CAVE 219342Drawings.pdf
PDF 33 MB Posted
- Solicitation number
- 140P2020R0112
About this file
This document outlines a federal contract opportunity for facility upgrades and repairs at Carlsbad Caverns National Park. The solicitation number is 140P2020R0112 and seeks to replace failing primary electrical distribution infrastructure and elevators 1 and 2, as well as steel repairs and replacements. The opportunity was issued by the Department of the Interior National Park Service National Office. Offerors should reference solicitation number 140P2020R0112 in their responses for the work required at Carlsbad Caverns National Park.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G0.1G0.
VOLUME 2 DRAWING PACKAGE
100% Final Construction Documents Package Submitted : 06 / 19 / 2020
19 June 2020 paldrich Text Box
QUALITY DESIGN CERTIFICATION
Prepared in Accordance with Design Development (Title I) Drawing No: 130/136851 Project Manager:
GENERAL
G0.0 COVER SHEET
G0.1 INDEX OF DRAWINGS / CODES AND REQUIREMENTS
G0.2 ABBREVIATIONS, GENERAL NOTES AND SYMBOLS
G1.0 STAGING PLAN - ELEVATOR SHAFT 1&2 REPAIR
G2.0 STAGING PLAN - ELEVATOR SHAFT 1&2 REPAIR
G3.0 STAGING PLAN - ELEVATOR SHAFT 1&2 REPAIR
STRUCTURAL DRAWINGS
S0.0 GENERAL NOTES ELEVATOR SHAFT 1&2 REPAIR
S0.01 ABBREVIATIONS AND KEYS ELEVATOR SHAFT 1&2 REPAIR
S0.1 ROOF PLANS
S0.2 MECHANICAL ROOM PLANS
S0.3 SECTIONS & DETAILS
S0.4 PIT PLANS & SECTIONS
S0.5 SECTIONS BEAM REINFORCEMENT
S0.6 SECTIONS BEAM REINFORCEMENT
S0.7 SECTIONS ELEVATOR ROOM
S0.8 SECTIONS BEAM REINFORCEMENT
S0.9 PIT SECTIONS CONTINUED
S1.0 EXISTING SHAFT ELEVATIONS
S1.1 EXISTING SHAFT ELEVATIONS
S1.2 EXISTING SHAFT ELEVATIONS
S1.3 EXISTING SHAFT ELEVATIONS
S1.4 EXISTING SHAFT ELEVATIONS
S1.5 EXISTING SHAFT ELEVATIONS
S1.6 EXISTING SHAFT ELEVATIONS
S1.7 EXISTING SHAFT ELEVATIONS
S1.8 EXISTING SHAFT ELEVATIONS
S1.9 EXISTING SHAFT ELEVATIONS
S2.0 EXISTING SHAFT ELEVATIONS
S2.1 EXISTING SHAFT ELEVATIONS
S2.2 NEW SHAFT ELEVATIONS
S2.3 NEW SHAFT ELEVATIONS
S2.4 NEW SHAFT ELEVATIONS
S2.5 NEW SHAFT ELEVATIONS
S2.6 NEW SHAFT ELEVATIONS
S2.7 NEW SHAFT ELEVATIONS
S2.8 NEW SHAFT ELEVATIONS
S2.9 NEW SHAFT ELEVATIONS
S3.0 NEW SHAFT ELEVATIONS
S3.1 NEW SHAFT ELEVATIONS
S3.2 NEW SHAFT ELEVATIONS
S3.3 NEW SHAFT ELEVATIONS
ARCHITECTURAL DRAWINGS
AD.1 DEMOLITION PLAN - CAVE LEVEL
AD.2 DEMOLITION PLANS - LEVEL 3 AND LEVEL 4
A1.1 FLOOR PLANS - CAVE LEVEL AND LEVEL 2
A1.2 FLOOR PLANS - LEVEL 3 AND LEVEL 4
A1.3 ROOF WALL SECTIONS OVER MACHINE ROOM 1 & 2
A1.4 ROOF SYSTEM AND DETAILS
A1.5 ROOF DETAILS
A2.1 REFLECTED CEILING PLAN - LEVEL 3
A3.1 WALL PARTITION TYPES
A3.2 DOOR AND FRAME TYPES, SCHEDULES AND DETAILS
A3.3 INTERIOR ELEVATION AND DETAILS
A4.1 ELEVATORS 1 & 2 GUTTER ELEVATIONS
A4.2 ELEVATORS 3 & 4 GUTTER ELEVATIONS
CODES AND REQUIREMENTS
The following standards, codes, statutory regulations and legislation identify the requirements for this specific project.
• IEBC 2018 International Existing Building Code
ADA Compliance: 2003 ICC/ ANSI A117.1, 2009 (when more restrictive and ABAAS)
• ABAAS Architectural Barriers Act Accessibility Standards
• ASME A17.1-2016/CSA B44-16 Safety Code For Elevator and Escalators
• IMC 2015 International Mechanical Code
• IPC 2015 International Plumbing Code
• NFPA 13 (2017) Standard for the installation of Sprinkler Systems
• NFPA 70 (2017) NEC National Electrical Code 2017
• NFPA 72 (2017) National Fire Alarm And Signaling Code 2017
• NFPA 90A Standard for the Installation of Air-Conditioning and Ventilating Systems
• NFPA 110 (2016) Standard for Emergency and Standby Power Systems
• NFPA 70E Standard for Electrical Safety Requirements for Employee Workplaces
• IECC 2015 International Energy Conservation Code
• National Electrical Manufacturers Association (NEMA) - Various
• UL - Various (Formerly Underwriters Laboratories)
• IEEE Standards (Various)
• EIA/TIA Standards (Various)
• State and Local Codes as required
• Project Management Information System (PMIS) #219342
• National Park Service Denver Service Center Workflows
CODE INTERPRETATIONS**
The Visitor Center Elevator No.'s 1 & 2 are not classified by IBC or to be utilized as evacuation elevators. Based on the understanding and direction of the NPS the installation will not be considered as an official High-Rise Application with travel greater than 120' which would require fire access elevators, however, illumination to the hoistway will be provided as part of the primary electrical upgrade in the hoistway of elevator No.'s 1 & 2 for both maintenance utilization and during rescue operations.
There are no fire sprinklers in either the machine rooms or hoistways. They are not required unless flammable materials are stored in the Machine Room.
** The scope of this project includes renovations to existing rooms and equipment within the facility, no new rooms or occupancy types have been created which would result in increased travel distance or occupancy loads; as such this drawing set does not include life safety drawings.
MECHANICAL DRAWINGS
M1.1 MECHANICAL SYMBOLS & ABBREVIATIONS
M1.2 MECHANICAL FLOOR PLAN LEVEL 3 DEMOLITION
M1.3 MECHANICAL FLOOR PLAN LEVEL 4 DEMOLITION
M2.0 MECHANICAL FLOOR PLAN LEVEL 3
M2.1 MECHANICAL FLOOR PLAN LEVEL 4
M4.0 MECHANICAL SCHEDULES & DETAILS
M4.1 MECHANICAL ELEVATOR DRAIN ISOMETRIC
ELECTRICAL DRAWINGS
E1.1 LEGEND ELECTRICAL
E1.2 GENERAL NOTES - DRAWING
E1.3 ELEVATOR ROOMS DEMOLITION
E1.4 CAVERN, HOISTWAY + TRANSFORMER VAULT DEMOLITION
E2.0 ELEVATOR 1&2 ROOM LIGHTING AND FIRE ALARM
E2.1 ELEVATOR 1&2 ROOM & ROOF POWER AND COMMUNICATIONS
E2.2 CAVERN LIGHTING AND POWER
E3.0 BASEMENT LEVEL POWER & COMMUNICATIONS
E3.1 ELECTRICAL SERVICES ELEVATOR 3 & 4 ROOM
E4.0 ELECTRICAL SCHEDULES
E4.1 SCHEDULES ELECTRICAL PANELBOARD
E4.2 ELECTRICAL ONE LINE SCHEMATIC
E4.3 GENERAL ONE LINE PROGRAMMABLE LOGIC CONTROLLER ONELINE
VERTICAL TRANSPORTATION DRAWINGS
VT1.0 VERTICAL TRANSPORTATION HOISTWAY & PIT PLAN
VT1.1 VERTICAL TRANSPORTATION MACHINE ROOM PLAN
VT1.2 VERTICAL TRANSPORTATION ELEVATOR HOISTWAY SECTION
VT1.3 VERTICAL TRANSPORTATION SECTION THROUGH EXISTING SHAFT
05/29/20
NOT FOR CONSTRUCTION
AS
BF
AS
VOLUME 2 DRAWING PACKAGE
G0.1
INDEX OF DRAWINGS / CODES
AND REQUIREMENTS
06/19/20
19 June 2020
SYMBOLS LEGEND
Sheet Number
A1.1 Sheet Number
Discipline Code
View Title
View Name 1/4" = 1'-0"
Drawing Scale
Drawing Number
View Title with Reference
A1.1 1/8" = 1'-0"
View Name1
Drawing Scale
Sheet Number
Drawing Number
Exterior Elevations
Sheet Number
A1.1
Position on Sheet
Interior Elevations
Sheet Number
A1.1 Position on Sheet
19 SIM
SIM 19
19 SIM
19 SIM
Building Section
Sheet Number
Position on Sheet
A1.1
SIM
A1.1
SIM
Wall Section
Sheet Number
A1.1
SIM
Position on Sheet
Detail - Section
Sheet Number
Position on Sheet
Detail - Plan/RCP
Sheet Number
Position on Sheet
A1.1
SIM
Drawing Revisions Revision Number
North Arrow
Graphic Scale 0 2' 4' 8'
Column Grid Lines
Column Grid Line1 2
A
B
Level Datum
Level Elevation
Level Name
0' - 0"
LEVEL 01
A1.1
SIM
Spot Elevation
10' - 0"
Spot Elevation
Room Tag
NAME
Room Name
Room Number
CL
Centerline Denotes Centerline of an Object
GENERAL NOTES
1. DRAWINGS & SPECIFICATIONS ARE COMPLIMENTARY
COMPONENTS OF THE CONTRACT DOCUMENTS, REVIEW ALL
DRAWINGS AND SPECIFICATIONS FOR THE COMPLETE SCOPE
OF WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY FOR
CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS OR
OMISSIONS ARE DISCOVERED.
2. REFER TO DEMOLITION DRAWINGS, IF ANY , FOR WORK
REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE
ACCORDINGLY.
3. ALL DIMENSIONS ARE SHOWN TO FINISH FACE OF WALL
UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
COORDINATE WITH SPECIAL FINISHES.
4. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS
REQUIRED.
5. ALL FIRE PARTITIONS SHALL BE TIGHTLY SEALED TO THE
UNDERSIDE OF DECK.
6. PENETRATIONS IN FIRE RATED PARTITIONS FOR CONDUIT,
PIPING, CABLE TRAYS, DUCTWORK AND OTHER ITEMS
FORMING OPENINGS SHALL BE FIRE-SAFED PER SPEC
SECTION 07 84 00 REQUIREMENTS WITH APPROPRIATE
"UL- LISTED" ASSEMBLY.
7. SEE SHEETS AD.1, AD.2 FOR DEMOLITION PLANS.
8. SEE SHEETS A1.1, A1.2 FOR FLOOR PLANS.
9. SEE SHEETS A1.4, A1.5 FOR ROOF SYSTEM AND DETAILS.
10. SEE SHEET A2.1 FOR REFLECTED CEILING PLAN.
11. SEE SHEET A3.1 FOR WALL PARTITION TYPES, DETAIL.
12. SEE SHEET A3.2 FOR DOOR AND FRAME TYPES, DETAILS.
13. SEE SHEET A3.2 FOR ROOM FINISH SCHEDULE, DOOR AND
FRAME SCHEDULE.
14. SEE SHEET A3.3 FOR INTERIOR DETAILS.
15. MAINTAIN 2 HOUR RATED ASSEMBLY AT ALL NEW AND
EXISTING WALLS AND FLOORS AT ELEVATOR MACHINE
ROOMS 301 & 302. PROVIDE CONTINUOUS 2 HOUR RATED
CONSTRUCTION THROUGH THE USE OF FIRESTOPPING PER
THE REQUIREMENTS OF SECTION 07 84 00 AT EXISTING OR
PROPOSED PENETRATIONS OR OPENINGS.
06/19/20
AS
BF
AS
VOLUME 2 DRAWING PACKAGE
G0.2
ABBREVIATIONS, GENERAL
NOTES AND SYMBOLS
AB ANCHOR BOLT, AUGER BORING
ABS AIR BREAK SWITCH
AC AIR CONDITIONING, ASBESTOS CEMENT,
ACRES
A/C ASPHALTIC CONCRETE
ACB AIR CIRCUIT BREAKER
ACSR ALUMINUM CONDUCTOR STEEL REINFORCED
ACST ACOUSTIC
AD AREA DRAIN, ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
AL ALUMINUM
AM ACOUSTIC MATERIAL
AMP,A AMPERE
AP ACCESS PANEL APPROX APPROXIMATE
ARCH ARCHITECTURAL
ARR ARRESTOR
ASPH ASPHALT
ABBREVIATIONS
B BASELINE
BO BOARD
BEJ BRICK EXPANSION JOINT
BLDG BUILDING
BLK BLOCK
BM BEAM
B BOTTOM
BRG BEARING
BR BOTTOM REGISTER
BSMT BASEMENT
C CELSIUS
CAP CAPACITY
CB CIRCUIT BREAKER
CD CEILING DIFFUSER
CEM CEMENT
CG CORNER GUARD
C&G CURB AND GUTTER
CH CHILLER
CI CAST IRON, COURTYARD INLET
CIP CAST IRON PIPE, CAST IN PLACE
CIR CIRCULATING
CJ CONTROL JOINT
CKT CIRCUIT
CLG CEILING
C CENTERLINE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE ARCH
CMU CONCRETE MASONRY UNITS
CND,C CONDUIT
CNDS CONDENSATE
CO CLEANOUT
CODP CLEANOUT W/ DECK PLUG
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
COND CONDUCTOR
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONV CONVERTER
COP,CU COPPER
CP NON-REINFORCED CONCRETE PIPE
CR CHAIR, CRASH RAIL
CRS STAINLESS STEEL
CS CONCRETE SEALER/SURFACE
CSK COUNTERSUNK
CT CERAMIC TILE, CURRENT TRANSFORMER, COOLING TOWER
CTR CENTER, COOLING TOWER RETURN
CTS COOLING TOWER SUPPLY
CW COLD WATER
CWB CAPILLARY WATER BARRIER
CONTR CONTRACTION
CPT CARPETD DEPTH, DEEP, DEGREE OF CURVATURE
DB DRY BULB, DECIBEL, DIRECT BURIAL
DD DIVERSION DIKE
DET DETAIL
DH DRILL HOLE
DI DUCTILE IRON
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DMPR DAMPER
DN DOWN
DP DISTRIBUTION PANEL
DS DOWNSPOUT, STORM DRAINAGE STRUCTURE
DW DOMESTIC WATER
DWG DRAWING
DWD DRINKING WATER DISPENSER
E EAST
EA EACH
EAN EXCEPT AS NOTED
EAT ENTERING AIR TEMPERATURE
EC EMPTY CONDUIT
EF EACH FACE, EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
EMER EMERGENCY
E/P EDGE OF PAVEMENT
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
EVAP EVAPORATIVE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXP JT EXPANSION JOINT
EXT EXTERIOR
F FIRE, FUSE, FILTER
FA FIRE ALARM FABX FIRE ALARM BOX
FD FLOOR DRAIN, FIRE DAMPER
FDN FOUNDATION
FDR FEEDER
FE FIRE EXTINGUISHER
FFE FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FL FLOOR, FLASHING, FLOW LINE
FLUOR FLUORESCENT
4 WAY FOUR WAY
FPH FROST PROOF HYDRANT
FR FRAME
FS FULL SIZE
FTG FOOTING
FJ FELT JOINT
FW FIRE WATER
FXTR FIXTURE
G GROUND, GAS LINE,GRAM
GA GAGE
GAL GALVANIZED
GC GLAZED COATING
GFI GROUND FAULT INTERRUPT
GFMU GROUND FACE MASONRY UNIT
GL GLASS
GR GRADE
GRD GROUND
GSU GLAZED STRUCTURAL UNIT
GW GROUND WATER
GWB GYPSUM WALL BOARD GYP GYPSUM
HGT,H HEIGHT, HUMIDIFIER
HB HOSE BIBB
HC HANDICAPPED
HD HARD DRAWN
HDW HARDWARE
HGSW HORN GAP SWITCH
HID HIGH INTENSITY DISCHARGE
HORIZ HORIZONTAL
HP HIGH POINT
HPS HIGH PRESSURE SODIUM
HR HOUR
HS HIGH STRENGTH
HW HOT WATER, HEADWALL
HWL HIGH WATER LEVEL
HVY HEAVY
HZ HERTZ
ID INSIDE DIAMETER, INSIDE DIMENSION
IE INVERT ELEVATION
IMC INTERMEDIATE METAL CONDUIT
INT INTERIOR
INSUL INSULATION, INSULATED
INV INVERT
INTX INTERSECTION
IP INLET PROTECTION
IRBF INDUSTRIAL RESIN BASE FLOORING
JB JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
JT JOINT
JST JOIST
K KILO
KIAC THOUSAND AMP INTERRUPT CAPACITY
KCP KEENE'S CEMENT PLASTER
KG KILOGRAM
KN KILONEWTON
KO KNOCK OUT
KV KILOVOLT
KVA KILOVOLT-AMPERE
KW KILOWATT
L/S LITERS PER SECOND
L LOUVER, LENGTH, LENGTH OF CURVE
LA LIGHTNING ARRESTOR
LC LEAD COVERED
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
LAV LAVATORY VERTICAL
LVC LENGTH OF VERTICAL CURVE
M/S METERS PER SECOND
M METER, MEGA
MACH MACHINE
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
ECH MECHANICAL
MET METAL
MH MANHOLE
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MLO MAIN LUG ONLY
MM,mm MILLIMETER
MO MOTOR OPERATED, MASONRY OPENING, MIDDLE ORDINATE
MP MEDIUM PRESSURE
MTD MOUNTED
MTG MOUNTING
MMP MEMBRANE WATERPROOFING
MULL MULLION
N NORTH
NA NOT APPLICABLE
NC NON CORROSIVE
NE NORTHEAST
NDC NOSE DOWN CURB
NEC NATIONAL ELECTRIC CODE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NTS NOT TO SCALE
NW NORTHWEST
OA OUTSIDE AIR
OC ON CENTER
OCB OIL CIRCUIT BREAKER
OD OUTSIDE DIAMETER OPNG OPENING
OPP OPPOSITE
OSD OPEN SITE DRAIN
OVHD,OH OVERHEAD
Pa PASCALES
P PIPE, POLE
PB PULL BOX
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PJF PREFORMED JOINT FILLER
PL PLATE
PLAS PLASTER
PLNJ PAPER AND LEAD NEOPRENE JACKET
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
PRELIM PRELIMINARY
PRESS PRESSURE
PRIM PRIMARY
PRV PRESSURE RELIEF VALVE
PS PULL SWITCH
PT POINT, POINT OF TANGENT
PTN PARTITION
PVC POINT OF VERTICAL CURVE, POLY VINYL CHLORIDE .
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENT PVMT PAVEMENT
QT QUARRY TILE
R RADIUS, RISER, RUBBER SHEATH
RA RETURN AIR
RAD RADIUS
RB RESILIENT VINYL BASE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN, ROAD
RECP RECEPTACLE
RED REDUCING
REINF REINFORCEMENT
REG REGULATOR, REGISTER
REQD REQUIRED
REV REVISION
RF ROOF, RETURN FAN
RHC REHEAT COIL
RI RUBBER INSULATED
RGS RIGID GALVANIZED STEEL
RL RAIN LEADER
RM ROOM
RPM REVOLUTIONS PER MINUTE
RVT RESILIENT VINYL TILE
S SECOND, SOUTH, SANITARY, SEWER, STRUCTURE
SAN SANITARY SEWER
SATC SUSPENDED ACOUSTICAL TILE CEILING
SCH SCHEDULE
SD SPLITTER DAMPER, STORM DRAIN
SE SOUTHEAST
SECT SECTION SERV SERVICE SF SILT FENCE
SG SUPPLY GRILLE
SH SHEET
SIM SIMILAR
1 PH SINGLE PHASE
SKCP SUSPENDED KEENE'S CEMENT PLASTER
SL SLOPE
SMH SANITARY MODULE
SP STATIC PRESSURE, SINGLE POLE
SPC SUSPENDED PLASTER CEILING
SPDT SINGLE POLE, DOUBLE THROW
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SQ SQUARE
SR SUPPLY REGISTER
SS SANITARY SEWER
ST STEAM, SINGLE THROW, STREET
STA STATION STD STANDARD
STL STEEL SUP SUPPORT
SUSP SUSPENDED
SV SHEET VINYL
SW SWITCH, SIDEWALK
SWBD SWITCHBOARD SWGR SWITCHGEART TILE,TOP,TANGENT
T&B TOP AND BOTTOM
TC TOP OF CURB
TEL TELEPHONE
TEMP TEMPERATURE, TEMPORARY
TERM TERMINAL
3/C THREE CONDUCTOR
3/P THREE POLE
3 WAY THREE WAY
TH TOTAL HEAD (PUMPS)
THRSLD THRESHOLD
TO TOP OF
TP TEST PIT
TR TOP REGISTER
TRANS TRANSITION
TS TOP OF STEEL, TOP OF STONE, TOP OF SLAB
TV TELEVISION
TW TOP OF WALL
TYP TYPICAL
UG UNDERGROUND
UCR UNDER COUNTER REFRIGERATOR
UGE UNDERGROUND ELECTRIC
UGT UNDERGROUND TELEPHONE
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
V VENT,VOLT,VALVE
VA VOLT AMPRE
VAC VACUUM
VCT VINYL COMPOSITION TILE
V ASB VINYL ASBESTOS
VC VARNISH CAMBRIC, VITRIFIED CLAY
VCP VITRIFIED CLAY PIPE
VENT VENTILATING
VERT VERTICAL
VEST VESTIBULE
VPI VERTICAL POINT OF INTERSECTION
VPOC VERTICAL POINT OF CURVE
VPOT VERTICAL POINT OF TANGENT
VS VENT STACK
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W WIDTH,WASTE,WATER,WATT,WEST
W WIRE, WATER LINE STRUCTURE
WA WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER CLOSET
WD WIDTH, WINDOW DIMENSION
WOM WALK OFF MATT
WL WATER LEVEL WP WATERPROOF, WEATHERPROOF
WS WASTE STACK, WATER SURFACE, WATERSTOP
WT WEIGHT
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
X-STR UNIT HEATER
2:1 SL 2 HORIZONTAL TO 1 VERTICAL SLOPE
1 ON 2 1 VERTICAL ON 2 HORIZONTAL SLOPE
DEFLECTION ANGLE
Ø DIAMETER, PHASE
STOP
ONE
WAY
STRAWBERRY
CACTUS
OCOTILLO
10"
E
TJBX
GP
GP
SH
SH
SH
SH
SH
SH
SH
M
STOP
ONE
WAY
STRAWBERRY
CACTUS
OCOTILLO
10"
E
TJBX
GP
GP
SH
SH
SH
SH
SH
SH
SH
M
CONTRACTOR STAGING AREA
APPROX LOCATION OF
ELEVATORS 1&2 AND
ELEVATORS 3&4
MAINTAIN ACCESS
FOR EMERGENCY
AND PARK VEHICLES
NOT FOR CONSTRUCTION
AS
BF
AS
G1.0
STAGING PLAN - ELEVATOR
SHAFT 1 & 2 REPAIR
STAGING AREAS
G1.0
NOT TO SCALE
VOLUME 2 DRAWING PACKAGE
CONTRACTOR STAGING / WORK AREA
GENERAL NOTES:
1. VEHICLE FUELING IS NOT ALLOWED IN THE PARK.
PROTOCOL FOR FUELING LARGE EQUIPMENT WILL NEED
TO COORDINATED WITH CONTRACTING OFFICER.
CONTRACTOR TO PROVIDE TEMPORARY 6'
HIGH CHAIN-LINK FENCE AT PERIMETER OF
STAGING AREA COORDINATE WITH
CONTRACTING OFFICER. CONTRACTOR TO
INSURE THAT FENCING IS TEMPORARILY
SECURED IN PLACE WITH SAND BAGS, ETC.
TO PREVENT IT FROM BEING BLOWN OVER,
COMPROMISED BY PARK VISITORS, ETC.
CONTRACTOR TO PROVIDE
TEMPORARY 6' HIGH CHAIN-
LINK FENCE AT PERIMETER
OF STAGING AREA
COORDINATE WITH
CONTRACTING OFFICER.
05/29/2006/19/20
5'-41_
1 _ 2
1 _ 2
1 _ 4
1 _ 4
3 _ 4
10'-11_ " 4'-2"
8"
10'-81_
8"8"101_
6'-71_
81_ "1'-6"
1 _ 2
1 _ 2
6'-61_
1 _ 2
1 _ 2
3 _ 4
1 _ 2
7'-11_ " 6'-01_
1'-61_
41'-03_
3'-10"
6'-71_
81_
E
D
6 7
ELEV.#1
ELEV.#2
ELEV.#3
ELEV.#4
RIDE OUT
LOBBY
EXISTING
SERVICE LOBBY
RIDE
IN
LOBBY
EXISTING
CAVE WALLS
EXISTING
CONC WALLS
CONTRACTOR STAGING / WORK AREA
GENERAL NOTES:
CONTRACTOR IS
RESPONSIBLE FOR
CONSTRUCTION ZONE
ACCESS AND EGRESS
CONTRACTOR TO PROVIDE
TEMPORARY CONSTRUCTION
PARTITION FOR SAFETY
CONTRACTOR STAGING /
WORK AREA
NOT FOR CONSTRUCTION
AS
BF
AS
KEY PLAN
VOLUME 2 DRAWING PACKAGE
G2.0
STAGING PLAN - ELEVATOR
SHAFT 1 & 2 REPAIR
ELEVATOR SHAFT STAGING AREA AT CAVE LEVEL
G2.0
1/4" = 1'-0"
78 5 05/29/20
1. CONTRACTOR TO VERIFY AN NPS CULTURAL RESOURCES
MONITOR WILL BEEN TO BE ON-SITE WHEN DEMOLITION
OCCURS AT CULTURAL RESOURCES, LIMITED TO DEMOLITION
AT EXISTING WALL PENETRATION FOR NEW ACCESS PANEL
AT CAVE LEVEL ELEVATOR SERVICE LOBBY ROOM L01 AND
THE ORIGINAL GUTTERS INSIDE ELEVATOR SHAFT.
115116117
STAIRST
AUDIO
PICK-UP
ELEV.#4
ELEV.#3
MECH.
ROOM
DO-RIGHT
ORIENTATION
ELEV.#1
ELEV.
#2
FIRST
AID
FIRST
AID
RESTROOM
DATA
CAVING
STORAGE
CAVING
STORAGE
ST.
CONTRACTOR NOTE:
1 ANTICIPATED WORK PLATFORM FOR ABATEMENT
AND COATING OF STEEL AT TOP AND BOTTOM OF
SHAFT IS EXISTING ELEVATOR CARS.
2 ANTICIPATED WORK PLATFORM FOR REMAINING
STEEL WORK IS NEW FALSE CAR. FOR EXISTING
STEEL BEAM AND RAIL REMOVAL AND NEW STEEL
BEAM INSTALLATION. FALSE CAR IS ANTICIPATED
WORK PLATFORM FOR NEW RAIL INSTALLATION
AS WELL.
3 CONTRACTOR SHALL INSTALL TEMPORARY NETTING
OR PLATFORM TO PREVENT ROCK SPOILS FROM
BEAM BRG POCKETS FROM FALLING DOWN SHAFT.
4 CONTRACTOR IS RESPONSIBLE FOR THE COST
OF ALL REPAIRS TO ELEVATOR MECHANICAL
EQUIPMENT THAT IS THE RESULT OF THE FAILURE
TO PROTECT THE EQUIPMENT DURING THE WORK.
5 VISITOR CENTER ELEVATION = +(1'-1")
FIRST FLOOR CONTRACTOR ACCESS
PROVIDE FULL CAR PROTECTION FOR ELEVATORS 1 AND 2
FOR PERSONNEL, TOOL AND EQUIPMENT TRANSPORT AS
DESCRIBED IN SECTION 01 50 00. ELEVATORS 1 & 2 MAY BE
USED FOR TRANSPORT OF SUPPLIES AND EQUIPMENT
FROM 7:30 TO 8:30 AM AND FROM 5:00 PM UNTIL FACILITY
CLOSING UNLESS OTHERWISE COORDINATED WITH THE
CONTRACTING OFFICER. CONTRACTOR PERSONNEL
TRANSPORT IS PERMITTED AT OTHER TIMES BUT NO
TOOLS OR EQUIPMENT CAN BE TRANSPORTED IN
ELEVATORS 3 & 4 BETWEEN 8:30 AM TO 5:00 PM.
CONTRACTOR TO PROVIDE
TEMPORARY CONSTRUCTION
PARTITION FOR SAFETY
CONTRACTOR STAGING /
WORK AREA
CONTRACTOR STAGING /
WORK AREA
THIS DOOR HAS 3'-11" X 6'-11"
CLEAR OPENING
THIS DOOR HAS 2'-11" X 6'-11"
CLEAR OPENING
CONTRACTOR IS RESPONSIBLE
FOR CONSTRUCTION ZONE
ACCESS AND EGRESS
CONTRACTOR IS
RESPONSIBLE FOR
CONSTRUCTION ZONE
ACCESS AND EGRESS
CONTRACTOR TO PROVIDE
TEMPORARY CONSTRUCTION
PARTITION FOR SAFETY
7' - 8"+-
4' - 0"
CONTRACTOR STAGING / WORK AREA
CONTRACTOR TRANSPORT OF SUPPLIES
AND EQUIPMENT AREA
06/19/20
AS
BF
AS
KEY PLAN
VOLUME 2 DRAWING PACKAGE
G3.0
STAGING PLAN - ELEVATOR
SHAFT 1 & 2 REPAIR
ELEVATOR SHAFT STAGING AREA AT VISITOR CENTER LEVEL
AREA DEPICTED FOR
ELEVATOR 1 & 2 AND 3 & 4
G3.0
1/4" = 1'-0"
VOLUME 2 DRAWING PACKAGE
ELEV SHAFT 1&2 REPAIR
S0.0
GENERAL NOTES
78 7
ELEV SHAFT 1&2 REPAIR
S0.01
ABBREVIATIONS AND KEYS
78 8
S0.1
ROOF PLANS
78 9
PLANS
S0.2
MECH ROOM
DETAILS
S0.3
SECTIONS &
78 11
& SECTIONS
S0.4
PIT PLANS
78 12
BEAM REINFORCEMENT
S0.5
SECTIONS
S0.6
ELEVATOR ROOM
S0.7
S0.8
CONTINUED
S0.9
PIT SECTIONS
ELEVATIONS
S1.0
EXISTING SHAFT
S1.1
78 19
S1.2
78 20
S1.3
S1.4
78 22
S1.5
S1.6
78 24
S1.7
S1.8
S1.9
78 27
S2.0
S2.1
78 29
S2.2
NEW SHAFT
78 30
S2.3
S2.4
78 32
S2.5
78 33
S2.6
78 34
S2.7
78 35
S2.8
78 36
S2.9
78 37
S3.0
78 38
S3.1
78 39
S3.2
78 40
S3.3
78 41
ELEV.#1
ELEV.#2
ELEV.#3
ELEV.#4
E
D
6 7
PARTIAL DEMO OF EXISTING WALL
FOR NEW ACCESS PANEL
CONTRACTOR TO FIELD VERIFY WALL
OPENING LOCATION AT ELEVATOR
SHAFT SIDE TO FIT IN EXISTING
LEDGE WIDTH AND THERE ARE NO
WALL ITEMS RELATED TO MEP AND
STRUCTURE BEFORE DEMOLITION
SERVICE
LOBBY
L01
REMOVE EXISTING DOOR
REMOVE EXISTING
ELEVATOR PIT LADDER
F
IE
L D
V E
R
IF
Y
'-1
/2
EXISTING LEDGE
L E
D G
E W
ID
T
H
E X
IS
T
IN
G
EXISTING STEEL ANGLE
AND TIE BACK BRACING
WALL OPENING TO CLEAR
STRUCTURAL ITEMS
GENERAL NOTES
1. DRAWINGS & SPECIFICATIONS ARE COMPLIMENTARY
COMPONENTS OF THE CONTRACT DOCUMENTS, REVIEW ALL
DRAWINGS AND SPECIFICATIONS FOR THE COMPLETE SCOPE
OF WORK. NOTIFY
CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS OR
OMISSIONS ARE DISCOVERED.
2. REFER TO DEMOLITION DRAWINGS, IF ANY , FOR WORK
REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE
ACCORDINGLY.
3. ALL DIMENSIONS ARE SHOWN TO FINISH FACE OF WALL
UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
COORDINATE WITH SPECIAL FINISHES.
4. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS
REQUIRED.
5. ALL FIRE PARTITIONS SHALL BE TIGHTLY SEALED TO THE
UNDERSIDE OF DECK.
6. PENETRATIONS IN FIRE RATED PARTITIONS FOR CONDUIT,
PIPING, CABLE TRAYS, DUCTWORK AND OTHER ITEMS
FORMING OPENINGS SHALL BE FIRE-SAFED PER SPEC
SECTION 07 84 00 REQUIREMENTS WITH APPROPRIATE
"UL- LISTED" ASSEMBLY.
7. SEE SHEETS AD.1, AD.2 FOR DEMOLITION PLANS.
8. SEE SHEETS A1.1, A1.2 FOR FLOOR PLANS.
9. SEE SHEETS A1.4, A1.5 FOR ROOF SYSTEM AND DETAILS.
10. SEE SHEET A2.1 FOR REFLECTED CEILING PLAN.
11. SEE SHEET A3.1 FOR WALL PARTITION TYPES, DETAIL.
12. SEE SHEET A3.2 FOR DOOR AND FRAME TYPES, DETAILS.
13. SEE SHEET A3.2 FOR ROOM FINISH SCHEDULE, DOOR AND
FRAME SCHEDULE.
14. SEE SHEET A3.3 FOR INTERIOR DETAILS.
NOT FOR CONSTRUCTION
AS
BF
AS
KEY PLAN
VOLUME 2 DRAWING PACKAGE
AD.1
DEMOLITION PLAN -
CAVE LEVEL
DEMOLITION PLAN - CAVE LEVEL
AD.1
1/4" = 1'-0"
78 42 05/29/20
CONTRACTING OFFICER IMMEDIATELY FOR
1. CONTRACTOR TO VERIFY AN NPS CULTURAL RESOURCES
MONITOR WILL BEEN TO BE ON-SITE WHEN DEMOLITION
OCCURS AT CULTURAL RESOURCES, LIMITED TO DEMOLITION
AT EXISTING WALL PENETRATION FOR NEW ACCESS PANEL
AT CAVE LEVEL ELEVATOR SERVICE LOBBY ROOM L01 AND
THE ORIGINAL GUTTERS INSIDE ELEVATOR SHAFT.
NOTES:
15. MAINTAIN 2 HOUR RATED ASSEMBLY AT ALL NEW AND
EXISTING WALLS AND FLOORS AT ELEVATOR MACHINE
ROOMS 301 & 302. PROVIDE CONTINUOUS 2 HOUR RATED
CONSTRUCTION THROUGH THE USE OF FIRESTOPPING PER
THE REQUIREMENTS OF SECTION 07 84 00 AT EXISTING OR
PROPOSED PENETRATIONS OR OPENINGS.
UP
E
D
REMOVE EXISTING DOOR
REMOVE EXISTING MACH ROOM
METAL CHECKERBOARD FLOOR
PLATES, STAIR AND SUPPORT
FRAMING; REFER TO STRUCTURAL
FOR ADDITIONAL INFORMATION
REMOVE EXISTING
DRAIN PIPE FROM ROOF
ABOVE TO INTERSTITIAL
SPACE BELOW
REMOVE PORTION OF EXISTING
CONCRETE FLOOR FOR NEW
DOOR INSTALLATION
STAIRS
ELEVATOR
MACHINE
ROOM -
ELEVATOR
1 & 2
4 1/2"
A3.2
Sim
A1.3
EXISTING ELEVATOR
EQUIPMENT TO BE REMOVED
E
D
ELEVATOR
MACHINE
ROOM -
ELEVATOR
3 & 4
REMOVE EXITING FLOOR HATCH
PLATFORM
REMOVE EXISTING HIGH WINDOW
EXISTING STRUCT X BRACING
TO REMAIN
REMOVE EXISTING DOOR
EXISTING DRAIN PIPE TO REMAIN
EXISTING DRAIN PIPE TO REMAIN
REMOVE EXISTING DOORS
REMOVE EXISTING ROOF DRAIN
REMOVE EXISTING ROOFING
AND STRUCTURE/SLAB FROM
PARAPET TOP TO CEILING BELOW
(PARAPET WALLS TO REMAIN
REFER TO ROOF DETAIL SHEET)
STAIRS
ELEVATOR
1 & 2 ROOF
LEVEL 4
- Following demolition of the roof assembly provide temporary protections at roof opening per spec section 02 41 00.3.2 requirements.
A1.3
ELEVATOR 1 & 2
MACHINE ROOM
(LEVEL 3)
ELEVATOR 1 & 2
ROOF (LEVEL 4)
LEVEL 1
3D - BUILDING LEVEL VIEW
ELEVATOR 1 & 2
INTERSTITIAL
SPACE (LEVEL 2)
ELEVATOR 3 & 4
MACHINE ROOM
(UPPER LEVEL 3)
ELEVATOR SHOP
(UPPER LEVEL 2)
NOT FOR CONSTRUCTION
AS
BF
AS
KEY PLAN
VOLUME 2 DRAWING PACKAGE
AD.2
DEMOLITION PLANS -
LEVEL 3 AND LEVEL 4
DEMOLITION PLAN - LEVEL 3 ELEVATOR 1 & 2 MACHINE ROOM DEMOLITION PLAN - LEVEL 4 ELEV. 1 & 2 ROOF / ELEV 3 & 4 MACHINE ROOM
AD.2
1/4" = 1'-0" AD.2
1/4" = 1'-0"
78 43 05/29/20
GENERAL NOTES
1. DRAWINGS & SPECIFICATIONS ARE COMPLIMENTARY
COMPONENTS OF THE CONTRACT DOCUMENTS, REVIEW ALL
DRAWINGS AND SPECIFICATIONS FOR THE COMPLETE SCOPE
OF WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY FOR
CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS OR
OMISSIONS ARE DISCOVERED.
2. REFER TO DEMOLITION DRAWINGS, IF ANY , FOR WORK
REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE
ACCORDINGLY.
3. ALL DIMENSIONS ARE SHOWN TO FINISH FACE OF WALL
UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
COORDINATE WITH SPECIAL FINISHES.
4. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS
REQUIRED.
5. ALL FIRE PARTITIONS SHALL BE TIGHTLY SEALED TO THE
UNDERSIDE OF DECK.
6. PENETRATIONS IN FIRE RATED PARTITIONS FOR CONDUIT,
PIPING, CABLE TRAYS, DUCTWORK AND OTHER ITEMS
FORMING OPENINGS SHALL BE FIRE-SAFED PER SPEC
SECTION 07 84 00 REQUIREMENTS WITH APPROPRIATE
"UL- LISTED" ASSEMBLY.
7. SEE SHEETS AD.1, AD.2 FOR DEMOLITION PLANS.
8. SEE SHEETS A1.1, A1.2 FOR FLOOR PLANS.
9. SEE SHEETS A1.4, A1.5 FOR ROOF SYSTEM AND DETAILS.
10. SEE SHEET A2.1 FOR REFLECTED CEILING PLAN.
11. SEE SHEET A3.1 FOR WALL PARTITION TYPES, DETAIL.
12. SEE SHEET A3.2 FOR DOOR AND FRAME TYPES, DETAILS.
13. SEE SHEET A3.2 FOR ROOM FINISH SCHEDULE, DOOR AND
FRAME SCHEDULE.
14. SEE SHEET A3.3 FOR INTERIOR DETAILS.
15. MAINTAIN 2 HOUR RATED ASSEMBLY AT ALL NEW AND
EXISTING WALLS AND FLOORS AT ELEVATOR MACHINE
ROOMS 301 & 302. PROVIDE CONTINUOUS 2 HOUR RATED
CONSTRUCTION THROUGH THE USE OF FIRESTOPPING PER
THE REQUIREMENTS OF SECTION 07 84 00 AT EXISTING OR
PROPOSED PENETRATIONS OR OPENINGS.
ELEV.#1
ELEV.#2
ELEV.#3
ELEV.#4
E
D
6 7
E
D
ELEVATOR SHAFT
STAIRS
ELEVATOR
1 & 2
INTERSTITIAL
SPACE
(LEVEL 2)
REPLACE EXISTING METAL PANEL
INFILL LOCATED BELOW THIS LEVEL
WITH AN 14GA STAINLESS STEEL PLATE
NAIL SET AND FIRE CAULKED IN PLACE
ELEVATOR 1 & 2
INTERSTITIAL
SPACE (LEVEL 2)
ELEVATOR 1 & 2
ROOF (LEVEL 4)
ELEVATOR 1 & 2
MACHINE ROOM
(LEVEL 3)
ELEVATOR 3 & 4
MACHINE ROOM
(UPPER LEVEL 3)
ELEVATOR SHOP
(UPPER LEVEL 2)LEVEL 1
3D - BUILDING LEVEL VIEW
SERVICE
LOBBY
L01
SERVICE
LOBBY
L02
NEW ACCESS PANEL
EXISTING LEDGE
EXISTING DOOR,
TYPICAL
L02
NEW DOOR
EXISTING DOOR, TYPICAL
NEW 7'-0" HIGH WIRE MESH PARTITION
FULL WIDTH OF OPENING
A3.3
A C
C E
S S
P A
N E
L
.5
"X .5
C U
S T
O M
NEW ELEVATOR PIT LADDERS
REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS
NEW CATWALK AT ELEVATOR PIT
REFER TO STRUCTURAL DRAWINGS
L01
A3.3
GENERAL NOTES
1. DRAWINGS & SPECIFICATIONS ARE COMPLIMENTARY
COMPONENTS OF THE CONTRACT DOCUMENTS, REVIEW ALL
DRAWINGS AND SPECIFICATIONS FOR THE COMPLETE SCOPE
OF WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY FOR
CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS OR
OMISSIONS ARE DISCOVERED.
2. REFER TO DEMOLITION DRAWINGS, IF ANY , FOR WORK
REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE
ACCORDINGLY.
3. ALL DIMENSIONS ARE SHOWN TO FINISH FACE OF WALL
UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
COORDINATE WITH SPECIAL FINISHES.
4. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS
REQUIRED.
5. ALL FIRE PARTITIONS SHALL BE TIGHTLY SEALED TO THE
UNDERSIDE OF DECK.
6. PENETRATIONS IN FIRE RATED PARTITIONS FOR CONDUIT,
PIPING, CABLE TRAYS, DUCTWORK AND OTHER ITEMS
FORMING OPENINGS SHALL BE FIRE-SAFED PER SPEC
SECTION 07 84 00 REQUIREMENTS WITH APPROPRIATE
"UL- LISTED" ASSEMBLY.
7. SEE SHEETS AD.1, AD.2 FOR DEMOLITION PLANS.
8. SEE SHEETS A1.1, A1.2 FOR FLOOR PLANS.
9. SEE SHEETS A1.4, A1.5 FOR ROOF SYSTEM AND DETAILS.
10. SEE SHEET A2.1 FOR REFLECTED CEILING PLAN.
11. SEE SHEET A3.1 FOR WALL PARTITION TYPES, DETAIL.
12. SEE SHEET A3.2 FOR DOOR AND FRAME TYPES, DETAILS.
13. SEE SHEET A3.2 FOR ROOM FINISH SCHEDULE, DOOR AND
FRAME SCHEDULE.
14. SEE SHEET A3.3 FOR INTERIOR DETAILS.
15. MAINTAIN 2 HOUR RATED ASSEMBLY AT ALL NEW AND
EXISTING WALLS AND FLOORS AT ELEVATOR MACHINE
ROOMS 301 & 302. PROVIDE CONTINUOUS 2 HOUR RATED
CONSTRUCTION THROUGH THE USE OF FIRESTOPPING PER
THE REQUIREMENTS OF SECTION 07 84 00 AT EXISTING OR
PROPOSED PENETRATIONS OR OPENINGS.
05/29/20
NOT FOR CONSTRUCTION
AS
BF
AS
KEY PLAN
VOLUME 2 DRAWING PACKAGE
A1.1
FLOOR PLANS - CAVE LEVEL
AND LEVEL 2
FLOOR PLAN - LEVEL 2 ELEVATOR 1 & 2 INTERSTITIAL SPACE
FLOOR PLAN - CAVE LEVEL
A1.1
1/4" = 1'-0"
A1.1
1/4" = 1'-0"
44 06/19/20
E
D
1' - 6"
NEW GUARD RAIL SEE
DETAIL 5/A3.3
NEW RATED DOOR
NEW INFILL RAISED
CONCRETE FLOOR
LEVEL WITH ADJACENT
FLOOR
NEW DRAIN PIPE
FROM ROOF ABOVE
RE: PLUMBING
NEW 2 HOUR FURRING
WALLS AROUND PIPE EXISTING CONCRETE FLOOR
NEW CONCRETE STAIR
ELEVATOR
MACHINE
ROOM -
ELEVATOR
1 & 2
6'-0"X6'-0" ROOF HATCH
ABOVE, TYPICAL OF 2
NEW ELEVATOR
EQUIPMENT, TYPICAL
A2
A
A3.3
1' - 6"
1' - 0"
A1.3
1/
2"
3 1/2" +-
INSIDE FACE OF SHAFT
WALL TO ALIGN WITH
ROOF DECK/SLAB
OPENING, TYPICAL
1'
1' - 0"
ELEVATOR SHAFT
BELOW
4"
2"
4"
1' - 0" 11" 11" 1' - 0"
NEW 1 1/2" OUTSIDE DIAMETER
STEEL PIPE HANDRAIL WITH
STEEL BRACKETS TO EXISTING
WALL PAINT TYP. HANDRAIL
HEIGHT 2'-10" TO TOP OF RAIL
2"
E
D
NEW ROOF DRAIN
ELEVATOR
1 & 2 ROOF
LEVEL 4
NEW ROOF HATCH,
TYPICAL OF 2
NEW DOORS
NEW 8" HIGH CURB AT DOOR
NEW 2 HOUR RATED PARTITION
INFILL WALL AT EXISTING WINDOW
NEW 2 HOUR RATED FURRING
WALL BETWEEN COLUMNS
AND AROUND PIPE
EXISTING STRUCT X BRACING
TO REMAIN
NEW RATED DOOR
NEW RATED FLOOR HATCH
EXISTING DRAIN PIPE TO REMAIN
NEW 2 HOUR FURRING SHAFT
WALLS AROUND PIPE
ELEVATOR
MACHINE
ROOM -
ELEVATOR
3 & 4
EXISTING DRAIN PIPE TO REMAIN
NEW DRAIN PIPE FROM
NEW PIPE PAN ABOVE
NEW RATED HORIZONTAL
SHAFT WALLS ABOVE
STAIRWAY
A1.5
INTERIOR HATCH:
PROVIDE 5'-0" X 5'-0" HATCH
WITHOUT INSULATION, 90 MINS
RATED PREFINISHED STEEL
CONSTRUCTION; SIMILAR TO
DETAIL 3/A1.5, FIELD VERIFY
SLAB OPENING SIZE
EXISTING PLATFORM
A1.4
SIM
B2
6' - 0" 2' - 0"
6'
(F R
A M
E O
P E
N
IN
G
6'
6' - 0"
EXISTING ELECTRICAL PANEL
EXTEND SHAFT WALL LINER
PANEL TO EXISTING WALL
EXTEND SHAFT WALL TO FACE OF
COLUMN WITH FIRE SEALANT
2"
(frame opening, field verify)
5' - 0"
(f ra m e op en in g, fi el d ve rif y)
5'
PROVIDE FIRE SEALANT AT ALL
PIPE / CONDUIT PENETRATIONS
OF SHAFT WALLS
A
A2
A
A2
A
A2 A2
2"
2"
SCUPPER, SET BOTTOM
OF SCUPPER OPENING
AT 2" ABOVE ROOF
DRAIN ELEVATION
CRICKET, VALLEY SLOPE
AT 1/8"=1'-0" PER FOOT MIN.
A1.4
SIM .
A1.4
SIM .
A1.4
SIM .
A1.4
1ROOF
SYSTEM
A1.3
2'
7' - 0"
30.00°
1/ 4"
P E
R F
O O
T S
LO
P
E M
IN
M
IN
2" .
1/ 4"
P E
R F
O O
T S
LO
P
E M
IN
. T
Y P
CRICKET, VALLEY
SLOPE AT 1/8"=1'-0"
PER FOOT MIN.
REFER TO REFLECTED
CEILING PLAN FOR AREA OF
SEMI-RIGID INSULATION
BELOW FLOOR SLAB
1/2" per foot
.SLOPE.SLOPE
..SLOPE..SLOPE
1/2" per foot
1/2" per foot
GUARDRAIL AT 3 SIDES
OF ROOF REFER TO
ROOF SECTION SHEET
ELEVATOR 1 & 2
INTERSTITIAL
SPACE (LEVEL 2)
ELEVATOR 1 & 2
ROOF (LEVEL 4)
ELEVATOR 1 & 2
MACHINE ROOM
(LEVEL 3)
ELEVATOR 3 & 4
MACHINE ROOM
(UPPER LEVEL 3)
ELEVATOR SHOP
(UPPER LEVEL 2)LEVEL 1
3D - BUILDING LEVEL VIEW
05/29/20
NOT FOR CONSTRUCTION
AS
BF
AS
KEY PLAN
VOLUME 2 DRAWING PACKAGE
A1.2
FLOOR PLANS - LEVEL 3 AND
LEVEL 4
FLOOR PLAN - LEVEL 3 ELEVATOR 1 & 2 MACHINE ROOM FLOOR PLAN - LEVEL 4 ELEVATOR 1 & 2 ROOF / ELEVATOR 3 & 4 MACHINE ROOM A1.2
1/4" = 1'-0" A1.2
1/4" = 1'-0"
GENERAL NOTES
1. DRAWINGS & SPECIFICATIONS ARE COMPLIMENTARY
COMPONENTS OF THE CONTRACT DOCUMENTS, REVIEW ALL
DRAWINGS AND SPECIFICATIONS FOR THE COMPLETE SCOPE
OF WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY FOR
CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS OR
OMISSIONS ARE DISCOVERED.
2. REFER TO DEMOLITION DRAWINGS, IF ANY , FOR WORK
REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE
ACCORDINGLY.
3. ALL DIMENSIONS ARE SHOWN TO FINISH FACE OF WALL
UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
COORDINATE WITH SPECIAL FINISHES.
4. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS
REQUIRED.
5. ALL FIRE PARTITIONS SHALL BE TIGHTLY SEALED TO THE
UNDERSIDE OF DECK.
6. PENETRATIONS IN FIRE RATED PARTITIONS FOR CONDUIT,
PIPING, CABLE TRAYS, DUCTWORK AND OTHER ITEMS
FORMING OPENINGS SHALL BE FIRE-SAFED PER SPEC
SECTION 07 84 00 REQUIREMENTS WITH APPROPRIATE
"UL- LISTED" ASSEMBLY.
7. SEE SHEETS AD.1, AD.2 FOR DEMOLITION PLANS.
8. SEE SHEETS A1.1, A1.2 FOR FLOOR PLANS.
9. SEE SHEETS A1.4, A1.5 FOR ROOF SYSTEM AND DETAILS.
10. SEE SHEET A2.1 FOR REFLECTED CEILING PLAN.
11. SEE SHEET A3.1 FOR WALL PARTITION TYPES, DETAIL.
12. SEE SHEET A3.2 FOR DOOR AND FRAME TYPES, DETAILS.
13. SEE SHEET A3.2 FOR ROOM FINISH SCHEDULE, DOOR AND
FRAME SCHEDULE.
14. SEE SHEET A3.3 FOR INTERIOR DETAILS.
15. MAINTAIN 2 HOUR RATED ASSEMBLY AT ALL NEW AND
EXISTING WALLS AND FLOORS AT ELEVATOR MACHINE
ROOMS 301 & 302. PROVIDE CONTINUOUS 2 HOUR RATED
CONSTRUCTION THROUGH THE USE OF FIRESTOPPING PER
THE REQUIREMENTS OF SECTION 07 84 00 AT EXISTING OR
PROPOSED PENETRATIONS OR OPENINGS.
45 06/19/20
21' - 0"
LEVEL 03
31' - 0"
LEVEL 04
EXISTING
EXISTING
A1.3
EXISTING STUCCO
PARAPET WALL
NEW 2 HOUR RATED
FURRING WALL
ROOF DRAIN
EXISTING STUCCO
PARAPET WALL BEYOND
EXISTING STUCCO
PARAPET WALL
A1.4
SIM
A1.4
SIM
7' - 0"
3'
1"
M
IN
1'
1"
B A
S E
O N
F
LO
O R
T O
F
LO
O R
H E
IG
H
T
0' -2
6'
0"
. M
IN
E X
IS
T
IN
G
NEW ROOF ON ROOF
STRUCTURE (NON-RATED
CONSTRUCTION)
4" SEMI-RIGID INSULATION
PIN TO DECK ABOVE
MEMBRANE ROOF
STEEL BEAM REFER TO
STRUCTURAL DRAWINGS
WALL SCUPPER
EXISTING
STUCCO WALL
1 1/2" DIA. STAINLESS
STEEL PIPE GUARDRAIL
CONNECT NEW DRAIN PIPE
FROM ROOF TO EXISTING
DRAIN PIPE REFER TO
MECHANICAL DRAWINGS
ROOF DRAIN PIPE DOWN TO
FLOOR BELOW REFER TO
MECHANICAL DRAWINGS
NEW ROOF MEMBRANE
FLASHING
1 3/4" DIA. STAINLESS
STEEL PIPE SLEEVE
WITH BRACKET
ELEVATOR
MACHINE
ROOM -
ELEVATOR
1 & 2
3 1/2" EQUAL EQUAL EQUAL, 3'-0" MAX TYP EQUAL 3 1/2"3 1/2"
to to p of g ua rd ra il
3'
M
IN
ROOF LINE BEYOND
ROOF HATCH
M
IN
8"
A1.5
A3.2
Sim
A1.4
SIM
ELEVATOR 1 & 2
INTERSTITIAL SPACE
(LEVEL 2)
NEW CONCRETE RAISED FLOOR
TO ALIGN WITH EXISTING
CONCRETE FLOOR BEYOND
(2 HOUR RATED CONSTRUCTION)
NEW CONCRETE STAIR AND RAISED
FLOOR (2 HOUR RATED CONSTRUCTION)
1'
2" SEMI-RIGID INSULATION
PIN TO DECK ABOVE
GUARDRAIL,
REFER TO PLAN
ALUMINUM THRESHOLD
HOLLOW METAL DOOR
AS SCHEDULED
CONCRETE CURB
A3.2
Sim
A3.2
SIM
A3.3
Sim
A1.3
E X
IS
T
IN
G
F
LO
O R
T O
F
LO
O R
H E
IG
H
T
0-
2"
; C O
N T
R A
C T
O R
T O
V E
R
IF
Y
INSULATION, REFER TO
MECHANICAL DRAWINGS
E
A1.3
31' - 0"
LEVEL 04
NEW ROOF ON ROOF STRUCTURE,
RE: STRUCTURAL DRAWINGS
EXISTING STUCCO
PARAPET WALL
4" SEMI-RIGID INSULATION
PIN TO DECK ABOVE
at r oo f h ig he st p oi nt
3' -6
M
IN
T
O T
O P
O F
G U
A R
D R
A
IL
to p of c ov er b oa rd 5"6"
5"
MEMBRANE ROOF
ROOF DRAIN
STEEL BEAM REFER TO
STRUCTURAL DRAWINGS
2"
SCUPPER BEYOND AT WALL,
BOTTOM OF SCUPPER OPENING
AT 2" ABOVE ROOF DRAIN INLET
EXISTING STUCCO
PARAPET WALL BEYOND
EXISTING STUCCO
PARAPET WALL
A1.4
SIM
A1.4
SIM
A1.4
SIM
A1.4
SIM
1'
(REFER TO REFLECTED CEILING PLAN)
17' - 0" WALL TO FACE OF SEMI-RIGID INSULATION
3 1/2" EQUAL EQUAL EQUAL EQUAL, 3'-0" MAX TYP EQUAL EQUAL EQUAL 3 1/2"
1 1/2" DIA. STAINLESS
STEEL PIPE GUARDRAIL
2 HOUR RATED FURRING
WALL REFER TO PLAN
ROOF DRAIN PIPE DOWN TO
FLOOR BELOW REFER TO
MECHANICAL DRAWINGS
NEW ROOF MEMBRANE FLASHING
ELEVATOR
MACHINE
ROOM -
ELEVATOR
1 & 2
EXISTING
A1.3
1 1/2" DIA. STAINLESS
STEEL PIPE GUARDRAIL
1 3/4" DIA. STAINLESS
STEEL PIPE SLEEVE WITH
1/2" THICK X 1 3/4" WIDE
BRACKET WELD TYPICAL
1/2" THICK X 2 1/2" WIDE
STAINLESS STEEL FLAT
BAR BRACKET
1/2" THICK X 2 1/2" WIDE
STAINLESS STEEL FLAT
BAR BRACKET CONTINUE
AT CENTER OF PLATE
WELD TO PLATE
1/2" THICK X 4" WIDE X 4" HIGH
STAINLESS STEEL PLATE AT
CENTER OF BRACKET
1/2" STAINLESS STEEL
EXPANSION ANCHOR CENTER
BETWEEN PLATE EDGE AND
BRACKET, 2 AT EACH PLATE
1'
8"
GENERAL NOTES
1. DRAWINGS & SPECIFICATIONS ARE COMPLIMENTARY
COMPONENTS OF THE CONTRACT DOCUMENTS, REVIEW ALL
DRAWINGS AND SPECIFICATIONS FOR THE COMPLETE SCOPE
OF WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY FOR
CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS OR
OMISSIONS ARE DISCOVERED.
2. REFER TO DEMOLITION DRAWINGS, IF ANY , FOR WORK
REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE
ACCORDINGLY.
3. ALL DIMENSIONS ARE SHOWN TO FINISH FACE OF WALL
UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
COORDINATE WITH SPECIAL FINISHES.
4. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS
REQUIRED.
5. ALL FIRE PARTITIONS SHALL BE TIGHTLY SEALED TO THE
UNDERSIDE OF DECK.
6. PENETRATIONS IN FIRE RATED PARTITIONS FOR CONDUIT,
PIPING, CABLE TRAYS, DUCTWORK AND OTHER ITEMS
FORMING OPENINGS SHALL BE FIRE-SAFED PER SPEC
SECTION 07 84 00 REQUIREMENTS WITH APPROPRIATE
"UL- LISTED" ASSEMBLY.
7. SEE SHEETS AD.1, AD.2 FOR DEMOLITION PLANS.
8. SEE SHEETS A1.1, A1.2 FOR FLOOR PLANS.
9. SEE SHEETS A1.4, A1.5 FOR ROOF SYSTEM AND DETAILS.
10. SEE SHEET A2.1 FOR REFLECTED CEILING PLAN.
11. SEE SHEET A3.1 FOR WALL PARTITION TYPES, DETAIL.
12. SEE SHEET A3.2 FOR DOOR AND FRAME TYPES, DETAILS.
13. SEE SHEET A3.2 FOR ROOM FINISH SCHEDULE, DOOR AND
FRAME SCHEDULE.
14. SEE SHEET A3.3 FOR INTERIOR DETAILS.
15. MAINTAIN 2 HOUR RATED ASSEMBLY AT ALL NEW AND
EXISTING WALLS AND FLOORS AT ELEVATOR MACHINE
ROOMS 301 & 302. PROVIDE CONTINUOUS 2 HOUR RATED
CONSTRUCTION THROUGH THE USE OF FIRESTOPPING PER
THE REQUIREMENTS OF SECTION 07 84 00 AT EXISTING OR
PROPOSED PENETRATIONS OR OPENINGS.
06/19/20
AS
BF
AS
VOLUME 2 DRAWING PACKAGE
A1.3
ROOF WALL SECTIONS OVER
MACHINE ROOM 1 & 2
WALL SECTION - EAST / WEST
WALL SECTION - NORTH / SOUTH
A1.3
1/2" = 1'-0"
A1.3
1/2" = 1'-0"
A1.3
NOT TO SCALE
GUARDRAIL BRACKET ASSEMBLY
MULTI-PIECE ADJUSTABLE
THRESHOLD WITH NON-SLIP
EPOXY ABRASIVE BONDED INTO
GROOVES - SET IN SEALANT BED
NEW DOOR
NEW ROOFING MEMBRANE AND
MEMBRANE FLASHING
NEW DOOR FRAME BEYOND
2" MIN RIGID INSULATION
EXTERIOR SHEATHING
EXISTING WALL
STEEL CHANNEL OR
BENT PLATE SUPPORT
ALIGN, TYPICAL
FLEXIBLE MEMBRANE LAP WITH
ROOF MEMBRANE FLASHING
FLEXIBLE MEMBRANE
"Z" CLIP
NEW CONCRETE CURB
8" C
U R
B
NEW ROOF STRUCTURE,
REFER TO STRUCTURAL
DRAWINGS
BACKER ROD AND SEALANT, TYP
NEW STUCCO FINISH
TO MATCH EXISTING
METAL FLASHING BEYOND
STEEL ANGLE SUPPORT
5"
EXTEND ROOF MEMBRANE FLASHING
UP AND ON TOP OF CURB
5"
3".
8" M
IN
F
LA
S
H
IN
G
REMOVE PORTION
OF EXISTING WALL
AT DOOR LOCATION
FOR NEW ROOF
INSTALLATION
R E
F E
R T
O R
O O
F S
E C
T
IO
N S
STEEL DOWEL
WITH EPOXY @ 6"
O.C. ANCHORED
INTO EXISTING
SLAB CONNECT
TO NEW CURB
VAPOR BARRIER
4" 4"
SLOTTED DOME CAST IRON DRAIN ASSEMBLY
MEMBRANE ROOFING
CONCRETE SLAB ON METAL DECK
REFER TO STRUCTURAL DRAWINGS
CLAMPING RING
NOTES:
1. CLAMPING RING MUST PROVIDE
CONSTANT COMPRESSION ON
WATER CUT-OFF MASTIC
2. ROOF MEMBRANE TO EXTEND MIN.
OF 1/2" FROM CLAMPING RING
TOWARD DRAIN
2" M
IN
PREMANUFACURED TAPERED INSULATION
SUMP OR TAPERED ROOFING INSULATION AT
DRAIN
4" MIN. SEMI-RIGID INSULATION REFER TO
DETAIL 1/2.1 FOR ADDITIONAL INFORMATION
ROUND HOLE CUT IN MEMBRANE AT DRAIN
SHOULD EXTEND PAST CLAMPING RING A MIN.
1" HOLE IN MEMBRANE TO BE LARGER THAN
DIAMETER OF PIPE
COMPATIBLE SEALANT/WATER CUT-OFF MASTIC
BETWEEN DRAIN BOWL FLANGE AND ROOF
MEMBRANE WHERE CLAMPING RING
COMPRESSES
VAPOR BARRIER, FLASHED AND SEALED TO
DRAIN BODY (TYPICAL)
4"
4"
GROUT DAM
TPO ROOFING MEMBRANE
5/8" DENSDECK PRIMED OR EQUAL
COVERBOARD - ADHERED (TYPICAL)
POLYISOCYANURATE INSULATION BOARD
(MIN. AVERAGE R-30), ADHERED. PROVIDE
TAPERED INSULATION BOARD AS REQUIRED TO
MAINTAIN A MIN. 1/4" PER 1'-0 SLOPE TO DRAIN
AT ALL LOCATIONS (TYPICAL)
CONCRETE DECK
ROOF AIR/VAPOR BARRIER (TYPICAL)
NOTES:
1. VAPOR BARRIER TO BE PART OF THE OVERALL TESTED ROOFING ASSEMBLY (TYPICAL).
2. VAPOR BARRIER TO BE FLASHED AND SEALED TO ALL PENETRATIONS, DRAINS, CURBS, ADJACENT WALLS, ETC. (TYPICAL).
NEW ROOFING MEMBRANE
AND MEMBRANE FLASHING
NEW EXTERIOR SHEATHING (ALIGN WITH
WALL ABOVE) ON FLEXIBLE MEMBRANE
OVER CONTINUOUS MOISTURE TREATED
WOOD BLOCKING (FIELD VERIFY THE
DEPTH OF DEMOLITION)
EXISTING WALL
NEW ROOF ON ROOF STRUCTURE,
RE: STRUCTURAL DRAWINGS
TERMINATION BAR
EXISTING STUCCO PARAPET WALL
EXISTING TERMINATION
BAR TO BE REMOVED
EXISTING STUCCO WALL
FINISH TO BE REMOVED TO
FACE OF MASONRY UNITS
NEW ROOF MEMBRANE FLASHING
EXTEND UP TO TOP OF SHEATHING
EXISTING ROOFING
MEMBRANE, MEMBRANE
FLASHING AND SHEATHING
SUPPORT TO BE REMOVED
TO FACE OF MASONRY UNITS
4"
F
LA
S H
IN
G
3"
CONTINUOUS BEAD OF WATERBLOCK
SEALANT
SURFACE REGLET FLASHING,
1/
2"
NEW STUCCO FINISH TO ALIGN
AND MATCH EXISTING
METAL FLASHING AND COUNTER FLASHING
NEW FLEXIBLE MEMBRANE
FLASHING TIE INTO EXISTING AIR
AND MOISTURE BARRIER, TYPICAL
NEW FLEXIBLE MEMBRANE LAP
WITH ROOF VAPOR BARRIER
LAP FLEXIBLE MEMBRANE
WITH METAL FLASHING, TOP
AND BOTTOM OF FLASHING
SEALANT
D E
M O
LI
T
IO
N
7"
NEW FLEXIBLE MEMBRANE
FLASHING TIE INTO EXISTING
AIR AND MOISTURE BARRIER
LAP ROOF MEMBRANE OVER
FLEXIBLE MEMBRANE
PRESSURE-SENSITIVE
ELASTOFORM FLASHING
WATER CUT-OFF MASTIC
GALVANIZED SHEET
METAL SCUPPER
ROOF MEMBRANE
WALL LINE BEYOND
LAP SEALANT
STRUCTURAL DECK
MEMBRANE FLASHING
SLOPE
METAL FLASHING WITH DRIP
NEW STUCCO FINISH TO
ALIGN AND MATCH EXISTING
METAL FLASHING WITH DRIP
3/4" MOISTURE TREATED
PLYWOOD (4 SIDES)
T.O. COMP. DECK
VARIES
T.O. EXST. WALL
CONTINUOUS AIR VAPOR
BARRIER RE: ROOF SYSTEM
2"
EXISTING STUCCO
PARAPET WALL
FLEXIBLE MEMBRANE
2"2"
SCUPPER SIDE METAL FLASHING
REMOVE EXISTING MASONRY
UNITS TO NEAREST FULL MASONRY
UNITS, TYPICAL AT TOP AND
BOTTOM OF SCUPPER OPENING
EXISTING STUCCO WALL
LAP ROOF AIR VAPOR BARRIER
OVER FLEXIBLE MEMBRANE
METAL SILL TRIM
SEALANT
CONTINUOUS MOISTURE TREATED
WOOD BLOCKING AROUND SCUPPER.
MOISTURE TREATED TO BE ALL SIDES
OF BLOCKING (INCLUDING CUT SIDES)
4"
A1.4
SIM
MOISTURE TREATED
WOOD BLOCKING
NEW FLEXIBLE MEMBRANE
FLASHING TIE INTO EXISTING
AIR AND MOISTURE BARRIER
PROVIDE POSITIVE
DRAINAGE @ SCUPPER
06/19/20
AS
BF
AS
VOLUME 2 DRAWING PACKAGE
A1.4
ROOF SYSTEM AND DETAILS
ROOF SECTION DETAIL AT EXISTING DOOR SILL ROOF DRAIN @ CONC ROOF
ROOFING SECTION @ CONCRETE DECK
ROOF SECTION DETAIL AT ROOF / WALL
ROOF SECTION DETAIL AT SCUPPER
A1.4
1 1/2" = 1'-0"
A1.4
3" = 1'-0"
A1.4
3" = 1'-0" A1.4
3" = 1'-0" A1.4
3" = 1'-0"
6'-0" X 6'-0" CUSTOM ROOF DOUBLE LEAF
INSULATED ACCESS HATCH
DESIGN BASE - BILCO HATCH TYPE D-50T
HATCH SPRING, TYPICAL
STAINLESS STEEL HINGE
HATCH CURB INTEGRAL
ALUMINUM CAP FLASHING
CORNERS FULLY WELDED
INSULATED PREFINISHED
ALUMINUM HATCH COVER
HATCH CURB BY HATCH
MANUFACTURER
2" HATCH CURB INSULATION
BY HATCH MANUFACTURER
2" HATCH COVER INSULATION
BY HATCH MANUFACTURER
ALUMINUM COVER LINER
AUTOMATIC HOLD OPEN
ARM WITH RED VINYL GRIP
AND COVER RELEASE
ARM GUIDE BRACKET
EPDM GASKET
LOCK STRIKE
SLAM LATCH (2 POINT) WITH
INSIDE AND OUTSIDE HANDLES
WITH PADLOCK HASPS
LIFTING MECHANISM WITH
REINFORCED COMPOSITE
TUBES AND ELECTROCOATED
COMPRESSION SPRINGS
3'-0". 3'-0".
6'-0" FRAME OPENING
HATCH SHALL BE FULLY ACCESSIBLE
WHEN OPENED, NO CENTRAL BEAM
AT MID HATCH OPENING
A1.5
SIM .
NEOPRENE GASKET
6'-0" X 6'-0" CUSTOM ROOF DOUBLE LEAF
INSULATED ACCESS HATCH
DESIGN BASE - BILCO HATCH TYPE D-50T
FRAME OPENING
6'-0".
F R
A M
E O
P E
N
IN
G
6' -0
3'-0". 3'-0".
HATCH SPRING, TYPICAL
HATCH HINGE, TYPICAL
HATCH HANDLE
HATCH CURB INTEGRAL
ALUMINUM CAP FLASHING
BY HATCH MANUFACTURER
INSULATED ALUMINUM
HATCH COVER
HATCH CURB BY HATCH
MANUFACTURER
6'-0".
NEW ROOFING MEMBRANE AND
MEMBRANE FLASHING
NEW ROOF RE: ROOF SYSTEM
STEEL CHANNEL OR BENT PLATE
SUPPORT (ALL AROUND HATCH)
NEW ROOF ON ROOF STRUCTURE,
RE: STRUCTURAL DRAWINGS
SEALANT ALL AROUND
EXTEND ROOF MEMBRANE
FLASHING UNDER AND SEAL TIGHT
AT HATCH CURB CAP FLASHING
ALIGN CHANNEL OR BENT PLATE
WITH HATCH FRAME OPENING
8" M
IN
ROOF HATCH ON CHANNEL
OR BENT PLATE SUPPORT
INSULATED ALUMINUM
HATCH COVER
HATCH CURB INSULATION
06/19/20
AS
BF
AS
VOLUME 2 DRAWING PACKAGE
A1.5
ROOF DETAILS
ROOF HATCH SECTION DETAIL
ROOF HATCH PLAN AND ELEVATION
ROOF SECTION DETAIL AT HATCH CURB
A1.5
NOT TO SCALE
A1.5
NOT TO SCALEA1.5
3" = 1'-0"
E
PROVIDE NEW
2 HOUR RATED
HORIZONTAL
SHAFT WALLS
AROUND PIPE
EXISTING DRAIN
PIPE TO REMAIN
EXISTING PIPE
AT CEILING
STAIRS
ELEVATOR
MACHINE
ROOM -
ELEVATOR 3 & 4
ELEVATOR
MACHINE
ROOM -
ELEVATOR 1 & 2
PROVIDE DRAIN
PAN UNDER PIPE
PROVIDE PAN DRAIN
PIPE OVERFLOW
EXISTING DRAIN PIPE
ROOF OPENING AND
HATCH, TYPICAL OF 2
A3.3
PIPE END CLEANOUTS
PROVIDE FIRE RATED
ACCESS PANEL
MID-PIPE CLEANOUTS
PROVIDE FIRE RATED
ACCESS PANEL
EXTENT OF 2" SEMI-
RIGID INSULATION
PIN TO DECK ABOVE
NEW ROOF DRAIN
PIPE PENETRATION
AT NEW ROOF
EXTENT OF 4" SEMI-
RIGID INSULATION
PIN TO DECK ABOVE
7' - 0"
ELEVATOR 1 & 2
MACHINE ROOM
(LEVEL 3)
ELEVATOR 1 & 2
ROOF (LEVEL 4)
LEVEL 1
3D - BUILDING LEVEL VIEW
ELEVATOR 1 & 2
INTERSTITIAL
SPACE (LEVEL 2)
ELEVATOR 3 & 4
MACHINE ROOM
(UPPER LEVEL 3)
ELEVATOR SHOP
(UPPER LEVEL 2)
NOT FOR CONSTRUCTION
AS
BF
AS
KEY PLAN
VOLUME 2 DRAWING PACKAGE
A2.1
REFLECTED CEILING PLAN -
LEVEL 3
REFLECTED CEILING PLAN - LEVEL 3 ELEVATOR 1, 2, 3, & 4 MACHINE ROOM
A2.1
1/4" = 1'-0"
78 49 05/29/20
GENERAL NOTES
1. DRAWINGS & SPECIFICATIONS ARE COMPLIMENTARY
COMPONENTS OF THE CONTRACT DOCUMENTS, REVIEW ALL
DRAWINGS AND SPECIFICATIONS FOR THE COMPLETE SCOPE
OF WORK. NOTIFY CONTRACTING OFFICER IMMEDIATELY FOR
CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS OR
OMISSIONS ARE DISCOVERED.
2. REFER TO DEMOLITION DRAWINGS, IF ANY , FOR WORK
REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE
ACCORDINGLY.
3. ALL DIMENSIONS ARE SHOWN TO FINISH FACE OF WALL
UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
COORDINATE WITH SPECIAL FINISHES.
4. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS
REQUIRED.
5. ALL FIRE PARTITIONS SHALL BE TIGHTLY SEALED TO THE
UNDERSIDE OF DECK.
6. PENETRATIONS IN FIRE RATED PARTITIONS FOR CONDUIT,
PIPING, CABLE TRAYS, DUCTWORK AND OTHER ITEMS
FORMING OPENINGS SHALL BE FIRE-SAFED PER SPEC
SECTION 07 84 00 REQUIREMENTS WITH APPROPRIATE
"UL- LISTED" ASSEMBLY.
7. SEE SHEETS AD.1, AD.2 FOR DEMOLITION PLANS.
8. SEE SHEETS A1.1, A1.2 FOR FLOOR PLANS.
9. SEE SHEETS A1.4, A1.5 FOR ROOF SYSTEM AND DETAILS.
10. SEE SHEET A2.1 FOR REFLECTED CEILING PLAN.
11. SEE SHEET A3.1 FOR WALL PARTITION TYPES, DETAIL.
12. SEE SHEET A3.2 FOR DOOR AND FRAME TYPES, DETAILS.
13. SEE SHEET A3.2 FOR ROOM FINISH SCHEDULE, DOOR AND
FRAME SCHEDULE.
14. SEE SHEET A3.3 FOR INTERIOR DETAILS.
15. MAINTAIN 2 HOUR RATED ASSEMBLY AT ALL NEW AND
EXISTING WALLS AND FLOORS AT ELEVATOR MACHINE
ROOMS 301 & 302. PROVIDE CONTINUOUS 2 HOUR RATED
CONSTRUCTION THROUGH THE USE OF FIRESTOPPING PER
THE REQUIREMENTS OF SECTION 07 84 00 AT EXISTING OR
PROPOSED PENETRATIONS OR OPENINGS.
LINE OF STRUCTURE
ABOVE
2 1/2" C-H SHAFT
WALL STUD
5/8"5/8" 1 1/2" 1"
3 3/4"
A3.1
SIM
09 29 00
5/8" GWB 2 LAYERS
07 92 16
SEALANT
07 92 16
SEALANT
09 29 00
1" SHAFTWALL
LINER PANEL
09 29 00
SOUND
ATTENUATION
BAT (SAB)
LINE OF EXISTING
WALL OPENING
09 29 00
5/8" GWB 2 LAYERS
07 92 16
SEALANT BOTH SIDES
07 92 16
SEALANT BOTH SIDES
09 29 00
SOUND ATTENUATION
BATTS (SAB)
09 22 16
METAL STUDS
STAGGERED
09 29 00
5/8" GWB 2 LAYERS
A3.1
SIM
LINE OF EXISTING
WALL OPENING
WALL PLASTER FINISH
AND TEXTURE TO
MATCH EXISTING WALL
WALL PLASTER FINISH
AND TEXTURE TO
MATCH EXISTING WALL
EXISTING PIPE
EXISTING FLOOR SLAB
RATING INFORMATION:
FIRE RATING - 2 HOUR TEST:
PEI AER-09038
WHI-495-PSH 0154/0167
09 29 00
5/8" GWB 2 LAYERS
R E
F E
R T
O D
E T
A
IL
REFER TO DETAIL
A3.1
SIM
A3.1
SIM
07 92 16
SEALANT BOTH SIDES
09 29 00
5/8" GWB 3 LAYERS AT
HORIZONTAL PLANE
1/
2" 1/
2" M
IN
DESIGN BASIS: UL-HW-D-0044
CONCRETE SLAB
09 22 16
METAL STUDS
09 29 00
5/8" GWB 1 OR 2 LAYERS,
REFER TO PARTITION TYPE
07 84 00
MINERAL WOOL
07 84 00
FIRESTOPPING
06/19/20
AS
BF
AS
VOLUME 2 DRAWING PACKAGE
A3.1
WALL PARTITION TYPES
WALL PARTITON TYPE A2 WALL PARTITON TYPE B2 WALL PARTITON TYPE C2
(TYPE A2) 2 HOUR SHAFTWALL
NOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED
SHAFTWALLS: UL V473
MARK STUD WIDTH PRTN WIDTH DESIGN STC
A2 2 1/2" 3 3/4" 40
(TYPE B2) 2 HOUR INFILL WALL
NOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED WALLS:
UL V438
MARK STUD WIDTH PRTN WIDTH DESIGN STC
B2 3 5/8" EXST. WALL 50
(TYPE C2) 2 HOUR HORIZONTAL
ENCLOSURENOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED HORIZONTAL
ENCLOSURE: PEI AER-09038; WHI-495-PSH 0154/0167
MARK STUD WIDTH PRTN WIDTH DESIGN STC
C2 2 1/2" 3 3/4" 50
PARTITION WALL HEAD DETAIL
A3.1
1 1/2" = 1'-0" A3.1
3" = 1'-0" A3.1
1 1/2" = 1'-0" A3.1
3" = 1'-0"
01 - HOLLOW METAL FRAME
2" 3' - 2" 2"
7'
2"
FIELD VERIFY
3' - 6" R.O.
F
IE
LD
V
E R
IF
Y
7'
R O
03 - HOLLOW METAL FRAME
2" 3' - 2" 2"
6'
2"
FIELD VERIFY
3' - 6" R.O
F
IE
LD
V
E R
IF
Y
6'
1"
R .O
04 - HOLLOW METAL FRAME
2" 3' - 8" 2"
8" 6'
2"
FIELD VERIFY
4' - 0" R.O.
F
IE
LD
V
E R
IF
Y
6'
1"
R .O
NEW
CURB
02 - HOLLOW METAL FRAME
2"
7'
2"
FIELD VERIFY
3' - 0" R.O.
F
IE
LD
V
E R
IF
Y
7'
R .O
2"2' - 8"
F - FLUSH
P E
R S
C H
E D
U
LE
PER SCHEDULE
G - HALF GLASS
6"
6" 6"
3'
PER SCHEDULE
P E
R S
C H
E D
U
LE
AP - ACCESS PANEL
1" 1' - 11 1/2" 1"
P E
R D
E T
A
IL
1" 1'
1/
2" 1"
FLOOR
SOLID GROUT
EXISTING
PLASTER WALL
BACKER ROD AND SEALANT
2" X 8" HOLLOW METAL FRAME
ALIGN WITH EXISTING WALL
PLASTER FINISH TO MATCH AND
ALIGN WITH EXISTING WALL FINISH
EXPANSION ANCHOR TO EXISTING
MASONRY WALL, TYPICAL
1/2" 7 3/4".
NEW PLASTER FINISH
MATCHING EXISTING
REMOVE EXISTING WOOD
DOOR AND FRAME
HOLLOW METAL DOOR AS
SCHEDULED
SEALANT
REMOVE PARTIAL OF EXISTING
CONCRETE CURB FOR NEW DOOR
FRAME INSTALLATION
NEW CONCRETE CURB LINE
TO CLEAR NEW DOOR FRAME
EXISTING WALL
5/ 8"
2" 1/
4"
2" 1 15/16"
4 1/2" (curb demo)
SOLID GROUT
SEALANT, TYPICAL
2" HOLLOW METAL FRAME
EXPANSION ANCHOR TO
EXISTING MASONRY WALL
HOLLOW METAL DOOR AS
SCHEDULED
ANCHOR CLIPS
EXISTING WALL
1/2" 1/2"
R O
U G
H O
P E
N
IN
G
PATCH EXISTING WALL AND
WALL FINISH PER DEMOLITION,
TYPICAL
2" 5/
8"
2" 1 15/16"
A3.2
SIM .
PATCH EXISTING WALL
AND PLASTER FINISH PER
DEMOLITION, TYPICAL
BACKER ROD AND
SEALANT, TYPICAL
2" X 8" HOLLOW METAL
FRAME
EXPANSION ANCHOR TO
EXISTING MASONRY WALL
HOLLOW METAL DOOR
AS SCHEDULED
ANCHOR CLIPS
EXISTING MASONRY WALL
7 3/4".
2" 1/
4"
R O
U G
H O
P E
N
IN
G
SOLID GROUT
5/ 8"
1 15/16" 2"
SOLID GROUT
BACKER ROD AND SEALANT,
TYPICAL
2" X 8" HOLLOW METAL
FRAME ALIGN WITH EXISTING
EXTERIOR WALL
PLASTER FINISH TO MATCH
AND ALIGN WITH EXISTING
WALL PLASTER FINISH
ANCHOR TO STEEL STUDS
NEW WALL ADDITION
HOLLOW METAL DOOR AS
SCHEDULED
CONCRETE CURB BELOW
RE: SECTION DETAIL
EXISTING WALL
DOUBLE 8" STEEL STUDS
AT DOOR JAMB
CONTINUOUS PLASTER
FINISH RETURN AT JAMB
INTERIOREXTERIOR
8"
N
E W
W A
LL
A
D D
IT
IO
N
N E
W D
O O
R R
O U
G H
O P
E N
IN
G
3'
EXPANSION ANCHOR TO
EXISTING MASONRY WALL,
TYPICAL
NEW PLASTER FINISH ALIGN
WITH EXISTING PLASTER WALL
SOLID GROUT
EXISTING WALL
(F
IE
LD
V
E R
IF
Y
4' -0
E
X
IS
T
IN
G D
O O
R R
O U
G H
O P
E N
IN
G
A1.4
SIM
NEW FLEXIBLE MEMBRANE FLASHING
TIE INTO EXISTING WALL AIR AND
MOISTURE BARRIER, TYPICAL
FLEXIBLE MEMBRANE FLASHING
ON SHEET METAL SUPPORT
SEAL TIGHT AT SEALANT
BATT INSULATION
3 5/8" STEEL STUDS WITH 5/8" GYPSUM WALL BOARD
EXTERIOR SHEATHING ALIGN
WITH ADJACENT SHEATHING
HOLLOW METAL FRAME BEYOND
WALL LINE BEYOND
ALUMINUM THRESHOLD
SET IN BED OF SEALANT
FLOOR
ALUMINUM THRESHOLD TO
ALIGN WITH DOOR FRAME
TYPICAL 1/
2"
HOLLOW METAL DOOR
AS SCHEDULED
06/19/20
AS
BF
AS
VOLUME 2 DRAWING PACKAGE
A3.2
DOOR AND FRAME TYPES,
SCHEDULES AND DETAILS
DOOR FRAME TYPE
DOOR TYPE
DOOR AND FRAME SCHEDULE
IDENTIFICATION DIMENSIONS PANEL
TYPE
FRAME
FIRE
RATING
STC
RATING HW SET NOTESDOOR NO. ROOM NO. ROOM NAME
WIDTH
H T
PANEL
COUNT TYPE MATERIAL FINISH GLAZING MATERIAL FINISHW1 W2
TOTAL
WIDTH
L01 1' - 11 1/2" 1' - 11 1/2" 2" AP SS Default SS Default 90 SEE SHEET A3.3 FOR ACCESS PANEL ELEVATION
L02 L02 SERVICE LOBBY 2' - 8" 7' - 0" 1 3/4" F HM PNT 02 HM PNT 90 FIELD VERIFY ROUGH OPENING DIMENSIONS
301 301 ELEVATOR MACHINE ROOM - ELEVATOR 1 & 2 3' - 2" 6' - 9" 1 3/4" F HM PNT 03 HM PNT 90 FIELD VERIFY ROUGH OPENING DIMENSIONS
302 302 ELEVATOR MACHINE ROOM - ELEVATOR 3 & 4 3' - 2" 7' - 1" 1 3/4" F HM PNT 01 HM PNT 90 FIELD VERIFY ROUGH OPENING DIMENSIONS
401 400 STAIRWAY 3' - 0" 6' - 1" 1 3/4" F HM PNT 04 HM PNT 90 FIELD VERIFY ROUGH OPENING DIMENSIONS
402 400 STAIRWAY 3' - 2" 6' - 9" 1 3/4" G HM PNT 03 HM PNT FIELD VERIFY ROUGH OPENING DIMENSIONS
SERVICE LOBBYL01
DOOR JAMB DETAIL / HEAD SIMILAR - DOOR 301
DOOR JAMB DETAIL / HEAD SIM-DOOR L02 / DOOR 402 SIMDOOR JAMB DETAIL / HEAD SIMILAR - DOOR 302
DOOR JAMB DETAIL / HEAD SIMILAR - DOOR 401DOOR SILL DETAIL AT THRESHOLD
ROOM FINISH SCHEDULE
ROOM NUMBER NAME
FLOOR
Wall Finish
CEILING
CommentsFINISH BASE FINISH
301 ELEVATOR MACHINE ROOM -
ELEVATOR 1 & 2
SEAMLESS EPOXY
FLOORING (SEF)
NA PAINT PAINT REFER TO SPECIFICATION FOR SEAMLESS EPOXY FLOORING (SEF); PAINT TO MATCH EXISTING
302 ELEVATOR MACHINE ROOM -
ELEVATOR 3 & 4
NA NA PAINT PAINT LIMITED TO NEW GYPSUM WALL BOARD ONLY; PAINT TO MATCH EXISTING
400 STAIRWAY NA NA PAINT NA LIMITED TO ALL NEW DOORS, DOOR FRAMES AND NEW GYPSUM WALL BOARD ONLY; PAINT TO
MATCH EXISTING
L01 SERVICE LOBBY NA NA NA NA
L02 SERVICE LOBBY NA NA NA NA
A3.2
1/4" = 1'-0"
A3.2
1/4" = 1'-0"
A3.2
3" = 1'-0"
A3.2
3" = 1'-0"
A3.2
3" = 1'-0"
A3.2
3" = 1'-0"
A3.2
3" = 1'-0"
SEE SPEC.
SEE SPEC.
SEE SPEC.
SEE SPEC.
SEE SPEC.
SEE SPEC.
(insulated)
(insulated)
(insulated)
(insulated)
-750' - 0"
CAVE LEVEL
1"
(O P
E N
IN
G
S
IZ
E
1' -1
1/
2"
1"
T
IL
E S
U P
(B A
S E
T
IL
E
3' - 5" 1"
(OPENING SIZE)
1'-11 1/2". 1"
CUT WALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .