Amendment_02_PreBid_Conference_Presentation_7-29-22_02.pptx
PPTX presentation 14 MB Posted
- Attached to
- Old Courthouse Phase 2 Renovations, Gateway Arch N Federal contract opportunity
- Solicitation number
- 140P2022R0159
About this file
This document provides details for a federal contract opportunity to renovate the Old Courthouse in St. Louis, Missouri. The solicitation number is 140P2022R0159 and is seeking contractors to complete Phase 2 of renovations to the Old Courthouse, which is part of the Gateway Arch National Park. Responses are due by August 19th, 2022. The Department of the Interior National Park Service National Office is the contracting agency. Renovation work includes structural repairs, HVAC system upgrades, electrical system upgrades, and restoration of interior spaces.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Virtual Pre-Proposal Conference
Gateway Arch National Park Old Courthouse Phase 2 Renovations
Solicitation: 140P2022R0159
NPS PMIS #: GANP 242900/253127
Formerly Jefferson National Expansion Memorial (JEFF 199879)
THIS MEETING WILL BE RECORDED
August 2, 2022 E X P E R I E N C E Y O U R A M E R I C A
This is the pre proposal conference for the Gateway Arch National Park, formerly known as Jefferson National Expansion Memorial. So if you see the JEFF acronym that was the previous park name and acronym and we are now GANP.
The project that we are talking about today is the Old Courthouse Phase 2 Renovations. We appreciate everyone’s interest and attendance this morning. We will start with Park and Partner introductions and the agenda. For those in attendance, we will be recording this presentation and that will be made available to interested parties. I will introduce myself and then pass it over to Tim Burger, the Contracting Officer.
Agenda WELCOME Ming-Yi Wong, DSC INTRODUCTIONS Tim Burger, DSC Contracting Officer Attendees List will be included in an amendment Meeting Participation logistics – Agenda posted with Solicitation amendments Site Location PROJECT OVERVIEW Ming-Yi Wong, DSC Project Manager
PARK LOCATION + HISTORY
PROJECT OVERVIEW + SCOPE OF WORK
BID INFORMATION Tim Burger, Contracting Officer BID CLINS Tim Burger, Contracting Officer VIRTUAL CONFERENCE + PHYSICAL TOUR Tim Burger, Contracting Officer PRE-PROPOSAL CONFERENCE QUESTIONS Tim Burger, Contracting Officer CONCLUSION Ming-Yi Wong, DSC Project Manager
NPS – Old Courthouse Phase 2 Renovations
Project Location Park History Developmental History Resources Existing Conditions Significant Features Project Scope of Work Contracting
Project Overview
Project Location Location Map Aerial image of the site
This Old St. Louis Courthouse is located in downtown St. Louis, Missouri, near the riverfront on a city block bordered by Fourth, Chestnut, Market and Broadway Streets. The Courthouse is situated on the St. Louis Arch Grounds and has served as the center for political and social activity in the mid-19th century St Louis. The building and grounds provided a public forum for gatherings and political speeches while the courtrooms hosted significant trials in American history such as the Dred Scott civil rights case and the Virginia Minor women’s right to vote case.
The old courthouse is a Greek Revival Architectural style with a cruciform plan and a central rotunda. Construction began in 1839 and completed by 1845, however the current extant dome of a Renaissance style, was replaced in 1851. The Old Courthouse is essentially a 2-story building, with the north wing being the only portion that has a third story and features formal Greek Revival style elements with pedimented facades, fluted Doric columns, pilasters and elevated entrances which are all representative details of that style. The central Rotunda rises to 5 levels before tapering to an oculus at the center. The building initially evolved over a period of 36 years from a federal style courthouse that was eventually enclosed and then expanded into the Greek Revival structure that stands today.
Developmental History
Original Federal Style Courthouse 1828 Construction of the Old Courthouse 1838–1862 Ongoing Courthouse Use 1862–1895 Decline of the Old Courthouse 1895–1935 National Park Establishment 1935–1940 Rehabilitation of the Old Courthouse 1940–1965 Maintenance and Management 1965 to Present Exterior and First Floor Accessibility Improvements 2014-2019
This slide shows the development history. The Jefferson National Expansion Memorial was designated by President Franklin Delano Roosevelt in 1935 in an executive order but the Old Courthouse was officially deeded over to NPS in 1940. More information in available in the Historic Structures Report of 2013.
The Old Courthouse is significant for both its architecture and its association with historic events.
Resources for Project Information:
Technical Plans + Specifications, July 2022* Interior Wayfinding and Signage, July 2022* Historic Preservation Plan Matrix, August 2022* pending Historic Structure Report, July 2013* General Management Plan, 2009 Secretary of the Interior’s Standards for Historic Preservation NPS Preservation Briefs Supplemental Studies* *Included in solicitation Resources
There are several resources available online on our NPS websites as well as in the solicitation package that will aid in a better understanding of this very complicated building. With the evolution of construction, each wing was developed slightly differently with different construction methods. The resources that are available online are the park’s General Management Plan, developed in 2009 that provides high level planning for the overall park, The Secretery of Interior Standards for Historic Preservation governs all of the NPS existing buildings and landscape capital improvements projects, and
Refer to the solicitation package of technical plans and specifications, including the appendices – these documents will prepare you for understanding not only the technical aspects of the project but also the importance of the historic fabric that we’re going to be working with and around. There is a Historic Preservation Plan Matrix that will aid in your understanding of how the technical plans and specifications will impact some of the character-defining features of the building – the matrix document references the developmental history, NPS historic preservation policies, Secretary of Interior Standards for Historic Preservation and assists in identifying areas warranting historic fabric protection, the document will be issued in an upcoming amendment.
Note that included in the solicitation package - there are hazardous material reports, interior wayfinding and signage drawing set, the historic structure report that provides background on history and significance and General Hierarchy of Decisions and Protections in understanding how the design was developed to minimize impacts to the historic fabric. Also note that with any excavations in and around historic buildings and cultural landscapes, archaeology is a consideration and so there will be archaeological monitoring provided by the NPS as the projects moves forward with any excavation, digging, ground disturbance. That coordination is very important to NPS.
Existing Conditions
This is a site plan of the Old Courthouse, designed as Greek cross with 4 wings that can be quite disorienting when you are in the building.
Basement
Here is the basement floor with some images of the significant interior rooms on the left but also storage and maintenance spaces on the left. The basement floor plan is segmented so there is not contiguous access from one wing to another wing – you will have to go up to the first floor in order to access another basement wing. And you can see the central Rotunda basement structure. Please note that all of these floor plans are from the Historic Structures Report and NOT from the technical drawings. These are somewhat simplified and intended to highlight some of the significant features of each floor and to orient you without the detail of the Construction Drawings.
Basement
These are more photos of the basement, note the varying conditions of the interior of the basement level. The brick barrel vaulting is one of the many important features of the basement level.
First Floor
Here is the first floor with several images of character defining features such as the flooring materials, casework surrounding the doors, iron work on the staircases and the Rotunda. There are various limestone flooring and encaustic tiles.
First Floor
Here you see some exhibit spaces in the galleries on the first floor and in the Rotunda and also accessibility improvements, completed within the last 10 years. These are temporary or semi-permanent accessibility improvements, that were carefully installed to facilitate accessibility and to protect the historic flooring falling in line with the Secretary of the Interior Standards for Historic Preservation.
Second Floor
Here is the second floor, that features some of the courtroom spaces that have undergone some restoration over the years. One of the things to highlight aside from the historic elements and materials, is that there are varying finished floor elevations throughout this project, reflecting back on how each wing was constructed differently and at different times. Providing for accessibility is a big component of this project.
Second Floor
This is the area surrounding the dome/Rotunda as well as a photo of one of the historic courtroom spaces.
Third Floor/Attic
Here is the third floor and attic spaces, note the skylights and how there are few rooms in the eaves of certain wings, there is also access into the Dome itself. These are spaces that we are unlikely to go into on the tour.
Third Floor/Attic
Some images of the Dome structure.
Project Background – Significant Features Interior character-defining features include:
Limestone slab floors (corridors, rotunda) Cut and polished stone tile checkerboard floors executed in black and white, and red and white squares.
Encaustic tile floor in the Southwest Courtroom/Gallery Decorative balconies and columns in the Rotunda, and early tapered tongue and groove wood strip flooring on the second, third and fourth levels, dated as early as 1869.
Two restored circular/oval courtrooms on the second floor with c. 1870 (possible 1905 remodeling) courtroom furniture, surrounded by wood and cast-iron columns.
Here are some of the interior character defining features that are very important to preserve throughout this project – to protect during construction and to minimize the impact on where the project scope will work directly with the historic fabric – this is noted in the Historic Preservation Plan Matrix and in the Historic Structures Report. Note the various floorings, decorative balconies and columns and courtrooms spaces.
Project Background – Significant Features Wooden casework for door surrounds and many original doors; most of the original window casework was removed in 1910-1912, so the remaining nine windows retaining their original casework are extremely important to the building.
Casework in the building copies Grecian motifs and is executed not only in wood but in stone and cast iron in various locations within the structure.
Here is the casework surrounding the doors – some out of wood but there are casework constructed from stone or cast iron.
Project Background – Existing Conditions Basement Special Considerations:
Protection of Historic Fabric Hazardous Materials Segmented Access Downtown St. Louis Location
Here are some of the existing conditions that we have noted – read it all. Note that there are hazardous material reports and work plan in the solicitation package.
Project Scope of Work – Overview Fire Suppression Installation of a building-wide fire suppression and alarm system;
Heat and Cooling Removal of the 1941 National Park Service era steam heating system with later installed window air conditioning units and the introduction of a four-pipe hot and cold-water modern heating and air conditioning system and installation of an upgraded electrical system to support these changes;
Window Replacement Replacement of 140 sets of 1942-54 era 6 over 6 window sash for ventilation; bid option Accessibility Accessibility upgrades including three accessible toilet rooms and interior elevator;
And here are critical building systems – fire suppression, HVAC, electrical and plumbing as well as window replacement and accessibility improvements.
Fire Suppression Building-wide fire suppression and alarm system
This will be a more general, high level discussion on the scope of work – a building-wide fire suppression and alarm system.
Heating and Cooling Radiator removal 4-pipe hot and cold-water modern heating and air conditioning system Commissioning
Also, the HVAC system – removal of existing steam heating system and radiators and the installation of a new four-pipe hot and cold water heating and AC system. And there is also commissioning. Many of the routing for the project will go through existing openings or chases in order to minimize impacts to the historic fabric – there is the document in the appendices, General Hierarchy of Decisions and Protections that list out the decision making process during design.
Window Replacement Ventilation Eliminate window units
Window replacement – removal of bird netting, window units due to the new AC system being installed, etc. Part of effort for this project is to restore the historic facades for this highly visible building.
Accessibility Accessible Restrooms Elevator to 2nd Floor Ramps (multiple finished floor elevations) Rotunda Railing
Accessibility – the installation of an elevator to provide access to the second floor, as well as ramps that address the various finished floor elevations and accessible restrooms. There is also a new rotunda railing included in this project scope.
Here is the first floor plan – you can see the highlighted yellow portion indicates that existing concrete floor was a non-historic 1940s concrete replacement work and therefore became the strategy for how to design for an elevator in the historic building.
Exterior
Exterior Scope:
Ameren Vault + Duct Bank Construction Trailer Chiller Courtyard
Some of the exterior improvements include the Ameren Vault and Duct Bank which will actually be constructed by Ameren but the coordination and acquisition is part of this project scope. There is also a chiller courtyard where work will occur. And that concludes my segment, back to you Tim/CO.
SOLICITATION NO.140P2022R0159
SUMMARY OF SOLICITATION AND AWARD INFORMATION
Refer to the Solicitation for complete information.
PRE-PROPOSAL VIRTUAL MEETING – August 2, 2022 at 11 AM CDT PRE-PROPOSAL ON SITE MEETING – August 4, 2022 at 10am and 1pm PRE-PROPOSAL QUESTIONS DUE – 7 days prior to Offers Due OFFERS DUE – September 2, 2022 at 3PM CDT SUBMISSION – Electronic only to: See Section L of RFP SECTION L – 52.216-1 – Type of Contract – Firm Fixed Price NAICS Code: 236220 - Small Business Size Standard: $39.5M
THIS IS A FULL AND OPEN COMPETIVE PROCUREMENT
PERIOD OF PERFORMANCE: Project completion 18 months after Notice to Proceed.
CONTRACT VALUE: More than $10M
CONTRACT PRICE SCHEDULE – Definition of Contract Line Items
BID CLINS
PRE-PROPOSAL CONFERENCE QUESTIONS
Administrative questions are the only questions permitted to be asked and answered during this conference. Please state your name and company before you ask your question. The question will be repeated, and responses provided. The CO requests all non-administrative questions be submitted in writing via email to both the CO, Tim Burger, and the CS, Edwin Berry as follows:
timothy_burger@nps.gov edwin_berry@contractor.nps.gov Responses to questions that may be stated during the pre-solicitation site visit do not change the Solicitation document.
Changes to the Solicitation document shall be made as an amendment to the solicitation document. Answers to questions received will be issued as an amendment to the solicitation.
QUESTIONS AFTER PRE-PROPOSAL CONFERENCE
Direct all questions the CO requests that they be submitted in writing via email to both the CO, Tim Burger, and the CS, Edwin Berry as follows:
timothy_burger@nps.gov edwin_berry@contractor.nps.gov Questions and answers will be issued by written amendment posted as an amendment to the solicitation. Offerors are required to fill out and sign the acknowledgment of amendments received (SF1442 Section 19) and include this when submitting your offer on the Form 1442.
The DEADLINE FOR QUESTIONS IS: 7 days prior to bids due. This presentation and the recorded pre-proposal site visit meeting will be available to participants via an e-mail attachment.
For all other interested vendors not able to attend this pre-proposal site visit, an amendment will have directions on how to request this presentation and the recorded pre-proposal site visit.
Solicitation Protocol and Tips All communication with the Contracting Officer during the solicitation period will be documented in emails. No phone calls, please.
Amendments will be issued every Friday at noon, unless something urgent needs to be relayed.
DO NOT wait until the last day questions. There will be no extensions.
Thank You For Your Interest in This Project E X P E R I E N C E Y O U R A M E R I C A
National Park Service U.S. Department of the Interior image2.jpeg image3.png image4.JPG image5.JPG image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.jpeg image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.jpeg image35.png image36.png image37.png image38.png image39.png image40.png image41.png image42.png image43.png image44.png image1.jpeg
File details come from the government source that posted it. Updated .