This document is an amendment to a federal solicitation providing responses to contractor questions, an updated wage determination, and an extended proposal response date. Key details include the solicitation is for the National Park Service to rehabilitate the Tuolumne Meadows Campground in Yosemite National Park to enhance the visitor experience. The period of performance is extended to 770 calendar days after notice to proceed. The proposal response date is revised to August 17, 2021. The amendment provides responses to 29 contractor questions, clarifying requirements around water sources, safety plans, tree removal, drawings, and specifications.

View the file

Other files

File Type Posted
B09_Amend_0003_ConstructionClause_0003.pdf PDF
B09_Amend_0003_Attach_5B2_PSP_Vol_II_PriceSched_0003.xlsx XLSX spreadsheet
Sol_140P2021R0082_Amd_0003.pdf PDF
B09_Amend_0003_Sol_140P2021R0082_Responses_to_Questions_0003.pdf PDF
B09_Amend_02_Attach_2F_YOSE-229677_Bid_Document_Adjustments_Memo_20100804_0002.pdf PDF
B09_Amend_02_Attach_1C_YOSE-229677_Technical_Bid_Specs_Div_22-27_0002.pdf PDF
B09_Amend_02_Attach_3B_20376009-Rev0-Otak_Tuolumne_Meadows_CG_Geotech-08032021_0002.pdf PDF
B09_Amend_02_Attach_1D_02_YOSE-229677_Technical_Bid_Specs_Div_31-33_0002.pdf PDF
B09_Amend_02_Attach_2E_YOSE-229677_Bid_Docs_Utilities_Volume_3_0002.pdf PDF
B09_Amend_02_Attach_2D_YOSE-229677_Bid_Docs_080321_Structural_Architecture_MEP_Volume_5_0002.pdf PDF
B09_Amend_02_Attach_2B_YOSE-229677_Bid_Docs_Grading_Alignment_Details_Signage_Soil_Prep_Volume_4_0002.pdf PDF
B09_Amend_02_Attach_2A_YOSE-229677_Bid_Docs_Gen_TESC-Demo-Volume_1_0002.pdf PDF
B09_Amend_02_Attach_1A_YOSE-229677_Bid_Specs_Cover_TOC_Div_01_0002.pdf PDF
B09_Amend_02_Attach_4_WageDetermination_CA20210018_20210723_0002.pdf PDF
B09_Amend_02_Attach_1B_YOSE-229677_Technical_Bid_Specs_Div_02-13_0002.pdf PDF
B09_Amend_02_Attach_2C_YOSE-229677_Bid_Docs_Site-Plans-Volume_2_0002.pdf PDF
Sol_140P2021R0082_Amd_0002.pdf PDF
Attach_2E_YOSE-229677_Construction_Drawings_070121_Utilities_Volume_3_rev_0001.pdf PDF
Sol_140P2021R0082_Amd_0001.pdf PDF
B08_Solit_Attach_2A_YOSE-229677_Construction_Drawings_070121_Gen_TESC-Demo-Volume_1.pdf PDF
B08_Solit_Attach_3A_YOSE_229677_Hazardous_Materials_Report.pdf PDF
Sol_140P2021R0082.pdf PDF
B08_Solit_Attach_5B2_PSP_Vol_II_PriceSched_Draft.xlsx XLSX spreadsheet
B08_Solit_Attach_2E_YOSE-229677_Construction_Drawings_070121_Utilities_Volume_3.pdf PDF
B08_Solit_ConstructionClauseTemplate_REQD.pdf PDF
B08_Solit_Attach_1B_YOSE-229677_Techincal_Specs_Div_31-33.pdf PDF
B08_Solit_Attach_1A_YOSE-229677_Division_01_Specs.pdf PDF
B08_Solit_Attach_2C_YOSE-229677_Construction_Drawings_070121_Site-Plans-Volume_2.pdf PDF
B08_Solit_Attach_2D_YOSE-229677_Construction_Drawings_070121_Structural_Architecture_MEP_Volume_5.pdf PDF
B08_Solit_Attach_5B3_PSP_Vol_II_GenRefs.doc DOC document
B08_Solit_Attach_2B_YOSE-229677_Construction_Drawings_070121_Grading_Alignment_Details_Signage_Soil_Prep_Volume_4.pdf PDF
B08_Solit_Attach_5B1_PSP_Vol_II_SF24-16d_BidBonds.pdf PDF
B08_Solit_Attach_5A1_PSP_Vol_I_ProjExp.docx DOCX document
B08_Solit_Attach_3B_YOSE_229677_Geotechnical_Draft_070121.pdf PDF
B08_Solit_Attach_1C_YOSE-229677_Technical_Specs_Div_02-13.pdf PDF
A16_JOFOC_BrandName_YOSE_229677_Over150k_REQD.pdf PDF
B08_Solit_Attach_5A2_PSP_Vol_I_PastPerf.docx DOCX document
B08_Solit_Attach_4_Wage_Determination_CA20200018_070821.pdf PDF
B08_Solit_Attach_5B4_PSP_Vol_II_SubKPlanForm.doc DOC document
B08_Solit_Attach_1D_YOSE-229677_Technical_Specs_Div_22-27.pdf PDF
B08_Solit_Attach_5A_PSP_Cover.rtf RTF text file
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YOSE 229677: Solicitation 140P2021R0082, Rehabilitate Tuolumne Meadows to Enhance the Visitor Experience - Amendment 0002

1) The purpose of this Amendment is to provide the pre-proposal site visit attendance log held July 22, 2021 and provide responses to questions. (see attached attendance log).

2) An updated Wage Determination (Bacon-Davis) has been provided under this Amendment 02 (ref CA20210018 dated 20210723)

3) In addition, the proposal response date has been extended to August 17, 2021.

4) Responses to Questions:

QUESTION 1:

During the site visit it was mentioned that no local water source is available at this time. Is there a NPS form available for requesting a local water source? And if so, would time allow for it to be approved prior to bid date?

RESPONSE 1:

There is no specific form used to request a local water source. There are several options for drawing water within that region of the park.

Option 1 – Water vault in the old White Wolf water system. The water vault generally produces 8,000 gallons every other day and is a spring fed raw water source. To use this source backflow prevention and clean equipment are required. Additionally, a pump is required to fill the water tanker. Approval of this source may be possible prior to bid date.

Option 2 – Tenaya Lake. To draw from Tenaya Lake compliance is required from the resources staff and Park Hydrologist. This process would take time and approval is unlikely prior to bid date. To use this source backflow prevention and clean equipment are required. One additional note the tribes are not happy about the location where the current contractor is drawing their water. If the contractor wishes to use this source consultation with the tribes may be required.

Option 3 – Tuolumne River Surface Water. To draw from the Tuolumne River compliance is required from the resources staff and Park Hydrologist. Variable seasonal flow may limit the amount of water that can be drawn. This process would take time and approval is unlikely prior to bid date. To use this source backflow prevention and clean equipment are required. If this water source were selected additional approval may be required from San Francisco Public Utilities Commission.

QUESTION 2:

This project covers a large area with varying terrain requiring significant effort in estimating and takeoffs. Will NPS extend RFP due date 1 week to allow more time to accurately estimate this project?

RESPONSE 2:

Bid date is revised to 12:00 PM MDT, August 17, 2021.

QUESTION 3:

Can the Safety Officer position be dual hatted with another position?

RESPONSE 3:

Yes, as long as safety requirements are met.

QUESTION 4:

The solicitation states a July 7, 2023 project end date. Will the project allow two full summer construction seasons?

RESPONSE 4:

The period of performance is extended to NLT November 9, 2023. This assumes substantial completion NLT October and punch-list/closeout items to be completed 770 days after NTP (estimated to be September 30, 2021).

QUESTION 5:

For tree removal. If trees are found that are not in the contract, how quickly can NPS arborist come take a look at the marked trees and review/approve? What is the intention of the tree removal – to chip, dispose off-site, or keep on-site?

RESPONSE 5:

The contractor should flag all trees for removal. NPS/YOSE natural resource expert will be made available to review them. The intention is to use medium to large logs as part of the campsite delineation, refer to detail 3/C8.7 (18-36” dia. logs). Smaller logs can be used as litter and duff for revegetation/soil restoration areas. Excess and debris to be removed from the park as needed.

QUESTION 6:

Does the contractor need to fence off the entire campground with construction fencing? Where are key areas for hiker conflicts?

RESPONSE 6:

No, it is not necessary to fence the entire campground as it will be closed to the public and to all groups such as SARs (Search and Rescue). The contractor should fence areas where there is a possibility of pedestrian traffic to keep visitors safe and out of the construction site. The park can guide the team on signage to divert pedestrians to other trails, connections, crossings, etc. Hikers are anticipated to enter at the end of A loop, the top of B loop and the far side of the D loop (see attached map for reference).

QUESTION 7:

What are the requirements for Biofuel?

RESPONSE 7:

SECTION 01 42 00 covers the use and handling of biofuels.

QUESTION 8:

Can the contractor see the Tioga Road contract drawings and/or schedule to know what is anticipated for closures, waiting times, etc. and how the project will overlap with this one?

RESPONSE 8:

The following link shows the delays for the Tioga road project. The contract completion date is in the fall of 2022, until the road closes in the fall of 2022, estimated to be October 31, 2022. This could change due to a variety of unforeseen conditions, such as fire, snow, slides, flooding, etc.

https://www.nps.gov/yose/planyourvisit/roadwork.htm

QUESTION 9:

Will contracting be able to award this contract if there is only one bidder?

RESPONSE 9:

Prospective offerors familiar with the construction site may not have attended the site visit;

however, the government anticipates more than one offer in response to this competitive request for proposals. In the event a single offer is received, the contracting officer will determine if an award is in the best interest of the government. This determination would include a review of proposed technical and pricing volumes and the ability for the CO to determine the offered price is fair and reasonable.

QUESTION 10:

Generator hours for construction camp.

RESPONSE 10:

Weekdays 7:00 am to 7:00 pm; weekends 8:00 am to 5:00 pm.

QUESTION 11:

Can a map of the trails that lead to the backpackers camp be provided so a proper sequencing plan and schedule may be submitted?

RESPONSE 11:

See attached map for reference.

QUESTION 12:

Tree removal may only be conducted from 8/1 to 1/31. To what extend can this be extended given the narrow construction window for the 2021 season?

RESPONSE 12:

Tree removal cannot be done sooner than Notice to Proceed. The campground, and potential tree clearing, can occur in 2021 until the Tioga Road is closed for the season due to weather. Tree clearing can resume in the spring of 2022.

QUESTION 13:

Is it anticipated that a grading permit (obtained by the contractor) will be required from the county or parks department be required? It does not appear to be listed under section 01 31 00 1.8B or 1.8C

RESPONSE 13:

No grading permit is required to work within the campground since this is a Federal property and a county is not required.

QUESTION 14:

Where is the potable water source for the project?

RESPONSE 14:

Refer to response for Question 1.

QUESTION 15:

Specification Sections 6,7,8,9,10 and 13 are not provided in the original solicitation. Will these documents be provided in an amendment/addendum?

RESPONSE 15:

These documents are attached in this response, please see pdf attachment.

QUESTION 16:

Please verify that questions are due no later than 7 days prior to due date for proposals (per clause 52.252-5 para B).

RESPONSE 16:

Questions are due no later than 7 days prior to the due date for proposals. Offerors are encouraged to submit relevant questions before the established due date. NPS may not respond to questions received after August 10th, 2021.

QUESTION 17:

Solicitation page in sam.gov does not show "interested Vendors" tab. Would contracting be able to activate this tab?

RESPONSE 17:

The attendee list for the site visit is provided in this amendment. The interested vendors tab will not be used.

QUESTION 18:

To satisfy Factor 6 requirements, can offerors submit previously completed questionnaires for projects submitted under Factor 1 to alleviate the burden of requesting references complete multiple questionnaires for the same effort? Due to COVID it has become inherently more difficult to obtain completed questionnaires. If so, can these previously completed questionnaires be provided in Volume I rather than submitted to the designated point of contact?

RESPONSE 18:

Please utilize the procedures stated in the solicitation. The government reserves the right to use additional Past Performance information from CPARs or elsewhere.

QUESTION 19:

The SF1442 Continuation Page states the Period of Performance as 09/30/2021 to 07/07/2023 which is 645 calendar days. However, the Division 01 specifications (page 7) states “The Work shall be substantially complete and ready for use within 770 calendar days after Notice to

Proceed." Please advise on the correct performance period for the Tuolumne Meadows Campground project.

RESPONSE 19:

The performance period is 770 calendar days after notice to proceed, If the NTP is issued on 09/30/2021 the required completion date is 11/09/2023. The stated date is updated to reflect 770 days and is subject to recalculation at the time of NTP.

QUESTION 20:

Volume II – Business and Price Proposal requires submission of a Standard Form 24, Bid Bond duly executed between the offeror and the bonding company. Since this is an electronic proposal submission via email, do we need to submit the original bond in hard copy? If so, please advise on where bonds should be shipped and if the original hard copy is due at the same time as the electronic proposal submission.

RESPONSE 20:

Bonds should be submitted BOTH electronically, and hard copy. Hard copy bonds should be sent to: National Park Service, Denver Service Center , Ref: 140P2021R0082, 12795 W. Alameda Parkway, Lakewood, CO 80228

QUESTION 21:

Attachment 5B2, CLIN 7 is for Pavement Earth Surfacing and includes the note “(late request -quantity being developed and cost researched)” however, a quantity of 675 TN is provided. Is this quantity accurate or will an updated Contract Price Schedule be provided?

RESPONSE 21:

The stated quantity of 675 TN is accurate. Attachment 5B2 revision 1 is attached to this amendment. This revision removes verbiage in question.

QUESTION 22:

B08_Solit_Attach_1C_YOSE-229677_Technical_Specs_Div_02-13 appears to be missing divisions 06, 07, 08, 09,10, and 13 as listed in B08_Solit_Attach_1A_YOSE- 229677_Division_01_Specs "Table of Contents". Please provide missing divisions that are relevant to project.

RESPONSE 22:

Please see answer to question 15.

QUESTION 23:

Plan Sheet C2.25 calls out for Parking Spur Drainage Section See Detail 14 on Sheet C8.1. Does this occur at all Crushed Rock Parking Spurs or only where it is specifically called out?

RESPONSE 23:

Only where it is specifically called out.

QUESTION 24:

Plan Sheet C2.19 calls out for Crushed Rock Parking Spur (Typ.) See Detail 8 on Sheet C8.1.

However, these areas are depicted as Gravel Roadways. Detail 8 on Sheet C8.1 is called Crushed Rock Pedestrian Trail while Detail 9 on same sheet is called Gravel Roadway and Parking.

Please clarify which detail is to be used for the Parking Spurs.

RESPONSE 24:

Detail 9. All labels have been updated in the Addendum.

QUESTION 25:

Please confirm that the organic binder in Detail 8 and 9 on sheet C8.1 is only required where it is specifically called out as “With Binder” in the plans.

RESPONSE 25:

Correct, organic binder is only required where it is called out in the plans. This is also differentiated by its hatching.

QUESTION 26:

Plan Sheet C8.1 Detail 8 and 9 calls for a organic binder on all surfaces which note “with binder”.

Does the binder only go with the top 4”?

RESPONSE 26:

The design has it going with the top 4” but manufacturer’s recommendations should be followed.

QUESTION 27:

Spec Section 32 15 00 Aggregate Surfacing does not specify and binder. Is the soil stabilizer the binder? Is there a spec product to use such as the binder called out in Spec Section 32 15 43?

RESPONSE 27:

Soil stabilizer is the binder. An organic stabilizer is desired as specified in 32 15 43. Section 32 15 43 is the specification section for the stabilized surface solution. Both of these specification sections have been updated in the Addendum.

QUESTION 28:

Plan Sheets 37-45 are missing. Will they be provided?

RESPONSE 28:

These sheets are included in this Addendum.

QUESTION 29:

It appears that drawing #s C1.0 thru C1.8 are missing from “Attach_2A_Drawings_070121_Gen_TESC-Demo-Volume_1", Please provide missing drawings C1.0 thru C1.8.

RESPONSE 29:

C1.0 THRU C1.8 are included in this Addendum.