TICA_152836_-_FINAL_ContractPriceSchedule_BLANK.xls
XLS spreadsheet 37 KB Posted
- Solicitation number
- 140P2018R0001
About this file
Fillable Form - Contract Price Schedule
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| SOLICITATION NUMBER: 140P2018R0001 | |||||
| PARK - PMIS: TICA 152836 | |||||
| DEVELOPED AREA: American Fork, Utah | |||||
| PROJECT TITLE: Timpanogos Replcae/Relocat Unsafe/Unhealthy/Unsustainable Visitor Facility | |||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of summation error, the total corrected amounts govern. Round totals & extended prices to whole dollars. | |||||
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 1 | Replacement Visitor Contact Station | 1 | Lump Sum | $0.00 | |
| 2 | Road Relocation &Parking Lot | 1 | Lump Sum | $0.00 | |
| 2.4.a. | Soil Nail Placement | 320 | Lineal Foot | $0.00 | |
| 2.4.b. | Rock Nail Placement | 3660 | Lineal Foot | $0.00 | |
| 3 | Rock Fall Mitigation Fencing and associated work. | 1 | Lump Sum | $0.00 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 3) ------------------------------------ | $0.00 | ||||
| 4 | OPTION 1 - Courtyard Shade Structures | 1 | Lump Sum | $0.00 | |
| 5 | OPTION 2 - North Sidewalk, Fencing, and Concrete | 1 | Lump Sum | $0.00 | |
| 6 | Option 3 - Interpretive Bottle Filling Station | 1 | Lump Sum | $0.00 | |
| 7 | Option 4 - Parking Area Lighting | 1 | Lump Sum | $0.00 | |
| 9 | - 0 | ||||
| 10 | - 0 | ||||
| 11 | - 0 | ||||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 4 through 7) ------------------------------------ | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 7) ----------- | $0.00 | ||||
| All measurement and payment information is included in the project specifications, Section 012700. |
&RPARK - PMIS
CPS - &P
File details come from the government source that posted it.