B08_Solit_SCBL_152851_Attach_17_Project_Sustainability_Checklist.XLS

XLS spreadsheet 487 KB Posted

Attached to
SCBL 152851 - Rehabilitate and Expand Visitor Center
Solicitation number
140P2018R0061
Issued by

About this file

Attachment 17 - Project Sustainability Checklist - 140P2018R0061

View the file

Other files

File Type Posted
B09_Amendment_0002_-_Q_and_A.pdf PDF
B09_Amendment_0002_SF-30.pdf PDF
B09_Prebid_Sign-in_Sheet.pdf PDF
B09_Prebid_Meeting_Notes.pdf PDF
B09_Questions_and_Answers.pdf PDF
B09_Amendment_0001_SF-30.pdf PDF
B09_Section_L_-_Amendment_0001.pdf PDF
B08_Solit_SCBL_152851_Attach_06_Utility_Coordination.pdf PDF
B08_Solit_SCBL_152851_Attach_04_WDs.pdf PDF
B08_Solit_SCBL_152851_Attach_01_Specs.pdf PDF
B08_Solit_SCBL_152851_Attach_09_Proposed_Equals.docx DOCX document
B08_Solit_SCBL_152851_Attach_10_Hazmat_ID_Listing.doc DOC document
B08_Solit_SCBL_152851_Attach_16_SubCtrPlan.doc DOC document
B08_Solit_SCBL_152851_Attach_08_Geotech_Report.pdf PDF
B08_Solit_SCBL_152851_Attach_02_Drawings.pdf PDF
B08_Solit_SCBL_152851_Attach_03_Product_Files.pdf PDF
B08_Solit_SCBL_152851_Attach_05_Permit_Discussion.pdf PDF
B08_140P2018R0061.pdf PDF
B08_Solit_SCBL_152851_Attach_12_Past_Performance_Questionnaire.docx DOCX document
B08_Solit_SCBL_152851_Attach_14_SF-24_Bid_Bond.pdf PDF
B08_Solit_SCBL_152851_Attach_11_Key_Personnel_Quals.docx DOCX document
B08_Solit_SCBL_152851_Attach_13_Sub-Contractor_Reference.doc DOC document
B08_Solit_SCBL_152851_Attach_15_General_References.doc DOC document
B08_Solit_SCBL_152851_Attach_07_Hazmat_Report.pdf PDF
B01_SCBL_152851_Synopsis_PreSolitNotice.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions NPS Project Sustainability Checklist Building and Non Building Projects (For New Construction or Renovation) LEED 2009 Edition

INSTRUCTIONS

1This checklist is organized around the LEED NC v3, 2009 checklist and also accounts for progress in meeting federal sustainability requirements (Guiding Principles).
2To complete the checklist fill in all the blank cells under the column for the relevant submission responding with a Y, N or (in some cases) NA and a concise explanation of how the credit/regulation is or is not met. Copy to the next deliverable column unchanged answers for a particular sustainability feature. The purpose of this checklist is first and foremost to record whether sustainability features are included. Therefore it is not sufficient to indicate that a feature is not in the (design or construction) contract. The response should indicate whether this project does include the feature at the particular deliverable stage, and if so, how.
3Sustainability features highlighted in yellow are federal requirements (links to the federal requirements are provided) for all new building projects and major renovations, regardless of size. All federal requirements must be met for all new buildings and major building renovations. For building renovation projects which cost less than 50% of the current replacement value of the building, the project must only comply with those federal requirements applicable to the planned work.
4Compliance with ALL five Guiding Principles is required for a building to be considered in compliance. Projects that meet all the certification requirements of LEED at any of the four levels may not necessarily be compliant with the Guiding Principles.
5This form automatically counts LEED NC credits. As the result, if any LEED prerequisite is not met, the LEED-NC score (located near the top of the checklist) will indicate "Missed Prereq." regardless of the other LEED NC credits achieved.
6Sustainability features that are federal requirements, but have no parallel LEED credit, are identified at the left with green. Clicking the green cell will automatically navigate to the originating federal regulation.
7All Sustainable features indicated with a LEED credit (i.e. SS Credit 2 or EA Credit 3) have defined prescriptive requirements that are indicated in , LEED Reference Guide for Green Building Design and Construction, ©2009 USGBC
8For non-building projects use this same checklist. For federal requirements that don't apply to this non-building project, indicate with NA. Non building projects are defined as construction projects that do NOT include the construction of a building. Examples may include trailside parking, utility line, and road projects.
ADD information regarding maybe's

Checklist NPS Project Sustainability Checklist Building and Non-Building Projects (For New Construction or Renovation) LEED 2009 Edition

Project TypeBuilding Renovation
Project Title:Rehabilitate & Expand Historic Visitor CenterFund Source:Line ItemGross Project Construction Cost:Do NA's count as yes?0
Description:Predesign Begin Date:2015Gross Building Construction Cost:$2,610,000
Park/PMIS:SCBLFY of Const. Funding2017Gross Non Building (i.e. Site) Cost:
Architect/Engineer Firm:AHMB, LLCPark:SCBLBuilding Size (Square Feet)
Date:June 23, 2017State:NERegion:Midwest
Type of BuildingHistoric
Please Input CRV in block to the right for the building(s) in this projectIf Renovation, Exist. Bldg. CRV
% Federal Regulations AchievedIndicate CRV AboveIndicate CRV AboveIndicate CRV AboveIndicate CRV AboveIndicate CRV AboveIndicate CRV AboveABLI
35010001Total LEED-NC CreditsMissed Prereq.Missed Prereq.424039Missed Prereq.ACAD
LEED Certification LevelNot Certified/Missing Prereq.Not Certified/Missing Prereq.Certified (40 to 49)Certified (40 to 49)Below Certified LevelNot Certified/Missing Prereq.ADAM
AFAM
Max. Fed Reqmt?Sustainable Sites (SS)
Maximum LEED NC 2009 Credits: 26AFBG
Fed Reqmt Met?Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionAGFO
Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:ALKANOTES
1001110SS Prereq 1Construction Activity Pollution PreventionYN/AErosion Control measures will be provided for the site disturbance. Permanent seeding/planting; mulching;YN/AErosion Control measures will be provided for the site disturbance including permanent seeding/planting, silt fence, rock socks and inlet protection.YN/AErosion Control measures will be provided for the site disturbance including permanent seeding/planting, silt fence, rock socks and inlet protection.ALAG
1001110SS Credit 1Site SelectionY1Site is not prime farmland. Site is not previously undeveloped.Y1Site is not prime farmland. Site is not previously undeveloped.Y1Site is not prime farmland. Site is not previously undeveloped.ALCA
SS Credit 2Development Density & Community ConnectivityN0N0N0ALEU
SS Credit 3Brownfield RedevelopmentN0N0N0ALFL
SS Credit 4.1Alternative Transportation, Public Transportation AccessN0N0N0ALPO
SS Credit 4.2Alternative Transportation, Bicycle Storage & Changing RoomsN0N0N0AMME
SS Credit 4.3Alternative Transportation, Low-Emitting & Fuel-Efficient VehiclesN0project does not include modifications to existing parking lotN0N0project does not include modifications to existing parking lotAMIS
SS Credit 4.4Alternative Transportation, Parking CapacityN0project does not include modifications to existing parking lotN0N0project does not include modifications to existing parking lotANAC
SS Credit 5.1Site Development, Protect or Restore HabitatY1Use of native or adapted plantsY1Established construction boundaries to minimize disturbance; Selection of native plants in a high diversity mix of speciesY1Established construction boundaries to minimize disturbance; Selection of native plants in a high diversity mix of speciesANDE
SS Credit 5.2Site Development, Maximize Open SpaceN0N0N0ANJO
SS Credit 6.1Stormwater Design, Quantity Control (See EISA Section 438)N0project does not include stormwater detentionN0project site disturbance is estimated to be approximately 0.25 acres. Project does not include stormwater detentionN0project site disturbance is estimated to be approximately 0.25 acres. Project does not include stormwater detentionANIA
SS Credit 6.2Stormwater Design, Quality Control (See EISA Section 438)N0stormwater for new walks and building roof will discharge over grass and grassed swale. Level of water quality provided can be reviewed during Design Development.N0stormwater for new walks and building roof will discharge over grass and grassed swale. Available swale length is adequate for the small added impervious area and resulting runoff.N0stormwater for new walks and building roof will discharge over grass and grassed swale. Available swale length is adequate for the small added impervious area and resulting runoff.ANTI
1001110EISA 2007, Section 438Protect HydrologyYN/ADrainage patterns will be consistent with existing drainage. Total added impervious area is anticipated to be less than 5,000 sq ft.YN/ADrainage patterns will be consistent with existing drainage. Total added impervious area is estimated to be less than 5,000 sq ft.YN/ADrainage patterns will be consistent with existing drainage. Total added impervious area is estimated to be less than 5,000 sq ft.ANCM
SS Credit 7.1Heat Island Effect, Non-RoofY1Shade from native trees and shrubsY1Shade from native treesY1Shade from native treesAPIS
SS Credit 7.2Heat Island Effect, RoofNHistoric wood shingles are deep red; new will match in kindN0Historic wood shingles are deep red; new will match in kindN0New cedar shingles will be installed to match existing in kind.APPA
SS Credit 8Light Pollution ReductionY1Minimal site lighting; exterior fixtures are full cutoff and are to remain; interior lighting will comply w this creditY11. Site lighting is minimized

2. Exterior lighting will be full cut-off.

3. Interior lighting will not have direct spillage

4. There are not spot lights Y 1 1. Site lighting is existing/relocated.

2. New exterior lighting will be full cut-off.

3. Interior lighting will not have direct spillage

4. There are not spot lights.APCO
10010102006 NPS Mgmt Policies (Para. 4.9)Soundscape PreservationYN/ANo exterior noise producing equipmentYN/ADue to the increase in square footage of the building and increase of indoor air quality derived from the ventilation air, there is an increased need for cooling capacity. Despite more than doubling the cooling capacity, the new outdoor condensing units’ decibel level will be less than a 10% increase over the existing condensing units. Additionally, the new mechanical enclosure will mitigate the transmittance of sound to public and occupied spaces (currently, there is no enclosure providing any acoustical barrier). Overall, this will be an improvement to the existing soundscape.ARCH
10011102006 NPS Mgmt Policies (Para. 4.10)Dark Sky PreservationYN/AAll site and building exterior lighting is existing to remain. New lighting will be full cut-off lighting.YN/A1. Site lighting is minimized

2. Exterior lighting will be full cut-off.

3. Interior lighting will not have direct spillage

4. There are not spot lights Y N/A 1. Site lighting is existing/relocated.

2. New exterior lighting will be full cut-off.

3. Interior lighting will not have direct spillage

4. There are not spot lights.ARPO
LEED-NC SubtotalMissed Prereq.Missed Prereq.444Missed Prereq.ARHO
Water Efficiency (WE)
Maximum LEED NC 2009 Credits: 10ASIS
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionAZRU
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:BADL
1001110WE Prereq 1Water Use Reduction, 20% Reduction (see Guiding Principle III - Protect and Conserve Water)YN/ARequirement will be met via utilization of Water Sense and other low flow water closets, urinals, lavatories, sinks, and showers.YN/ARequirement will be met via utilization of Water Sense and other low flow water closets, urinals, lavatories, sinks, and showers.YN/ARequirement will be met via utilization of Water Sense and other low flow water closets, urinals, and lavatories.BAWA
1001110WE Credit 1Water Efficient Landscaping, Reduce by 50% (see Guiding Principle III - Protect and Conserve Water)Y2Use of low-water native plantsY2Use of native, low water plants and removal of high-water use lawn.Y2Use of native plants; irrigation system includes rain sensorBAND
WE Credit 1
(cont'd)Water Efficient Landscaping, No Potable Use or No IrrigationN0Existing lawn requires repair and repair current irrigation system; new plantings are native, low-water speciesN0Re-use of existing irrigation systemN0Re-use of existing irrigation systemBATT
WE Credit 2Innovative Wastewater TechnologiesN0N0N0BEOL
1001110NPS PolicyWater MeteringYN/AThe building has an existing water meter. The only new water line is a fire line that does not require metering.YN/AA new water meter is to be provided as part of the plumbing scope.YN/AA new water meter is to be provided as part of the plumbing scope.BELA
1000000EPACT 2005, Section 109Water Used for Energy ConservationNAN/ANAN/ANAN/ABIBE
WE Credit 3Water Use Reduction (30%, 35%, 40%)Y2Water Sense and other low flow fixtures shall be utilized to achieve 30% water use reduction.Y2Water Sense and other low flow fixtures shall be utilized to achieve 30% water use reduction.Y2Water Sense and other low flow fixtures shall be utilized to achieve 30% water use reduction.BICY
LEED-NC SubtotalMissed Prereq.Missed Prereq.444Missed Prereq.BIHO
Energy & Atmosphere (EA)
Maximum LEED NC 2009 Credits: 35BISO
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionBITH
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:BICA
1001110EA Prereq 1Fundamental Commissioning of the Building Energy Systems * (see Guiding Principle I - Employ Integrated Design Principles)YN/AFundamental commissioning shall be provided, the plan shall be developed in future design phases.YN/AFundamental commissioning shall be provided, the plan shall be developed in future design phases.YN/AFundamental commissioning shall be provided, the plan shall be developed in future design phases.BISC
1001110EA Prereq 2Minimum Energy Performance (see Guiding Principle II Optimize Energy Performance)YN/ADesign shall exceed ASHRAE 2010 Baseline Building by at least 30%.YN/ADesign shall exceed ASHRAE 2010 Baseline Building by at least 30%.YN/ADesign shall exceed ASHRAE 2010 Baseline Building by at least 30%.BLCA
1001110EA Prereq 3Fundamental Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials)YN/ANo CFC or HCFC refrigerants shall be utilized.YN/ANo CFC or HCFC refrigerants shall be utilized.YN/ANo CFC or HCFC refrigerants shall be utilized.BLAC
1001110EA Credit 1Optimize Energy Performance:** (Federal Regulations require 30% for New Construction and 20% for Existing Building Renovation. Note that this automatically equates to 10 Points for New Construction and 7 Points for Existing Building Renovation.) (see Guiding Principle II - Optimize Energy Performance)Y10The lightign and electrical system design is anticipated to beat the baseline energy code/guidelines by a minimum of 20% for existing buildings. Design shall exceed ASHRAE 2010 Baseline Building by at least 30%.Y10The lighting and electrical system design is anticipated to beat the baseline energy code/guidelines by a minimum of 20% for existing buildings. Design shall exceed ASHRAE 2010 Baseline Building by at least 30%.Y10The lighting and electrical system design is anticipated to beat the baseline energy code/guidelines by a minimum of 20% for existing buildings. Design shall exceed ASHRAE 2010 Baseline Building by at least 30%.BLRI
1000000EISA 2007, Section 433Reduce Fossil Fuel Derived EnergyNAN/ANAN/ANAN/ABLUE
1000000EO 13963Procure Environmentally sustainable electronic products (Predominantly relates to purchases of desktop/laptop computer and peripherals)NAN/ANAN/ANAN/ABOWA
1001110CFR Title 10, Part 436.4Procure Energy Star or FEMP designated productsYN/AEnergy Star or FEMP designated products shall be specified where available.YN/AEnergy Star or FEMP designated products shall be specified where available.YN/AEnergy Star or FEMP designated products have been specified where available.BOST
1001110EPACT 2005, Section 104Premium Efficiency Electric MotorsYN/AAll motors specified greater than 1.0 HP shall be premium efficiency.YN/AAll motors specified greater than 1.0 HP shall be premium efficiency.YN/AAll motors specified greater than 1.0 HP shall be premium efficiency.BOAF
1000000EISA 2007, Section 523On-Site Renewable Energy*** Solar Thermal for Hot Water (Choose NA if proven not life cycle cost effective)NAN/ANAN/ANAN/ABOHA
EA Credit 2On-Site Renewable Energy*** 1%-13% Renewable EnergyN0VA demonstrated value to ground-mounted pv, but budget will not support purchase at this timeN0VA demonstrated value to ground-mounted pv, but budget will not support purchase at this timeN0VA demonstrated value to ground-mounted pv, but budget will not support purchase at this timeBRCR
1001000EA Credit 3Enhanced Commissioning (required for projects with building size > 5,000 sf) (see Guiding Principle I - Employ Integrated Design Principles)Y2Enhanced commissioning shall be provided, the plan shall be developed in future design phases.N0Due to the fact that the project consists of an addition/renovation rather than a new build and the nature of the systems being installed, enhanced commissioning is not recommended.N0Due to the fact that the project consists of an addition/renovation rather than a new build and the nature of the systems being installed, enhanced commissioning is not recommended.BRVB
1001110EA Credit 4Enhanced Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials)Y2Refrigerant systems shall utilize R-410A to minimize or eliminate ozone depletion and global climate change.Y2Refrigerant systems shall utilize R-410A to minimize or eliminate ozone depletion and global climate change.Y2Refrigerant systems shall utilize R-410A to minimize or eliminate ozone depletion and global climate change.BUIS
1001110EA Credit 5Measurement & Verification (see Guiding Principle II - Optimize Energy Performance)Y3Building level utility meters shall be provided.Y3Building level utility meters shall be provided.Y3Building level utility meters shall be provided.BUFF
MOU Guiding Principles & EO 13693Measurement & Verification (see Guiding Principle II - Optimize Energy Performance)NA0NA0NA0
EA Credit 6Green PowerN0It is not anticipated that green alternate sources of energy will be available for this project.N0It is not anticipated that green alternate sources of energy will be available for this project.N0It is not anticipated that green alternate sources of energy will be available for this project.CABR
LEED-NC SubtotalMissed Prereq.Missed Prereq.171515Missed Prereq.CALI
Materials & Resources (MR)
Maximum LEED NC 2009 Credits: 14CANA
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionCRHA
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:CARI
MR Prereq 1Storage & Collection of RecyclablesYN/Aspace will be provided in staff break roomYN/Aspace will be provided in staff break roomYN/Aspace will be provided in staff work roomCACH
MR Credit 1.1Building Reuse, Maintain Existing Walls, Floors & RoofY2Expansion retains most of existing building and roofY2Expansion retains most of existing building and roofY2Expansion retains most of existing building and roofCANY
MR Credit 1.2Building Reuse, Maintain Interior Nonstructural ElementsY1Y1Y1CACO
1001110MR Credit 2Construction Waste Management, Divert 50% from Disposal (see Guiding Principle V - Reduce Environmental Impact of Materials)Y1general conditions will addressY1Addressed in general conditions.Y1Addressed in general conditions.CAHA
MR Credit 2
(cont'd)Construction Waste Management, Divert 75% from DisposalN0N0N0Adobe diversion opportunities are minimalCAME
MR Credit 3Materials ReuseN0project includes system replacementN0Project includes system replacementN0Project includes system replacementCAKR
1001110MR Credit 4Recycled Content, 10% (post-consumer + ½ pre-consumer). Use EPA's CPG for designated products to use)Y1Will need to verify as design progressesY1Up to 20% fly ash content allowed in concrete mix.Y1Up to 20% fly ash content allowed in concrete mix.CALO
MR Credit 4Recycled Content, 20% (post-consumer + ½ pre-consumer)N0N0Is noted in Div 1 - but detailed reporting is not required.N0Is noted in Div 1 - but detailed reporting is not required.CAHE
MR Credit 5Regional Materials, Extracted, Processed & Manufactured RegionallyY1Will need to verify as design progressesY1Will need to verify as design progressesN0Probably not achievable, given project locationCARE
1001110EO13693Biopreferred ProductsYN/AYN/AIs required by Div 1.YN/AIs required by Div 1.CAVO
MR Credit 6Rapidly Renewable MaterialsN0N0None specifiedN0None specifiedCARL
0001110MR Credit 7Certified Wood (see Guiding Principle V - Reduce Environmental Impact of Materials) - Note: LEED requires FSC certification, but for compliance with federal requirements any of the following certifications are sufficient: Forest Stewardship Council (FSC), Sustainable Forestry Initiative (SFI), American Tree Farm System (ATFS), or Programme for the Endorsement of Forest Certification (PEFC)Y1specifications may requireY1specifications may requireY1CAVE
LEED-NC SubtotalMissed Prereq.Missed Prereq.776Missed Prereq.CAWO
Indoor Environmental Quality (EQ)
Maximum LEED NC 2009 Credits: 15CAGR
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionCASA
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:CACL
1001110EQ Prereq 1Minimum IAQ Performance (See Guiding Principle IV, Enhance Indoor Environmental Quality)YN/ARequirement will be met.YN/ARequirement will be met.YN/ARequirement will be met.CATO
EQ Prereq 2Environmental Tobacco Smoke (ETS) ControlYN/AYN/AYN/ACEBR
EQ Credit 1Outdoor Air Delivery MonitoringY1Airflow measuring with accuracy of +/- 15%.Y1Airflow measuring with accuracy of +/- 15%.Y1Airflow measuring with accuracy of +/- 15%.CEBE
EQ Credit 2Increased VentilationN0N0N0CHSC
1001110EQ Credit 3.1Construction IAQ Management Plan, During Construction (See Guiding Principle IV, Enhance Indoor Environmental Quality)Y1All filtration media shall be replaced after construction and before occupancy. Construction activities shall also be isolated to prevent contamination of clean or occupied spaces. Finally, cleaning activities shall be conducted to control contaminants in the building.Y1All filtration media shall be replaced after construction and before occupancy. Construction activities shall also be isolated to prevent contamination of clean or occupied spaces. Finally, cleaning activities shall be conducted to control contaminants in the building.Y1All filtration media shall be replaced after construction and before occupancy. Construction activities shall also be isolated to prevent contamination of clean or occupied spaces. Finally, cleaning activities shall be conducted to control contaminants in the building.CHCU
1000000EQ Credit 3.2Construction IAQ Management Plan, Before Occupancy (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0N0N0CHAM
1001110EQ Credit 4.1Low-Emitting Materials, Adhesives & Sealants (See Guiding Principle IV, Enhance Indoor Environmental Quality)Y1Y1Y1CHIS
1001110EQ Credit 4.2Low-Emitting Materials, Paints & Coatings (See Guiding Principle IV, Enhance Indoor Environmental Quality)Y1Y1Y1CHPI
1001110EQ Credit 4.3Low-Emitting Materials, Flooring Materials (See Guiding Principle IV, Enhance Indoor Environmental Quality)Y1Will need to verify w Exhibit Designer as we're matching thoughout other spacesY1Y1CHAT
EQ Credit 4.4Low-Emitting Materials, Composite Wood & Agrifiber ProductsY1Y1Y1CHOH
EQ Credit 5Indoor Chemical & Pollutant Source ControlY1Y1Y1CBPO
1001110MOU Guiding Principles & EO 13423Moisture ControlYN/AYN/ASpecifed in Div 1YN/ASpecifed in Div 1CHCH
1001110EQ Credit 6.1Controllability of Systems, Lighting (See Guiding Principle IV, Enhance Indoor Environmental Quality)Y1Lighting controls shall be reconfigured to enhance indoor environment quality,.Y1Lighting controls shall be reconfigured to enhance indoor environment quality,.Y1Lighting controls shall be reconfigured to enhance indoor environment quality,.CHIC
EQ Credit 6.2Controllability of Systems, Thermal ComfortY1Individual comfort controls shall be provided for the mechanical system.Y1Individual comfort controls shall be provided for the mechanical system.Y1Individual comfort controls shall be provided for the mechanical system.CHRO
1001110EQ Credit 7.1Thermal Comfort, Design (See Guiding Principle IV, Enhance Indoor Environmental Quality)Y1Requirement will be met.Y1Requirement will be met.Y1Requirement will be met.CHIR
EQ Credit 7.2Thermal Comfort, VerificationN0N0N0CHRI
1000000EQ Credit 8.1Daylight & Views, Daylight 75% of Spaces (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0Existing exterir wall and window configurations are existing to remain and do not meet these requirements.N0Existing exterir wall and window configurations are existing to remain and do not meet these requirements.N0Existing exterir wall and window configurations are existing to remain and do not meet these requirements.CIRO
EQ Credit 8.2Daylight & Views, Views for 90% of SpacesN0Existing building is not view-friendlyN0Existing building is not view-friendlyN0Existing building is not view-friendlyCLBA
LEED-NC SubtotalMissed Prereq.Missed Prereq.101010Missed Prereq.CLMO
Innovation & Design Process (ID)
Maximum LEED NC 2009 Credits: 6COLO
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionCOLM
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:COSW
ID Credit 1.1Innovation in Design: Provide Specific TitleCOGA
ID Credit 1.2Innovation in Design: Provide Specific TitleCORO
ID Credit 1.3Innovation in Design: Provide Specific TitleCOWP
ID Credit 1.4Innovation in Design: Provide Specific TitleCRLA
ID Credit 1.5Innovation in Design: Provide Specific TitleCRMO
ID Credit 2LEED® Accredited ProfessionalCUGA
LEED-NC Subtotal000000CUIS
Regional Priority (RP)
Maximum LEED NC 2009 Credits: 4CURE
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionCUVA
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:DABE
RP Credit 1.1Regional Priority Credit: Region DefinedDAAV
RP Credit 1.2Regional Priority Credit: Region DefinedDESO
RP Credit 1.3Regional Priority Credit: Region DefinedDEVA
RP Credit 1.4Regional Priority Credit: Region DefinedDELA
LEED-NC Subtotal000000DELE
Non-LEED-NC Federal Requirements
Maximum LEED NC 2009 Credits: 26DEWA
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionDENA
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:DEMO
1011111MOU Guiding Principles & EO 13423 (pg. 3)Complete Integrated Design Narrative During Predesign OnlyN/AN/AYN/AN/AN/AN/AN/AN/AN/AN/AN/ADEPO
DETO
Fulfillment of Guiding Principles for HPSB completes 18 LEED NC credits and 6 prerequisites.DINO
LEED Certification Rating SystemDRTO
Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ pointsEBLA
For more information on LEED Certification and credits, visit www.usgbc.orgEDAL
EFMO
* For new buildings of 5,000 GSF or more and major renovations to buildings greter than or equal to 5,000 GSF, contract with an independent Commissioning Authority and comply with ASHRAE 0-2005, "The Commissioning Process". For smaller projects, comply with the requirements of LEED NC 2009, EA Prerequisite 1, "Fundamental Commissioning of the Building Energy Systems" (which allows the commissioning authority to be an employee of the design firm).EISE
** For new building projects of 5,000 GSF or more, perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential) to show performance at least 30% better (20% for major renovations) than a code compliant similar building. If it can be shown that meeting the 30% performance standard for new construction (or 20% for major renovations) is not life cycle cost effective (over 40 years - not 25 years per a recent regulatory change) then the project must incorporate the maximum energy savings that can be shown to be life cycle cost effective. For new building projects with a lower net construction value, an alternative method is to meet or exceed the minimum requirements prescribed by the ASHRAE Advanced Energy Design Guide (a much simpler prescriptive method for achieving the target) appropriate for the project's building. For buildings without an appropriate Advanced Energy Design Guide perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential).ELTE
*** The federal requirement (from EISA 2007) that relates to these LEED-NC credits is "Where life cycle cost effective, design systems to provide not less than 30 percent of the hot water demand through the installation and use of solar hot water heaters." The LEED credits for this item stipulates a percentage of total energy consumption to be provided by on site renewable sources. In some cases meeting the federal requirement will also meet the LEED requirement for these credits.ELCA
ELMA
ELMO
ELRO
ELIS
ERIE
ESSE
EUON
EVER
FAMA
FEHA
FIIS
FILA
FLNI
FLFO
FOTH
FOBO
FOCA
FODA
FODO
FDNC
FODU
FOFO
FOFR
FOLA
FOLS
FOMA
FOMC
FOMO
FONE
FOPO
FOPU
FORA
FOSC
FOSM
FOST
FOSU
FOUN
FOUS
FOVA
FOWA
FOBU
FRDE
FRDO
FRLA
FRED
FRSP
FRHI
GAAR
GATE
GARI
GEGR
GEMM
GERO
GWMP
GEWA
GWCA
GETC
GETT
GICL
GLAC
GLBA
GLCA
GLEC
GLDE
GOGA
GOSP
GOIS
GRCA
GRPO
GRTE
GRKO
GRBA
GREG
GRFA
GRSA
GRSM
GRSP
GREE
GUMO
GUCO
GUIS
HAFO
HALE
HAGR
HAMP
HAHA
HAFE
HSTR
HAVO
HEHO
PIMA
HOFR
HOME
HOCU
HOFU
HOBE
HOSP
HOVE
HUTR
IATR
ILMI
INDE
INDU
INUP
ISRO
JAGA
JAME
JELA
JEFF
JECA
JICA
JODR
JODA
JOER
JOFI
JOMU
JOFL
JOTR
JUBA
KALA
KAHO
KATM
KEFJ
KEPA
KEMO
KEWE
KIMO
KLGO
KLSE
KNRI
KOVA
KOWA
LACH
LACL
LAME
LAMR
LARO
LAVO
LABE
LECL
LEWI
LINC
LIBO
LIHO
LIBI
LIRI
LONG
LOWE
LOEA
LYJO
LYBA
MAWA
MAAC
MACA
MANA
MASI
MANZ
MABI
MALU
MAVA
MAMC
MCHO
MEVE
MIIN
MIMA
MIMI
MISS
MNRR
MOJA
MONO
MOCA
MOCR
MOPI
MORR
MORA
MORU
MUWO
NATC
NATR
NATT
NACE
NAMA
NACC
NPSA
NPNH
NWWM
NABR
NAVA
NEBE
NEJE
PINE
JAZZ
NERI
NEPE
NIFA
NICO
NISI
NIOB
NOAT
NOCA
NOCO
OBED
OCMU
OKCI
OPOT
OLSP
OLYM
OREG
ORCA
ORPI
OVVI
OXHI
OZAR
PAIS
PAAL
PARA
PERI
PECO
PIMI
PAAV
PEVI
PETE
PEFO
PETR
PIRO
PINN
PISP
PIPE
PISC
PORE
POEX
POGR
POCH
POHE
POPO
WHHO
PRSF
PRWI
PUHO
PUHE
QUSH
RABR
REDW
RICH
RIGR
ROCR
ROMO
ROWI
ROCA
RORI
ROLA
RUCA
SAHI
SAGU
SACN
SACR
SAPA
SAGA
SAMA
SAPU
SARI
SAAN
SAFR
SAJU
SAJH
SAND
SAFE
SAMO
SARA
SAIR
SCBL
SEMO
SEKI
SEBE
SHEN
SHIL
SHNC
SITK
SLBE
SPAR
STSP
STLI
STEA
STRI
SRNC
SUIT
SUCR
TAPR
THKO
OLST
THRO
THRB
THRI
THIS
EDIS
THJE
THST
TICA
TIMU
TONT
TOSY
TRTE
TUMA
TUPE
TUAI
TUIN
TUZI
USAR
ULSG
UPDE
VAFO
VAMA
VICK
VINC
VIVE
VIIS
VICR
VOYA
WACA
WAPA
WASH
WABA
WEFA
NWAK
WHIS
WHSA
WHMI
WIHO
WICR
WICA
WOTR
WORI
WRST
WRBR
WUPA
YELL
YORK
YONB
YOSE
YUHO
YUCH
ZION

&CForm E 62 (8/2/13)&R&P Erosion and Sediment Control Strategies:

1. Develop a Storm Water Pollution Prevention Plan (SWPPP)

2. Temporary seeding/planting

3. Permanent seeding/planting

4. Mulching

5. Earth dike

6. Silt fence

7. Sediment trap

8. Sediment Basin

9. If project involves interior work only, answer yes.

9. Other Site Selection:

1. Site is NOT prime farmland

2. Site is NOT previously undeveloped land lower than 5 ft. above 100 year flood plain.

3. Land is NOT habitat for threatened or endangered species.

4. Land is NOT within 100 ft. of wetlands

5. Land is public parkland (Parkland Exception)

6. Other Development Density:

1. Construct or renovate a building on a previously developed site and in a community with a min. density of 60,000 SF/Acre

2. Building is located on a previously developed site

3. Building is within 1/2 mile of a residential area with an avg. density of 10 Units/Acre

4. Building is located within 1/2 mile of at least 10 basic services

5. Building has pedestrian access between building and services

6. Other Brownfield Redevelopment:

1. Develop on a site documented as contaminated (ASTM E1903-97 Phase 2)

2. Develop on a site defined as a Brownfield by local, state, or federal agency

3. Other Alternative Transportation:

1. Locate project within 1/2 mile walking distance of an existing or planned and funded commuter rail, light rail, or subway station

2. Locate the project within 1/4 mile walking distance of 1 or more stops for 2 or more public, campus, or private bus lines useable by building occupants

3. Other Bicycle Storage and Changing Rooms:

1. Provide secure bicycle racks/storage within 200 yards of building entrance for 5% of all building users (peak) AND provide shower/changing facilities within 200 yards of building entrance for 0.5% of FTE occupants.

2. Provide covered storage facilities for securing bicycles for 15% of building occupants

3. Other Low Emitting & Fuel Efficient Vehicles:

1. Provide preferred parking for low-emitting and fuel-efficient vehicles for 5% of vehicle parking capacity (discounted parking rates may be acceptable substitute - consult ref. guide)

2. Install alternative-fuel fueling stations for 3% of the total vehicle parking capacity. Liquid or gaseous fueling facilities must be separately ventilated or located outdoors.

3. Other Parking Capacity:

1. Parking capacity sized to meet but not exceed local zoning requirements

2. Provide preferred parking for carpools/vanpools for 5% of total parking spaces.

3. The project provides parking for less than 5% of FTE occupants.

4. Provide discounted parking for carpools/vanpools may be substituted for preferred parking

5. Provide no new parking

6. Provide infrastructure/support to facilitate shared vehicle use (see ref. guide for examples)

7. Other Site Development - Protect or Restore Habitat:

1. Stack the building program

2. Tuck-under parking

3. Share parking facilities with neighbors

4. Establish construction boundaries to minimize disturbance of the existing site

5. Restore previously degraded areas to their natural state

6. Select of appropriate native or adapted plants.

7. Prohibit plants listed as invasive or noxious weed species.

8. Avoid monoculture

9. Other Maximize Open Space

1. Stacking the building program

2. Tuck-under parking

3. Sharing parking facilities

4. Other Stormwater Design-Quantity Control:

1. Vegetated Roofs,

2. Pervious Paving

3. Reuse stormwater for landscape irrigation

4. Reuse stormwater for toilet and urinal flushing

5. Reuse stormwater for custodial uses

6. Other Stormwater Design-Quality Control:

1. Vegetated roofs

2. Pervious pavement

3. Grid pavers

4. Rain Gardens

5. Vegetated Swales

6. Disconnection of Imperviousness

7. Rainwater Recycling

8. Low-impact development

9. Environmentally Sensitive Design

10. Constructed wetlands

11. Vegetated Filters

12. Other Protect Hydrology

For development footprints that exceeds 5,000 square feet maintain or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.