B08_Solit_SCBL_152851_Attach_17_Project_Sustainability_Checklist.XLS
XLS spreadsheet 487 KB Posted
- Solicitation number
- 140P2018R0061
About this file
Attachment 17 - Project Sustainability Checklist - 140P2018R0061
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions NPS Project Sustainability Checklist Building and Non Building Projects (For New Construction or Renovation) LEED 2009 Edition
INSTRUCTIONS
| 1 | This checklist is organized around the LEED NC v3, 2009 checklist and also accounts for progress in meeting federal sustainability requirements (Guiding Principles). |
| 2 | To complete the checklist fill in all the blank cells under the column for the relevant submission responding with a Y, N or (in some cases) NA and a concise explanation of how the credit/regulation is or is not met. Copy to the next deliverable column unchanged answers for a particular sustainability feature. The purpose of this checklist is first and foremost to record whether sustainability features are included. Therefore it is not sufficient to indicate that a feature is not in the (design or construction) contract. The response should indicate whether this project does include the feature at the particular deliverable stage, and if so, how. |
| 3 | Sustainability features highlighted in yellow are federal requirements (links to the federal requirements are provided) for all new building projects and major renovations, regardless of size. All federal requirements must be met for all new buildings and major building renovations. For building renovation projects which cost less than 50% of the current replacement value of the building, the project must only comply with those federal requirements applicable to the planned work. |
| 4 | Compliance with ALL five Guiding Principles is required for a building to be considered in compliance. Projects that meet all the certification requirements of LEED at any of the four levels may not necessarily be compliant with the Guiding Principles. |
| 5 | This form automatically counts LEED NC credits. As the result, if any LEED prerequisite is not met, the LEED-NC score (located near the top of the checklist) will indicate "Missed Prereq." regardless of the other LEED NC credits achieved. |
| 6 | Sustainability features that are federal requirements, but have no parallel LEED credit, are identified at the left with green. Clicking the green cell will automatically navigate to the originating federal regulation. |
| 7 | All Sustainable features indicated with a LEED credit (i.e. SS Credit 2 or EA Credit 3) have defined prescriptive requirements that are indicated in , LEED Reference Guide for Green Building Design and Construction, ©2009 USGBC |
| 8 | For non-building projects use this same checklist. For federal requirements that don't apply to this non-building project, indicate with NA. Non building projects are defined as construction projects that do NOT include the construction of a building. Examples may include trailside parking, utility line, and road projects. |
| ADD information regarding maybe's |
Checklist NPS Project Sustainability Checklist Building and Non-Building Projects (For New Construction or Renovation) LEED 2009 Edition
| Project Type | Building Renovation | ||||||||||||||||||||||||||||||
| Project Title: | Rehabilitate & Expand Historic Visitor Center | Fund Source: | Line Item | Gross Project Construction Cost: | Do NA's count as yes? | 0 | |||||||||||||||||||||||||
| Description: | Predesign Begin Date: | 2015 | Gross Building Construction Cost: | $2,610,000 | |||||||||||||||||||||||||||
| Park/PMIS: | SCBL | FY of Const. Funding | 2017 | Gross Non Building (i.e. Site) Cost: | |||||||||||||||||||||||||||
| Architect/Engineer Firm: | AHMB, LLC | Park: | SCBL | Building Size (Square Feet) | |||||||||||||||||||||||||||
| Date: | June 23, 2017 | State: | NE | Region: | Midwest | ||||||||||||||||||||||||||
| Type of Building | Historic | ||||||||||||||||||||||||||||||
| Please Input CRV in block to the right for the building(s) in this project | If Renovation, Exist. Bldg. CRV | ||||||||||||||||||||||||||||||
| % Federal Regulations Achieved | Indicate CRV Above | Indicate CRV Above | Indicate CRV Above | Indicate CRV Above | Indicate CRV Above | Indicate CRV Above | ABLI | ||||||||||||||||||||||||
| 35 | 0 | 1 | 0 | 0 | 0 | 1 | Total LEED-NC Credits | Missed Prereq. | Missed Prereq. | 42 | 40 | 39 | Missed Prereq. | ACAD | |||||||||||||||||
| LEED Certification Level | Not Certified/Missing Prereq. | Not Certified/Missing Prereq. | Certified (40 to 49) | Certified (40 to 49) | Below Certified Level | Not Certified/Missing Prereq. | ADAM | ||||||||||||||||||||||||
| AFAM | |||||||||||||||||||||||||||||||
| Max. Fed Reqmt? | Sustainable Sites (SS) | ||||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 26 | AFBG | ||||||||||||||||||||||||||||||
| Fed Reqmt Met? | Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | AGFO | |||||||||||||||||||||||
| Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | ALKA | NOTES | ||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | SS Prereq 1 | Construction Activity Pollution Prevention | Y | N/A | Erosion Control measures will be provided for the site disturbance. Permanent seeding/planting; mulching; | Y | N/A | Erosion Control measures will be provided for the site disturbance including permanent seeding/planting, silt fence, rock socks and inlet protection. | Y | N/A | Erosion Control measures will be provided for the site disturbance including permanent seeding/planting, silt fence, rock socks and inlet protection. | ALAG | |||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | SS Credit 1 | Site Selection | Y | 1 | Site is not prime farmland. Site is not previously undeveloped. | Y | 1 | Site is not prime farmland. Site is not previously undeveloped. | Y | 1 | Site is not prime farmland. Site is not previously undeveloped. | ALCA | |||||||||||||
| SS Credit 2 | Development Density & Community Connectivity | N | 0 | N | 0 | N | 0 | ALEU | |||||||||||||||||||||||
| SS Credit 3 | Brownfield Redevelopment | N | 0 | N | 0 | N | 0 | ALFL | |||||||||||||||||||||||
| SS Credit 4.1 | Alternative Transportation, Public Transportation Access | N | 0 | N | 0 | N | 0 | ALPO | |||||||||||||||||||||||
| SS Credit 4.2 | Alternative Transportation, Bicycle Storage & Changing Rooms | N | 0 | N | 0 | N | 0 | AMME | |||||||||||||||||||||||
| SS Credit 4.3 | Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles | N | 0 | project does not include modifications to existing parking lot | N | 0 | N | 0 | project does not include modifications to existing parking lot | AMIS | |||||||||||||||||||||
| SS Credit 4.4 | Alternative Transportation, Parking Capacity | N | 0 | project does not include modifications to existing parking lot | N | 0 | N | 0 | project does not include modifications to existing parking lot | ANAC | |||||||||||||||||||||
| SS Credit 5.1 | Site Development, Protect or Restore Habitat | Y | 1 | Use of native or adapted plants | Y | 1 | Established construction boundaries to minimize disturbance; Selection of native plants in a high diversity mix of species | Y | 1 | Established construction boundaries to minimize disturbance; Selection of native plants in a high diversity mix of species | ANDE | ||||||||||||||||||||
| SS Credit 5.2 | Site Development, Maximize Open Space | N | 0 | N | 0 | N | 0 | ANJO | |||||||||||||||||||||||
| SS Credit 6.1 | Stormwater Design, Quantity Control (See EISA Section 438) | N | 0 | project does not include stormwater detention | N | 0 | project site disturbance is estimated to be approximately 0.25 acres. Project does not include stormwater detention | N | 0 | project site disturbance is estimated to be approximately 0.25 acres. Project does not include stormwater detention | ANIA | ||||||||||||||||||||
| SS Credit 6.2 | Stormwater Design, Quality Control (See EISA Section 438) | N | 0 | stormwater for new walks and building roof will discharge over grass and grassed swale. Level of water quality provided can be reviewed during Design Development. | N | 0 | stormwater for new walks and building roof will discharge over grass and grassed swale. Available swale length is adequate for the small added impervious area and resulting runoff. | N | 0 | stormwater for new walks and building roof will discharge over grass and grassed swale. Available swale length is adequate for the small added impervious area and resulting runoff. | ANTI | ||||||||||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EISA 2007, Section 438 | Protect Hydrology | Y | N/A | Drainage patterns will be consistent with existing drainage. Total added impervious area is anticipated to be less than 5,000 sq ft. | Y | N/A | Drainage patterns will be consistent with existing drainage. Total added impervious area is estimated to be less than 5,000 sq ft. | Y | N/A | Drainage patterns will be consistent with existing drainage. Total added impervious area is estimated to be less than 5,000 sq ft. | ANCM | |||||||||||||
| SS Credit 7.1 | Heat Island Effect, Non-Roof | Y | 1 | Shade from native trees and shrubs | Y | 1 | Shade from native trees | Y | 1 | Shade from native trees | APIS | ||||||||||||||||||||
| SS Credit 7.2 | Heat Island Effect, Roof | N | Historic wood shingles are deep red; new will match in kind | N | 0 | Historic wood shingles are deep red; new will match in kind | N | 0 | New cedar shingles will be installed to match existing in kind. | APPA | |||||||||||||||||||||
| SS Credit 8 | Light Pollution Reduction | Y | 1 | Minimal site lighting; exterior fixtures are full cutoff and are to remain; interior lighting will comply w this credit | Y | 1 | 1. Site lighting is minimized |
2. Exterior lighting will be full cut-off.
3. Interior lighting will not have direct spillage
4. There are not spot lights Y 1 1. Site lighting is existing/relocated.
2. New exterior lighting will be full cut-off.
3. Interior lighting will not have direct spillage
| 4. There are not spot lights. | APCO | ||||||||||||||||||
| 1 | 0 | 0 | 1 | 0 | 1 | 0 | 2006 NPS Mgmt Policies (Para. 4.9) | Soundscape Preservation | Y | N/A | No exterior noise producing equipment | Y | N/A | Due to the increase in square footage of the building and increase of indoor air quality derived from the ventilation air, there is an increased need for cooling capacity. Despite more than doubling the cooling capacity, the new outdoor condensing units’ decibel level will be less than a 10% increase over the existing condensing units. Additionally, the new mechanical enclosure will mitigate the transmittance of sound to public and occupied spaces (currently, there is no enclosure providing any acoustical barrier). Overall, this will be an improvement to the existing soundscape. | ARCH | ||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | 2006 NPS Mgmt Policies (Para. 4.10) | Dark Sky Preservation | Y | N/A | All site and building exterior lighting is existing to remain. New lighting will be full cut-off lighting. | Y | N/A | 1. Site lighting is minimized |
2. Exterior lighting will be full cut-off.
3. Interior lighting will not have direct spillage
4. There are not spot lights Y N/A 1. Site lighting is existing/relocated.
2. New exterior lighting will be full cut-off.
3. Interior lighting will not have direct spillage
| 4. There are not spot lights. | ARPO | |||||||||||||||||||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | 4 | 4 | 4 | Missed Prereq. | ARHO | |||||||||||||||||||||
| Water Efficiency (WE) | ||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 10 | ASIS | |||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | AZRU | |||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | BADL | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | WE Prereq 1 | Water Use Reduction, 20% Reduction (see Guiding Principle III - Protect and Conserve Water) | Y | N/A | Requirement will be met via utilization of Water Sense and other low flow water closets, urinals, lavatories, sinks, and showers. | Y | N/A | Requirement will be met via utilization of Water Sense and other low flow water closets, urinals, lavatories, sinks, and showers. | Y | N/A | Requirement will be met via utilization of Water Sense and other low flow water closets, urinals, and lavatories. | BAWA | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | WE Credit 1 | Water Efficient Landscaping, Reduce by 50% (see Guiding Principle III - Protect and Conserve Water) | Y | 2 | Use of low-water native plants | Y | 2 | Use of native, low water plants and removal of high-water use lawn. | Y | 2 | Use of native plants; irrigation system includes rain sensor | BAND | ||||||||||
| WE Credit 1 | ||||||||||||||||||||||||||||
| (cont'd) | Water Efficient Landscaping, No Potable Use or No Irrigation | N | 0 | Existing lawn requires repair and repair current irrigation system; new plantings are native, low-water species | N | 0 | Re-use of existing irrigation system | N | 0 | Re-use of existing irrigation system | BATT | |||||||||||||||||
| WE Credit 2 | Innovative Wastewater Technologies | N | 0 | N | 0 | N | 0 | BEOL | ||||||||||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | NPS Policy | Water Metering | Y | N/A | The building has an existing water meter. The only new water line is a fire line that does not require metering. | Y | N/A | A new water meter is to be provided as part of the plumbing scope. | Y | N/A | A new water meter is to be provided as part of the plumbing scope. | BELA | ||||||||||
| 1 | 0 | 0 | 0 | 0 | 0 | 0 | EPACT 2005, Section 109 | Water Used for Energy Conservation | NA | N/A | NA | N/A | NA | N/A | BIBE | |||||||||||||
| WE Credit 3 | Water Use Reduction (30%, 35%, 40%) | Y | 2 | Water Sense and other low flow fixtures shall be utilized to achieve 30% water use reduction. | Y | 2 | Water Sense and other low flow fixtures shall be utilized to achieve 30% water use reduction. | Y | 2 | Water Sense and other low flow fixtures shall be utilized to achieve 30% water use reduction. | BICY | |||||||||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | 4 | 4 | 4 | Missed Prereq. | BIHO | |||||||||||||||||||||
| Energy & Atmosphere (EA) | ||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 35 | BISO | |||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | BITH | |||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | BICA | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EA Prereq 1 | Fundamental Commissioning of the Building Energy Systems * (see Guiding Principle I - Employ Integrated Design Principles) | Y | N/A | Fundamental commissioning shall be provided, the plan shall be developed in future design phases. | Y | N/A | Fundamental commissioning shall be provided, the plan shall be developed in future design phases. | Y | N/A | Fundamental commissioning shall be provided, the plan shall be developed in future design phases. | BISC | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EA Prereq 2 | Minimum Energy Performance (see Guiding Principle II Optimize Energy Performance) | Y | N/A | Design shall exceed ASHRAE 2010 Baseline Building by at least 30%. | Y | N/A | Design shall exceed ASHRAE 2010 Baseline Building by at least 30%. | Y | N/A | Design shall exceed ASHRAE 2010 Baseline Building by at least 30%. | BLCA | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EA Prereq 3 | Fundamental Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials) | Y | N/A | No CFC or HCFC refrigerants shall be utilized. | Y | N/A | No CFC or HCFC refrigerants shall be utilized. | Y | N/A | No CFC or HCFC refrigerants shall be utilized. | BLAC | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EA Credit 1 | Optimize Energy Performance:** (Federal Regulations require 30% for New Construction and 20% for Existing Building Renovation. Note that this automatically equates to 10 Points for New Construction and 7 Points for Existing Building Renovation.) (see Guiding Principle II - Optimize Energy Performance) | Y | 10 | The lightign and electrical system design is anticipated to beat the baseline energy code/guidelines by a minimum of 20% for existing buildings. Design shall exceed ASHRAE 2010 Baseline Building by at least 30%. | Y | 10 | The lighting and electrical system design is anticipated to beat the baseline energy code/guidelines by a minimum of 20% for existing buildings. Design shall exceed ASHRAE 2010 Baseline Building by at least 30%. | Y | 10 | The lighting and electrical system design is anticipated to beat the baseline energy code/guidelines by a minimum of 20% for existing buildings. Design shall exceed ASHRAE 2010 Baseline Building by at least 30%. | BLRI | ||||||||||
| 1 | 0 | 0 | 0 | 0 | 0 | 0 | EISA 2007, Section 433 | Reduce Fossil Fuel Derived Energy | NA | N/A | NA | N/A | NA | N/A | BLUE | |||||||||||||
| 1 | 0 | 0 | 0 | 0 | 0 | 0 | EO 13963 | Procure Environmentally sustainable electronic products (Predominantly relates to purchases of desktop/laptop computer and peripherals) | NA | N/A | NA | N/A | NA | N/A | BOWA | |||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | CFR Title 10, Part 436.4 | Procure Energy Star or FEMP designated products | Y | N/A | Energy Star or FEMP designated products shall be specified where available. | Y | N/A | Energy Star or FEMP designated products shall be specified where available. | Y | N/A | Energy Star or FEMP designated products have been specified where available. | BOST | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EPACT 2005, Section 104 | Premium Efficiency Electric Motors | Y | N/A | All motors specified greater than 1.0 HP shall be premium efficiency. | Y | N/A | All motors specified greater than 1.0 HP shall be premium efficiency. | Y | N/A | All motors specified greater than 1.0 HP shall be premium efficiency. | BOAF | ||||||||||
| 1 | 0 | 0 | 0 | 0 | 0 | 0 | EISA 2007, Section 523 | On-Site Renewable Energy*** Solar Thermal for Hot Water (Choose NA if proven not life cycle cost effective) | NA | N/A | NA | N/A | NA | N/A | BOHA | |||||||||||||
| EA Credit 2 | On-Site Renewable Energy*** 1%-13% Renewable Energy | N | 0 | VA demonstrated value to ground-mounted pv, but budget will not support purchase at this time | N | 0 | VA demonstrated value to ground-mounted pv, but budget will not support purchase at this time | N | 0 | VA demonstrated value to ground-mounted pv, but budget will not support purchase at this time | BRCR | |||||||||||||||||
| 1 | 0 | 0 | 1 | 0 | 0 | 0 | EA Credit 3 | Enhanced Commissioning (required for projects with building size > 5,000 sf) (see Guiding Principle I - Employ Integrated Design Principles) | Y | 2 | Enhanced commissioning shall be provided, the plan shall be developed in future design phases. | N | 0 | Due to the fact that the project consists of an addition/renovation rather than a new build and the nature of the systems being installed, enhanced commissioning is not recommended. | N | 0 | Due to the fact that the project consists of an addition/renovation rather than a new build and the nature of the systems being installed, enhanced commissioning is not recommended. | BRVB | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EA Credit 4 | Enhanced Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials) | Y | 2 | Refrigerant systems shall utilize R-410A to minimize or eliminate ozone depletion and global climate change. | Y | 2 | Refrigerant systems shall utilize R-410A to minimize or eliminate ozone depletion and global climate change. | Y | 2 | Refrigerant systems shall utilize R-410A to minimize or eliminate ozone depletion and global climate change. | BUIS | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EA Credit 5 | Measurement & Verification (see Guiding Principle II - Optimize Energy Performance) | Y | 3 | Building level utility meters shall be provided. | Y | 3 | Building level utility meters shall be provided. | Y | 3 | Building level utility meters shall be provided. | BUFF | ||||||||||
| MOU Guiding Principles & EO 13693 | Measurement & Verification (see Guiding Principle II - Optimize Energy Performance) | NA | 0 | NA | 0 | NA | 0 | |||||||||||||||||||||
| EA Credit 6 | Green Power | N | 0 | It is not anticipated that green alternate sources of energy will be available for this project. | N | 0 | It is not anticipated that green alternate sources of energy will be available for this project. | N | 0 | It is not anticipated that green alternate sources of energy will be available for this project. | CABR | |||||||||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | 17 | 15 | 15 | Missed Prereq. | CALI | |||||||||||||||||||||
| Materials & Resources (MR) | ||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 14 | CANA | |||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | CRHA | |||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | CARI | ||||||||||
| MR Prereq 1 | Storage & Collection of Recyclables | Y | N/A | space will be provided in staff break room | Y | N/A | space will be provided in staff break room | Y | N/A | space will be provided in staff work room | CACH | |||||||||||||||||
| MR Credit 1.1 | Building Reuse, Maintain Existing Walls, Floors & Roof | Y | 2 | Expansion retains most of existing building and roof | Y | 2 | Expansion retains most of existing building and roof | Y | 2 | Expansion retains most of existing building and roof | CANY | |||||||||||||||||
| MR Credit 1.2 | Building Reuse, Maintain Interior Nonstructural Elements | Y | 1 | Y | 1 | Y | 1 | CACO | ||||||||||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | MR Credit 2 | Construction Waste Management, Divert 50% from Disposal (see Guiding Principle V - Reduce Environmental Impact of Materials) | Y | 1 | general conditions will address | Y | 1 | Addressed in general conditions. | Y | 1 | Addressed in general conditions. | CAHA | ||||||||||
| MR Credit 2 | ||||||||||||||||||||||||||||
| (cont'd) | Construction Waste Management, Divert 75% from Disposal | N | 0 | N | 0 | N | 0 | Adobe diversion opportunities are minimal | CAME | |||||||||||||||||||
| MR Credit 3 | Materials Reuse | N | 0 | project includes system replacement | N | 0 | Project includes system replacement | N | 0 | Project includes system replacement | CAKR | |||||||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | MR Credit 4 | Recycled Content, 10% (post-consumer + ½ pre-consumer). Use EPA's CPG for designated products to use) | Y | 1 | Will need to verify as design progresses | Y | 1 | Up to 20% fly ash content allowed in concrete mix. | Y | 1 | Up to 20% fly ash content allowed in concrete mix. | CALO | ||||||||||
| MR Credit 4 | Recycled Content, 20% (post-consumer + ½ pre-consumer) | N | 0 | N | 0 | Is noted in Div 1 - but detailed reporting is not required. | N | 0 | Is noted in Div 1 - but detailed reporting is not required. | CAHE | ||||||||||||||||||
| MR Credit 5 | Regional Materials, Extracted, Processed & Manufactured Regionally | Y | 1 | Will need to verify as design progresses | Y | 1 | Will need to verify as design progresses | N | 0 | Probably not achievable, given project location | CARE | |||||||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EO13693 | Biopreferred Products | Y | N/A | Y | N/A | Is required by Div 1. | Y | N/A | Is required by Div 1. | CAVO | |||||||||||
| MR Credit 6 | Rapidly Renewable Materials | N | 0 | N | 0 | None specified | N | 0 | None specified | CARL | ||||||||||||||||||
| 0 | 0 | 0 | 1 | 1 | 1 | 0 | MR Credit 7 | Certified Wood (see Guiding Principle V - Reduce Environmental Impact of Materials) - Note: LEED requires FSC certification, but for compliance with federal requirements any of the following certifications are sufficient: Forest Stewardship Council (FSC), Sustainable Forestry Initiative (SFI), American Tree Farm System (ATFS), or Programme for the Endorsement of Forest Certification (PEFC) | Y | 1 | specifications may require | Y | 1 | specifications may require | Y | 1 | CAVE | |||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | 7 | 7 | 6 | Missed Prereq. | CAWO | |||||||||||||||||||||
| Indoor Environmental Quality (EQ) | ||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 15 | CAGR | |||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | CASA | |||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | CACL | ||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EQ Prereq 1 | Minimum IAQ Performance (See Guiding Principle IV, Enhance Indoor Environmental Quality) | Y | N/A | Requirement will be met. | Y | N/A | Requirement will be met. | Y | N/A | Requirement will be met. | CATO | ||||||||||
| EQ Prereq 2 | Environmental Tobacco Smoke (ETS) Control | Y | N/A | Y | N/A | Y | N/A | CEBR | ||||||||||||||||||||
| EQ Credit 1 | Outdoor Air Delivery Monitoring | Y | 1 | Airflow measuring with accuracy of +/- 15%. | Y | 1 | Airflow measuring with accuracy of +/- 15%. | Y | 1 | Airflow measuring with accuracy of +/- 15%. | CEBE | |||||||||||||||||
| EQ Credit 2 | Increased Ventilation | N | 0 | N | 0 | N | 0 | CHSC | ||||||||||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EQ Credit 3.1 | Construction IAQ Management Plan, During Construction (See Guiding Principle IV, Enhance Indoor Environmental Quality) | Y | 1 | All filtration media shall be replaced after construction and before occupancy. Construction activities shall also be isolated to prevent contamination of clean or occupied spaces. Finally, cleaning activities shall be conducted to control contaminants in the building. | Y | 1 | All filtration media shall be replaced after construction and before occupancy. Construction activities shall also be isolated to prevent contamination of clean or occupied spaces. Finally, cleaning activities shall be conducted to control contaminants in the building. | Y | 1 | All filtration media shall be replaced after construction and before occupancy. Construction activities shall also be isolated to prevent contamination of clean or occupied spaces. Finally, cleaning activities shall be conducted to control contaminants in the building. | CHCU | ||||||||||
| 1 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 3.2 | Construction IAQ Management Plan, Before Occupancy (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | N | 0 | N | 0 | CHAM | |||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EQ Credit 4.1 | Low-Emitting Materials, Adhesives & Sealants (See Guiding Principle IV, Enhance Indoor Environmental Quality) | Y | 1 | Y | 1 | Y | 1 | CHIS | |||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EQ Credit 4.2 | Low-Emitting Materials, Paints & Coatings (See Guiding Principle IV, Enhance Indoor Environmental Quality) | Y | 1 | Y | 1 | Y | 1 | CHPI | |||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EQ Credit 4.3 | Low-Emitting Materials, Flooring Materials (See Guiding Principle IV, Enhance Indoor Environmental Quality) | Y | 1 | Will need to verify w Exhibit Designer as we're matching thoughout other spaces | Y | 1 | Y | 1 | CHAT | ||||||||||||
| EQ Credit 4.4 | Low-Emitting Materials, Composite Wood & Agrifiber Products | Y | 1 | Y | 1 | Y | 1 | CHOH | ||||||||||||||||||||
| EQ Credit 5 | Indoor Chemical & Pollutant Source Control | Y | 1 | Y | 1 | Y | 1 | CBPO | ||||||||||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | MOU Guiding Principles & EO 13423 | Moisture Control | Y | N/A | Y | N/A | Specifed in Div 1 | Y | N/A | Specifed in Div 1 | CHCH | |||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EQ Credit 6.1 | Controllability of Systems, Lighting (See Guiding Principle IV, Enhance Indoor Environmental Quality) | Y | 1 | Lighting controls shall be reconfigured to enhance indoor environment quality,. | Y | 1 | Lighting controls shall be reconfigured to enhance indoor environment quality,. | Y | 1 | Lighting controls shall be reconfigured to enhance indoor environment quality,. | CHIC | ||||||||||
| EQ Credit 6.2 | Controllability of Systems, Thermal Comfort | Y | 1 | Individual comfort controls shall be provided for the mechanical system. | Y | 1 | Individual comfort controls shall be provided for the mechanical system. | Y | 1 | Individual comfort controls shall be provided for the mechanical system. | CHRO | |||||||||||||||||
| 1 | 0 | 0 | 1 | 1 | 1 | 0 | EQ Credit 7.1 | Thermal Comfort, Design (See Guiding Principle IV, Enhance Indoor Environmental Quality) | Y | 1 | Requirement will be met. | Y | 1 | Requirement will be met. | Y | 1 | Requirement will be met. | CHIR | ||||||||||
| EQ Credit 7.2 | Thermal Comfort, Verification | N | 0 | N | 0 | N | 0 | CHRI | ||||||||||||||||||||
| 1 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 8.1 | Daylight & Views, Daylight 75% of Spaces (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | Existing exterir wall and window configurations are existing to remain and do not meet these requirements. | N | 0 | Existing exterir wall and window configurations are existing to remain and do not meet these requirements. | N | 0 | Existing exterir wall and window configurations are existing to remain and do not meet these requirements. | CIRO | ||||||||||
| EQ Credit 8.2 | Daylight & Views, Views for 90% of Spaces | N | 0 | Existing building is not view-friendly | N | 0 | Existing building is not view-friendly | N | 0 | Existing building is not view-friendly | CLBA | |||||||||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | 10 | 10 | 10 | Missed Prereq. | CLMO | |||||||||||||||||||||
| Innovation & Design Process (ID) | ||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 6 | COLO | |||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | COLM | |||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | COSW | ||||||||||
| ID Credit 1.1 | Innovation in Design: Provide Specific Title | COGA | ||||||||||||||||||||||||||
| ID Credit 1.2 | Innovation in Design: Provide Specific Title | CORO | ||||||||||||||||||||||||||
| ID Credit 1.3 | Innovation in Design: Provide Specific Title | COWP | ||||||||||||||||||||||||||
| ID Credit 1.4 | Innovation in Design: Provide Specific Title | CRLA | ||||||||||||||||||||||||||
| ID Credit 1.5 | Innovation in Design: Provide Specific Title | CRMO | ||||||||||||||||||||||||||
| ID Credit 2 | LEED® Accredited Professional | CUGA | ||||||||||||||||||||||||||
| LEED-NC Subtotal | 0 | 0 | 0 | 0 | 0 | 0 | CUIS | |||||||||||||||||||||
| Regional Priority (RP) | ||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 4 | CURE | |||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | CUVA | |||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | DABE | ||||||||||
| RP Credit 1.1 | Regional Priority Credit: Region Defined | DAAV | ||||||||||||||||||||||||||
| RP Credit 1.2 | Regional Priority Credit: Region Defined | DESO | ||||||||||||||||||||||||||
| RP Credit 1.3 | Regional Priority Credit: Region Defined | DEVA | ||||||||||||||||||||||||||
| RP Credit 1.4 | Regional Priority Credit: Region Defined | DELA | ||||||||||||||||||||||||||
| LEED-NC Subtotal | 0 | 0 | 0 | 0 | 0 | 0 | DELE | |||||||||||||||||||||
| Non-LEED-NC Federal Requirements | ||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 26 | DEWA | |||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | DENA | |||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | DEMO | ||||||||||
| 1 | 0 | 1 | 1 | 1 | 1 | 1 | MOU Guiding Principles & EO 13423 (pg. 3) | Complete Integrated Design Narrative During Predesign Only | N/A | N/A | Y | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | DEPO | |||||||
| DETO | ||||||||||||||||||||||||||||
| Fulfillment of Guiding Principles for HPSB completes 18 LEED NC credits and 6 prerequisites. | DINO | |||||||||||||||||||||||||||
| LEED Certification Rating System | DRTO | |||||||||||||||||||||||||||
| Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ points | EBLA | |||||||||||||||||||||||||||
| For more information on LEED Certification and credits, visit www.usgbc.org | EDAL | |||||||||||||||||||||||||||
| EFMO | ||||||||||||||||||||||||||||
| * For new buildings of 5,000 GSF or more and major renovations to buildings greter than or equal to 5,000 GSF, contract with an independent Commissioning Authority and comply with ASHRAE 0-2005, "The Commissioning Process". For smaller projects, comply with the requirements of LEED NC 2009, EA Prerequisite 1, "Fundamental Commissioning of the Building Energy Systems" (which allows the commissioning authority to be an employee of the design firm). | EISE | |||||||||||||||||||||||||||
| ** For new building projects of 5,000 GSF or more, perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential) to show performance at least 30% better (20% for major renovations) than a code compliant similar building. If it can be shown that meeting the 30% performance standard for new construction (or 20% for major renovations) is not life cycle cost effective (over 40 years - not 25 years per a recent regulatory change) then the project must incorporate the maximum energy savings that can be shown to be life cycle cost effective. For new building projects with a lower net construction value, an alternative method is to meet or exceed the minimum requirements prescribed by the ASHRAE Advanced Energy Design Guide (a much simpler prescriptive method for achieving the target) appropriate for the project's building. For buildings without an appropriate Advanced Energy Design Guide perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential). | ELTE | |||||||||||||||||||||||||||
| *** The federal requirement (from EISA 2007) that relates to these LEED-NC credits is "Where life cycle cost effective, design systems to provide not less than 30 percent of the hot water demand through the installation and use of solar hot water heaters." The LEED credits for this item stipulates a percentage of total energy consumption to be provided by on site renewable sources. In some cases meeting the federal requirement will also meet the LEED requirement for these credits. | ELCA | |||||||||||||||||||||||||||
| ELMA | ||||||||||||||||||||||||||||
| ELMO | ||||||||||||||||||||||||||||
| ELRO | ||||||||||||||||||||||||||||
| ELIS | ||||||||||||||||||||||||||||
| ERIE | ||||||||||||||||||||||||||||
| ESSE | ||||||||||||||||||||||||||||
| EUON | ||||||||||||||||||||||||||||
| EVER | ||||||||||||||||||||||||||||
| FAMA | ||||||||||||||||||||||||||||
| FEHA | ||||||||||||||||||||||||||||
| FIIS | ||||||||||||||||||||||||||||
| FILA | ||||||||||||||||||||||||||||
| FLNI | ||||||||||||||||||||||||||||
| FLFO | ||||||||||||||||||||||||||||
| FOTH | ||||||||||||||||||||||||||||
| FOBO | ||||||||||||||||||||||||||||
| FOCA | ||||||||||||||||||||||||||||
| FODA | ||||||||||||||||||||||||||||
| FODO | ||||||||||||||||||||||||||||
| FDNC | ||||||||||||||||||||||||||||
| FODU | ||||||||||||||||||||||||||||
| FOFO | ||||||||||||||||||||||||||||
| FOFR | ||||||||||||||||||||||||||||
| FOLA | ||||||||||||||||||||||||||||
| FOLS | ||||||||||||||||||||||||||||
| FOMA | ||||||||||||||||||||||||||||
| FOMC | ||||||||||||||||||||||||||||
| FOMO | ||||||||||||||||||||||||||||
| FONE | ||||||||||||||||||||||||||||
| FOPO | ||||||||||||||||||||||||||||
| FOPU | ||||||||||||||||||||||||||||
| FORA | ||||||||||||||||||||||||||||
| FOSC | ||||||||||||||||||||||||||||
| FOSM | ||||||||||||||||||||||||||||
| FOST | ||||||||||||||||||||||||||||
| FOSU | ||||||||||||||||||||||||||||
| FOUN | ||||||||||||||||||||||||||||
| FOUS | ||||||||||||||||||||||||||||
| FOVA | ||||||||||||||||||||||||||||
| FOWA | ||||||||||||||||||||||||||||
| FOBU | ||||||||||||||||||||||||||||
| FRDE | ||||||||||||||||||||||||||||
| FRDO | ||||||||||||||||||||||||||||
| FRLA | ||||||||||||||||||||||||||||
| FRED | ||||||||||||||||||||||||||||
| FRSP | ||||||||||||||||||||||||||||
| FRHI | ||||||||||||||||||||||||||||
| GAAR | ||||||||||||||||||||||||||||
| GATE | ||||||||||||||||||||||||||||
| GARI | ||||||||||||||||||||||||||||
| GEGR | ||||||||||||||||||||||||||||
| GEMM | ||||||||||||||||||||||||||||
| GERO | ||||||||||||||||||||||||||||
| GWMP | ||||||||||||||||||||||||||||
| GEWA | ||||||||||||||||||||||||||||
| GWCA | ||||||||||||||||||||||||||||
| GETC | ||||||||||||||||||||||||||||
| GETT | ||||||||||||||||||||||||||||
| GICL | ||||||||||||||||||||||||||||
| GLAC | ||||||||||||||||||||||||||||
| GLBA | ||||||||||||||||||||||||||||
| GLCA | ||||||||||||||||||||||||||||
| GLEC | ||||||||||||||||||||||||||||
| GLDE | ||||||||||||||||||||||||||||
| GOGA | ||||||||||||||||||||||||||||
| GOSP | ||||||||||||||||||||||||||||
| GOIS | ||||||||||||||||||||||||||||
| GRCA | ||||||||||||||||||||||||||||
| GRPO | ||||||||||||||||||||||||||||
| GRTE | ||||||||||||||||||||||||||||
| GRKO | ||||||||||||||||||||||||||||
| GRBA | ||||||||||||||||||||||||||||
| GREG | ||||||||||||||||||||||||||||
| GRFA | ||||||||||||||||||||||||||||
| GRSA | ||||||||||||||||||||||||||||
| GRSM | ||||||||||||||||||||||||||||
| GRSP | ||||||||||||||||||||||||||||
| GREE | ||||||||||||||||||||||||||||
| GUMO | ||||||||||||||||||||||||||||
| GUCO | ||||||||||||||||||||||||||||
| GUIS | ||||||||||||||||||||||||||||
| HAFO | ||||||||||||||||||||||||||||
| HALE | ||||||||||||||||||||||||||||
| HAGR | ||||||||||||||||||||||||||||
| HAMP | ||||||||||||||||||||||||||||
| HAHA | ||||||||||||||||||||||||||||
| HAFE | ||||||||||||||||||||||||||||
| HSTR | ||||||||||||||||||||||||||||
| HAVO | ||||||||||||||||||||||||||||
| HEHO | ||||||||||||||||||||||||||||
| PIMA | ||||||||||||||||||||||||||||
| HOFR | ||||||||||||||||||||||||||||
| HOME | ||||||||||||||||||||||||||||
| HOCU | ||||||||||||||||||||||||||||
| HOFU | ||||||||||||||||||||||||||||
| HOBE | ||||||||||||||||||||||||||||
| HOSP | ||||||||||||||||||||||||||||
| HOVE | ||||||||||||||||||||||||||||
| HUTR | ||||||||||||||||||||||||||||
| IATR | ||||||||||||||||||||||||||||
| ILMI | ||||||||||||||||||||||||||||
| INDE | ||||||||||||||||||||||||||||
| INDU | ||||||||||||||||||||||||||||
| INUP | ||||||||||||||||||||||||||||
| ISRO | ||||||||||||||||||||||||||||
| JAGA | ||||||||||||||||||||||||||||
| JAME | ||||||||||||||||||||||||||||
| JELA | ||||||||||||||||||||||||||||
| JEFF | ||||||||||||||||||||||||||||
| JECA | ||||||||||||||||||||||||||||
| JICA | ||||||||||||||||||||||||||||
| JODR | ||||||||||||||||||||||||||||
| JODA | ||||||||||||||||||||||||||||
| JOER | ||||||||||||||||||||||||||||
| JOFI | ||||||||||||||||||||||||||||
| JOMU | ||||||||||||||||||||||||||||
| JOFL | ||||||||||||||||||||||||||||
| JOTR | ||||||||||||||||||||||||||||
| JUBA | ||||||||||||||||||||||||||||
| KALA | ||||||||||||||||||||||||||||
| KAHO | ||||||||||||||||||||||||||||
| KATM | ||||||||||||||||||||||||||||
| KEFJ | ||||||||||||||||||||||||||||
| KEPA | ||||||||||||||||||||||||||||
| KEMO | ||||||||||||||||||||||||||||
| KEWE | ||||||||||||||||||||||||||||
| KIMO | ||||||||||||||||||||||||||||
| KLGO | ||||||||||||||||||||||||||||
| KLSE | ||||||||||||||||||||||||||||
| KNRI | ||||||||||||||||||||||||||||
| KOVA | ||||||||||||||||||||||||||||
| KOWA | ||||||||||||||||||||||||||||
| LACH | ||||||||||||||||||||||||||||
| LACL | ||||||||||||||||||||||||||||
| LAME | ||||||||||||||||||||||||||||
| LAMR | ||||||||||||||||||||||||||||
| LARO | ||||||||||||||||||||||||||||
| LAVO | ||||||||||||||||||||||||||||
| LABE | ||||||||||||||||||||||||||||
| LECL | ||||||||||||||||||||||||||||
| LEWI | ||||||||||||||||||||||||||||
| LINC | ||||||||||||||||||||||||||||
| LIBO | ||||||||||||||||||||||||||||
| LIHO | ||||||||||||||||||||||||||||
| LIBI | ||||||||||||||||||||||||||||
| LIRI | ||||||||||||||||||||||||||||
| LONG | ||||||||||||||||||||||||||||
| LOWE | ||||||||||||||||||||||||||||
| LOEA | ||||||||||||||||||||||||||||
| LYJO | ||||||||||||||||||||||||||||
| LYBA | ||||||||||||||||||||||||||||
| MAWA | ||||||||||||||||||||||||||||
| MAAC | ||||||||||||||||||||||||||||
| MACA | ||||||||||||||||||||||||||||
| MANA | ||||||||||||||||||||||||||||
| MASI | ||||||||||||||||||||||||||||
| MANZ | ||||||||||||||||||||||||||||
| MABI | ||||||||||||||||||||||||||||
| MALU | ||||||||||||||||||||||||||||
| MAVA | ||||||||||||||||||||||||||||
| MAMC | ||||||||||||||||||||||||||||
| MCHO | ||||||||||||||||||||||||||||
| MEVE | ||||||||||||||||||||||||||||
| MIIN | ||||||||||||||||||||||||||||
| MIMA | ||||||||||||||||||||||||||||
| MIMI | ||||||||||||||||||||||||||||
| MISS | ||||||||||||||||||||||||||||
| MNRR | ||||||||||||||||||||||||||||
| MOJA | ||||||||||||||||||||||||||||
| MONO | ||||||||||||||||||||||||||||
| MOCA | ||||||||||||||||||||||||||||
| MOCR | ||||||||||||||||||||||||||||
| MOPI | ||||||||||||||||||||||||||||
| MORR | ||||||||||||||||||||||||||||
| MORA | ||||||||||||||||||||||||||||
| MORU | ||||||||||||||||||||||||||||
| MUWO | ||||||||||||||||||||||||||||
| NATC | ||||||||||||||||||||||||||||
| NATR | ||||||||||||||||||||||||||||
| NATT | ||||||||||||||||||||||||||||
| NACE | ||||||||||||||||||||||||||||
| NAMA | ||||||||||||||||||||||||||||
| NACC | ||||||||||||||||||||||||||||
| NPSA | ||||||||||||||||||||||||||||
| NPNH | ||||||||||||||||||||||||||||
| NWWM | ||||||||||||||||||||||||||||
| NABR | ||||||||||||||||||||||||||||
| NAVA | ||||||||||||||||||||||||||||
| NEBE | ||||||||||||||||||||||||||||
| NEJE | ||||||||||||||||||||||||||||
| PINE | ||||||||||||||||||||||||||||
| JAZZ | ||||||||||||||||||||||||||||
| NERI | ||||||||||||||||||||||||||||
| NEPE | ||||||||||||||||||||||||||||
| NIFA | ||||||||||||||||||||||||||||
| NICO | ||||||||||||||||||||||||||||
| NISI | ||||||||||||||||||||||||||||
| NIOB | ||||||||||||||||||||||||||||
| NOAT | ||||||||||||||||||||||||||||
| NOCA | ||||||||||||||||||||||||||||
| NOCO | ||||||||||||||||||||||||||||
| OBED | ||||||||||||||||||||||||||||
| OCMU | ||||||||||||||||||||||||||||
| OKCI | ||||||||||||||||||||||||||||
| OPOT | ||||||||||||||||||||||||||||
| OLSP | ||||||||||||||||||||||||||||
| OLYM | ||||||||||||||||||||||||||||
| OREG | ||||||||||||||||||||||||||||
| ORCA | ||||||||||||||||||||||||||||
| ORPI | ||||||||||||||||||||||||||||
| OVVI | ||||||||||||||||||||||||||||
| OXHI | ||||||||||||||||||||||||||||
| OZAR | ||||||||||||||||||||||||||||
| PAIS | ||||||||||||||||||||||||||||
| PAAL | ||||||||||||||||||||||||||||
| PARA | ||||||||||||||||||||||||||||
| PERI | ||||||||||||||||||||||||||||
| PECO | ||||||||||||||||||||||||||||
| PIMI | ||||||||||||||||||||||||||||
| PAAV | ||||||||||||||||||||||||||||
| PEVI | ||||||||||||||||||||||||||||
| PETE | ||||||||||||||||||||||||||||
| PEFO | ||||||||||||||||||||||||||||
| PETR | ||||||||||||||||||||||||||||
| PIRO | ||||||||||||||||||||||||||||
| PINN | ||||||||||||||||||||||||||||
| PISP | ||||||||||||||||||||||||||||
| PIPE | ||||||||||||||||||||||||||||
| PISC | ||||||||||||||||||||||||||||
| PORE | ||||||||||||||||||||||||||||
| POEX | ||||||||||||||||||||||||||||
| POGR | ||||||||||||||||||||||||||||
| POCH | ||||||||||||||||||||||||||||
| POHE | ||||||||||||||||||||||||||||
| POPO | ||||||||||||||||||||||||||||
| WHHO | ||||||||||||||||||||||||||||
| PRSF | ||||||||||||||||||||||||||||
| PRWI | ||||||||||||||||||||||||||||
| PUHO | ||||||||||||||||||||||||||||
| PUHE | ||||||||||||||||||||||||||||
| QUSH | ||||||||||||||||||||||||||||
| RABR | ||||||||||||||||||||||||||||
| REDW | ||||||||||||||||||||||||||||
| RICH | ||||||||||||||||||||||||||||
| RIGR | ||||||||||||||||||||||||||||
| ROCR | ||||||||||||||||||||||||||||
| ROMO | ||||||||||||||||||||||||||||
| ROWI | ||||||||||||||||||||||||||||
| ROCA | ||||||||||||||||||||||||||||
| RORI | ||||||||||||||||||||||||||||
| ROLA | ||||||||||||||||||||||||||||
| RUCA | ||||||||||||||||||||||||||||
| SAHI | ||||||||||||||||||||||||||||
| SAGU | ||||||||||||||||||||||||||||
| SACN | ||||||||||||||||||||||||||||
| SACR | ||||||||||||||||||||||||||||
| SAPA | ||||||||||||||||||||||||||||
| SAGA | ||||||||||||||||||||||||||||
| SAMA | ||||||||||||||||||||||||||||
| SAPU | ||||||||||||||||||||||||||||
| SARI | ||||||||||||||||||||||||||||
| SAAN | ||||||||||||||||||||||||||||
| SAFR | ||||||||||||||||||||||||||||
| SAJU | ||||||||||||||||||||||||||||
| SAJH | ||||||||||||||||||||||||||||
| SAND | ||||||||||||||||||||||||||||
| SAFE | ||||||||||||||||||||||||||||
| SAMO | ||||||||||||||||||||||||||||
| SARA | ||||||||||||||||||||||||||||
| SAIR | ||||||||||||||||||||||||||||
| SCBL | ||||||||||||||||||||||||||||
| SEMO | ||||||||||||||||||||||||||||
| SEKI | ||||||||||||||||||||||||||||
| SEBE | ||||||||||||||||||||||||||||
| SHEN | ||||||||||||||||||||||||||||
| SHIL | ||||||||||||||||||||||||||||
| SHNC | ||||||||||||||||||||||||||||
| SITK | ||||||||||||||||||||||||||||
| SLBE | ||||||||||||||||||||||||||||
| SPAR | ||||||||||||||||||||||||||||
| STSP | ||||||||||||||||||||||||||||
| STLI | ||||||||||||||||||||||||||||
| STEA | ||||||||||||||||||||||||||||
| STRI | ||||||||||||||||||||||||||||
| SRNC | ||||||||||||||||||||||||||||
| SUIT | ||||||||||||||||||||||||||||
| SUCR | ||||||||||||||||||||||||||||
| TAPR | ||||||||||||||||||||||||||||
| THKO | ||||||||||||||||||||||||||||
| OLST | ||||||||||||||||||||||||||||
| THRO | ||||||||||||||||||||||||||||
| THRB | ||||||||||||||||||||||||||||
| THRI | ||||||||||||||||||||||||||||
| THIS | ||||||||||||||||||||||||||||
| EDIS | ||||||||||||||||||||||||||||
| THJE | ||||||||||||||||||||||||||||
| THST | ||||||||||||||||||||||||||||
| TICA | ||||||||||||||||||||||||||||
| TIMU | ||||||||||||||||||||||||||||
| TONT | ||||||||||||||||||||||||||||
| TOSY | ||||||||||||||||||||||||||||
| TRTE | ||||||||||||||||||||||||||||
| TUMA | ||||||||||||||||||||||||||||
| TUPE | ||||||||||||||||||||||||||||
| TUAI | ||||||||||||||||||||||||||||
| TUIN | ||||||||||||||||||||||||||||
| TUZI | ||||||||||||||||||||||||||||
| USAR | ||||||||||||||||||||||||||||
| ULSG | ||||||||||||||||||||||||||||
| UPDE | ||||||||||||||||||||||||||||
| VAFO | ||||||||||||||||||||||||||||
| VAMA | ||||||||||||||||||||||||||||
| VICK | ||||||||||||||||||||||||||||
| VINC | ||||||||||||||||||||||||||||
| VIVE | ||||||||||||||||||||||||||||
| VIIS | ||||||||||||||||||||||||||||
| VICR | ||||||||||||||||||||||||||||
| VOYA | ||||||||||||||||||||||||||||
| WACA | ||||||||||||||||||||||||||||
| WAPA | ||||||||||||||||||||||||||||
| WASH | ||||||||||||||||||||||||||||
| WABA | ||||||||||||||||||||||||||||
| WEFA | ||||||||||||||||||||||||||||
| NWAK | ||||||||||||||||||||||||||||
| WHIS | ||||||||||||||||||||||||||||
| WHSA | ||||||||||||||||||||||||||||
| WHMI | ||||||||||||||||||||||||||||
| WIHO | ||||||||||||||||||||||||||||
| WICR | ||||||||||||||||||||||||||||
| WICA | ||||||||||||||||||||||||||||
| WOTR | ||||||||||||||||||||||||||||
| WORI | ||||||||||||||||||||||||||||
| WRST | ||||||||||||||||||||||||||||
| WRBR | ||||||||||||||||||||||||||||
| WUPA | ||||||||||||||||||||||||||||
| YELL | ||||||||||||||||||||||||||||
| YORK | ||||||||||||||||||||||||||||
| YONB | ||||||||||||||||||||||||||||
| YOSE | ||||||||||||||||||||||||||||
| YUHO | ||||||||||||||||||||||||||||
| YUCH | ||||||||||||||||||||||||||||
| ZION |
&CForm E 62 (8/2/13)&R&P Erosion and Sediment Control Strategies:
1. Develop a Storm Water Pollution Prevention Plan (SWPPP)
2. Temporary seeding/planting
3. Permanent seeding/planting
4. Mulching
5. Earth dike
6. Silt fence
7. Sediment trap
8. Sediment Basin
9. If project involves interior work only, answer yes.
9. Other Site Selection:
1. Site is NOT prime farmland
2. Site is NOT previously undeveloped land lower than 5 ft. above 100 year flood plain.
3. Land is NOT habitat for threatened or endangered species.
4. Land is NOT within 100 ft. of wetlands
5. Land is public parkland (Parkland Exception)
6. Other Development Density:
1. Construct or renovate a building on a previously developed site and in a community with a min. density of 60,000 SF/Acre
2. Building is located on a previously developed site
3. Building is within 1/2 mile of a residential area with an avg. density of 10 Units/Acre
4. Building is located within 1/2 mile of at least 10 basic services
5. Building has pedestrian access between building and services
6. Other Brownfield Redevelopment:
1. Develop on a site documented as contaminated (ASTM E1903-97 Phase 2)
2. Develop on a site defined as a Brownfield by local, state, or federal agency
3. Other Alternative Transportation:
1. Locate project within 1/2 mile walking distance of an existing or planned and funded commuter rail, light rail, or subway station
2. Locate the project within 1/4 mile walking distance of 1 or more stops for 2 or more public, campus, or private bus lines useable by building occupants
3. Other Bicycle Storage and Changing Rooms:
1. Provide secure bicycle racks/storage within 200 yards of building entrance for 5% of all building users (peak) AND provide shower/changing facilities within 200 yards of building entrance for 0.5% of FTE occupants.
2. Provide covered storage facilities for securing bicycles for 15% of building occupants
3. Other Low Emitting & Fuel Efficient Vehicles:
1. Provide preferred parking for low-emitting and fuel-efficient vehicles for 5% of vehicle parking capacity (discounted parking rates may be acceptable substitute - consult ref. guide)
2. Install alternative-fuel fueling stations for 3% of the total vehicle parking capacity. Liquid or gaseous fueling facilities must be separately ventilated or located outdoors.
3. Other Parking Capacity:
1. Parking capacity sized to meet but not exceed local zoning requirements
2. Provide preferred parking for carpools/vanpools for 5% of total parking spaces.
3. The project provides parking for less than 5% of FTE occupants.
4. Provide discounted parking for carpools/vanpools may be substituted for preferred parking
5. Provide no new parking
6. Provide infrastructure/support to facilitate shared vehicle use (see ref. guide for examples)
7. Other Site Development - Protect or Restore Habitat:
1. Stack the building program
2. Tuck-under parking
3. Share parking facilities with neighbors
4. Establish construction boundaries to minimize disturbance of the existing site
5. Restore previously degraded areas to their natural state
6. Select of appropriate native or adapted plants.
7. Prohibit plants listed as invasive or noxious weed species.
8. Avoid monoculture
9. Other Maximize Open Space
1. Stacking the building program
2. Tuck-under parking
3. Sharing parking facilities
4. Other Stormwater Design-Quantity Control:
1. Vegetated Roofs,
2. Pervious Paving
3. Reuse stormwater for landscape irrigation
4. Reuse stormwater for toilet and urinal flushing
5. Reuse stormwater for custodial uses
6. Other Stormwater Design-Quality Control:
1. Vegetated roofs
2. Pervious pavement
3. Grid pavers
4. Rain Gardens
5. Vegetated Swales
6. Disconnection of Imperviousness
7. Rainwater Recycling
8. Low-impact development
9. Environmentally Sensitive Design
10. Constructed wetlands
11. Vegetated Filters
12. Other Protect Hydrology
For development footprints that exceeds 5,000 square feet maintain or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.