.pdf PDF
B08_Attachment_04_Appendix_C_-_Soil_Borings_0002.pdf PDF
B08_Attachment_04_Appendix_B_-_Storm_Inspections_PART_2_0002.pdf PDF
B08_Attachment_04_Appendix_L_-_MiniVA-1_meeting_minutes_fnl_0002.pdf PDF
B08_Attachment_02_NY20240003_DOL_Wage_Determination_0002.pdf PDF
B08_GATE_318738_Solicitation_AM_002_0002.pdf PDF
Sol_140P2023R0063_Amd_0002.pdf PDF
B08_Attachment_04_Appendix_F_-_PAF_0002.pdf PDF
B08_Attachment_04_Appendix_H_Preservation_Briefs_0002.pdf PDF
Sol_140P2023R0063_Amd_0001.pdf PDF
B08_Attachment_01_GATE318738_65_POR_Report_(1).pdf PDF
B08_140P2023R0063_GATE_318738.pdf PDF
B08_Attachment_02_DOL_Wage_Determination_NY20230003_(2).pdf PDF
B08_Attachment_03_Proposal_Submission_Package_GATE.docx DOCX document
Sol_140P2023R0063.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GATE 318738 - Ft Hancock Water/Wastewater

Solicitation #1402023R0127

Solicitation Questions and NPS Responses

# Bidder Question NPS Response 1 We are preparing our Factor 1 submittal on Page 38 of 48 we are asked to Submit resumes for key personnel as identified in Section H of this solicitation. Section H states as Key Personnel and lists Quality Control Manager and Safety Manager as key positions. On page 48 it lists On-site Quality Control Specialist and On-site Safety

Specialist. Please confirm that the Phase 1, Factor 1 submittal requirement is for the

Safety and QC Manager and not the Safety and QC Specialist.

That is correct. Please submit resumes for QC Manager and Safety Manager. The

"Manager" and "Specialist" positions are considered to be one and the same. There is no separate requirement for a Quality Control Specialist and Safety Specialist in addition to QC

Manager and Safety Manager. Both the QC Manager and the Safety Manager are on "on-site" positions.

2 Is it appropriate to use current NPS DB Projects as reference projects for the Phase 1 , Factor 3 portion of this proposal effort.

The solicitation requires bidders to submit projects that are completed. If a bidder submits projects that are still in progress, NPS will evaluate them, but they will likely be rated lower.