This document provides details on a federal solicitation for repair work on a national park building. The solicitation number is 140P2022R0072 and seeks bids to repair the west wing of Fort Mason Building 201 located in the Golden Gate National Recreation Area. The work includes seismic strengthening. Bids are solicited by the Department of the Interior National Park Service National Office. Offerors should provide pricing to complete the repair and seismic work on the specified wing of the building. The response deadline is not stated but the solicitation was issued on September 22, 2022. The award date was also not included but typically occurs within 90 days of the closing date for responses.

View the file

Other files

File Type Posted
B09_Wage_Determination_SF_1_19_23_0010.pdf PDF
Sol_140P2022R0072_Amd_0010.pdf PDF
B09_Wage_Determination_Updated_11_4_22_0009.txt TXT text file
AS-CONST_GOGA_Ft_Mason_Bldg_201_Elect_Rehab_0009.pdf PDF
B09_Amd_9_Schedule_of_Changes_Q_A_0009.pdf PDF
Sol_140P2022R0072_Amd_0009.pdf PDF
B09_Amd_8_Schedule_of_Changes_Q_A_Respones_0008.pdf PDF
Sol_140P2022R0072_Amd_0008.pdf PDF
Sol_140P2022R0072_Amd_0007.pdf PDF
B09_Amd_7_Schedule_of_Changes_Q_A_0007.pdf PDF
GOGA_212511D_Virtual_Project_Overview-20221014_100154-Meeting_Recording_0006.mp4 MP4 file
Sol_140P2022R0072_Amd_0006.pdf PDF
Image_0006.jpeg JPEG file
Sol_140P2022R0072_Amd_0005.pdf PDF
14_October_MS_Teams_Invite_0005.pdf PDF
140P2022R0072_Virtual_Project_Review_Presentation_0004.pptx PPTX presentation
Sol_140P2022R0072_Amd_0004.pdf PDF
09_29_00_Gypsum_Board_ADDEND3_0003.pdf PDF
01_27_00_DEFINITION_OF_CONTRACT_LINE_ITEMS_ADDEN3_0003.pdf PDF
01_33_23a_SubmittalList-ReviewEstimate_rev_0003.xlsx XLSX spreadsheet
Sol_140P2022R0072_Amd_0003.pdf PDF
03_31_00_CAST-IN-PLACE_CONCRETE_ADDEN3_0003.pdf PDF
B09_Amd_2_Schedule_of_Changes_Q_A_0002.pdf PDF
Sol_140P2022R0072_Amd_0002.pdf PDF
IMG_7944_0001.JPG JPG image
DSCN0951_0001.JPG JPG image
IMG_7798_0001.JPG JPG image
IMG_7945_0001.JPG JPG image
IMG_7801_0001.JPG JPG image
DSCN0622_0001.JPG JPG image
DSCN0903_0001.JPG JPG image
DSCN0914_0001.JPG JPG image
IMG_7950_0001.JPG JPG image
DSCN0952_0001.JPG JPG image
DSCN0895_0001.JPG JPG image
IMG_7803_0001.JPG JPG image
DSCN1048_0001.JPG JPG image
IMG_7739_0001.JPG JPG image
DSCN0944_0001.JPG JPG image
IMG_7937_0001.JPG JPG image
DSCN0611_0001.JPG JPG image
IMG_7746_0001.JPG JPG image
IMG_7768_0001.JPG JPG image
IMG_7938_0001.JPG JPG image
DSCN0915_0001.JPG JPG image
DSCN1053_0001.JPG JPG image
DSCN0919_0001.JPG JPG image
DSCN0938_0001.JPG JPG image
DSCN0912_0001.JPG JPG image
B201_BASEMENT_0001.zip ZIP file
Show 40 more

Latest 50 of 195 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

STRUCTURAL REVISIONS 9/22SO.3,

SO.4, S1.3W, S2.1W, S2.5W, S2.6W, S3.1W, S3.2W, S3.4W, S5.1W, S6.1W

9/22A1.00E REVISED ROOM B03E1.00E

cwatson Typewritten Text X

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

E S

O F D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G0.01 05/27/2022

CR

LJ

ST 641

2 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

SHEET LIST

SHT.

NO.

SUB

SHEET

TITLE OF SHEET

PLUMBING

139 P0.01 SYMBOLS, LEGENDS AND ABBREVIATIONS - PLUMBING

140 P1.00W BASEMENT PLAN - WEST WING - PLUMBING

141 P1.01W FIRST FLOOR PLAN - WEST WING - PLUMBING

142 P1.02W SECOND FLOOR PLAN -WEST WING - PLUMBING

143 P1.03W THIRD FLOOR PLAN - WEST WING - PLUMBING

144 P1.00E BASEMENT PLAN - EAST WING - PLUMBING

145 P1.01E FIRST FLOOR PLAN - EAST WING - PLUMBING

ELECTRICAL

146 E0.01 ELECTRICAL COVER SHEET

147 E0.10 ELECTRICAL SCHEDULES

148 ED1.00W DEMOLITION BASEMENT PLAN - WEST WING - ELECTRICAL

149 ED1.01W DEMOLITION FIRST FLOOR PLAN - WEST WING - ELECTRICAL

150 ED1.02W DEMOLITION SECOND FLOOR PLAN - WEST WING - ELECTRICAL

151 ED1.03W DEMOLITION THIRD FLOOR PLAN - WEST WING - ELECTRICAL

152 ED1.00E DEMOLITION BASEMENT PLAN - EAST WING - ELECTRICAL

153 ED1.01E DEMOLITION FIRST FLOOR PLAN - EAST WING - ELECTRICAL

154 ED1.02E DEMOLITION SECOND FLOOR PLAN - EAST WING - ELECTRICAL

155 ED1.03E DEMOLITION THIRD FLOOR PLAN - EAST WING - ELECTRICAL

156 E1.00W BASEMENT PLAN - WEST WING - ELECTRICAL

157 E1.01W FIRST FLOOR PLAN - WEST WING - ELECTRICAL

158 E1.02W SECOND FLOOR PLAN - WEST WING - ELECTRICAL

159 E1.03W THIRD FLOOR PLAN - WEST WING - ELECTRICAL

160 E1.00E BASEMENT PLAN - EAST WING - ELECTRICAL

161 E1.01E FIRST FLOOR PLAN - EAST WING - ELECTRICAL

162 E1.02E SECOND FLOOR PLAN - EAST WING - ELECTRICAL

163 E1.03E THIRD FLOOR PLAN - EAST WING - ELECTRICAL

164 E2.01 BASEMENT ELECTRICAL POWER PLAN

165 E2.02 FIRST FLOOR ELECTRICAL POWER PLAN

166 E2.03 SECOND FLOOR ELECTRICAL POWER PLAN

167 E2.04 THIRD FLOOR ELECTRICAL POWER PLAN

168 E2.00 ONE-LINE DIAGRAM

SHT.

NO.

SUB

SHEET

TITLE OF SHEET

72 A5.51W INTERIOR DETAILS

73 A5.52W INTERIOR DETAILS

74 A6.51W DOOR SCHEDULE

75 A6.52W WINDOW DETAILS

76 A6.53W DOOR AND LOUVER DETAILS

77 A8.01W EXISTING FINISH SCHEDULE

78 A8.02W EXISTING FINISH SCHEDULE

79 A1.00E BASEMENT PLAN - EAST WING

80 A1.01E FIRST FLOOR PLAN - EAST WING

81 A1.02E SECOND FLOOR PLAN - EAST WING

82 A1.03E THIRD FLOOR PLAN - EAST WING

83 A1.50E BASEMENT RCP - EAST WING

84 A1.51E FIRST FLOOR RCP - EAST WING

85 A1.52E SECOND FLOOR RCP - EAST WING

86 A5.51E DETAILS - EAST WING

87 A5.52E ENLARGED PLANS AND ELEVATIONS - EAST WING

88 A6.51E WINDOW DETAILS - EAST WING

STRUCTURAL

89 S0.1 TITLE PAGE

90 S0.2 GENERAL NOTES

91 S0.3 GENERAL NOTES

92 S0.4 GENERAL NOTES

93 S0.5 TYPICAL CONCRETE DETAILS

94 SD1.0 BASEMENT/FOUNDATION DEMOLITION PLAN

95 S1.0 BASEMENT/FOUNDATION PLAN

96 S1.1 LEVEL 1 FLOOR FRAMING PLAN

97 S1.2 LEVEL 2 FLOOR FRAMING PLAN

98 S1.3 LEVEL 3 FLOOR FRAMING PLAN

99 S1.4 LEVEL 3 REFLECTED CEILING PLAN

100 S1.5 ROOF FRAMING PLAN

101 S2.1 MOMENT FRAME ELEVATION

102 S2.2 MOMENT FRAME ELEVATION

103 S2.3 MOMENT FRAME ELEVATION

104 S2.4 MOMENT FRAME ELEVATION

105 S2.5 MOMENT FRAME ELEVATION

106 S2.6 MOMENT FRAME ELEVATION

107 S2.7 MOMENT FRAME ELEVATION

108 S3.1 FOUNDATION DETAILS

109 S3.2 FOUNDATION DETAILS

110 S3.3 FOUNDATION DETAILS

111 S3.4 FOUNDATION DEMOLITION DETAILS

112 S4.1 WALL SECTIONS

113 S5.1 STEEL MOMENT FRAME DETAILS

114 S5.2 STEEL MOMENT FRAME DETAILS

115 S6.1 WOOD FRAMING DETAILS

116 S6.2 WOOD FRAMING DETAILS

117 S6.3 WOOD FRAMING DETAILS

118 S1.6 EAST WING ENLARGED PLANS

119 S8.1 EAST WING RETROFIT DETAILS

MECHANICAL

120 M0.01 SYMBOLS, LEGENDS AND ABBREVIATIONS - MECHANICAL

121 M0.02 EQUIPMENT SCHEDULES - MECHANICAL

122 M0.03 EQUIPMENT SCHEDULES - MECHANICAL

123 MD1.00W BASEMENT DEMOLITION PLAN - WEST WING - MECHANICAL

124 MD1.01W FIRST FLOOR DEMOLITION PLAN - WEST WING - MECHANICAL

125 MD1.02W SECOND FLOOR DEMOLITION PLAN - WEST WING - MECHANICAL

126 MD1.03W THIRD FLOOR DEMOLITION PLAN - WEST WING - MECHANICAL

127 MD1.01E FIRST FLOOR DEMOLITION PLAN - EAST WING - MECHANICAL

128 MD1.02E SECOND FLOOR DEMOLITION PLAN - EAST WING - MECHANICAL

129 M1.00W BASEMENT PLAN - WEST WING - MECHANICAL

130 M1.01W FIRST FLOOR PLAN - WEST WING - MECHANICAL

131 M1.02W SECOND FLOOR PLAN - WEST WING - MECHANICAL

132 M1.03W THIRD FLOOR PLAN - WEST WING - MECHANICAL

133 M1.04 ROOF PLAN - MECHANICAL

134 M1.00E BASEMENT PLAN - EAST WING - MECHANICAL

135 M1.01E FIRST FLOOR PLAN - EAST WING - MECHANICAL

136 M1.02E SECOND FLOOR PLAN - EAST WING - MECHANICAL

137 M5.01 DETAILS - MECHANICAL

138 M5.02 DETAILS - MECHANICAL

SHT.

NO.

SUB

SHEET

TITLE OF SHEET

GENERAL

1 G0.00 COVER SHEET

2 G0.01 SHEET LIST

3 G1.00 PROJECT OVERVIEW SITE PLAN

4 G2.00 FLS PLAN - BASEMENT

5 G2.01 FLS PLAN - FIRST FLOOR

6 G2.02 FLS PLAN - SECOND FLOOR

7 G2.03 FLS PLAN - THIRD FLOOR

8 G3.00 ACCESSIBILITY PLAN - BASEMENT

9 G3.01 ACCESSIBILITY PLAN - FIRST FLOOR

10 G3.02 ACCESSIBILITY PLAN - SECOND FLOOR

11 G3.03 ACCESSIBILITY PLAN - THIRD FLOOR

CIVIL

12 C1.1 SITE PLAN

13 C2.1 SITE PLAN ENLARGEMENTS

14 C3.1 EROSION CONTROL PLAN

15 C4.1 DETAILS

16 C5.1 EROSION CONTROL DETAILS

ARCHITECTURAL

17 A0.01 ABBREVIATIONS, SYMBOLS, AND NOTES

18 AD1.00W DEMO/SALVAGE PLAN - BASEMENT WEST

19 AD1.01W DEMO/SALVAGE PLAN - FIRST FLOOR WEST

20 AD1.02W DEMO/SALVAGE PLAN - SECOND FLOOR WEST

21 AD1.03W DEMO/SALVAGE PLAN - THIRD FLOOR WEST

22 AD1.50W DEMO/SALVAGE RCP - BASEMENT WEST

23 AD1.51W DEMO/SALVAGE RCP - FIRST FLOOR WEST

24 AD1.52W DEMO/SALVAGE RCP - SECOND FLOOR WEST

25 AD1.53W DEMO/SALVAGE RCP - THIRD FLOOR WEST

26 AD2.51W DEMO/SALVAGE ENLARGED EXTERIOR ELEVATIONS

27 AD4.51W DEMO/SALVAGE INTERIOR ELEVATIONS

28 AD4.52W DEMO/SALVAGE INTERIOR ELEVATIONS

29 AD1.00E DEMO/SALVAGE PLAN - BASEMENT EAST

30 AD1.01E DEMO/SALVAGE PLAN - FIRST FLOOR EAST

31 AD1.02E DEMO/SALVAGE PLAN - SECOND FLOOR EAST

32 AD1.50E DEMO/SALVAGE RCP - BASEMENT EAST

33 AD1.51E DEMO/SALVAGE RCP - FIRST FLOOR EAST

34 AD1.52E DEMO/SALVAGE RCP - SECOND FLOOR EAST

35 A1.00 OVERALL BASEMENT FLOOR PLAN

36 A1.01 OVERALL FIRST FLOOR PLAN

37 A1.02 OVERALL SECOND FLOOR PLAN

38 A1.03 OVERALL THIRD FLOOR PLAN

39 A1.04 OVERALL ROOF PLAN

40 A2.01 EXTERIOR ELEVATIONS - NORTH

41 A2.02 EXTERIOR ELEVATIONS - SOUTH

42 A2.03 EXTERIOR ELEVATIONS - EAST AND WEST

43 A7.00 WINDOW SCHEDULE

44 A7.01 WINDOW SCHEDULE

45 A7.02 WINDOW SCHEDULE

46 A7.03 WINDOW SCHEDULE

47 A1.00W BASEMENT PLAN - WEST WING

48 A1.01W FIRST FLOOR PLAN - WEST WING

49 A1.02W SECOND FLOOR PLAN - WEST WING

50 A1.03W THIRD FLOOR PLAN - WEST WING

51 A1.50W BASEMENT RCP - WEST WING

52 A1.51W FIRST FLOOR RCP - WEST WING

53 A1.52W SECOND FLOOR RCP - WEST WING

54 A1.53W THIRD FLOOR RCP - WEST WING

55 A2.51W ENLARGED EXTERIOR ELEVATIONS & DETAILS

56 A3.01W BUILDING SECTION

57 A3.02W BUILDING SECTION

58 A3.03W BUILDING SECTION

59 A3.04W BUILDING SECTION

60 A3.05W BUILDING SECTION

61 A3.06W BUILDING SECTION

62 A3.07W BUILDING SECTION

63 A3.51W WALL SECTIONS

64 A3.52W WALL SECTIONS

65 A4.51W INTERIOR ELEVATIONS

66 A4.52W INTERIOR ELEVATIONS

67 A4.53W INTERIOR ELEVATIONS

68 A4.54W INTERIOR ELEVATIONS

69 A4.55W INTERIOR ELEVATIONS

70 A4.56W INTERIOR ELEVATIONS

71 A4.57W INTERIOR ELEVATIONS

SHEET INDEX

LAN

LAN

LAN

LAN

2LAN

2LAN

2LAN82LAN

82LAN

82LAN

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

0W

2E

2E

82LAN

82LAN

82LAN

82LAN

82LAN

82LAN

82LAN

82LAN

82LAN

98LAN

WEST WING EAST WING

M A

T C

H L

IN

E

(E) CONC CURB

(E) PARKING

(E) AC PAVING

(E) PARKING

(E) PARKING (E) PARKING

(E P

A R

K

IN

G

(E A

C P

A V

IN

G

(E) HISTORIC CONC WALK

(E) CONC WALK

(E) LAWN

(E) PARKING

(E) PARKING

(E) PARKING

(E) PARKING

(E) PARKING

(E) LAWN

(E) LAWN

(E) AC PAVING

(E) CURB RAMP

(E) LAWN(E) LAWN

(E) LAWN

(E) LAWN

(E) AC PAVING

(E) LANDSCAPE AREA

(E) LANDSCAPE AREA

(E) WOOD PORCH AND STAIR

(E) CONC WALK

(E) CONC CURB

(E) CONC CURB

(E) CONC CURB

(E) CONC WALK

(E) FLAG POLE

(E) INTERPRETIVE SIGNAGE

(E) BICYCLE RACK TO REMAIN

LEGEND

ACCESSIBLE ROUTE DURING

CONSTRUCTION

BUILDING OUTLINE

FIRE ACCESS

CONTRACTOR STAGING AREA

PROJECT WORK LIMITS BOUNDARY

GENERAL NOTES

1. REFERENCE CIVIL DRAWINGS FOR REVISED GRADING,

PAVING AND DRAINAGE AROUND BUILDING AND SITE.

2. REFERENCE MECHANICAL DRAWINGS FOR (N)

EXTERIOR EQUIPMENT LOCATIONS.

3. CONTRACTOR TO VERIFY LOCATION OF ALL (E)

UTILITIES.

4. PROJECT BOUNDARY INCLUDES HISTORIC SPACES

WITHIN THE HEADQUARTERS BUILDING TO REMAIN

UNDISTURBED DURING PROJECT WORK.

THIS PROJECT CONSISTS OF LABOR, EQUIPMENT AND

MATERIAL TO SEISMICALLY STRENGTHEN THE EAST AND

WEST WINGS OF FORT MASON BUILDING 201 IN TWO PHASES

OF CONSTRUCTION AND WILL INCLUDE: CONSTRUCTING NEW

STEEL MOMENT FRAMES AND COLLECTORS ON THE FIRST,

SECOND, THIRD FLOORS, AND ATTIC SPACE OF THE THREE-

STORY BUILDING; NEW CONCRETE FOUNDATIONS AND SHEAR

WALLS AT BASEMENT LEVEL THAT ARE INTEGRAL TO MOMENT

FRAMES ABOVE; STRENGTHENING ROOF FRAMING AT WWII

INFILL; PROVIDING POSITIVE CONNECTIONS BETWEEN THE

WOOD FRAMING AND FOUNDATIONS OF THE CRAWLSPACE;

CONNECTING EXISTING FLOOR DIAPHRAGMS, REMOVAL AND

REINSTALLATION OR RELOCATING MECHANICAL, ELECTRICAL

AND PLUMBING SYSTEM COMPONENTS RELATED TO SEISMIC

STRENGTHENING THROUGHOUT THE BUILDING;

IMPROVEMENTS TO SEISMIC HAZARDS RELATED TO THE

MECHANICAL, ELECTRICAL AND PLUMBING SYSTEM

COMPONENTS AND REMOVAL OF ABANDONED NON-

HISTORICALLY SIGNIFICANT PIPES, DUCTS, AND CONDUITS

THROUGHOUT; RELOCATING AND MODIFYING PORTIONS OF

HISTORIC INTERIOR WOOD PARTITIONS WITH DOORS, GLASS

RELIGHTS, AND CABINETS TO ACCOMMODATE NEW MOMENT

FRAMES; REPAIRS AND REPLACEMENT OF HISTORIC CEILING

AND WALL FINISHES, RESILIENT FLOORING, WALL BASES, AND

CARPETS ASSOCIATED WITH NEW MOMENT FRAMES AND

COLLECTORS; PAINTING OPAQUE INTERIOR SURFACES

THROUGHOUT, INCLUDING NEW STRUCTURAL MEMBERS AND

TRIMS, WALLS, CEILINGS, INTERIOR PARTITIONS, EXPOSED

ELECTRICAL CONDUITS/RACEWAYS, FIRE SPRINKLER PIPING,

AND MECHANICAL DUCTWORK; RELOCATING TWO EXTERIOR

DOORS AND REMOVING TWO WINDOWS AT WEST WALL

BASEMENT LEVEL, PROVIDING NEW EXTERIOR LANDINGS,

STEPS AND HANDRAILS; REMOVAL AND RECONSTRUCTION OF

EXTERIOR WOOD PORCH AND STAIR; MOBILIZATION,

DEMOBILIZATION, AND GENERAL CONDITIONS AS RELATED TO

THIS LINE ITEM ALONG WITH PROTECTION, REMEDIATION OF

HAZARDOUS MATERIALS, CUTTING, PATCHING, REPAIR AND

PAINTING OF ADJACENT FINISHES, EXCAVATION FOR NEW

FOOTINGS; SEGREGATING, STOCKPILING, TESTING, AND

DISPOSAL OF CLASS III NON-HAZARDOUS EXCAVATED SOILS,

IMPORT CLEAN FILL AND ALL OTHER WORK NECESSARY TO

RETURN THE SYSTEM WORKING ORDER.

EXISTING CONSTRUCTION, MATERIALS AND FINISHES ARE

CONSIDERED HISTORIC FABRIC IN ALL LOCATIONS. AS A

HISTORIC REHABILITATION PROJECT, THE GOAL IS TO

DISTURB AS LITTLE EXISTING HISTORIC FABRIC AS POSSIBLE.

DEMOLITION MUST BE SELECTIVE TO MINIMIZE THE LOSS OF

HISTORIC FABRIC AND DAMAGE TO HISTORIC FINISHES. CARE

MUST BE TAKEN WHEN SALVAGING MATERIALS FOR

REINSTALLATION OR SALVAGE, TO PREVENT OR MINIMIZE

DAMAGE TO THE MATERIAL REMOVED AND THE SURROUNDING

HISTORIC BUILDING FABRIC. ANY DISTURBANCE TO HISTORIC

FABRIC MUST BE APPROVED BY THE CONTRACTING OFFICER

PRIOR TO REMOVAL. SEE SPECIFICATIONS SECTIONS 013591 -

HISTORIC PRESERVATION TREATMENT PROCEDURES, 024105 -

SELECTIVE DEMOLITION, AND 024119 - SELECTIVE

STRUCTURAL DEMOLITION FOR DETAILED INFORMATION AND

PROCEDURES.

PROJECT SUMMARY

16 0 16 32

SCALE OF FEET

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G1.00 05/27/2022

CR

LJ

ST 641

3 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

PROJECT OVERVIEW SITE

PLAN

PROJECT OVERVIEW SITE PLAN

T R

U E

B L D

G

14.49°

UP

UP

DN

DN

S-1 300 1

STORAGE B23

S-1 300 2

FMR

BOILER B14

B 50 24

GYM B19, B21

B 50 11

LOCKER RM B15

' - 9

WEST WING EAST WING

CRAWL SPACE

B25

S-1 300 1

STOR B13

S-2 300 1

GAS B12

HALL

B11

STAIR

ST4-B

B 150 2

MAIL B16

B 150 2

IT RM B20

B 50 4

LOCKER B22

S-1 300 1

STOR B24

T R

A V

E L D

IS

T A

N C

E

COMMON PATH = 66'

TRAVEL DISTANCE = 72'

B 150 1

CHANGE B28

B 150 1

RR B27

B 150 1

SHOWER B26

M A

T C

H L

IN

E

' - 1

A-3 ASSEMBLY

B BUSINESS

S-1 STORAGE

LOCKER

OCCUPANT LOAD ARROW

EGRESS PATH

ROOM

AREA & OCCUPANT LOAD TAG

AREA

LOAD

FACTOR

OCC.

LOAD

OCC. GRP

CIRCULATION

ONE HOUR FIRE RATED WALL

AREA KEPT CLEAR FOR EXITING

FROM EAST WING

LEGEND

NEW OR REINSTALLED

ILLUMINATED EXIT SIGN

TEMPORARY PARTITION AND EXIT

ACCESS DOOR

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G2.00 05/27/2022

CR

LJ

ST 641

4 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

FLS PLAN - BASEMENT

BASEMENT EGRESS PLAN

10 0 10 20

SCALE OF FEET

CODE STANDARDS

THIS PROJECT IS A REHABILITATION IN ACCORDANCE WITH THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES. BUILDING 201 IS LISTED ON THE

NATIONAL REGISTER OF HISTORIC PLACES.

APPLICABLE BUILDING CODES:

2019 CALIFORNIA HISTORICAL BUILDING CODE (TITLE 24, PART 8) IN CONJUNCTION WITH THE 2019 CALIFORNIA BUILDING CODE, WHICH INCORPORATES THE 2018 INTERNATIONAL BUILDING CODE AND

REFERENCE STANDARD NFPA 13

2019 CALIFORNIA MECHANICAL CODE (BASED ON THE 2018 UMC)

2016 CALIFORNIA ELECTRICAL CODE (BASED ON THE 2017 NEC)

2019 CALIFORNIA PLUMBING CODE (BASED ON THE 2018 UPC)

2019 CALIFORNIA FIRE CODE (BASED ON THE 2018 IFC)

2006 ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

LOT/LOCATION:

THE PROJECT LOCATION IS IN THE GOLDEN GATE NATIONAL RECREATION AREA (GGNRA), SAN

FRANCISCO, CALIFORNIA. FROM HIGHWAY 101/LOMBARD STREET TRAVEL NORTH ONTO FRANKLIN

STREET. CROSS BAY STREET AND CONTINUE NORTH ON FRANKLIN STREET TURNING WEST ONTO

MACARTHUR AVE. FORT MASON BUILDING 201 IS ON THE RIGHT.

CBC CHAPTER 3 – OCCUPANCY CLASSIFICATION AND USE

A-3, ASSEMBLY USE

B, OFFICE USE

S-1, MODERATE-HAZARD STORAGE

S-2, LOW-HAZARD STORAGE

CBC CHAPTER 5 – GENERAL BUILDING HEIGHTS AND AREAS

MAXIMUM ALLOWABLE BUILDING HEIGHT (TABLE 504.3)

TYPE VB CONSTRUCTION, SPRINKLERED – 60 FEET (BASED ON B OCCUPANCY)

ACTUAL: EXEMPTED BY ARTICLE 8-302.5 OF CALIFORNIA HISTORICAL BUILDING CODE

ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLANE (TABLE 504.4)

TYPE VB CONSTRUCTION, SPRINKLERED – 3 STORIES (BASED ON B OCCUPANCY)

ACTUAL: EXEMPTED BY ARTICLE 8-302.5 OF CALIFORNIA HISTORICAL BUILDING CODE

ALLOWABLE AREA (TABLE 506.2, NO AREA INCREASES APPLIED)

TYPE VB CONSTRUCTION, SPRINKLERED WITH NFPA 13 SYSTEM

THIRD FLOOR: ACTUAL 5,230SF B/27,000SF MAX ALLOWABLE AREA = 0.19

SECOND FLOOR: ACTUAL 7,489SF B/27,000SF MAX ALLOWABLE AREA = 0.28

FIRST FLOOR: (ACTUAL 2,685SF A-3/6,00SF MAX ALLOWABLE AREA = 0.45)+ (ACTUAL

5,885SF B /27,000SF MAX ALLOWABLE AREA = 0.22) = 0.67

BASEMENT: (ACTUAL 2,257SF B /27.000SF MAX ALLOWABLE AREA = 0.084)+ (ACTUAL

1,510SF S-1/27,000SF MAX ALLOWABLE AREA =0.056 ) =0.14

BUILDING AREA SUMMARY FOR ALL STORIES: 0.19 + 0.280 + .67 + 0.14 = 1.28 < 2

ONE-HOUR RATED FIRE SEPARATION REQUIRED BETWEEN A-3 ASSEMBLY AND B

BUSINESS OCCUPANCIES (TABLE 508,4)

CBC CHAPTER 6 – TYPES OF CONSTRUCTION

CONSTRUCTION TYPE – VB, SPRINKLERED - NO FIRE-RESISTANCE RATED BUILDING

ELEMENTS REQUIRED (TABLE 601)

CODE SUMMARY

CBC CHAPTER 10 – MEANS OF EGRESS

MAXIMUM FLOOR AREA ALLOWANCE PER OCCUPANT

(TABLE 1004.5)

STORAGE – 300GSF/OCCUPANT

ASSEMBLY WITHOUT FIX SEATS– 15SF/OCCUPANT

BUSINESS - 150GSF/OCCUPANT

OCCUPANT LOAD PER STORY - WEST WING

THIRD FLOOR: 47 OCCUPANTS

SECOND FLOOR: 66 OCCUPANTS

FIRST FLOOR: 221 OCCUPANTS

BASEMENT: 52 OCCUPANTS

BUILDING OCCUPANT LOAD: 386 TOTAL OCCUPANTS

DN

DN

DN

UP

DN

UP

A-3 15 172

LG MEETING RM 126

B 150 12

OPEN OFFICE 144

B 150 2

OFFICE 148

B 150 2

OFFICE 125

' - 9

/8

1 1

11911

NO

OCCUPANCY;

ASSOCIATED

WITH A-3

76' - 3 3/8"

WEST WING EAST WING

B 150 2

CONFERENCE

ROOM 262

B 150 2

RECEPTION

B 150 2

PM 01

B 150 9

PROJECT MANAGEMENT

B 150 1

COPY

B 300 1

STORAGE

B 150 2

MAIL ROOM

B 150 2

NATURAL

RESOURCES

B 150 2

OFFICE

B 150 2

OFFICE

B 150 3

OFFICE

B 150 2

OFFICE

B 150 1

OFFICE

B 150 2

OFFICE

B 150 6

INFO

TECHNOLOGY

STAIR

ST-B-1

HALL

LONGEST TRAVEL DISTANCE = 83'

B 150 2

OFFICE 136 460

B 150 3

OFFICE 135

B 150 2

OFFICE 134

B 150 1

OFFICE 136b

B 150 2

OFFICE 139

B 150 2

OFFICE 138

B 150 2

OFFICE 137

B 150 2

OFFICE 133

B 150 2

BREAK 132

B 150 2

OFFICE 149

B 150 2

OFFICE 147

B 150 2

OFFICE 146

B 150 2

OFFICE 143

B 150 2

OFFICE 142

B 300 1

JAN 128

B 300 1

STOR 141

B 150 1

RR 140

B 150 1

RR 150

NO OCCUPANCY;

ASSOCIATED WITH

A-3

VEST

RR

RR

VEST

ENTRY

126a

B 150 1

INFO

TECHNOLOGY

B 150 2

RR

HALL

HALL

VESTIBULE

VESTIBULE

VESTIBULE

114C

VESTIBULE

B 150 1

RR

THIS AREA MUST BE KEPT

CLEAR FOR EXITING FROM

THE EAST WING

ENTRY

A-3 ASSEMBLY

B BUSINESS

S-1 STORAGE

LOCKER

OCCUPANT LOAD ARROW

EGRESS PATH

ROOM

AREA & OCCUPANT LOAD TAG

AREA

LOAD

FACTOR

OCC.

LOAD

OCC. GRP

CIRCULATION

ONE HOUR FIRE RATED WALL

AREA KEPT CLEAR FOR EXITING

FROM EAST WING

LEGEND

NEW OR REINSTALLED

ILLUMINATED EXIT SIGN

TEMPORARY PARTITION AND EXIT

ACCESS DOOR

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G2.01 05/27/2022

CR

LJ

ST 641

5 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

FLS PLAN - FIRST FLOOR

FIRST FLOOR EGRESS PLAN

10 0 10 20

SCALE OF FEET

SEE G2.00 - FLS PLAN - BASEMENT FOR CODE SUMMARY

DN

B 150 3

OFFICE 220

1 1

87' - 3 1/8"

/8

78' -

/4

WEST WING EAST WING

B 150 2

OFFICE 235

B 150 3

OFFICE 234

B 150 2

OFFICE 233

B 150 2

OFFICE 232

B 150 2

OFFICE 231

B 150 2

COPY 238

B 300 1

STOR 238a

B 150 2

OFFICE 230

B 150 2

CONF 229

B 150 2

OFFICE 228

B 150 3

OFFICE 224

B 150 1

KITCHEN 227

B 150 1

RR 226

B 150 3

RECEPTION 222

B 150 1

OPEN OFFICE 223

B 150 4

MEETING 217 250

B 150 2

OFFICE 216 198

B 150 2

OFFICE 213

B 150 3

RR 212

B 150 2

RR 211

B 150 11

OPEN OFFICE 214

B 300 1

STOR 219

B 300 1

STOR 218

B 150 6

OPEN OFFICE 237

B 150 2

OFFICE 236

VEST.

217a

HALL

HALL

ELEV

EL-1

VESTIBULE

STAIR

ST2-2

HALL

COMMON PATH = 79'-6"

THIS AREA MUST BE KEPT

CLEAR FOR EXITING FROM

THE EAST WING

COMMON PATH = 42'-6"

COMMON PATH = 57'-0"

LONGEST TRAVEL DISTANCE = 149'-0"

COMMON PATH = 53'-9"

COMMON PATH = 31'-6"

COMMON PATH = 34'-6"

COMMON PATH = 22'-0"

A-3 ASSEMBLY

B BUSINESS

S-1 STORAGE

LOCKER

OCCUPANT LOAD ARROW

EGRESS PATH

ROOM

AREA & OCCUPANT LOAD TAG

AREA

LOAD

FACTOR

OCC.

LOAD

OCC. GRP

CIRCULATION

ONE HOUR FIRE RATED WALL

AREA KEPT CLEAR FOR EXITING

FROM EAST WING

LEGEND

NEW OR REINSTALLED

ILLUMINATED EXIT SIGN

TEMPORARY PARTITION AND EXIT

ACCESS DOOR

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G2.02 05/27/2022

CR

LJ

ST 641

6 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

FLS PLAN - SECOND

FLOOR

10 0 10 20

SCALE OF FEET

SECOND FLOOR EGRESS PLAN

DN

1 1

WEST WING EAST WING

B 150 2

OFFICE 312

B 150 1

OFFICE 313

B 150 1

OFFICE 314

B 150 2

OFFICE 315

B 150 5

OPEN OFFICE 311

B 150 2

COPY/MAIL 31075

B 150 1

OFFICE 318a

B 150 1

BREAK 317

B 150 1

OFFICE 318

B 150 2

OFFICE 320

B 150 2

OFFICE 321

B 150 2

OFFICE 322

B 150 2

OFFICE 323

B 150 3

OFFICE 324

B 150 2

OFFICE 326

B 150 1

OFFICE 325

B 150 2

OFFICE 327

B 150 2

OFFICE 328

B 150 7

OPEN OFFICE

B 150 2

RECEPTION 309

B 150 1

OFFICE 331

B 150 1

OFFICE 332

B 150 1

OFFICE 333

B 150 1

OFFICE 334

HALL

HALL

VEST

ELEV

EL-1

STAIR

ST-C-3

STAIR

ST2-3

STAIR

ST5-3

THIS AREA MUST BE KEPT

CLEAR FOR EXITING FROM

THE EAST WING

COMMON PATH = 40'-6"

A-3 ASSEMBLY

B BUSINESS

S-1 STORAGE

LOCKER

OCCUPANT LOAD ARROW

EGRESS PATH

ROOM

AREA & OCCUPANT LOAD TAG

AREA

LOAD

FACTOR

OCC.

LOAD

OCC. GRP

CIRCULATION

ONE HOUR FIRE RATED WALL

AREA KEPT CLEAR FOR EXITING

FROM EAST WING

LEGEND

NEW OR REINSTALLED

ILLUMINATED EXIT SIGN

TEMPORARY PARTITION AND EXIT

ACCESS DOOR

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G2.03 05/27/2022

CR

LJ

ST 641

7 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

FLS PLAN - THIRD FLOOR

10 0 10 20

SCALE OF FEET

THIRD FLOOR EGRESS PLAN

LOCKER

B22

FMR BOILER

B14

HALL

B11

GAS

B12

STOR

B13

LOCKER RM

B15

MAIL

B16

GYM

B19

GYM

B21

IT RM

B20

CHANGE

B28

RR

B27

SHOWER

B26

STOR

B23

STOR

B24

CRAWL SPACE

B25

WEST WING EAST WING

ELECTRICAL

B08

ELECTRICAL

B09

TELEPHONE

B10

STOR

B02

HALL

B01a

STORAGE

B07

HALL

B01

STORAGE

B03

STORAGE

B04

HALL

B01c

BOILER

B06

CRAWL SPACE

B29

STORAGE

B05

ELEV

EL-1

LEGEND

ACCESSIBLE ROUTE/ PATH OF TRAVEL

(36" MINIMUM CLEAR WIDTH)

60" DIAMETER CLEAR FLOOR AREA

ACCESSIBLE BUILDING ENTRANCE

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G3.00 05/27/2022

CR

LJ

ST 641

8 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

ACCESSIBILITY PLAN -

BASEMENT

BASEMENT FLOOR PLAN

10 0 10 20

HALL

CONFERENCE

ROOM

MAIL ROOM

NATURAL

RESOURCES

VESTIBULE

INFO

TECHNOLOGY

INFO

TECHNOLOGY

OFFICE

114B

STORAGE

118B

OFFICE

RR

RECEPTION

PROJECT

MANAGEMENT

107 OFFICE

OFFICE

OFFICE

VESTIBULE

VESTIBULE

HALL

RR

PM 01

HALL

106STAIR

ST-B-1

OFFICE

OFFICE

OFFICE

134 OFFICE

BREAK

132 VEST.

RR

RR

STAIR

ST3-1

VEST.

JAN

128OPEN OFFICE

OFFICE

136b

OFFICE

OFFICE

OFFICE

STOR

HALL

141a

OFFICE

OFFICE

143RR

OFFICE

OFFICE

OFFICE

OFFICE

RR

VEST

ENTRY

126a

LG MEETING RM

VEST

OFFICE

STAIR

ST2-1

INFO

TECHNOLOGY

114A

ELEV

EL-1

ENTRY

INFO

TECHNOLOGY

114D

VESTIBULE

114C

LEGEND

ACCESSIBLE ROUTE/ PATH OF TRAVEL

(36" MINIMUM CLEAR WIDTH)

60" DIAMETER CLEAR FLOOR AREA

ACCESSIBLE BUILDING ENTRANCE

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G3.01 05/27/2022

CR

LJ

ST 641

9 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

ACCESSIBILITY PLAN -

FIRST FLOOR

FIRST FLOOR PLAN

OFFICE

OFFICE

STORAGE

OFFICE

RR

OFFICE

HALL

OFFICE

OFFICE

HALL

203b

STAIR

ST-B-2

RR

RR

OFFICE

OPEN OFFICE

OFFICE

MEETING

OFFICE

RECEPTION

222 OPEN OFFICE

HALL

OFFICE

HALL

KITCHEN

RR

OFFICE

CONF

OFFICE

OFFICE

231 OFFICE

OFFICE

OFFICE

OFFICE

OPEN OFFICE

COPY

VEST.

231a

VEST.

217a

STO

STO

STAIR

ST2-2

VESTIBULE

STOR

238a

OFFICE

HALL

ELEV

EL-1

LEGEND

ACCESSIBLE ROUTE/ PATH OF TRAVEL

(36" MINIMUM CLEAR WIDTH)

60" DIAMETER CLEAR FLOOR AREA

ACCESSIBLE BUILDING ENTRANCE

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G3.02 05/27/2022

CR

LJ

ST 641

10 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

ACCESSIBILITY PLAN -

SECOND FLOOR

SECOND FLOOR PLAN

CONFERENCE

OFFICE

HALL

OFFICE

BREAK

RR

VEST

STAIR

ST-B-3

OFFICE

OFFICE

OFFICE

OFFICE

OPEN OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BREAK

OPEN OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

COPY/MAIL

RECEPTION

HALL

OFFICE

OFFICE

318a

HALL

STAIR

ST2-3 STAIR

ST-C-3

ELEV

EL-1

LEGEND

ACCESSIBLE ROUTE/ PATH OF TRAVEL

(36" MINIMUM CLEAR WIDTH)

60" DIAMETER CLEAR FLOOR AREA

ACCESSIBLE BUILDING ENTRANCE

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

G3.03 05/27/2022

CR

LJ

ST 641

11 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

ACCESSIBILITY PLAN -

THIRD FLOOR

THIRD FLOOR PLAN

ENLARGEMENTS

ARCHITECTURAL ABBREVIATIONS

@ AT

AFF ABOVE FINISHED FLOOR

AC ASPHALT CONCRETE

AP ACCESS PANEL

ADJ ADJUSTABLE

AGGR AGGREGATE

ALUM ALUMINUM

L ANGLE

APPROX APPROXIMATE

ARCH ARCHITECT(URE)

ASPH ASPHALT

AVG AVERAGE

BM BEAM

BLKG BLOCKING

BITUM BITUMINOUS

BD BOARD

BO BOTTOM OF ____

BOT BOTTOM

BLDG BUILDING

BLT-IN BUILT-IN

CAB CABINET

CPT CARPET

CB CATCH BASIN

CBU CEMENTITIOUS BACKING

UNIT

CLG CEILING

CTR CENTER

CL CENTERLINE

CEM CEMENT

CT CERAMIC TILE

CLR CLEAR

CLO CLOSET

CW COLD WATER

COL COLUMN

CONC CONCRETE

CMU CONC. MASONRY UNIT

CONST CONSTRUCTION

CONT CONTINUOUS

CO CONTRACTING OFFICER

CONTR CONTRACTOR

CJ CONTROL JOINT

CNTR COUNTER

CONN CONNECTION

CORR CORRIDOR

CSK COUNTERSUNK

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DR DOOR

DBL DOUBLE

DN DOWN

DS DOWNSPOUT

DWB DRAWING

DSP DRY STANDPIPE

E EAST

EA EACH

EJ EXPANSION JOINT

ELEC ELECTRIC(AL)

ELEV ELEVATION

EMER ENCLOSURE

EQ EQUAL

EQUIP EQUIPMENT

(E) EXISTING

EXT EXTERIOR

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FIN FINISH

FF EL FINISHED FLOOR

ELEVATION

FA FIRE ALARM

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FHC FIRE HOSE CABINET

FP FIREPROOF

FLASH FLASHING

FB FLAT BAR

FLR FLOOR

FAB FABRICATE

FD FLOOR DRAIN

FLUOR FLUORESCENT

FT FOOT or FEET

FTG FOOTING

FDTN FOUNDATION

FS FULL SIZE

FURN FURNISH

FURG FURRING

FUT FUTURE

GALV GALVANIZED

GEN GENERAL

GL GLASS

GLULAM GLUE LAMINATED BEAM

GR GRADE

G GROUND

GYP BD GYPSUM BOARD

GYP BDX GYPSUM BOARD

(TYPE X)

HCP HANDICAPPED

HNDRL HANDRAIL

HGR HANGER

HDBD HARDBOARD

HDW HARDWARE

HDWD HARDWOOD

HT HEIGHT

HSS HOLLOW STEEL SECTION

HORIZ HORIZONTAL

HB HOSE BIBB

HW HOT WATER

IN INCH(ES)

ID INSIDE DIAMETER

INSTL INSTALL

INSUL INSULATION

INT INTERIOR

JS JOINT SEALANT

JT JOINT

LAM LAMINATE

LAV LAVATORY

LTG LIGHTING

LIN LINEAR

MH MANHOLE

MF MOMENT FRAME

MFR MANUFACTURE(R)

MO MASONRY OPENING

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MTL METAL

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MULL MULLION

(N) NEW

NOM NOMINAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NPS NATIONAL PARK SERVICE

NO NUMBER

OBS OBSCURE

OC ON CENTER

O.H. OVERHANG

OPNG OPENING

OPP OPPOSITE

OD OUTSIDE DIAMETER

OF/CI OWNER FURNISHED/

CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED/

OWNER INSTALLED

PT PAINT(ED)

PR PAIR

PBD PARTICLE BOARD

PTN PARTITION

PLAM PLASTIC LAMINATE

PL PLATE

PLUMB PLUMBING

PLYWD PLYWOOD

LB POUND

PT PRESERVATIVE TREATED

QTY QUANTITY

RAD RADIUS

RCP REFLECTED CEILING

PLAN

RWD REDWOOD

REF REFERENCE

REF REFRIGERATOR

REG REGISTER

REINF REINFORCE

RESIL RESILIENT

REQ'D REQUIRED

REV REVISION

R RISER

RD ROOF DRAIN

RM ROOM

RO ROUGH OPENING

SAM SELF-ADHERED

MEMBRANE

SCHED SCHEDULE

SECT SECTION

SHT SHEET

SHTHG SHEATHING

SHWR SHOWER

SIM SIMILAR

SC SOLID CORE

S SOUTH

SPEC SPECIFICATION(S)

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STA STATION

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SYMM SYMMETRICAL

TEL TELEPHONE

TEMP TEMPERATURE

THK THICK

T&G TONGUE AND GROOVE

TO TOP OF ____

TOC TOP OF CURB

TOD TOP OF DECK

TOL TOP OF LOG

TOP TOP OF PAVEMENT

TOW TOP OF WALL

TYP TYPICAL

UNFIN UNFINISHED

U.P. UNPEELED

UR URINAL

UNO UNLESS NOTED

OTHERWISE

VFY VERIFY

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VERT VERTICAL

VCT VINYL COMPOSITION

TILE

VEST VESTIBULE

W WEST

WC WATER CLOSET

WD WOOD

WP WATERPROOF

WR WATER RESISTANT

WRB WEATHER RESISTANT

BARRIER

WSCT WAINSCOT

WT WEIGHT

W/ WITH

W/0 WITHOUT

1. THESE DRAWINGS, ALONG WITH THE SPECIFICATIONS, DESCRIBE THE BUILDING PROJECT EXCEPT AS NOTED.

2. INFORMATION IS LOCATED ON DRAWINGS AND IN SPECIFICATION SECTIONS FOR THE CONTRACTORS CONVENIENCE AND IS NOT INTENDED TO DEFINE SPECIFIC SUBCONTRACTORS SCOPE OF WORK. CONTRACTOR IS RESPONSIBLE FOR

COORDINATION OF ALL WORK IN CONFORMANCE WITH THE CONSTRUCTION CONTRACT.

3. THESE DRAWINGS HAVE BEEN ASSEMBLED FOR USE AT THEIR CURRENT SIZE. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR WORK NOT CONFORMING TO THESE DOCUMENTS DUE TO REDUCED DRAWINGS BEING USED FOR

ESTIMATING OR CONSTRUCTION PURPOSES.

4. DIMENSIONS TO NEW WALLS ARE TO FACE OF FRAMING, U.N.O.

5. DIMENSIONS TO EXISTING WALLS ARE TO FACE OF FINISH, U.N.O.

6. ALIGN NEW FRAMING AS INDICATED ON DRAWINGS.

7. PRIOR TO SCHEDULING OF WORK AND COMMENCING OF CONSTRUCTION, CONTRACTOR SHALL FIELD VERIFY EXISITNG CONDITIONS AND DIMENSIONS SHOWN AND NOTIFY CONTRACTING OFFICER OF ANY OMISSIONS OR DISCREPANCIES.

COMMENCEMENT OF WORK INDICATES ACCEPTANCE OF EXISTING CONDITIONS.

8. COORDINATE DEMOLITION AND SALVAGE WORK IN CONJUNCTION WITH NEW CONSTRUCTION.

9. AREAS OF THE BUILDING ARE HISTORICALLY SIGNIFICANT UNLESS OTHERWISE NOTED. WORK IS TO BE CONDUCTED SO AS TO ENSURE PRESERVATION OF EXISTING HISTORIC FINISHES AND CHARACTER DEFINING FEATURES.

GENERAL NOTES

A101

A101

A101

PROJECT NORTH

A1

VIEW TITLE

SCALE

DRAWING TITLE

BUILDING SECTION

WALL SECTION

EXTERIOR ELEVATION

A-1011

R e f

1 Ref

R e f

1 Ref

INTERIOR ELEVATION

101 DOOR NUMBER

0 GRID LINES

Room name

ROOM NAME

ROOM NUMBER

XXXX-X WALL TAG

SPOT ELEVATION

KEYNOTE

WINDOW TYPE1t

REVISION1

SYMBOLS

FF EL = XXXX.X' FINISHED FLOOR ELEVATION

FINISHED CEILING ELEVATION X' - X" AFF

MOMENT FRAME - SEE STRUCTURALMF-X

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

A0.01 05/27/2022

CR

LJ

ST 641

17 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

ABBREVIATIONS,

SYMBOLS, AND NOTES

1 95 6 7 8

B

C

D

E

F

G

A

B.2

D.7

2 3

D.2

B.8

C.5

LOCKER

B22

FMR BOILER

B14

HALL

B11

GAS

B12

STOR

B13

LOCKER RM

B15

MAIL

B16

GYM

B19

GYM

B21

IT RM

B20

CHANGE

B28

RR

B27

SHOWER

B26

STOR

B23

STOR

B24

CRAWL SPACE

B25

A.1

A.5

B.3

B.5

C.1

D.1

D.5

D.6

E.1

E.5

E.9

F.5

F.9

1.1 2.1 2.9

4.5

5.1

5.5 6.5

6.9 7.1

7.5

FF EL = 0' - 0" ±

FF EL = 0' - 6" ±

FF EL = -0' - 3" ±

8 9

M A

T C

H L

IN

E

E A

S T

W

IN

G

AD4.51WG3 AD4.51W

G2

AD4.51W

G1

AD4.51W F2 AD4.51W

F1

AD4.51W

F3

AD4.51WF4

/2

/8

/8

/4

/4

11' - 7 1/8" ± 11' - 7 3/8" ± 12' - 2 1/8" ± 14' - 9 5/8" ± 15' - 4 3/8" ± 15' - 2 3/4" ± 15' - 6 5/8" ± 10' - 5" ±

B21

B19

B b

AD2.51W 1

16 16

16 16

KEY PLAN

SHEET NOTES - DEMO PLAN

1. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL

BE FIELD VERIFIED PRIOR TO START OF THE WORK.

2. COORDINATE DEMOLITION AND SALVAGE WORK IN

CONJUNCTION WITH NEW CONSTRUCTION.

3. SEE SPECIFICATION SECTION 024100 FOR

ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.

4. SEE CIVIL /MECHANICAL /PLUMBING /ELECTRICAL

DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION. DEMOLITION OR REMOVAL AND

REINSTALLATION OF EQUIPMENT TO BE

COORDINATED.

5. AREAS OF THE BUILDING ARE HISTORICALLY

SIGNIFICANT UNLESS OTHERWISE NOTED. WORK IS

TO BE CONDUCTED SO AS TO ENSURE PRESERVATION

OF EXISTING HISTORIC FINISHES AND CHARACTER

DEFINING FEATURES.

6. SEE SPECIFICATIONS FOR REQUIREMENTS FOR

REMOVAL AND/OR REMEDIATION OF HAZARDOUS

MATERIALS.

7. COORDINATE ALL DEMOLITION OF ARCHITECTURAL

FINISHES, SUBSTRATE, AND FRAMING WITH

STRUCTURAL DEMOLITION AND NEW CONSTRUCTION

REQUIREMENTS. DO NOT OVER DEMOLISH.

LEGEND - DEMO

(E) CONSTRUCTION TO REMAIN

REMOVE (E) CONSTRUCTION - SEE KEYNOTES

FOR ADDITIONAL INFORMATION

EXTENTS OF FLOOR OR STRUCTURE REMOVAL

AS INDICATED

8 0 8 16

SCALE OF FEET

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

AD1.00W

05/27/2022

CR

LJ

ST 641

18 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

DEMO/SALVAGE PLAN -

BASEMENT WEST

DEMO/SALVAGE PLAN - BASEMENT WEST

SHEET KEYNOTES

1 DEMOLISH (E) SLAB ON GRADE IN DESIGNATED AREA

TO RECEIVE NEW WORK PER STRUCTURAL

2 REMOVE (E) DOOR, FRAME, AND TRIM

3 REMOVE AND SALVAGE (E) WINDOW SASH, FRAME,

GLAZING, HARDWARE, AND TRIM

4 RELOCATE (E) ELECTRICAL PANEL PER ELECTRICAL

DRAWINGS

5 DEMOLISH (E) POSTS, PEDESTALS, AND FOOTINGS IN

DESIGNATED AREA TO RECEIVE NEW WORK PER

STRUCTURAL

6 DEMOLISH DESIGNATED PORTION OF (E) CONTINUOUS

FOOTING BELOW CONCRETE WALL PER STRUCTURAL

7 REMOVE AND SALVAGE DESIGNATED PORTION OF (E)

PARTITION IN AREA TO RECEIVE NEW WORK

8 REMOVE AND SALVAGE (E) DOOR, FRAME, AND TRIM

9 DEMOLISH DESIGNATED PORTION OF (E) CONCRETE

WALL AT NEW DOOR OPENING. SEE STRUCTURAL

10 DEMOLISH (E) EXTERIOR CONCRETE STEPS

11 PREPARE OPENING TO RECEIVE NEW DOOR

12 DEMO MIRROR THAT CONFLICTS WITH NEW MOMENT

FRAME COLUMN.

13 REMOVE FLOOR FINISH AND WALL BASE IN ENTIRE

ROOM

14 REMOVE AND SALVAGE FLOOR FINISH AND WALL

BASE IN ENTIRE ROOM

15 REMOVE (E) CONCRETE FIRE ESCAPE LANDING PAD

16 DEMOLISH (E) WOOD POST AND FOOTING BELOW PER

STRUCTURAL.

UP

1 95 6 7 8

B

C

D

E

F

G

A

B.2

D.7

2 3

D.2

B.8

C.5

OFFICE

OFFICE

OFFICE

134 OFFICE

BREAK

132 VEST.

RR

RR

STAIR

ST3-1

VEST.

JAN

128OPEN OFFICE

OFFICE

136b

OFFICE

OFFICE

OFFICE

STOR

HALL

141a

OFFICE

OFFICE

RR

OFFICE

OFFICE

OFFICE

OFFICE

RR

VEST

ENTRY

126a

LG MEETING RM

VEST

OFFICE

STAIR

ST2-1

A.1

A.5

B.3

B.5

C.1

D.1

D.5

D.6

E.1

E.5

E.9

F.5

F.9

1.1 2.1 2.9

4.5

5.1

5.5 6.5

6.9 7.1

7.5

TYP.1

M A

T C

H L

IN

E

E A

S T

W

IN

G

AD4.51W H1 AD4.51W

H2

AD4.51W

B1

AD4.51W C1

AD4.51WD2

AD4.51WD1

AD4.51W A2 AD4.51W

A1

AD4.51WA3 AD4.51W E2 AD4.51W

E1

AD4.52W W1

AD4.52W X1 AD4.52WX2 AD4.52WY1

/2

/8

/8

/4

/4

11' - 7 1/8" ± 11' - 7 3/8" ± 12' - 2 1/8" ± 14' - 9 5/8" ± 15' - 4 3/8" ± 15' - 2 3/4" ± 15' - 6 5/8" ± 10' - 5" ± b

146b

148b

125b

KEY PLAN

SHEET NOTES - DEMO PLAN

1. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL

BE FIELD VERIFIED PRIOR TO START OF THE WORK.

2. COORDINATE DEMOLITION AND SALVAGE WORK IN

CONJUNCTION WITH NEW CONSTRUCTION.

3. SEE SPECIFICATION SECTION 024100 FOR

ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.

4. SEE CIVIL /MECHANICAL /PLUMBING /ELECTRICAL

DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION. DEMOLITION OR REMOVAL AND

REINSTALLATION OF EQUIPMENT TO BE

COORDINATED.

5. AREAS OF THE BUILDING ARE HISTORICALLY

SIGNIFICANT UNLESS OTHERWISE NOTED. WORK IS

TO BE CONDUCTED SO AS TO ENSURE PRESERVATION

OF EXISTING HISTORIC FINISHES AND CHARACTER

DEFINING FEATURES.

6. SEE SPECIFICATIONS FOR REQUIREMENTS FOR

REMOVAL AND/OR REMEDIATION OF HAZARDOUS

MATERIALS.

7. COORDINATE ALL DEMOLITION OF ARCHITECTURAL

FINISHES, SUBSTRATE, AND FRAMING WITH

STRUCTURAL DEMOLITION AND NEW CONSTRUCTION

REQUIREMENTS. DO NOT OVER DEMOLISH.

LEGEND - DEMO

(E) CONSTRUCTION TO REMAIN

REMOVE (E) CONSTRUCTION - SEE KEYNOTES

FOR ADDITIONAL INFORMATION

EXTENTS OF FLOOR OR STRUCTURE REMOVAL

AS INDICATED

8 0 8 16

SCALE OF FEET

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

AD1.01W

05/27/2022

CR

LJ

ST 641

19 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

DEMO/SALVAGE PLAN -

FIRST FLOOR WEST

DEMO/SALVAGE PLAN - FIRST FLOOR WEST

SHEET KEYNOTES

1 REMOVE (E) FLOOR COVERING, SHEATHING, AND

FRAMING IN HATCHED AREAS TO PERMIT PASSAGE

AND INSTALLATION OF NEW STRUCTURAL COLUMNS

PER STRUCTURAL DRAWINGS

2 REMOVE AND SALVAGE DESIGNATED PORTION OF (E)

PARTITION IN AREA TO RECEIVE NEW WORK

3 REMOVE AND SALVAGE (E) DOOR, FRAME, AND TRIM

4 REMOVE AND SALVAGE (E) WINDOW SASH, FRAME,

GLAZING, HARDWARE, AND TRIM

5 REMOVE AND SALVAGE (E) COUNTER, CASEWORK,

FIXTURES, EQUIPMENT, AND ACCESSORIES

6 TEMPORARY CONSTRUCTION PARTITION - PRESERVE

ACCESS TO STAIR FROM EAST WING

7 REMOVE FLOOR FINISH AND WALL BASE IN ENTIRE

ROOM

8 MAXIMUM LIMITS OF DEMO OF (E) FLOOR COVERING,

SHEATHING, AND FRAMING TO PERMIT INSTALLATION

OF NEW STRUCTURAL ELEMENTS BELOW

9 FLIP HAND OF (E) DOOR, (E) TRIM TO REMAIN

1 95 6 7 8

B

C

D

E

F

G

A

B.2

D.7

2 3

D.2

B.8

C.5

RR

RR

OFFICE

OPEN OFFICE

OFFICE

MEETING

OFFICE

RECEPTION

222 OPEN OFFICE

HALL

OFFICE

HALL

KITCHEN

RR

OFFICE

CONF

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OPEN OFFICE

COPY

VEST.

231a

VEST.

217a

STO

STO

STAIR

ST2-2 VESTIBULE

STOR

238a

OFFICE

HALL

A.1

A.5

B.3

B.5

C.1

D.1

D.5

D.6

E.1

E.5

E.9

F.5

F.9

1.1 2.1 2.9

4.5

5.1

5.5 6.5

6.9 7.1

7.5

1 TYP.

M A

T C

H L

IN

E

E A

S T

W

IN

G

AD4.52W

Z1

AD4.52W

AA1

AD4.52W

N1

AD4.52WP1 AD4.52W Q1

AD4.52W

R1

AD4.52W

S1

AD4.52W

T1

AD4.52WT2

AD4.52W U1 AD4.52WV1

/2

/8

/8

/4

/4

11' - 7 1/8" ± 11' - 7 3/8" ± 12' - 2 1/8" ± 14' - 9 5/8" ± 15' - 4 3/8" ± 15' - 2 3/4" ± 15' - 6 5/8" ± 10' - 5" ±

KEY PLAN

SHEET NOTES - DEMO PLAN

1. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL

BE FIELD VERIFIED PRIOR TO START OF THE WORK.

2. COORDINATE DEMOLITION AND SALVAGE WORK IN

CONJUNCTION WITH NEW CONSTRUCTION.

3. SEE SPECIFICATION SECTION 024100 FOR

ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.

4. SEE CIVIL /MECHANICAL /PLUMBING /ELECTRICAL

DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION. DEMOLITION OR REMOVAL AND

REINSTALLATION OF EQUIPMENT TO BE

COORDINATED.

5. AREAS OF THE BUILDING ARE HISTORICALLY

SIGNIFICANT UNLESS OTHERWISE NOTED. WORK IS

TO BE CONDUCTED SO AS TO ENSURE PRESERVATION

OF EXISTING HISTORIC FINISHES AND CHARACTER

DEFINING FEATURES.

6. SEE SPECIFICATIONS FOR REQUIREMENTS FOR

REMOVAL AND/OR REMEDIATION OF HAZARDOUS

MATERIALS.

7. COORDINATE ALL DEMOLITION OF ARCHITECTURAL

FINISHES, SUBSTRATE, AND FRAMING WITH

STRUCTURAL DEMOLITION AND NEW CONSTRUCTION

REQUIREMENTS. DO NOT OVER DEMOLISH.

LEGEND - DEMO

(E) CONSTRUCTION TO REMAIN

REMOVE (E) CONSTRUCTION - SEE KEYNOTES

FOR ADDITIONAL INFORMATION

EXTENTS OF FLOOR OR STRUCTURE REMOVAL

AS INDICATED

8 0 8 16

SCALE OF FEET

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

AD1.02W

05/27/2022

CR

LJ

ST 641

20 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

DEMO/SALVAGE PLAN -

SECOND FLOOR WEST

DEMO/SALVAGE PLAN - SECOND FLOOR WEST

SHEET KEYNOTES

1 REMOVE (E) FLOOR COVERING, SHEATHING, AND

FRAMING IN HATCHED AREAS TO PERMIT PASSAGE

AND INSTALLATION OF NEW STRUCTURAL COLUMNS

PER STRUCTURAL DRAWINGS

2 REMOVE AND SALVAGE (E) WINDOW SASH, FRAME,

GLAZING, HARDWARE, AND TRIM

3 REMOVE AND SALVAGE DESIGNATED PORTION OF (E)

PARTITION IN AREA TO RECEIVE NEW WORK

4 TEMPORARY CONSTRUCTION PARTITION - PRESERVE

ACCESS TO STAIR FROM EAST WING

5 PROTECT AND PRESERVE (E) WALL-MOUNTED MAP.

SEE 01 35 91 HISTORIC PRESERVATION TREATMENT

PROCEDURES

6 REMOVE AND RELOCATE (E) TELEPHONE EQUIPMENT

PER PARK REQUIREMENTS

1 95 6 7 8

B

C

D

E

F

G

A

B.2

D.7

2 3

D.2

B.8

C.5

OFFICE

OFFICE

OFFICE

OFFICE

OPEN OFFICE

OFFICE

331 OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BREAK

OPEN OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

COPY/MAIL

RECEPTION

HALL

OFFICE

OFFICE

318a

HALL

VEST

STAIR

ST2-3

STAIR

ST-C-3

A.1

A.5

B.3

B.5

C.1

D.1

D.5

D.6

E.1

E.5

E.9

F.5

F.9

1.1 2.1 2.9

4.5

5.1

5.5 6.5

6.9 7.1

7.5

12 TYP.

M A

T C

H L

IN

E

E A

S T

W

IN

G

AD4.52W G1

OFFICE

OFFICE

AD4.52WH1

AD4.52W

E1

AD4.52W

F1

AD4.52W

J1

AD4.52W

K1

AD4.52W

L1

AD4.52WL2

AD4.52W

M1

AD4.52W A1 AD4.52WB1

AD4.52W

C1

AD4.52W

C2

AD4.52W

D1

/2

/8

/8

/4

/4

11' - 7 1/8" ± 11' - 7 3/8" ± 12' - 2 1/8" ± 14' - 9 5/8" ± 15' - 4 3/8" ± 15' - 2 3/4" ± 15' - 6 5/8" ± 10' - 5" ±

KEY PLAN

SHEET NOTES - DEMO PLAN

1. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL

BE FIELD VERIFIED PRIOR TO START OF THE WORK.

2. COORDINATE DEMOLITION AND SALVAGE WORK IN

CONJUNCTION WITH NEW CONSTRUCTION.

3. SEE SPECIFICATION SECTION 024100 FOR

ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.

4. SEE CIVIL /MECHANICAL /PLUMBING /ELECTRICAL

DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION. DEMOLITION OR REMOVAL AND

REINSTALLATION OF EQUIPMENT TO BE

COORDINATED.

5. AREAS OF THE BUILDING ARE HISTORICALLY

SIGNIFICANT UNLESS OTHERWISE NOTED. WORK IS

TO BE CONDUCTED SO AS TO ENSURE PRESERVATION

OF EXISTING HISTORIC FINISHES AND CHARACTER

DEFINING FEATURES.

6. SEE SPECIFICATIONS FOR REQUIREMENTS FOR

REMOVAL AND/OR REMEDIATION OF HAZARDOUS

MATERIALS.

7. COORDINATE ALL DEMOLITION OF ARCHITECTURAL

FINISHES, SUBSTRATE, AND FRAMING WITH

STRUCTURAL DEMOLITION AND NEW CONSTRUCTION

REQUIREMENTS. DO NOT OVER DEMOLISH.

LEGEND - DEMO

(E) CONSTRUCTION TO REMAIN

REMOVE (E) CONSTRUCTION - SEE KEYNOTES

FOR ADDITIONAL INFORMATION

EXTENTS OF FLOOR OR STRUCTURE REMOVAL

AS INDICATED

8 0 8 16

SCALE OF FEET

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

AD1.03W

05/27/2022

CR

LJ

ST 641

21 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

DEMO/SALVAGE PLAN -

THIRD FLOOR WEST

DEMO/SALVAGE PLAN - THIRD FLOOR WEST

SHEET KEYNOTES

1 REMOVE AND SALVAGE DESIGNATED PORTION OF (E)

PARTITION IN AREA TO RECEIVE NEW WORK

2 REMOVE (E) FLOOR COVERING, SHEATHING, AND

FRAMING IN HATCHED AREAS TO PERMIT PASSAGE

AND INSTALLATION OF NEW STRUCTURAL COLUMNS

PER STRUCTURAL DRAWINGS

3 REMOVE AND SALVAGE (E) DOOR, FRAME, AND TRIM

4 TEMPORARY CONSTRUCTION PARTITION - PRESERVE

ACCESS TO STAIR FROM EAST WING

5 REMOVE AND RELOCATE (E) TELEPHONE EQUIPMENT

PER PARK REQUIREMENTS

B

C

D

E

F

G

A

B.2

D.7

2 3

D.2

B.8

C.5

GYM

B19

GYM

B21

IT RM

B20

STOR

B23

CHANGE

B28

LOCKER

B22

MAIL

B16

LOCKER RM

B15

FMR BOILER

B14

CRAWL SPACE

B25

STOR

B13

STAIR

ST4-B

GAS

B12

HALL

B11

ELEV

EL-1

STOR

B24

SHOWER

B26RR

B27

A.1

A.5

B.3

B.5

C.1

D.1

D.5

D.6

E.1

E.5

E.9

F.5

F.9

1.1 2.1 2.9

4.5

5.1

5.5 6.5

6.9 7.1

7.5

TYP.

TYP.

2 2

2 2

M A

T C

H L

IN

E

E A

S T

W

IN

G

/2

/8

/8

/4

/4

11' - 7 1/8" ± 11' - 7 3/8" ± 12' - 2 1/8" ± 14' - 9 5/8" ± 15' - 4 3/8" ± 15' - 2 3/4" ± 15' - 6 5/8" ± 10' - 5" ±

TYP.3

3 TYP.

KEY PLAN

SHEET NOTES - DEMO RCP

1. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL

BE FIELD VERIFIED PRIOR TO START OF THE WORK.

2. COORDINATE DEMOLITION AND SALVAGE WORK IN

CONJUNCTION WITH NEW CONSTRUCTION.

3. SEE SPECIFICATION SECTION 024100 FOR

ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.

4. SEE CIVIL /MECHANICAL /PLUMBING /ELECTRICAL

DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION.

5. AREAS OF THE BUILDING ARE HISTORICALLY

SIGNIFICANT UNLESS OTHERWISE NOTED. WORK IS

TO BE CONDUCTED SO AS TO ENSURE PRESERVATION

OF EXISTING HISTORIC FINISHES AND CHARACTER

DEFINING FEATURES.

6. SEE SPECIFICATIONS FOR REQUIREMENTS FOR

REMOVAL AND/OR REMEDIATION OF HAZARDOUS

MATERIALS.

7. COORDINATE ALL DEMOLITION OF ARCHITECTURAL

FINISHES, SUBSTRATE, AND FRAMING WITH

STRUCTURAL DEMOLITION AND NEW CONSTRUCTION

REQUIREMENTS. DO NOT OVER DEMOLISH.

8. WHERE EXISTING CEILING TRIM OCCURS AT AREA TO

BE DEMOLISHED, REMOVE AND REINSTALL TRIM

(E)

C-5

2' WIDE CELOTEX PANELS

C-3

PLASTER BOARD & WOOD BATTENS

C-4

2' SQUARE CELOTEX TILES

C-6

GYPSUM BOARD

C-2

DARK TEXTURE SQUARE TILE

C-1

LIGHT TEXTURE SQUARE TILE

WD

STAINED WOOD

OPEN TO STRUCTURE

DEMO

CONC

CONCRETE - SEE STRUCTURAL

LEGEND - CEILING TYPES

LEGEND - DEMO RCP

(E) CONSTRUCTION TO REMAIN

REMOVE (E) CONSTRUCTION - SEE KEYNOTES

FOR ADDITIONAL INFORMATION

EXTENTS OF FLOOR OR STRUCTURE REMOVAL -

SEE DEMO PLANS

APPROXIMATE EXTENTS OF CEILING REMOVAL -

SEE CEILING TYPES LEGEND BELOW

8 0 8 16

SCALE OF FEET

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

AD1.50W

05/27/2022

CR

LJ

ST 641

22 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

DEMO/SALVAGE RCP -

BASEMENT WEST

DEMO/SALVAGE RCP - BASEMENT WEST

SHEET KEYNOTES

1 REMOVE (E) CEILING, SHEATHING, AND FRAMING IN

HATCHED AREAS TO PERMIT PASSAGE AND

INSTALLATION OF NEW STRUCTURAL COLUMNS PER

STRUCTURAL DRAWINGS. SALVAGE FINISHES OF

HISTORICAL SIGNIFICANCE FOR REINSTALLATION

2 REMOVE (E) CEILING, SHEATHING, AND FRAMING TO

MAXIMUM LIMITS OF HATCHED AREA FOR NEW

CONCRETE BEAM PER STRUCTURAL DRAWINGS.

SALVAGE FINISHES OF HISTORICAL SIGNIFICANCE FOR

REINSTALLATION

3 REMOVE (E) CEILING FINISH IN HATCHED AREA FOR

INSTALLATION OF NEW STRUCTURAL MEMBER ABOVE

CEILING. SALVAGE FINISHES OF HISTORICAL

SIGNIFICANCE FOR REINSTALLATION

C

D

E

F

G

A

B.2

D.7

2 3

D.2

B.8

C.5

ELEV

EL-1

OFFICE

OFFICE

OFFICE

134 OFFICE

BREAK

132 VEST.

RR

RR

STAIR

ST3-1

VEST.

JAN

128OPEN OFFICE

OFFICE

136b

OFFICE

OFFICE

OFFICE

STOR

HALL

141a

OFFICE

OFFICE

143RR

OFFICE

OFFICE

OFFICE

148 OFFICE

RR

VEST

ENTRY

126a

LG MEETING RM

VEST

OFFICE

STAIR

ST2-1

A.1

A.5

B.3

B.5

C.1

D.1

D.5

D.6

E.1

E.5

E.9

F.5

F.9

1.1 2.1 2.9

4.5

5.1

5.5 6.5

6.9 7.1

7.5

TYP.

M A

T C

H L

IN

E

E A

S T

W

IN

G

/2

/8

/8

/4

/4

11' - 7 1/8" ± 11' - 7 3/8" ± 12' - 2 1/8" ± 14' - 9 5/8" ± 15' - 4 3/8" ± 15' - 2 3/4" ± 15' - 6 5/8" ± 10' - 5" ±

TYP.

KEY PLAN

SHEET NOTES - DEMO RCP

1. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL

BE FIELD VERIFIED PRIOR TO START OF THE WORK.

2. COORDINATE DEMOLITION AND SALVAGE WORK IN

CONJUNCTION WITH NEW CONSTRUCTION.

3. SEE SPECIFICATION SECTION 024100 FOR

ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.

4. SEE CIVIL /MECHANICAL /PLUMBING /ELECTRICAL

DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION.

5. AREAS OF THE BUILDING ARE HISTORICALLY

SIGNIFICANT UNLESS OTHERWISE NOTED. WORK IS

TO BE CONDUCTED SO AS TO ENSURE PRESERVATION

OF EXISTING HISTORIC FINISHES AND CHARACTER

DEFINING FEATURES.

6. SEE SPECIFICATIONS FOR REQUIREMENTS FOR

REMOVAL AND/OR REMEDIATION OF HAZARDOUS

MATERIALS.

7. COORDINATE ALL DEMOLITION OF ARCHITECTURAL

FINISHES, SUBSTRATE, AND FRAMING WITH

STRUCTURAL DEMOLITION AND NEW CONSTRUCTION

REQUIREMENTS. DO NOT OVER DEMOLISH.

8. WHERE EXISTING CEILING TRIM OCCURS AT AREA TO

BE DEMOLISHED, REMOVE AND REINSTALL TRIM

(E)

C-5

2' WIDE CELOTEX PANELS

C-3

PLASTER BOARD & WOOD BATTENS

C-4

2' SQUARE CELOTEX TILES

C-6

GYPSUM BOARD

C-2

DARK TEXTURE SQUARE TILE

C-1

LIGHT TEXTURE SQUARE TILE

WD

STAINED WOOD

OPEN TO STRUCTURE

DEMO

CONC

CONCRETE - SEE STRUCTURAL

LEGEND - CEILING TYPES

LEGEND - DEMO RCP

(E) CONSTRUCTION TO REMAIN

REMOVE (E) CONSTRUCTION - SEE KEYNOTES

FOR ADDITIONAL INFORMATION

EXTENTS OF FLOOR OR STRUCTURE REMOVAL -

SEE DEMO PLANS

APPROXIMATE EXTENTS OF CEILING REMOVAL -

SEE CEILING TYPES LEGEND BELOW

8 0 8 16

SCALE OF FEET

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

AD1.51W

05/27/2022

CR

LJ

ST 641

23 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

DEMO/SALVAGE RCP -

FIRST FLOOR WEST

DEMO/SALVAGE RCP - FIRST FLOOR WEST

SHEET KEYNOTES

1 REMOVE (E) CEILING, SHEATHING, AND FRAMING IN

HATCHED AREAS TO PERMIT PASSAGE AND

INSTALLATION OF NEW STRUCTURAL COLUMNS PER

STRUCTURAL DRAWINGS. SALVAGE FINISHES OF

HISTORICAL SIGNIFICANCE FOR REINSTALLATION

2 REMOVE (E) CEILING FINISH IN HATCHED AREA FOR

INSTALLATION OF NEW STRUCTURAL MEMBER ABOVE

CEILING. SALVAGE FINISHES OF HISTORICAL

SIGNIFICANCE FOR REINSTALLATION

3 TEMPORARY CONSTRUCTION PARTITION - PRESERVE

ACCESS TO STAIR FROM EAST WING

C

D

E

F

G

A

B.2

D.7

2 3

D.2

B.8

C.5

ELEV

EL-1

RR

RR

OFFICE

OPEN OFFICE

OFFICE

MEETING

OFFICE

RECEPTION

OPEN OFFICE

HALL

OFFICE

HALL

KITCHEN

RR

OFFICE

CONF

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OPEN OFFICE

COPY

VEST.

231a

VEST.

217a

STO

STO

218 STAIR

ST2-2

VESTIBULE

STOR

238a

OFFICE

HALL

A.1

A.5

B.3

B.5

C.1

D.1

D.5

D.6

E.1

E.5

E.9

F.5

F.9

1.1 2.1 2.9

4.5

5.1

5.5 6.5

6.9 7.1

7.5

M A

T C

H L

IN

E

E A

S T

W

IN

G

TYP.

/2

/8

/8

/4

/4

11' - 7 1/8" ± 11' - 7 3/8" ± 12' - 2 1/8" ± 14' - 9 5/8" ± 15' - 4 3/8" ± 15' - 2 3/4" ± 15' - 6 5/8" ± 10' - 5" ±

TYP.

KEY PLAN

SHEET NOTES - DEMO RCP

1. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL

BE FIELD VERIFIED PRIOR TO START OF THE WORK.

2. COORDINATE DEMOLITION AND SALVAGE WORK IN

CONJUNCTION WITH NEW CONSTRUCTION.

3. SEE SPECIFICATION SECTION 024100 FOR

ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.

4. SEE CIVIL /MECHANICAL /PLUMBING /ELECTRICAL

DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION.

5. AREAS OF THE BUILDING ARE HISTORICALLY

SIGNIFICANT UNLESS OTHERWISE NOTED. WORK IS

TO BE CONDUCTED SO AS TO ENSURE PRESERVATION

OF EXISTING HISTORIC FINISHES AND CHARACTER

DEFINING FEATURES.

6. SEE SPECIFICATIONS FOR REQUIREMENTS FOR

REMOVAL AND/OR REMEDIATION OF HAZARDOUS

MATERIALS.

7. COORDINATE ALL DEMOLITION OF ARCHITECTURAL

FINISHES, SUBSTRATE, AND FRAMING WITH

STRUCTURAL DEMOLITION AND NEW CONSTRUCTION

REQUIREMENTS. DO NOT OVER DEMOLISH.

8. WHERE EXISTING CEILING TRIM OCCURS AT AREA TO

BE DEMOLISHED, REMOVE AND REINSTALL TRIM

(E)

C-5

2' WIDE CELOTEX PANELS

C-3

PLASTER BOARD & WOOD BATTENS

C-4

2' SQUARE CELOTEX TILES

C-6

GYPSUM BOARD

C-2

DARK TEXTURE SQUARE TILE

C-1

LIGHT TEXTURE SQUARE TILE

WD

STAINED WOOD

OPEN TO STRUCTURE

DEMO

CONC

CONCRETE - SEE STRUCTURAL

LEGEND - CEILING TYPES

LEGEND - DEMO RCP

(E) CONSTRUCTION TO REMAIN

REMOVE (E) CONSTRUCTION - SEE KEYNOTES

FOR ADDITIONAL INFORMATION

EXTENTS OF FLOOR OR STRUCTURE REMOVAL -

SEE DEMO PLANS

APPROXIMATE EXTENTS OF CEILING REMOVAL -

SEE CEILING TYPES LEGEND BELOW

8 0 8 16

SCALE OF FEET

C-30276

RENEWAL

L

IC

ENSED ARCHITEC

T

CALIF

OR

N

IA

FO

ET

AT

S

DATE

TROY A.

AINSWORTH

11/30/2023

DESIGNED:

DRAWN:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET

DRAWING NO.

PMIS/PKG NO.

DRAWING NO.

D R

A W

IN

G

S T

O B

E P

R

IN

T E D

I N

G R

A Y

S C

A L E

IF

D

IS

T

IN

C T

S H

A D

D

O T

S A

R E N

O T

V

IS

IB

L E

IN

F O

R M

A T

IO

N

M A

Y B

E M

IS

S

IN

G

D

OF

AD1.52W

05/27/2022

CR

LJ

ST 641

24 168

212511

166685

GOLDEN GATE NATIONAL RECREATION AREA

REPAIR WEST WING OF FM201

FOR SEISMIC STRENGTHENING

DEMO/SALVAGE RCP -

SECOND FLOOR WEST

DEMO/SALVAGE RCP - SECOND FLOOR WEST

SHEET KEYNOTES

1 REMOVE (E) CEILING, SHEATHING, AND FRAMING IN

HATCHED AREAS TO PERMIT PASSAGE AND

INSTALLATION OF NEW STRUCTURAL COLUMNS PER

STRUCTURAL DRAWINGS. SALVAGE FINISHES OF

HISTORICAL SIGNIFICANCE FOR REINSTALLATION

2 REMOVE (E) CEILING FINISH IN HATCHED AREA FOR

INSTALLATION OF NEW STRUCTURAL MEMBER ABOVE

CEILING. SALVAGE FINISHES OF HISTORICAL

SIGNIFICANCE FOR REINSTALLATION

3 TEMPORARY CONSTRUCTION PARTITION - PRESERVE

ACCESS TO STAIR FROM EAST WING

4 PROTECT AND PRESERVE (E) WALL-MOUNTED MAP.

SEE 01 35 91 HISTORIC PRESERVATION TREATMENT

PROCEDURES

C

D

E

F

G

A

B.2

D.7

2 3

D.2

B.8

C.5

VEST

ELEV

EL-1STAIR

ST-C-3

OFFICE

OFFICE

OFFICE

OFFICE

OPEN OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BREAK

OPEN OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

COPY/MAIL

RECEPTION

309HALL

OFFICE

OFFICE

318a

HALL

VEST

STAIR

ST2-3

STAIR

ST-C-3

A.1

A.5

B.3

B.5

C.1

D.1

D.5

D.6

E.1

E.5

E.9

F.5

F.9

1.1 2.1 2.9

4.5

5.1

5.5 6.5

6.9 7.1

7.5

1 2

M A

T C

H L

IN

E

E A

S T

W

IN

G

/2

/8

/8

/4

/4

11' - 7 1/8" ± 11' - 7 3/8" ± 12' - 2 1/8" ± 14' - 9 5/8" ± 15' - 4 3/8" ± 15' - 2 3/4" ± 15' - 6 5/8" ± 10' - 5" ±

TYP.TYP.

KEY PLAN

SHEET NOTES - DEMO RCP

1. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL

BE FIELD VERIFIED PRIOR TO START OF THE WORK.

2. COORDINATE DEMOLITION AND SALVAGE WORK IN

CONJUNCTION WITH NEW CONSTRUCTION.

3. SEE SPECIFICATION SECTION 024100 FOR

ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.

4. SEE CIVIL /MECHANICAL /PLUMBING /ELECTRICAL

DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION.

5. AREAS OF THE BUILDING ARE HISTORICALLY

SIGNIFICANT UNLESS OTHERWISE NOTED. WORK IS

TO BE CONDUCTED SO AS TO ENSURE PRESERVATION

OF EXISTING…