This document provides responses to questions for solicitation 140P2021R0082 to rehabilitate the Tuolumne Meadows Campground. The solicitation requires site delineation logs ranging from 18 to 36 inches in diameter and 8 feet in length, as well as boulders weighing 200 to 700 pounds and measuring 18 to 28 inches. If sufficient materials are not available on site, the contract includes optional CLINs to import additional logs or boulders as directed by the contracting officer. New conduit and fiber optic cable will be installed to connect a new kiosk to the main distribution frame and electrical panels. The Department of the Interior National Park Service is the contracting agency.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YOSE 229677: Solicitation 140P2021R0082, Rehabilitate Tuolumne Meadows to Enhance the Visitor Experience - Amendment 0003
1) The purpose of this Amendment is to provide responses to questions, provide the pre-proposal conference attendance list (that was left out of Amend 0002), and an updated Clause package for a revised CLIN structure/price schedule.
2) Responses to Questions:
Question 30:
This project is requiring site logs for delineation in the range of 18''-36'' in diameter with a length of 8
ft. If there are not enough site logs generated by the tree removal portion of the project will the contractor become responsible for importing of additional site logs shown on the design drawings?
RESPONSE 30:
The design intention is to utilize as much material on site as possible without importing material. If the number of logs shown on the drawings exceeds what has been harvested on site, the COR will direct the contractor on how materials will be redistributed or substituted across the campground. In the event imported material is required, Option CLIN 8 will be exercised if the government determines this Option CLIN is necessary. This CLINs will be exercised in accordance with the contract terms and conditions.
Question 31:
This project is requiring 2-man site boulders for delineation ranging from 200lb - 700lb with a size range of 18''-28'' If there are not enough 2-man site boulders generated by the boulder salvage and relocate portion of the project will the contractor become responsible for importing of additional boulders shown on the design drawings?
RESPONSE 31:
The design intention is to utilize as much material on site as possible without importing material. If the number of boulders shown on the drawings exceeds what has been harvested on site, the COR will direct the contractor on how materials will be redistributed or substituted across the campground.
In the event imported material is required, Option CLIN 9 will be exercised, if the government determines this Option CLIN is necessary. This CLINs will be exercised in accordance with the contract terms and conditions.
Question 32:
Please clarify whether 1.5'' conduit for fiber optic data cable from MDF to new Kiosk (shown on E2.1 & E2.3) is existing to be reused or new to be installed? Please clarify if new fiber cable is to be installed.
RESPONSE 32:
Conduit and fiber optic cable are new.
Question 33:
Please verify if conduits from panel A2 to new RV receptacle's (shown on E2.2) are new or existing to be reused?
RESPONSE 33:
Conduits are shown as new.
Question 34:
Please verify if conduit from panel A2 to new Kiosk (shown on E2.2) is new or existing to be reused?
YOSE 229677: Solicitation 140P2021R0082, Rehabilitate Tuolumne Meadows to Enhance the Visitor Experience - Amendment 0003
RESPONSE 34:
Conduit is shown as new.