140P2022R0045-0006_Att01b-Q40_Revised_Drawing_C1_220805_0006.pdf

PDF 460 KB Posted

Attached to
ACAD-151309, Demo/Const New Maint Facility (GAOA)
Solicitation number
140P2022R0045
Issued by

About this file

This document package includes civil engineering drawings and notes for a federal contract opportunity to demolish an existing maintenance facility and construct a new one at Acadia National Park in Bar Harbor, Maine. Key details include demolishing the existing McFarland Hill Maintenance Facility and constructing a new one in its place under Solicitation 140P2022R0045 from the Department of the Interior National Park Service. The civil drawings provide site plans, utility plans, construction notes, legends and other details for the demolition and construction work. Relevant specifications are identified on the drawing index for structural, architectural, fire protection, plumbing, mechanical, electrical, telecommunications, and security aspects of the project.

View the file

Other files

File Type Posted
140P2022R0045-0007_Att01_QuestionsAndResponses-Final_01-129_220912_0007.pdf PDF
Sol_140P2022R0045_Amd_0007.pdf PDF
140P2022R0045-0006_Att01a-Q18_SpecSection334600-Subdrainage_220805_0006.pdf PDF
140P2022R0045-0006_Att01_QuestionsAndResponses_01-129_220907_0006.pdf PDF
Sol_140P2022R0045_Amd_0006.pdf PDF
140P2022R0045-0005_Att01b-Q60_SpecSect321443-PorousUnitPaving_220819_0005.pdf PDF
140P2022R0045-0005_Att01a-Q35_SpecSect334120-HighDensityPolyethylenePipe_220819_0005.pdf PDF
Sol_140P2022R0045_Amd_0005.pdf PDF
140P2022R0045-0005_Att01_QuestionsAndResponses_01-107_0005.pdf PDF
140P2022R0045-0005_Att02_RevClausesAndProvisions_220823_0005.pdf PDF
140P2022R0045-0004_Att01c-Q51_RevSpecSect334120-HighDensityPolyethylenePipe_220803_0004.pdf PDF
Sol_140P2022R0045_Amd_0004.pdf PDF
140P2022R0045-0004_Att02_DVB_GD_No_MA08_Maine-Building_220805_0004.pdf PDF
140P2022R0045-0004_Att01a-Q36_RevSpecSect323223_01-MechStabilizedEarthWall_220803_0004.pdf PDF
140P2022R0045-0004_Att01_QuestionsAndResponses_01-65_0004.pdf PDF
140P2022R0045-0004_Att01b-Q50_BollardDwg_220726_0004.pdf PDF
140P2022R0045-0003_Att01c-Q16_CarmonProductCutsheets_170620_0003.pdf PDF
140P2022R0045-0003_Att01b-Q09_SpecSect028214-AsbestosAbatement_Rev220725_0003.pdf PDF
140P2022R0045-0003_Att01a-Q03_ACAD151309B_GeotechnicalFinalDesignReport_211201_0003.pdf PDF
Sol_140P2022R0045_Amd_0003.pdf PDF
140P2022R0045-0003_Att01-QuestionsAndResponses_01-51_220727_0003.pdf PDF
140P2022R0045-0002_Att01b-PreProposal_Mtg_SignIn_Sheets_220713_0002.pdf PDF
Sol_140P2022R0045_Amd_0002.pdf PDF
140P2022R0045-0002_Att01a-PreProposal_Mtg_Presentation_w-Notes_220713_0002.pdf PDF
Sol_140P2022R0045_Amd_0001.pdf PDF
140P2022R0045-0001_Att01_Revised_SF1442_220707_0001.pdf PDF
140P2022R0045_Att01b-100pctSpecifications-Vol2of2_220325.pdf PDF
140P2022R0045_Att02-100pctDrawings_220325.pdf PDF
140P2022R0045_Att04a-ProposalSubmissionPackage_220707.zip ZIP file
140P2022R0045_Att01a-100pctSpecifications-Vol1of2_220325.pdf PDF
Sol_140P2022R0045.pdf PDF
140P2022R0045_Att05-Vaccination-Certification-Notification_210824.pdf PDF
140P2022R0045_Att04b-ProposalSubmissionPackage-Sample_220707.pdf PDF
140P2022R0045_Att07-SubKPlanForm_220519.docx DOCX document
140P2022R0045_Att06-Certification-of-Vaccination-Form_Exp250228.pdf PDF
140P2022R0045_Att08-Closeout-OM_List_220413.pdf PDF
140P2022R0045_Att03-DVB_GD_No_MA08_Maine-Building_220401.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL GENERAL NOTES,

LEGEND, AND

ABBREVIATIONS

2.69%

Utility Notes #1 07/29/202

AutoCAD SHX Text C1

AutoCAD SHX Text

R. MAZZOLLA

AutoCAD SHX Text

A. GORETOY

AutoCAD SHX Text

A. KACZUR

AutoCAD SHX Text

AutoCAD SHX Text UTILITY NOTES: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND DESIGN AS THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND DESIGN AS NECESSARY OF ALL PERMANENT AND TEMPORARY UTILITY RELOCATIONS, INTERIOR, UNDER GROUND AND OVERHEAD. 2. FIRE HYDRANTS SHALL NOT BE REMOVED FROM SERVICE. FIRE HYDRANTS SHALL NOT BE REMOVED FROM SERVICE. 3. UTILITY SERVICES SHALL BE MAINTAINED TO ALL EXISTING BUILDING FACILITIES. UTILITY SERVICES SHALL BE MAINTAINED TO ALL EXISTING BUILDING FACILITIES. IF DISRUPTION OF SERVICE REQUIRED CONTRACTOR REQUIRED TO CONTACT CONTRACTING OFFICER 48 HOURS IN ADVANCE. DURATION OF ANY SHUT DOWN SHALL NOT EXCEED 8 HOURS UNLESS APPROVED IN WRITING BY CONTRACTING OFFICER. 4. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN ACCORDANCE WITH ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL OSHA REGULATIONS.

AutoCAD SHX Text CONTACT NUMBERS: 1. MAINE 811: 1-888-344-7233 OR WWW.MAINE811.COM MAINE 811: 1-888-344-7233 OR WWW.MAINE811.COM 2. BAR HARBOR SHERIFF'S OFFICE: 1-207 288-3391 OR 911 BAR HARBOR SHERIFF'S OFFICE: 1-207 288-3391 OR 911 3. NATIONAL PARK SERVICE DISPATCHER (24 HOURS) 1-617-242-5659NATIONAL PARK SERVICE DISPATCHER (24 HOURS) 1-617-242-5659

AutoCAD SHX Text SPILL PREVENTION AND RESPONSE PROCEDURE: 1. ANY DISCHARGE OF WASTE OIL OR ANY OTHER POLLUTANT TO THE ANY DISCHARGE OF WASTE OIL OR ANY OTHER POLLUTANT TO THE ENVIRONMENT REQUIRES IMMEDIATE NOTIFICATION TO THE MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION: OIL SPILL (24HR) 1-800-482-0777 OR HAZARDOUS MATERIAL SPILL (24HR) 1-800-452-4664. 2. ANY INCIDENT OF CONTAMINATION RESULTING FROM THE IMPROPER DISCHARGE ANY INCIDENT OF CONTAMINATION RESULTING FROM THE IMPROPER DISCHARGE OF POLLUTANTS TO GROUNDWATER OR THE STORMWATER SYSTEM SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR OTHER PARTIES THAT THE GOVERNMENT DETERMINES TO BE RESPONSIBLE FOR THE CONTAMINATION. PURSUANT TO STATE LAWS AND REGULATIONS, THE GOVERNMENT MAY REQUIRE THE CONTRACTOR AND OTHER RESPONSIBLE PARTIES TO REMEDIATE ANY INCIDENTS THAT MAY ADVERSELY IMPACT GROUNDWATER OR SURFACE WATER QUALITY. 3. THE CONTRACTOR SHALL MAINTAIN ON THE SITE APPROPRIATE MATERIALS TO THE CONTRACTOR SHALL MAINTAIN ON THE SITE APPROPRIATE MATERIALS TO CONTAIN AND RECOVER OILS AND OTHER POLLUTANTS TO PREVENT RELEASE INTO THE ENVIRONMENT.

AutoCAD SHX Text

1. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THESE PLANS, THE PROJECT ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THESE PLANS, THE PROJECT SPECIFICATIONS, AND FEDERAL, STATE, MAINE AND LOCAL STANDARDS. 2. THE COMPLETED INSTALLATION SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE, THE COMPLETED INSTALLATION SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, ORDINANCES, AND REGULATIONS. PERMITS, LICENSES, AND INSPECTIONS REQUIRED BY THE GOVERNING AUTHORITIES FOR THE EXECUTION AND COMPLETION OF WORK SHALL BE SECURED BY THE CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION, UNLESS DIRECTED OTHERWISE BY THE CONTRACTING OFFICER. 3. THE GOVERNMENT IS NOT RESPONSIBLE FOR THE SAFETY OF THE CONTRACTOR OR ITS THE GOVERNMENT IS NOT RESPONSIBLE FOR THE SAFETY OF THE CONTRACTOR OR ITS CREW. ALL O.S.H.A. REGULATIONS SHALL BE STRICTLY ADHERED TO IN THE PERFORMANCE OF THE WORK. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL WALKWAYS AND FOR THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL WALKWAYS AND FOR KEEPING THEM CLEAN AND FREE OF CONSTRUCTION MATERIALS AND DEBRIS, AND PROVIDING DUST CONTROL AS REQUIRED. IN ADDITION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRASH REMOVAL REQUIRED WITHIN THE LOD. 5. CONTRACTOR SHALL MAINTAIN ALL UTILITIES ADJACENT TO OCCUPIED BUILDINGS OR CONTRACTOR SHALL MAINTAIN ALL UTILITIES ADJACENT TO OCCUPIED BUILDINGS OR PROPERTIES UNLESS WRITTEN AUTHORIZATION IS PROVIDED BY THE CONTRACTING OFFICER. 6. THE LOCATION OF UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE FOR THE LOCATION OF UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE FOR INFORMATION ONLY AND ARE NOT GUARANTEED TO BE COMPLETE OR ACCURATE. CONTRACTOR SHALL FIELD VERIFY ELEVATIONS, PIPE SIZES, AND MATERIAL TYPES PRIOR TO CONSTRUCTION AND SHALL BRING ANY DISCREPANCIES TO THE CONTRACTING OFFICER A MINIMUM OF 7 DAYS PRIOR TO CONSTRUCTION. 7. THE CONTRACTOR SHALL MAINTAIN AT ALL TIMES A SET OF RECORD DRAWINGS AND THE CONTRACTOR SHALL MAINTAIN AT ALL TIMES A SET OF RECORD DRAWINGS AND SPECIFICATIONS DURING THE PROGRESSION OF THE PROJECT. RECORD DRAWINGS AND SPECIFICATIONS SHALL ALSO BE UPDATED ON A DAILY BASIS AND SHALL BE SUBMITTED TO THE CONTRACTING OFFICER AT THE COMPLETION OF THE CONSTRUCTION. RECORD DRAWINGS SHALL INCLUDE THE LOCATION OF ALL UNDERGROUND AND ABOVE GROUND UTILITIES, ENCOUNTERED AND/OR RELOCATED. THE CONTRACTOR SHALL PROVIDE A HARD COPY AND ELECTRONIC COPY OF ALL AS-BUILT DRAWINGS. ELECTRONIC COPIES ARE REQUIRED IN CAD (.DWG) FORMAT AND PDF PLAN SET. 8. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES AS CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES AS APPLICABLE. 9. MATERIAL SHALL BE NEW UNLESS IDENTIFIED TO BE SALVAGED ON THE PLANS. THE MATERIAL SHALL BE NEW UNLESS IDENTIFIED TO BE SALVAGED ON THE PLANS. THE USE OF MANUFACTURER'S NAMES, MODELS, AND NUMBERS ARE INTENDED TO ESTABLISH STYLE, QUALITY, APPEARANCE, AND USEFULNESS. PROPOSED SUBSTITUTIONS WILL REQUIRE WRITTEN APPROVAL FROM THE CONTRACTING OFFICER. 10. NO MANUFACTURER AND/OR INSTALLER IDENTIFYING INFORMATION SHALL APPEAR ON NO MANUFACTURER AND/OR INSTALLER IDENTIFYING INFORMATION SHALL APPEAR ON FINISHED INSTALLATION. 11. A SAFETY PLAN SHALL BE REQUIRED REFER TO SECTION 01 35 23 SAFETY A SAFETY PLAN SHALL BE REQUIRED REFER TO SECTION 01 35 23 SAFETY REQUIREMENTS. 12. CONSTRUCTION DEBRIS MUST BE DISPOSED OF OFF SITE AT AN APPROVED FACILITY IN CONSTRUCTION DEBRIS MUST BE DISPOSED OF OFF SITE AT AN APPROVED FACILITY IN ACCORDANCE WITH THE CONSTRUCTION WASTE MANAGEMENT PLAN. CONTRACTOR SHALL PROVIDE CONSTRUCTION WASTE MANAGEMENT PLAN IN ACCORDANCE WITH THE SPECIFICATION SECTION 017419. 13. CONTRACTOR IS RESPONSIBLE FOR DEMOLISHING/REMOVING AND REINSTALLING CONTRACTOR IS RESPONSIBLE FOR DEMOLISHING/REMOVING AND REINSTALLING TEMPORARY FACILITIES (I.E. FENCING, BARRIERS, UTILITIES) AS DIRECTED BY THE CONTRACTING OFFICER AND AS REQUIRED TO PERFORM THE WORK. 14. SITE AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S ACTIVITIES SHALL BE SITE AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S ACTIVITIES SHALL BE RETURNED TO THE EXISTING CONDITIONS. AREAS WILL BE CONSIDERED COMPLETELY RESTORED UPON CONTRACTING OFFICER APPROVAL. 15. CONTRACTOR SHALL TAKE MEASURES NECESSARY TO CONTROL NOISE IN ACCORDANCE CONTRACTOR SHALL TAKE MEASURES NECESSARY TO CONTROL NOISE IN ACCORDANCE WITH PARK RULES AND AS DIRECTED BY THE CONTRACTING OFFICER. CONTRACTOR IS RESPONSIBLE FOR COLLECTION, TRANSPORTATION AND DISPOSAL OF ALL CONSTRUCTION MATERIALS AND WASTE TO AND FROM THE SITE. REFER TO SECTIONS 02 41 13 AND 31 10 00 FOR MORE INFORMATION. 16. CONTRACTOR SHALL CONTACT 1-888-344-7233 FOR A UTILITY MARKING 7-10 DAYS CONTRACTOR SHALL CONTACT 1-888-344-7233 FOR A UTILITY MARKING 7-10 DAYS PRIOR TO WORK. ADDITIONALLY, CONTACT ALL UTILITY OPERATORS NOT AFFILIATED WITH ONE CALL IN ORDER TO LOCATE ALL OTHER UTILITIES WITHIN THE PROJECT AREA. 17. MAINTAIN UTILITIES IN ACTIVE OPERATION AT ALL TIMES. PROVIDE BYPASS PIPING AND MAINTAIN UTILITIES IN ACTIVE OPERATION AT ALL TIMES. PROVIDE BYPASS PIPING AND PUMPING WHERE REQUIRED. MAKE ALL NEW UTILITY SYSTEMS OPERATIONAL BEFORE ANY EXISTING SYSTEMS ARE ABANDONED OR REMOVED. IF EXISTING UTILITIES ARE TAKEN OUT OF SERVICE FOR CONNECTIONS, THE TIMING SHALL BE AS APPROVED BY THE ENGINEER. 18. PREVENT WATER PONDING RESULTING FROM CONSTRUCTION OPERATIONS. PROMPTLY PREVENT WATER PONDING RESULTING FROM CONSTRUCTION OPERATIONS. PROMPTLY REMOVE ANY PONDED WATER TO THE SATISFACTION OF THE ENGINEER. 19. MAINTAIN ACCESS AND EGRESS FOR PERSONS, MATERIALS, DELIVERIES AND EQUIPMENT MAINTAIN ACCESS AND EGRESS FOR PERSONS, MATERIALS, DELIVERIES AND EQUIPMENT TO ADJACENT PROPERTIES, DRIVEWAYS AND BUILDING ENTRANCES AT ALL TIMES. ENSURE THAT ALL TEMPORARY FACILITIES REQUIRED TO MAINTAIN ACCESS ARE CLEARLY MARKED, SIGNED, SECURED, WELL LIT AND PROTECTED. 20. TREE PROTECTION: SEE LANDSCAPE PLANS FOR TREE PROTECTION AND PROTECTION OF TREE PROTECTION: SEE LANDSCAPE PLANS FOR TREE PROTECTION AND PROTECTION OF WOODLAND EDGES.

AutoCAD SHX Text

CONSTRUCTION AND MATERIAL NOTES

AutoCAD SHX Text APPLICABLE CODES: 1. 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL MECHANICAL CODE 2. 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL PLUMBING CODE 3. 2020 NATIONAL ELECTRICAL CODE NFPA 702020 NATIONAL ELECTRICAL CODE NFPA 70

AutoCAD SHX Text 6/7/12 20:25 USSL683319 C:\BMS\WSP-PB-US-PW-02\WSP__SHEENA.LU\D0430142\CIVIL GENERAL NOTES.DWG C1

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

AutoCAD SHX Text

ACAD 151309B

AutoCAD SHX Text

ACADIA NATIONAL PARK, MAINE

AutoCAD SHX Text

MCFARLAND HILL MAINTENANCE FACILITY

AutoCAD SHX Text 02/09/2022

AutoCAD SHX Text

AutoCAD SHX Text 165700

AutoCAD SHX Text Date

AutoCAD SHX Text

REVISION

AutoCAD SHX Text Mark

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text VEHICLE ACCESS NOTES: 1. ALL VEHICLES AND EQUIPMENT ENTERING THE PROJECT AREA MUST BE CLEAN OF ALL VEHICLES AND EQUIPMENT ENTERING THE PROJECT AREA MUST BE CLEAN OF PLANT MATERIALS AND DIRT AND FREE FROM OIL LEAKS, AND ARE SUBJECT TO INSPECTION. 2. WASH ALL CONSTRUCTION AND RESTORATION/ REVEGETATION EQUIPMENT (INCLUDING WASH ALL CONSTRUCTION AND RESTORATION/ REVEGETATION EQUIPMENT (INCLUDING THE INSIDE BEDS OF VEHICLES HAULING MATERIALS) TO THOROUGHLY REMOVE ALL DIRT, PLANT, AND OTHER FOREIGN MATERIAL PRIOR TO ARRIVING ON SITE. PARTICULAR ATTENTION MUST BE SHOWN TO- THE UNDER CARRIAGE AND ANY SURFACE WHERE SOIL CONTAINING EXOTIC SEEDS MAY EXIST. 3. ALLOW NPS TO INSPECT EACH PIECE OF EQUIPMENT BEFORE ENTERING THE PROJECT. ALLOW NPS TO INSPECT EACH PIECE OF EQUIPMENT BEFORE ENTERING THE PROJECT. PROVIDE THE CLEANING AND INSPECTION RECORDS TO THE CO. EQUIPMENT FOUND OPERATING ON THE PROJECT THAT HAS NOT BEEN INSPECTED OR HAS OIL LEAKS WILL BE SHUT DOWN AND SUBJECT TO CITATION. 4. SEE SECTION 01 11 00 SUMMARY OF WORK.SEE SECTION 01 11 00 SUMMARY OF WORK.

AutoCAD SHX Text AG ABOVE GROUND ABOVE GROUND BMP BEST MANAGEMENT PRACTICE BEST MANAGEMENT PRACTICE BM BENCHMARK BENCHMARK CB CATCH BASIN CATCH BASIN CL CENTER LINE CENTER LINE CMP CORRUGATED METAL PIPE CORRUGATED METAL PIPE CO CONTRACTING OFFICER CONTRACTING OFFICER C.O. CLEAN OUT CLEAN OUT COM COMMUNICATION COMMUNICATION CONC CONCRETE CONCRETE CPP CORRUGATED PLASTIC PIPE CORRUGATED PLASTIC PIPE DIS DOOR AT SILL DOOR AT SILL DIP DUCTILE IRON PIPE DUCTILE IRON PIPE E ELECTRICAL ELECTRICAL EX EXISTING EXISTING FFE FINAL FLOOR ELEVATION FINAL FLOOR ELEVATION FF FINISHED FLOOR ELEVATION FINISHED FLOOR ELEVATION FR.DR. FRENCH DRAIN FRENCH DRAIN GPM GALLONS PER MINUTE GALLONS PER MINUTE GR GRATE ELEVATION GS GALVANIZED STEEL GALVANIZED STEEL HB HORIZONTAL BEND HORIZONTAL BEND HR HOUR INV INVERT ELEVATION INVERT ELEVATION INV IN INVERT IN INVERT IN INV OUT INVERT OUT INVERT OUT LOD LIMIT OF DISTURBANCE LIMIT OF DISTURBANCE LOW LIMIOT OF WORK LIMIOT OF WORK MH MANHOLE MANHOLE NFPA NATIONAL FIRE PROTECTION NATIONAL FIRE PROTECTION ASSOCIATION NPS NATIONAL PARK SERVICE NATIONAL PARK SERVICE OSHA OCCUPATIONAL SAFETY OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION OF OUTFALL OUTFALL PMS PANTONE MATCHING SYSTEM PANTONE MATCHING SYSTEM PE POLYEHTYLENE POLYEHTYLENE PT POINT POINT REHAB REHABILITATE EXISTING REHABILITATE EXISTING SAN SANITARY SEWER SANITARY SEWER SD-# STRORM DRAINAGE-RUN ID# STRORM DRAINAGE-RUN ID# SMH SANITARY MANHOLE SANITARY MANHOLE SM-# SANITARY MAIN-RUN ID# SANITARY MAIN-RUN ID# SHA STATE HIGHWAY ADMINISTRATION STATE HIGHWAY ADMINISTRATION STA STATION STATION TBA TO BE ABANDONED IN PLACE TO BE ABANDONED IN PLACE TBD TO BE DEMOLISHED TO BE DEMOLISHED TBR TO BE REMOVED TO BE REMOVED TC TELECOMMUNICATION TELECOMMUNICATION TDH TOTAL DYNAMIC HEAD TOTAL DYNAMIC HEAD (TYP.) TYPICAL TYPICAL UG UNDER GROUND UNDER GROUND UST UNDERGROUND STORAGE TANKUNDERGROUND STORAGE TANK

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

MH

AutoCAD SHX Text

CB

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text

PROPOSED FEATURES

AutoCAD SHX Text

EXISTING FEATURES

AutoCAD SHX Text

SMH

AutoCAD SHX Text G

AutoCAD SHX Text

LIMIT OF DISTURBANCE

AutoCAD SHX Text

STORMWATER DRAINAGE PIPE

AutoCAD SHX Text

TYPE F CATCH BASIN

AutoCAD SHX Text

STORM DRAIN MANHOLE

AutoCAD SHX Text

OUTLET STRUCTURE

AutoCAD SHX Text

SANITARY SEWER

AutoCAD SHX Text

TELECOMMUNICATION CONDUIT

AutoCAD SHX Text

ELECTRICAL CONDUIT

AutoCAD SHX Text

WATER SUPPLY MAIN

AutoCAD SHX Text

SANITARY MANHOLE

AutoCAD SHX Text

TELECOM HANDHOLE

AutoCAD SHX Text

ELECTRICAL MANHOLE

AutoCAD SHX Text

GRADING DRAINAGE SLOPE

AutoCAD SHX Text

ROADWAY LIGHT POLE WITH BOLLARDS

AutoCAD SHX Text

GRADING CONTOUR

AutoCAD SHX Text

STEEL-BACKED TIMBER GUARD RAIL

AutoCAD SHX Text

TREELINE

AutoCAD SHX Text

UNDERGROUND TELEPHONE & IT

AutoCAD SHX Text

ABOVE GROUND ELECTRIC

AutoCAD SHX Text

UNDERGROUND ELECTRIC

AutoCAD SHX Text

DECIDUOUS TREE

AutoCAD SHX Text

VALVE

AutoCAD SHX Text

UTILITY POLE

AutoCAD SHX Text

CONIFEROUS TREE

AutoCAD SHX Text

SPOT ELEVATION

AutoCAD SHX Text

SEWER MANHOLE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

ROCK

AutoCAD SHX Text

CONTROL POINT

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

ANCHOR

AutoCAD SHX Text

MANHOLE

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

ELECTRIC UTILITY

AutoCAD SHX Text

UNDERGROUND PROPANE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

WATER

AutoCAD SHX Text

SEWER

AutoCAD SHX Text

FORCED MAIN

AutoCAD SHX Text

BENCHMARK DISK

AutoCAD SHX Text

WATER SHUT OFF

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

DOOR AT SILL

AutoCAD SHX Text

MINOR CONTOUR

AutoCAD SHX Text

MAJOR CONTOUR

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text E

AutoCAD SHX Text

ELECTRICAL HANDHOLE

AutoCAD SHX Text

ELECTRICAL TRANSFORMER

AutoCAD SHX Text

TR

USCS686173

Line

USCS686173

Cloud

GENERAL
G0 - COVERSHEET
G1 - DRAWING LIST
G2 - CODE SUMMARY TABLES
G3 - LIFE SAFETY PLANS
G4 - ACCESSIBILITY PLAN
CIVIL
LANDSCAPE
L1 INX ABB NTS
L2 REF PLN
L3 TR PROT PLN
L4 SITE PLN
L5 LA PLN ENLG
L6 LYT PLN ENL
L7 PAV PLN ENL
L8 PLNT PLN TR
L9 PLNT PLN SG
L10 PLNT EN
L11 SECT ELEV
L12 PAV DET
L13 FNC DET
L14 FRN DET
L15 PLNT DET
L16 PLNT SCHED
STRUCTURAL
S1 STRUC GEN NOTES
S2 STRUC GEN NOTES
S3 Z1 FOUND PLAN
S4 Z2 FOUND PLAN
S5 WATER TANK PLAN
S6 Z1 SLAB JT PLAN
S7 Z2 SLAB JT PLAN
S8 ROOF FRAM PLAN
S9 OUTBUILDINGS
S10 OUTBUILDINGS
S11 WALL ELEVS
S12 CONC DETAILS
S13 CONC DETAILS
S14 CONC DETAILS
S15 PIER SCHEDULES
S16 WOOD DETAILS
ARCHITECTURE
A0 - GENERAL NOTES
A1 - TYPICAL SYMBOLS AND ABBREVIATIONS
A2 - TYPICAL MOUNTING HEIGHTS
A3 - PARTITION TYPES
A4 - PARTITION TYPES
A5 - EXTERIOR ASSEMBLY
A6 - INTERIOR SIGNAGE
A7 - EXISTING CONDITION PLAN
A8 - PHASE 1
A9 - PHASE 2
A10 - PHASE 3
A11 - PHASE 4
A12 - PHASE 5
A13 - DEMOLITION SITE PLAN
A14 - OVERALL PLAN
A15 - LEVEL 1 -ZONE 1
A16 - LEVEL 1 -ZONE 2
A17 - LEVEL 1 -DIMENSION PLAN-ZONE 1
A18 - LEVEL 1 -DIMENSION PLAN -ZONE 2
A19 - ROOF -ZONE 1
A20 - ROOF -ZONE 2
A21 - BUILDING ELEVATIONS
A22 - BUILDING ELEVATIONS
A23 - BUILDING SECTIONS
A24 - BUILDING SECTIONS
A25 - WALL SECTIONS
A26 - WALL SECTIONS
A27 - WALL SECTIONS
A28 - WALL SECTIONS
A29 - WALL SECTIONS
A30 - WALL SECTIONS
A31 - EXTERIOR PLAN DETAILS
A32 - EXTERIOR PLAN DETAILS
A33 - EXTERIOR SECTION DETAILS
A34 - EXTERIOR SECTION DETAILS
A35 - ROOF DETAILS
A36 - SITE STRUCTURES
A37 - SITE STRUCTURES
A38 - SITE STRUCTURES
A39 - SITE STRUCTURE DETAILS
A40 - SITE STRUCTURE DETAILS
A41 - INTERIOR ELEVATIONS
A42 - MULTIPURPOSE PLAN AND ELEVATIONS
A43 - MULTIPURPOSE OPERABLE PARTITIONS
A44 - CONFERENCE ROOM PLAN AND ELEVATIONS
A45 - RESTROOM PLANS AND ELEVATIONS
A46 - RESTROOM PLANS AND ELEVATIONS
A47 - RESTROOM PLANS AND ELEVATION
A48 - ENLARGED SHOP PLANS
A49 - INTERIOR DETAILS
A50 - INTERIOR DETAILS
A51 - MILLWORK DETAILS
A52 - SHELF DETAILS
A53 - FINISH SCHEDULE
A54 - FINISH PLAN -ZONE 1
A55 - FINISH PLAN -ZONE 2
A56 - FURNITURE PLAN -ZONE 1
A57 - FURNITURE PLAN -ZONE 2
A58 - ZONE 1 RCP
A59 - ZONE 2 RCP
A60 - CEILING DETAILS
A61 - DOOR SCHEDULE
A62 - DOOR SCHEDULE
A63 - TYPICAL DOOR TYPES & HARDWARE
A64 - EXTERIOR STOREFRONT TYPES
A65 - FRAMED OPENINGS DETAILS
A66 - FRAMED OPENINGS DETAILS
A67 - LOUVER TYPES AND DETAILS
A68 - INTERIOR GLAZED SYSTEM TYPES
FIRE ALARM
FA1 LEGEND
FA2 ALARM L1 Z1
FA3 ALARM L1 Z2
FIRE PROTECTION
FP1 LEGEND
FP2 SPRK L1 Z1
FP3 SPRK L1 Z2
FP4 DETAILS
PLUMBING
P1 - LEGENDS, SYMBOLS, NOTES & ABBREVIATIONS
P2 - PLUMBING FLOOR PLANS
P3 - PLUMBING ROOF PLAN
P4 - PLUMBING UNDERGROUND PLAN -ZONE 1
P5 - PLUMBING UNDERGROUND PLAN -ZONE 2
P6 - PLUMBING LEVEL 1 PLAN -ZONE 1
P7 - PLUMBING LEVEL 1 PLAN -ZONE 2
P8 - PLUMBING ENLARGED PLANS 01
P9 - PLUMBING ENLARGED PLANS 02
P10 - PLUMBING DETAIL SHEET 01
P11 - PLUMBING DETAIL SHEET 02
P12 - PLUMBING DETAIL SHEET 03
P13 - PLUMBING DETAIL SHEET 04
P14 - DOMESTIC WATER RISER DIAGRAM -ZONE 1
P15 - DOMESTIC WATER RISER DIAGRAM -ZONE 2
P16 - SANITARY AND VENT RISER DIAGRAM -ZONE 1
P17 - SANITARY AND VENT RISER DIAGRAM -ZONE 2
P18 - COMPRESSED AIR AND PROPANE RISER DIAGRAM
P19 - PLUMBING SCHEDULES
MECHANICAL
M1 - HVAC LEGEND & SYMBOLS
M2 - HVAC GENERAL NOTES & ABBREVIATIONS
M3 - LEVEL 1 -DUCTWORK PLAN -ZONE 1
M4 - LEVEL 1 -DUCTWORK PLAN -ZONE 2
M5 - ENLARGED PLANS AND SECTIONS
M6 - LEVEL 1 -PIPING PLAN -ZONE 1
M7 - LEVEL 1 -PIPING PLAN -ZONE 2
M8 - MECHANICAL FLOW DIAGRAMS
M9 - MECHANICAL DETAILS
M10 - MECHANICAL DETAILS
M11 - MECHANICAL DETAILS
M12 - MECHANICAL DETAILS
M13 - MECHANICAL DETAILS
M14 - MECHANICAL SCHEDULES
M15 - MECHANICAL SCHEDULES
M16 - MECHANICAL SCHEDULES
M17 - MECHANICAL CONTROL DRAWINGS
M18 - MECHANICAL CONTROL DRAWINGS
M19 - MECHANICAL CONTROL DRAWINGS
M20 - MECHANICAL CONTROL DRAWINGS
ELECTRICAL
E1 LEGEND
E2 SITE LIGHTING
E3 SITE POWER
E4 LIGHTING L1 Z1
E5 LIGHTING L1 Z2
E6 LTG SITE STRUCT
E7 POWER L1 Z1
E8 POWER L1 Z2
E9 POW SITE STRUCT
E10 LPRO ROOF Z1
E11 LPRO ROOF Z2
E12 POWER RISER
E13 SCHEDULES
E14 SCHEDULES
E15 SCHEDULES
E16 SCHEDULES
E17 SCHEDULES
E18 ELEC DETAILS
E19 ELEC DETAILS
E20 ELEC DETAILS
E21 ELEC DETAILS
E22 ELEC DETAILS
E23 ELEC DETAILS
E24 ELEC DETAILS
TELECOM
T1 - LEGENDS NOTES AND ABBREVIATIONS
T2 - TELECOM PLAN -LEVEL 1 -ZONE 1
T3 - TELECOM PLAN -LEVEL 1 -ZONE 2
T4 - ENLARGED PLANS AND ELEVATIONS
T5 - ENLARGED PLANS AND ELEVATIONS
T6 - TELECOM DETAILS
T7 - TELECOM DETAILS
T8 - TELECOM DETAILS
T9 - TELECOM RISERS
T10 - ADMIN HQ BLDG TELECOM ROOM
SECURITY
SE1 - SECURITY PLAN -LEVEL 1 -ZONE 1
SE2 - SECURITY PLAN -LEVEL 1 -ZONE 2
SE3 - SECURITY DETAILS
SE4 - SECURITY ENLARGED PLANS AND ELEVATIONS
SE5 - SECURITY RISERS

File details come from the government source that posted it. Updated .