CAVE169636 287291 219342 CD DIV1.pdf

PDF 5 MB Posted

Attached to
CAVE 169636/219342/287291 - Carlsbad Caverns Natio
Solicitation number
140P2020R0112
Issued by

About this file

This project manual and construction documents package specifies requirements for a federal construction contract to replace aging electrical infrastructure and repair elevators at Carlsbad Caverns National Park. The scope of work includes demolishing old electrical systems and installing a new 12.47kV primary distribution network, 480V secondary distribution, generator, lighting, and receptacles. It also involves removing the existing corroded steel support structure for Elevators 1 and 2, replacing it with stainless steel, and installing new elevator equipment and architectural and MEP systems upgrades. Construction is to proceed in stages to minimize impacts to park operations. The National Park Service is the contracting agency, with responses due by June 19, 2020 and award dates to be determined. The package includes specifications, drawings, reports on subsurface conditions and hazardous materials, and requirements for permits, project management, quality control, and environmental compliance.

View the file

Other files

File Type Posted
Sol_140P2020R0112_Amd_0006.pdf PDF
Sol_140P2020R0112_Amd_0005.pdf PDF
Amendment 4 31 23 17 ROCK EXCAVATION 2020 08 14 edits_0004.pdf PDF
Amendment 4 Question response_0004.pdf PDF
Amenemdnt 4 SF 30 140P2020R0112_0004.pdf PDF
Sol_140P2020R0112_Amd_0004.pdf PDF
Amendment 4 Otis Elev Carlsbad Caverns 1 2 1976 10 15_0004.pdf PDF
Sol_140P2020R0112_Amd_0003.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD_0002.docx DOCX document
Sol_140P2020R0112_Amd_0002.pdf PDF
CAVE-219342-Final CD Pkg_STSI_0001.pdf PDF
Historic-Feature-Photos_0001.docx DOCX document
CAVE_ElectricLine_Reveg_Reqt_0001.docx DOCX document
09 97 13 STEEL COATINGS_0001.pdf PDF
CAVE Preproposal_Final_0001.pptx PPTX presentation
Sol_140P2020R0112_Amd_0001.pdf PDF
CAVE-219342-Final CD Pkg_PKA Coatings Letter Report_0001.pdf PDF
DB NM 20200012-02-14-20_0001.pdf PDF
Pre-Proposal Conference 07-28-20 Attendee List_0001.docx DOCX document
DB NM 202000018-05-15-20-Bldg_0001.pdf PDF
07 Final Geotech Site Report20050803.pdf PDF
CAVE 219342Drawings.pdf PDF
CAVE 169636 SpecificationsVol 1.pdf PDF
CAVE219342SpecificationsVol 2.pdf PDF
CAVE 169636CD DrawingsVol 1.pdf PDF
10 CAVEToposurvey1998.pdf PDF
08 ElecRestGPRSurvey20200618.pdf PDF
13 Part2RadonReportCAVE042120FTC2.pdf PDF
12 CAVE Engineering Site Visit Report B.pdf PDF
09 HazmatInvACME20180810.pdf PDF
Sol_140P2020R0112.pdf PDF
11 Asbestos Inspection Report Elevators12.pdf PDF
Copy of CAVE219342169636 Bid Sheetposted.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Parks Service, Denver Service

Center

CAVE 169636 - Replace Old/Failing Primary Electrical

Distribution Infrastructure

CAVE 287291 - Install Generator For Primary Electric

Distribution

CAVE 219342 - Replacement Structural Steel &

Elevator Equipment for #1 & 2 Elevators

Project Manual – Volumes 1 & 2, Div. 01

100% Final Construction Documents Package

06/19/2020

CAVE - 169636 / 287291 / 219342

This page intentionally left blank.

CAVE - 169636 / 287291 / 219342 00 01 10 - 1

Table of Contents

TABLE OF CONTENTS

DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 07 - SEALS PAGE – VOL 1

00 01 07 – SEALS PAGE – VOL 2

DIVISION 01 — GENERAL REQUIREMENTS

01 11 00 - SUMMARY OF WORK

01 26 01 - CONTRACT MOD PROCEDURES

01 27 00 - CONTRACT LINE ITEMS

01 31 00 - PROJECT MANAGEMENT

01 32 16 - CONSTRUCTION SCHEDULE

01 32 33 - PHOTO DOCUMENTATION

01 33 23 - SUBMITTAL PROCEDURES

01 33 23 - SUBMITTAL PROCEDURES – VOL 1 APPENDIX

01 33 23 - SUBMITTAL PROCEDURES – VOL 2 APPENDIX

01 35 13.22 – ARCHEOLOGICAL PROTECTION

01 35 23 - SAFETY REQUIREMENTS

01 35 91 - HISTORIC PRESERVATION TREATMENT

01 40 00 - QUALITY REQUIREMENTS

01 40 00 - QUALITY REQUIREMENTS – VOL 1 APPENDIX

01 40 00 - QUALITY REQUIREMENTS – VOL 2 APPENDIX

01 42 19 - REFERENCE STANDARDS

01 50 00 - TEMPORARY FACILITIES AND CONTROLS

01 57 19.11 - INDOOR AIR QUALITY

01 57 19.12 - NOISE ACOUSTICS MANAGEMENT

01 57 23 - TEMPORARY STORM WATER POLLUTION PREVENTION

01 67 00 - PRODUCT REQUIREMENTS

01 73 29 - CUTTING AND PATCHING

01 73 40 - EXECUTION

01 74 19 - CONSTRUCTION WASTE MANAGEMENT DISPOSAL

01 74 19 - WASTE MANAGEMENT - APPENDIX A

01 74 19 - WASTE MANAGEMENT - APPENDIX B

01 77 00 - CLOSEOUT PROCEDURES

01 78 23 - OPERATION AND MAINTENANCE DATA

01 78 23 - OPERATION AND MAINTENANCE DATA - VOL 1 APPENDIX

01 78 23 - OPERATION AND MAINTENANCE DATA – VOL 2 APPENDIX

01 79 00 - DEMOSTRATION AND TRAINING

01 91 14 - TOTAL BUILDING COMMISSIONING

CAVE - 169636 / 287291 / 219342 00 01 10 - 2

Table of Contents

D I V I S I O N 0 0

PROCUREMENT AND CONTRACTING

REQUIREMENTS

CAVE - 169636 SEALS AND SIGNATURES

SEALS AND SIGNATURES

I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and that I am a duly registered

Professional Engineer under the laws of the State of New Mexico.

CHAD A. ZIMMERMAN 06/12/2020

Sections covered by this seal: 03 09 00, 03 15 19, 04 05 13, 04 05 23, 04 05 50, 04 22 00, 05 50 00, 07 92 00, 09 24 24, 09 96 00, 10 14 00, 31 23 00, 31 23 17, 31 23 33, 31 25 00, 32 12 16

I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and that I am a duly registered

Professional Engineer under the laws of the State of New Mexico.

PAUL K. DAVILA 06/12/2020

Sections covered by this seal: 07 84 00, 26 05 00, 26 05 13, 26 05 19, 26 05 43, 26 05 74, 26 08 13, 26 13 16, 26 23 00, 26 24 13, 26 27 26, 26 28 00, 26 32 14, 26 36 00, 33 05 15, 33 52 10, 33 56 16, 40 63 43

END OF SECTION

CAVE - 219342 00 01 07 - 1

SEALS PAGE

SECTION 00 01 07

I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and that I am a duly registered architect under the laws of the State of ________.

(INSERT NAME) Date

My license renewal date is December 31, ___________

Pages or sheets covered by this seal:

am a duly registered engineer under the laws of the State of ________.

NM

Brian Perlberg 6/19/2020

All M-sheets. Division 22 and 23 specifications.

New Mexico

SPECIFICATIONS SECTIONS:024119,

033000, 036000, 051200, 099713

2021.

New Mexico

Paul Keith Davila 19 June 2020

Division 26 & 40 19 June 2020

Thomas S. Soell

CAVE - 219342 00 01 07 - 2

I hereby certify that the portion of this technical submission described

New Mexico

Julianne Scherer 19 June 2020

Division 01-14 Specifications (U.O.N.)

19 June 2020

D I V I S I O N 0 1

GENERAL REQUIREMENTS

CAVE - 219342 01 11 00 - 1

SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work phases.

3. Work under other contracts.

4. Government Furnished Materials.

5. Contractor use of premises.

6. Public use of site.

7. Occupancy requirements for buildings.

8. Work Restrictions.

9. Special Construction Requirements.

10. Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Carlsbad Caverns New Mexico. Volume 1: Electrical Infrastructure

Upgrade Package and Volume 2: Replace Structural Steel & Elevator Equipment for

Elevator No.’s 1 & 2 Package.

B. Volume 1, Electrical Infrastructure Upgrade Package, the Work consists of the following:

The Work includes providing complete functioning systems in compliance with

National Electrical Code (NEC), manufacturer’s instruction, performance requirements specified, as shown in the contract documents. The scope of work are documented on design drawings and within this specification and are to design

(where stipulated) supply, coordinate, undertake, install, test and commission the following

a. Demolition of the electrical services and building work which become redundant as part of the electrical infrastructure alignment project and safely move from site and dispose of in accordance with 01-74-19 Construction

Waste Management and Disposal.

b. Coordination with XCEL Energy for the amendments to the 12.47kV

Primary distribution.

c. Provision of staged works to enable the site to operate under their normal conditions, including the provision of all temporary supplies and provisions.

d. Provision of a new 480V 60Hz 1000kVA standby diesel generator in a level

1 enclosure with managed load bank

e. Provision of new 12.47kV distribution, cable duct bank, conduits and raceways, cables, MV switchboards, switchgear and transformers.

f. Provision of new Low Voltage distribution, cable duct bank, conduits and raceways, switchboards, switchgear, ATS and transformers.

CAVE - 219342 01 11 00 - 2

g. Modifications to existing electrical installations to accommodate reconnection to new electrical infrastructure. (Including inspecting and testing of the existing electrical services).

h. Grounding and surge protection to NFPA 70.

i. PLC control and associated cables conduits and raceways, communications and control cabling, power supplies and equipment and required programming

j. New Lighting and Emergency lighting systems and associated control, cabling conduit, breakers etc.(Note all external luminaires shall be approved by NPS submit required information to the contracting officer for final approval)

k. New receptacle power and associated cabling conduit, breakers etc.

l. Construction work and structural work in connection with the project including but not limited to new generator enclosure, concrete/reinforced ductbanks, equipment pads, make good surfaces of removed equipment and ground surface reinstatement, painting and making good internal and external surfaces, new fiberglass trench covers and reinstating wall floor and ceiling penetration ratings (fire/smoke and acoustics as required).

m. Testing and Commissioning

n. Operations and Maintenance Manuals and as built drawings

o. Integrated systems test

p. Training of site Owners staff, Owners staff and Owners maintenance contractor.

C. Volume 2, Replace Structural Steel & Elevator Equipment for Elevator No.’s 1 & 2 Package the Work consists of the following:

The Work includes the replacement of all components of Elevators No.’s 1 & 2, including cars, counterweights, elevator ropes, overspeed governor, pit equipment, machine room equipment, wiring, plus guiderails and their alignment. New elevator components shall be suitable for operation in a humid environment. The new Elevators No.’s 1 & 2 Cars elevator system shall be inspected and certified prior to final acceptance. The scope of work shall include provisions for hazardous material abatement, protection of natural resources, radon monitoring to control radon radiation dose limits as required. This project will also remove the existing corroded steel support structure for Elevators No.’s 1 & 2, and replace it with a new support structure fabricated entirely of corrosion resistant stainless steel. New vertical elevator and counterweight rails shall be installed. The roof above

Elevator No.’s 1 & 2 is to be removed and replaced in it’s entirety and a new roof with roof hatches provided. Machine rooms No. 1, 2, 3, & 4 elevators require various architectural upgrades to bring them into code compliance, and shaft drainage and lighting are to be included. Work associated with historic tile and shaft gutters/drains is to be coordinate with NPS Cultural Resources monitor prior to start of work in these areas.

The scope of work are documented on design drawings and within this specification and are to design (where stipulated) supply, coordinate, undertake, install, test and commission the following:

a. Provision of staged works to enable the site to operate under their normal conditions, including the provision of all temporary supplies and provisions.

b. Grounding and surge protection to NFPA 70.

CAVE - 219342 01 11 00 - 3

c. Testing and Commissioning

d. Operations and Maintenance Manuals and as built drawings

e. Integrated systems test

f. Training of site Owners staff, Owners staff and Owners maintenance contractor

D. Project will be constructed under a single prime contract for scope included under both

Volume 1 & 2.

1.3 WORK PHASES

A. The Work shall be conducted in a single phase project broken down into stages to accommodate site operations.

1.4 WORK UNDER OTHER CONTRACTS

A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract.

Coordinate the Work of this Contract with work performed under separate contracts.

1.5 GOVERNMENT-FURNISHED MATERIALS

A. Government will furnish products indicated.

1. NPS is furnishing a 2,000 gal fuel tank.

2. The following protocols shall be followed concerning Government-furnished items:

a. Government will arrange and pay for delivery of Government-furnished items according to Contractor's Construction Schedule.

b. After delivery, Government will inspect delivered items for damage.

Contractor shall be present for and assist in Government's inspection.

c. If Government-furnished items are damaged, defective, or missing, Government will arrange for replacement.

d. Contractor is responsible for receiving, unloading, and handling

Government-furnished items at Project site.

e. Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.

f. If Government-furnished items are damaged as a result of Contractor's operations, Contractor shall repair or replace them.

g. Contractor shall install and otherwise incorporate Government-furnished items into the Work.

1.6 CONTRACTOR USE OF SITE

A. General: Contractor will not be allowed use of site outside the confines of the project drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated.

CAVE - 219342 01 11 00 - 4

1. Limits: Confine construction operations to areas where work is permitted as indicated on drawings.

2. Limit site disturbance, including earthwork and clearing of vegetation, to the areas indicated on the drawings, note areas are of historical importance and cannot be disturbed.

a. All areas must to be returned to their original condition; this work shall be completed per Government requirements after a Government damage assessment is completed.

b. All vehicles and equipment entering the project area must be clean of plant materials and dirt and free from oil leaks and are subject to inspection. Wash all construction and restoration/ revegetation equipment (including the inside beds of vehicles hauling materials) to thoroughly remove all dirt, plant, and other foreign material prior to entering the project. Particular attention must be shown to the under carriage and any surface where soil containing exotic seeds may exist. Allow the CO to inspect each piece of equipment before entering the project. Provide the cleaning and inspection records to the CO. Equipment found operating on the project that has not been inspected, or has oil leaks will be shut down.

c. Weed Free Material Sources: Do not import into the project limits rock, sand, gravel, earth, subsoil, or other natural materials from a Contractor-selected non-commercial materials source, that have not been certified free of non-native, invasive plant species. Materials imported into the project limits which do not include a noxious weed free certification may be rejected and ordered by the CO to be removed from the project limits. The

CO has the discretion of requesting inspection of certified materials by a third party, and rejecting the use of the source if non-native plants or seeds thereof are found to be present.

B. Storage of Materials: Confine storage of materials as approved by the Contracting Officer per the staging areas provided on the staging plan.

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

This work shall be completed per Government requirements after a Government damage assessment is completed.

2. Natural resources include preserving the humidity and temperature within the cave and protection of the bats, refer to section 13 80 00 for additional requirements.

3. Provide temporary barriers to protect existing trees and plants and root zones.

4. Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction.

5. Do not fasten ropes, cables, or guys to existing trees or any natural resources or natural features.

6. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

D. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

CAVE - 219342 01 11 00 - 5

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

E. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials.

Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park

Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

F. Use of Site: Limit use of premises to areas within the construction limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

Limits:

a. Limit site disturbance, including earthwork and clearing of vegetation, to a 50 foot wide corridor (25 feet on each side of alignment) along the proposed electrical line alignment.

b. Limit site disturbance, including earthwork and clearing of vegetation, to a 10 foot corridor around the edge of the proposed switch gear, transformers, vaults and/or structures as shown on the drawings.

c. Construction limits will be identified and staked and flagged with construction tape or some similar material prior to any construction activity. Stakes will be minimum 30-inches high and a no more than 100 feet apart.

d. Orange construction fencing will define the construction zone for the day and confine activity to the minimum area required for construction. Construction fencing must be a minimum 18-inches tall and a minimum 200 feet long.

e. Should equipment move accidentally outside the approved corridor or approved staging areas, the contractor will report the incident to the Contracting Officer who will conduct a damage assessment and devise remediation

1.7 PUBLIC USE OF SITE

A. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public during park operating hours.

1.8 OCCUPANCY REQUIRMENTS FOR BUILIDINGS

A. Existing Buildings

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

CAVE - 219342 01 11 00 - 6

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations.

Protect building and its occupants during construction period.

c. In order to confirm that all of the conditions above have been met, and to make sure that emergency egress routes and temporary enclosures do not conflict with park operations or the safety of its visitors and staff contractor is to submit a temporary egress plan to the CO and Park for their review and approval. This temporary egress plan shall document the limits or work, highlight all egress routes, and show all contractor access points into the work zone.

1.9 CONDUCT OF OPERATIONS

A. At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests 48 hours in advance of the work to the Contracting Officer for approval.

C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

1.10 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during the normal business working hours. The park normal business hours in the winter are 8:00 a.m. to 5:00 p.m., and in the summer are 8:00 a.m. to 7:00 p.m. and the park normal weekend hours in the winter are 8:00 a.m. to 5:00 p.m., and in the summer are 8:00 a.m. to 7:00 p.m. except when otherwise indicated and agreed with the Contracting Officer.

1. The contractor is to note that bat season is mid-April to late October. The contractor is to note specific requirements for the preservation of park activities during these periods. No loud work (including use of temporary generators), or trenching past 5:00 p.m. during bat season. Contractor to coordinate exact dates with Contracting Officer.

2. Refer to sheet G3.0 for requirements for use of the elevators for equipment transport.

B. Existing Utilities

1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the

Government.

CAVE - 219342 01 11 00 - 7

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by

Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Contracting Officer’s written permission.

3. Hours for Utility Shutdowns: As approved by the Contracting Officer (note: the site is a public building additionally has artifacts which require to be kept in specific environmental conditions). Maximum power outage at housing units is 60 minutes, and it must take place between 8am – 5pm. Maximum power outage for non-housing buildings is 8 hours; must take place outside of regular business hours. Visitor Center and Cave power outage must take place outside of public visitation hours.

D. Nonsmoking Building: Smoking is not permitted within Park under any circumstances.

1.11 SPECIAL CONSTRUCTION REQUIREMENTS

A. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.

1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.

B. The contractor is to note that bat season is mid-April to late October. The contractor is to note specific requirements for the preservation of park activities during these periods. No loud work or trenching past 5:00 p.m. during bat season.

1.12 ADDITIONAL REPORTS

A. A copy of the report is available to all plan holders with this package.

B. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.

C. Volume I Specific Reports:

1. Electrical Resistivity and Ground Penetrating Radar Survey, Carlsbad Caverns

National Park dated June 18, 2020 by HDR

2. Final Geotechnical Site Investigation Report, Repair and Rehabilitate Sewer

System, Carlsbad Caverns National Park, NM dated August 3, 2005 by Yeh and

Associates, Inc. (included for general information on subsurface soil conditions to inform trenching approach)

3. Hazardous Material Investigation Carlsbad Caverns Electrical Distribution System dated August 10, 2018 by Acme Environmental

CAVE - 219342 01 11 00 - 8

4. Topographic Survey, Carlsbad Caverns National Park updated 10/98 by Pettigrew and Associates

D. Volume II Specific Reports:

1. Asbestos Inspection Elevator #1 and #2 Structure, Carlsbad Caverns National

Park, dated February 1. 2019 by Acme Environments

2. Cave Radon Engineering Site Visit Report dated August 2, 2019 by Southern

Arizona Office, National Park Service

PART 2 - Radon Screening at Carlsbad National Caverns, Elevator Shafts 1 & 2 dated April 21, 2020 by Landmark Environmental Inc.PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

CAVE - 219342 01 26 01 - 1

CONTRACT MOD PROCEDURES

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition

Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

CAVE - 219342 01 26 01 - 2

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

CAVE - 219342 01 26 01 - 3

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General

Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The

Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank

CAVE - 219342 01 26 01 - 4

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and

Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01

Specification, “Construction Schedule”, for time impact analysis requirements.

TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work. Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from

Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources.

Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

http://www.nps.gov/dscw/publicforms.htm#ct

CAVE - 219342 01 26 01 - 5

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers , Ownership and Operating Expense

Schedule (use latest edition and applicable region)

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above.

If the US Army Corp of Engineers is utilized then their standby rates prevail.

If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Shall not be applied to overhead amounts; and overhead shall not be applied to profit. Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

CAVE - 219342 01 26 01 - 6

Overhead………………10%

Profit………………8%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

PART 2 - PRODUCTS

PART 3 - EXECUTION

END OF SECTION 01 26 01

CAVE - 219342 01 27 00 - 1

CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Items – Base Price:

1. Contract Line Item No.001 – Volume 2, Demolition and Abatement. This item consists of demolition of structural steel and elevator equipment for Elevators 1 &

2; as well as demolition of architectural and MEP systems associated with scope indicated at Elevators 1, 2, 3, & 4. Abatement to be provided at Elevators 1 & 2 as indicated. Refer to drawings, specifications and contract documents for more detail.

a. Work associated with CLIN includes:

1) Structural Steel & Elevator Equipment Demolition

2) Architectural and MEP Systems Demolition

3) Abatement of Hazardous Materials

2. Contract Line Item No.002 – Volume 2, Structural Steel Replacement. This item consists of replacement of structural steel for the Park Elevators 1 & 2. Refer to drawings, specifications and contract documents for more detail.

a. Work associated with CLIN includes:

1) Replacement of Structural Steel

3. Contract Line Item No.003 – Volume 2, New Elevator Installation. This item consists of installation of new elevator equipment for Elevators 1 & 2; as well as architectural and MEP systems upgrades associated with scope indicated at

Elevators 1, 2, 3, & 4. Refer to drawings, specifications and contract documents for more detail.

a. Work associated with CLIN includes:

1) Replacement of Elevator Equipment

2) Architectural & MEP Upgrades

CAVE - 219342 01 27 00 - 2

B. Contract Line Items - Optional:

1. Contract Line Item, Option No.004 – Volume 1, Primary Electrical Distribution

Infrastructure. This item consists of furnishing and installing the new electrical primary distribution system for the Park and removing the old existing system.

Refer to drawings, specifications and contract documents for more detail.

a. Work associated with this CLIN includes:

1) Electrical Demolition

2) Primary Electrical Site Distribution

3) Distribution Apparatus and Feeders

4) Electrical Secondary Service & Distribution

5) Electrical Temporary Power

2. Contract Line Item, Option No. 005 – Volume 1, Generator. This item consists of furnishing and installing the new generator system and removing the old existing generator system. Refer to drawings, specifications and contract documents for more detail.

a. Work associated with this CLIN includes:

1) Generator in a weatherproof acoustic enclosure

2) Generator Power Electrical Distribution including feeder cables and conduits to to switchboard VSB-E and ATS C feeder (MB1)

3) Load bank

4) PLC system

5) System Distribution switchboard and Feeders

6) Construction of new generator pad and architectural enclosure including all doors, hardware, finishes etc

7) New access stairs to parking area at maintenance yard.

8) Lightning protection to the generator yard

9) Emergency lighting, Lighting and power to generator enclosure

10) Panelboard PB-GLP and feeder and conduit.

11) Fire protection (extinguishers)

12) Generator Fuel System

13) Installation of client provided fuel tank

14) Fuel

15) Existing Generator System Demolition

16) Temporary power to accommodate generator demolition

3. Contract Line Item, Option No. 006 – Volume 1, Concrete Encasement of

Ductbanks. This item consists of furnishing and installing concrete in the electrical site distribution ductbank system. Refer to drawings, specifications and contract documents for more detail.

a. Work associated with this CLIN includes:

C. Payment for Contract Line Items:

1. Measurement for payment will be monthly estimate of project completion.

a. Schedule of Values shall be submitted to Contracting Officer for approval prior to commencement of work.

b. Monthly draws will be a percentage of completion based on the Schedule of

Values.

c. All progress estimates will verified by the Contracting Officer.

CAVE - 219342 01 27 00 - 3

2. Payment will be made at the contract lump sum price.

END OF SECTION 01 27 00

CAVE - 219342 01 27 00 - 4

CAVE - 219342 01 31 00 - 1

PROJECT MANAGEMENT

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions

2. Construction Coordination.

3. Submittals

4. Coordination Drawings.

5. Requests for Information (RFIs).

6. NPS/DSC Project Website.

7. Project meetings.

8. Environmental Coordination.

9. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting

Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

4. Section 01 91 14 “Total Building Commissioning” for coordinating the work with

Owner’s Commissioning Authority.

1.2 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the

Specifications to ensure efficient and orderly installation of each part of the Work.

Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

CAVE - 219342 01 31 00 - 2

5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-installation conferences.

8. Project closeout activities.

9. Commissioning activities.

1.3 SUBMITTALS

A. Daily Work Schedule; Submit a Daily work Schedule detailing construction work in karst sensitive areas or areas where the Electric Resitivity survey showed the likely potential for voids. Submit to Contracting Officer 30 days before start of ground disturbing site work.

B. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.

1. Content: Project-specific information, drawn accurately to scale. Do not base

Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, and electrical systems.

b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to the

Contracting Officer (CO) for resolution of such conflicts.

c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.

d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.

CAVE - 219342 01 31 00 - 3

e. Indicate required installation sequences.

2. Sheet Size: At least 8-1/2 by 11 inchesbut no larger than 30 by 40 inches.

3. Number of Copies: Submit two opaque copies of each submittal. Contracting

Officer will return one copy.

4. Refer to individual Sections for Coordination Drawing requirements for Work in those Section

C. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans: Show architectural and structural elements, and electrical Work.

Supplement plan drawings with section drawings where required to adequately represent the Work.

2. Switch Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of electrical equipment.

3. Structural Penetrations: Indicate penetrations and openings required for all disciplines.

4. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.

5. Electrical Work: Show the following:

a. Runs of vertical and horizontal conduit 1-1/4 inches in diameter and larger.

b. Light fixture, exit light, and emergency battery pack locations.

c. Panel board, switch board, switchgear, transformer, busway, generator, and motor control center locations.

d. Location of pull boxes and junction boxes, dimensioned from column center lines.

6. Review: Contracting Officer (CO) will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If CO determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, CO will so inform Contractor, who shall make changes as directed and resubmit.

7. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."

D. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:

1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.

2. File Preparation Format: AutoCad.dwg, Version 2018, operating in Microsoft

Windows operating system.

3. File Submittal Format: Submit or post coordination drawing files using Portable

Document Format (PDF) file format.

CAVE - 219342 01 31 00 - 4

4. Contracting Officer (CO) will furnish Contractor one set of digital data files

(AutoCad.dwg) of Drawings for use in preparing coordination digital data files.

a. CO makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.

b. Digital Data Software Program: Drawings are available in AutoCad.dwg.

E. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent for Primary Electrical Project.

2. Letter designating Project Superintendent for Elevator 1 & 2 Project.

3. Construction Schedule.

4. A comprehensive breakdown of the Schedule of Values.

5. Accident Prevention Plan.

6. A list of Subcontractors for this project.

7. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

8. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

9. Waste Management Plan.

10. Quality Control Plan.

11. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP).

12. Indoor Air Quality (IAQ) Management Plan.

13. Contractors Commissioning Plan.

14. Historic Preservation Treatment Plan.

15. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

F. All items listed must be provided to the Contracting Officer before the Pre-Construction

Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

1.4 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC Project website.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

CAVE - 219342 01 31 00 - 5

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses,…

This is the start of the file's text. The full file is on GovTribe.