This document provides a price schedule template for a federal contract solicitation to rehabilitate the Tuolumne Meadows Campground in Yosemite National Park. The solicitation is issued by the National Park Service's Denver Service Center and seeks pricing for base line items including campground site improvements and existing restroom rehabilitation. It also requests pricing for multiple contract options such as new restroom buildings, an entry kiosk, winter vault toilet, pavement, site logs and boulders for delineation. Offerors must submit pricing for all baseline and option line items. Pricing should be lump sum where specified and unit priced with extended totals provided for unit priced line items. The schedule also provides space for offerors to include any related costs that are not covered by specific line items.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: 140P2021R0082 | |||||
| PARK - PMIS: | YOSE - 229677 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Tuolumne Meadows Campground | ||||
| Project Title: | Rehabilitate the TM Campground to Enhance the Visitor Experience | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. Refer to section "H" of this solicitation for additional information regarding contract options. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Campground Site Improvements | 1 | Lump Sum | $0.00 | $0.00 |
| 2 | Existing Restrooms Rehabilitation | 8 | Each | $0.00 | $0.00 |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 2) --------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | New Restroom Building - Loop H | 1 | Lump Sum | $0.00 | $0.00 |
| 4 | New Restroom Building - Group Camp | 1 | Lump Sum | $0.00 | $0.00 |
| 5 | Entry Kiosk | 1 | Lump Sum | $0.00 | $0.00 |
| 6 | Winter Vault Toilet | 1 | Lump Sum | $0.00 | $0.00 |
| 7 | Pavement Earth Surfacing | 675 | TN | $0.00 | $0.00 |
| 8 | Site Logs for Delineation 18"-36" in diameter if sufficient materials are not available on site (Not to Exceed) Added in Amendment 3 | 4,550 | LF | $0.00 | $0.00 |
| 9 | 2-man Site Boulders for Delineation 200-700 lbs with size range of 18"-28" if sufficient materials are not available on site (Not to Exceed) Added in Amendment 3 | 347 | TN | $0.00 | $0.00 |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 through 9) ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 9) -------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |