Copy of CAVE219342169636 Bid Sheetposted.pdf
PDF 135 KB Posted
- Solicitation number
- 140P2020R0112
About this file
This document contains a construction estimate for the solicitation to replace failing primary electrical distribution infrastructure and repair elevator steel at Carlsbad Caverns National Park. The estimate provides line item costs for various phases of the project including elevator demolition and abatement, structural steel replacement for the elevators, a new elevator installation, upgrading the primary electrical distribution system either with or without a new backup generator, and encasement of electrical ductbanks in concrete. The total project cost will be determined based on which combination of optional line items for electrical work and backup power the Department of the Interior National Park Service selects in solicitation number 140P2020R0112. Responses to the solicitation are due on or before an unspecified date.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAVE 169636/219342/287291
Carlsbad Caverns National Park - Replace Old/Failing Primary Electrical Distribution Infrastructure/
Elevators 1 and 2 Steel Repairs and Replacement
DETAILED COST/PRICE BREAKDOWN
Bid Item 001 CLIN 1
Item Material
Cost/Unit Unit Number Total Material
Cost/Item No. Labor Labor
Rate/hr Days Spent on Item Cost No. Equipment Equipment
Rate/Hr
Days Spent on Item Cost
F20 Roof Demo F20 Machine Room Concrete Demo F20 Relocate RTU F20 Elevator Demo F20 Guide Rail Demo F20 Steel Framing Demo F20 Beam Pocket Grout Demo F20 Non-Hazardous Haul & Disposal
F20 Lead Based Paint Abatement F20 Roofing Tar Abatement F20 Haz-Mat Haul and Disposal General Conditions
Bid Item 002 CLIN 2
Item Material
Cost/Unit Unit Number Total Material
Cost/Item No. Labor Labor
Rate/hr Days Spent on Item Cost No. Equipment Equipment
Rate/Hr
Days Spent on Item Cost
B10 Running Work Platform B10 Clean & Prep Grout Pockets B10 Crane Rental B10 Structural Steel Frame B10 Beam Coating B10Shaft Wall Repairs (Shotcrete) General Conditions subtotal Taxes
Total Materials Total Labor Total Equipment
Total Labor Cost
MATERIALS LABOR EQUIPMENT
Overhead subtotal
Profit Total Cost
CLIN 002: Structural Steel Replacement subtotal Profit
Total Cost
Total Cost of Subsidiary Items subtotal
Overhead
Total Materials Cost Total Labor Cost
Total Equipment Cost
CLIN 001: Elevator Demolition/Abatement
MATERIALS LABOR EQUIPMENT
Total Equipment Cost Total Cost of Subsidiary Items subtotal
Total Materials Cost
Total Materials subtotal Taxes
Total Labor Total Equipment
Elevators 1 and 2 Steel Repairs and Replacement
DETAILED COST/PRICE BREAKDOWN
Bid Item 003 CLIN 3
Item Material
Cost/Unit Unit Number Total Material
Cost/Item No. Labor Labor
Rate/hr Days Spent on Item Cost No. Equipment Equipment
Rate/Hr
Days Spent on Item Cost
A10 Pit Platform Foundations B20 Machine Room Roof Structure B30 Machine Room Roofing C10 Interior Construction C30 Interior Finishes C10 Conveying Systems D20 Plumbing
D30 HVAC
D50 Electrical General Conditions
Bid Item 4 Option 1
Item Material
Cost/Unit Unit Number Total Material
Cost/Item No. Labor Labor
Rate/hr Days Spent on Item Cost No. Equipment Equipment
Rate/Hr
Days Spent on Item Cost
D50 Electrical Demo D50 Primary Electrical Site Distribution D50 Secondary Service & Distribution D50 Temporary Power G20 Pavement Cutting/Patching General Conditions subtotal Profit
Total Cost
Total Cost of Subsidiary Items subtotal
Overhead
Total Labor Cost Total Equipment Cost
Total Materials Cost subtotal Taxes
Total Materials Total Labor Total Equipment subtotal Profit
Total Cost
Primary Electrical Distribution Infrastructure
MATERIALS LABOR EQUIPMENT
Total Cost of Subsidiary Items subtotal
Overhead
Total Labor Cost Total Equipment Cost
Total Materials Cost subtotal Taxes
Total Materials Total Labor Total Equipment
New Elevator Installation
MATERIALS LABOR EQUIPMENT
Elevators 1 and 2 Steel Repairs and Replacement
DETAILED COST/PRICE BREAKDOWN
Bid Item 5 Option 2
Item Material
Cost/Unit Unit Number Total Material
Cost/Item No. Labor Labor
Rate/hr Days Spent on Item Cost No. Equipment Equipment
Rate/Hr
Days Spent on Item Cost
D50 Generator Demo, Haul Off, Disposal D50 New Generator, Fuel Tank, Associated Gear D50 Generator Power Distribution, ATS D50 Generator Conduit & Wiring D50 EM Power Ductbank / Conductors (PB-22 to PB24) D50 Lightning Protection G20 Generator Yard Construction General Conditions
Bid Item 6 Option 3
Item Material
Cost/Unit Unit Number Total Material
Cost/Item No. Labor Labor
Rate/hr Days Spent on Item Cost No. Equipment Equipment
Rate/Hr
Days Spent on Item Cost
D50 Ductbank Concrete Encasement General Conditions subtotal Profit
Total Cost of Subsidiary Items subtotal
Overhead
Total Labor Cost Total Equipment Cost
Total Materials Cost subtotal Taxes
Total Materials Total Labor Total Equipment subtotal Profit
Total Cost
Concrete Encasement of Ductbanks
MATERIALS LABOR EQUIPMENT
Total Cost of Subsidiary Items subtotal
Overhead
Total Labor Cost Total Equipment Cost
Total Materials Cost subtotal Taxes
Total Materials Total Labor Total Equipment
Generator
MATERIALS LABOR EQUIPMENT
CONSTRUCTION ESTIMATE
File details come from the government source that posted it. Updated .