B08_Solit_SCBL_152851_Attach_06_Utility_Coordination.pdf

PDF 234 KB Posted

Attached to
SCBL 152851 - Rehabilitate and Expand Visitor Center
Solicitation number
140P2018R0061
Issued by

About this file

Attachment 06 - Utility Coordination - 140P2018R0061

View the file

Other files

File Type Posted
B09_Amendment_0002_-_Q_and_A.pdf PDF
B09_Amendment_0002_SF-30.pdf PDF
B09_Prebid_Sign-in_Sheet.pdf PDF
B09_Prebid_Meeting_Notes.pdf PDF
B09_Questions_and_Answers.pdf PDF
B09_Amendment_0001_SF-30.pdf PDF
B09_Section_L_-_Amendment_0001.pdf PDF
B08_Solit_SCBL_152851_Attach_04_WDs.pdf PDF
B08_Solit_SCBL_152851_Attach_01_Specs.pdf PDF
B08_Solit_SCBL_152851_Attach_09_Proposed_Equals.docx DOCX document
B08_Solit_SCBL_152851_Attach_10_Hazmat_ID_Listing.doc DOC document
B08_Solit_SCBL_152851_Attach_16_SubCtrPlan.doc DOC document
B08_Solit_SCBL_152851_Attach_08_Geotech_Report.pdf PDF
B08_Solit_SCBL_152851_Attach_02_Drawings.pdf PDF
B08_Solit_SCBL_152851_Attach_17_Project_Sustainability_Checklist.XLS XLS spreadsheet
B08_Solit_SCBL_152851_Attach_03_Product_Files.pdf PDF
B08_Solit_SCBL_152851_Attach_05_Permit_Discussion.pdf PDF
B08_140P2018R0061.pdf PDF
B08_Solit_SCBL_152851_Attach_12_Past_Performance_Questionnaire.docx DOCX document
B08_Solit_SCBL_152851_Attach_14_SF-24_Bid_Bond.pdf PDF
B08_Solit_SCBL_152851_Attach_11_Key_Personnel_Quals.docx DOCX document
B08_Solit_SCBL_152851_Attach_13_Sub-Contractor_Reference.doc DOC document
B08_Solit_SCBL_152851_Attach_15_General_References.doc DOC document
B08_Solit_SCBL_152851_Attach_07_Hazmat_Report.pdf PDF
B01_SCBL_152851_Synopsis_PreSolitNotice.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONFERENCE

RECORD

Purpose of

Contact

To Review Applicable Electrical Utility Requirements

Project Name

Scotts Bluff Visitor Center Remodel

Project # 3039.00

Prepared By Kit Davidson, Melina Moser

Date 3/27/2017

Present

Jennifer Heimbouch Office Supervisor Roosevelt Public Power District jheimbouch@rooseveltppd.com

(308) 635-2424

AE Design contacted the local electrical utility to review the requirements for the above referenced project. Following is a summary of the items that were discussed:

The following building characteristics were reviewed with the utility company:

Project Address 190276 Old Oregon Trail Rd Gering, NE 69341

Building Size 9,650 SF

Anticipated Building Use Visitors Center/Museum

Anticipated NEC Calculated Load 225kVA

Requested voltage and phase 208V/3-Phase

The following is a list of items provided by the utility company, confirmed via email 3/23/2017 from Jennifer.

1) We will provide the meter and everything on the primary side, you will need to provide secondary wiring out of the pad mount transformer.

2) We will be using the cement pad that is existing.

3) The transformer size will be the 3 phase, 208/120, 225kva that was in the quote that was sent to you, we can provide the fault current after we have purchased the transformer.

4) There are no forms that need to be submitted, but payment is due before we stake the job and purchase the material needed to complete the job.

5) The existing feeders will be fine for the new transformer; we will not have to pull anything new.

Quote is attached for reference.