This document contains specifications for porous unit paving to be installed at Acadia National Park in Maine. The specifications require concrete grid pavers measuring 23.625 inches by 15.75 inches and between 3-1/8 inches thick. The pavers must meet ASTM C1319 standards and be installed with plastic edge restraints and an aggregate setting bed. The pavers will be set in sand and soil fill, with seeded grass planted in the fill to cover the installed porous paving area. The project involves demolishing an existing maintenance facility and constructing a new one at the same location under solicitation number 140P2022R0045 from the National Park Service within the Department of the Interior.

View the file

Other files

File Type Posted
140P2022R0045-0007_Att01_QuestionsAndResponses-Final_01-129_220912_0007.pdf PDF
Sol_140P2022R0045_Amd_0007.pdf PDF
140P2022R0045-0006_Att01a-Q18_SpecSection334600-Subdrainage_220805_0006.pdf PDF
140P2022R0045-0006_Att01_QuestionsAndResponses_01-129_220907_0006.pdf PDF
140P2022R0045-0006_Att01b-Q40_Revised_Drawing_C1_220805_0006.pdf PDF
Sol_140P2022R0045_Amd_0006.pdf PDF
140P2022R0045-0005_Att01a-Q35_SpecSect334120-HighDensityPolyethylenePipe_220819_0005.pdf PDF
Sol_140P2022R0045_Amd_0005.pdf PDF
140P2022R0045-0005_Att01_QuestionsAndResponses_01-107_0005.pdf PDF
140P2022R0045-0005_Att02_RevClausesAndProvisions_220823_0005.pdf PDF
140P2022R0045-0004_Att01c-Q51_RevSpecSect334120-HighDensityPolyethylenePipe_220803_0004.pdf PDF
Sol_140P2022R0045_Amd_0004.pdf PDF
140P2022R0045-0004_Att02_DVB_GD_No_MA08_Maine-Building_220805_0004.pdf PDF
140P2022R0045-0004_Att01a-Q36_RevSpecSect323223_01-MechStabilizedEarthWall_220803_0004.pdf PDF
140P2022R0045-0004_Att01_QuestionsAndResponses_01-65_0004.pdf PDF
140P2022R0045-0004_Att01b-Q50_BollardDwg_220726_0004.pdf PDF
140P2022R0045-0003_Att01c-Q16_CarmonProductCutsheets_170620_0003.pdf PDF
140P2022R0045-0003_Att01b-Q09_SpecSect028214-AsbestosAbatement_Rev220725_0003.pdf PDF
140P2022R0045-0003_Att01a-Q03_ACAD151309B_GeotechnicalFinalDesignReport_211201_0003.pdf PDF
Sol_140P2022R0045_Amd_0003.pdf PDF
140P2022R0045-0003_Att01-QuestionsAndResponses_01-51_220727_0003.pdf PDF
140P2022R0045-0002_Att01b-PreProposal_Mtg_SignIn_Sheets_220713_0002.pdf PDF
Sol_140P2022R0045_Amd_0002.pdf PDF
140P2022R0045-0002_Att01a-PreProposal_Mtg_Presentation_w-Notes_220713_0002.pdf PDF
Sol_140P2022R0045_Amd_0001.pdf PDF
140P2022R0045-0001_Att01_Revised_SF1442_220707_0001.pdf PDF
140P2022R0045_Att01b-100pctSpecifications-Vol2of2_220325.pdf PDF
140P2022R0045_Att02-100pctDrawings_220325.pdf PDF
140P2022R0045_Att04a-ProposalSubmissionPackage_220707.zip ZIP file
140P2022R0045_Att01a-100pctSpecifications-Vol1of2_220325.pdf PDF
Sol_140P2022R0045.pdf PDF
140P2022R0045_Att05-Vaccination-Certification-Notification_210824.pdf PDF
140P2022R0045_Att04b-ProposalSubmissionPackage-Sample_220707.pdf PDF
140P2022R0045_Att07-SubKPlanForm_220519.docx DOCX document
140P2022R0045_Att06-Certification-of-Vaccination-Form_Exp250228.pdf PDF
140P2022R0045_Att08-Closeout-OM_List_220413.pdf PDF
140P2022R0045_Att03-DVB_GD_No_MA08_Maine-Building_220401.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACAD – 151309B 32 14 43 - 1

POROUS UNIT

PAVING

SECTION 321443 - POROUS UNIT PAVING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Concrete grid pavers

2. Aggregate setting bed for pavers.

3. Edge restraints.

B. Related Requirements:

1. Section 312000 "Earth Moving" for excavation, subgrade materials and geotextiles.

2. Section 329200 “Turf and Other Seeded Areas" for planting ground cover in porous paving.

1.2 ACTION SUBMITTALS

A. Product Data: For the following:

1. Concrete Grid Pavers.

2. Edge restraints.

B. Samples:

1. Full-size units of each type of unit paver indicated.

1.3 INFORMATIONAL SUBMITTALS

A. Material Certificates: For unit pavers. Include statements of material properties indicating compliance with requirements, including compliance with standards. Provide for each type and size of unit.

B. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for unit pavers, indicating compliance with requirements.

1. For grid paving units, include durability test data based on testing according to proven field performance requirements of ASTM C 1319 performed on units subjected to three years' exposure to same general type of environment, temperature range, and traffic volume as Project.

2. For solid interlocking paving units, include test data for freezing and thawing according to ASTM C 67.

ACAD – 151309B 32 14 43 - 2

PAVING

1.4 DELIVERY, STORAGE, AND HANDLING

A. Store pavers on elevated platforms in a dry location. If units are not stored in an enclosed location, cover tops and sides of stacks with waterproof sheeting, securely tied.

PART 2 - PRODUCTS

2.1 CONCRETE UNIT PAVERS

A. Source Limitations: Obtain each type of paver from single source that has resources to provide materials and products of consistent quality in appearance and physical properties.

B. Concrete Grid Pavers: Grid paving units complying with ASTM C 1319, made from normal-weight aggregates.

1. Thickness: 3-1/8 inches (80 mm)

2. Face Size and Shape: 23.625 inches (60 cm) x 15.75 inches (40 cm)

3. Color: Provide samples to be approved by COR

2.2 ACCESSORIES

A. Plastic Edge Restraints: Triangular PVC extrusions, 1-3/4 inches (45 mm) high by 3-1/2 inches (90 mm) wide, designed to serve as edge restraints for unit pavers; rigid type for straight edges and flexible type for curved edges, with pipe connectors and 3/8-inch- (9.5-mm-) diameter by 12-inch- (300-mm-) long steel spikes.

2.3 AGGREGATE SETTING-BED MATERIALS

A. Graded Aggregate for Base Course: Sound crushed stone or gravel complying with requirements in Section 312000 "Earth Moving" for base-course material.

B. Sand for Leveling Course: Sound, sharp, washed, natural sand or crushed stone complying with gradation requirements in ASTM C 33/C 33M for fine aggregate.

C. Drainage Geotextile: Per Specification 312000 “Earth Moving”.

2.4 FILL MATERIALS

A. Soil Fill for Porous Paving: Planting soil according to Section 329200 "Turf and Other Seeded Areas."

B. Aggregate Fill for Porous Paving: Graded, sound, crushed stone or gravel complying with ASTM D 448 for Size No. 8.

1. Color: Provide samples to be approved by COR.

A. Grass Seed: Comply with requirements in Section 329200 "Turf and Other Seeded Areas."

ACAD – 151309B 32 14 43 - 3

PAVING

PART 3 - EXECUTION

3.1 PREPARATION

A. Proof-roll prepared subgrade according to requirements in Section 312000 "Earth Moving" to identify soft pockets and areas of excess yielding. Proceed with porous paver installation only after deficient subgrades have been corrected and are ready to receive base course for porous paving.

3.2 INSTALLATION, GENERAL

A. Do not use unit pavers with chips, cracks, voids, discolorations, and other defects that might be structurally unsound or visible in finished work.

B. Mix pavers from several pallets or cubes, as they are placed, to produce uniform blend of colors and textures.

C. Cut unit pavers with motor-driven masonry saw equipment to provide clean, sharp, unchipped edges. Cut units to provide pattern indicated and to fit adjoining work neatly. Use full units without cutting where possible. Hammer cutting is not acceptable.

D. Tolerances:

1. Variation in Plane between Adjacent Units (Lipping): Do not exceed 1/16-inch (1.5-mm) unit-to-unit offset from flush.

2. Variation from Level or Indicated Slope: Do not exceed 1/8 inch in 24 inches (3 mm in 600 mm) and 1/4 inch in 10 feet (6 mm in 3 m) or a maximum of 1/2 inch (13 mm).

E. Provide edge restraints as indicated. Install edge restraints before placing unit pavers.

1. Install edge restraints to comply with manufacturer's written instructions. Install stakes at intervals required to hold edge restraints in place during and after porous paver installation.

3.3 SETTING-BED INSTALLATION

A. Compact subgrade uniformly to at least 95 percent of ASTM D 698 laboratory density.

B. Proof-roll prepared subgrade to identify soft pockets and areas of excess yielding. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Architect, and replace with compacted backfill or fill as directed.

C. Place drainage geotextile over prepared subgrade, overlapping ends and edges at least 12 inches (300 mm).

D. Place aggregate subbase and base, compact by tamping with plate vibrator.

ACAD – 151309B 32 14 43 - 4

PAVING

E. Place aggregate subbase and base, compact to 100 percent of ASTM D 1557 maximum laboratory density, and screed to depth indicated.

F. Place drainage geotextile over compacted subbase, overlapping ends and edges at least 12 inches (300 mm).

G. Place drainage geotextile over compacted base course, overlapping ends and edges at least 12 inches (300 mm).

H. Place leveling course, taking care that moisture content remains constant and density is loose and constant until pavers are set and compacted.

3.4 PAVER INSTALLATION

A. Set unit pavers on leveling course, being careful not to disturb leveling base. If pavers have lugs or spacer bars to control spacing, place pavers hand tight against lugs or spacer bars. If pavers do not have lugs or spacer bars, place pavers with a 1/16-inch- (1.6-mm-) minimum and 1/8-inch- (3.2-mm-) maximum joint width. Use string lines to keep straight lines. Fill gaps between units that exceed 3/8 inch (10 mm) with pieces cut to fit from full-size pavers.

1. When installation is performed with mechanical equipment, use only unit pavers with lugs or spacer bars on sides of each unit.

B. Compact pavers into leveling course with a low-amplitude plate vibrator capable of a 3500- to 5000-lbf (16- to 22-kN) compaction force at 80 to 90 Hz. Use vibrator with neoprene mat on face of plate or other means as needed to prevent cracking and chipping of pavers. Perform at least three passes across paving with vibrator.

1. Compact pavers when there is sufficient surface to accommodate operation of vibrator, leaving at least 36 inches (900 mm) of uncompacted pavers adjacent to temporary edges.

2. Before ending each day's work, compact installed concrete pavers except for 36-inch (900-mm) width of uncompacted pavers adjacent to temporary edges (laying faces).

3. As work progresses to perimeter of installation, compact installed pavers that are adjacent to permanent edges unless they are within 36 inches (90 mm) of laying face.

4. Before ending each day's work and when rain interrupts work, cover pavers that have not been compacted and leveling course on which pavers have not been placed with nonstaining plastic sheets to protect them from rain.

C. Place soil fill as follows, immediately after vibrating pavers into leveling course. Spread and screed soil fill level with tops of pavers. Vibrate pavers and add soil fill until porous paving is filled to about 3/4 inch (19 mm) from top surface; remove excess soil fill if any.

1. Before ending each day's work, place soil fill in installed porous paving except for 42-inch (1067-mm) width of unfilled paving adjacent to temporary edges (laying faces).

2. As work progresses to perimeter of installation, place soil fill in installed paving that is adjacent to permanent edges unless it is within 42 inches (1067 mm) of laying face.

3. Before ending each day's work and when rain interrupts work, cover paving that has not been filled with nonstaining plastic sheets to protect it from rain.

ACAD – 151309B 32 14 43 - 5

PAVING

D. After filling pavers with soil, sow seed according to Section 329200 "Turf and Grasses," except sow seed at half the rate specified for seeding lawns. Sweep seed from surfaces of pavers into voids and water with fine spray.

1. Within 24 hours after sowing seed, spread an additional 3/16 inch (4.8 mm) of uncompacted soil fill over seed and soak with water.

E. Place graded aggregate fill immediately after vibrating pavers into leveling course. Spread and screed aggregate fill level with tops of pavers.

1. Before ending each day's work, place aggregate fill in installed porous paving except for 42-inch (1067-mm) width of unfilled paving adjacent to temporary edges (laying faces).

2. As work progresses to perimeter of installation, place aggregate fill in installed paving that is adjacent to permanent edges unless it is within 42 inches (1067 mm) of laying face.

3. Before ending each day's work and when rain interrupts work, cover paving that has not been filled with nonstaining plastic sheets to protect it from rain.

F. As work progresses, remove and replace pavers that are loose, chipped, broken, stained, or otherwise damaged or that do not match adjoining units. Provide new units to match adjoining units and install in same manner as original units, with same joint treatment and with no evidence of replacement.

3.5 MAINTENANCE AND PROTECTION

A. Water newly planted grass and keep moist until grass is established. Maintain grass that is planted in paving to comply with requirements in Section 329200 "Turf and Grasses."

B. Erect barricades and warning signs as required to protect newly planted areas from traffic.

Maintain barricades for 60 days after planting.

END OF SECTION 321443