Terracon Consultants, Inc. 1392 13 th Ave SW Great Falls, MT 59404
P [406] 453 5400 F [406] 761 6655 terracon.com
DRAFT
Geotechnical Design Report Rockfall Mitigation Project
Timpanogos Cave National Monument
American Fork, Utah
February 26, 2016
Terracon Project No. C4155339
Prepare for:
A&E Architects, PC
Missoula, Montana
Prepared by:
Terracon Consultants, Inc.
Great Falls, Montana
Terracon Consultants, Inc. 1392 13 th Ave SW Great Falls, MT 59404
P [406] 453 5400 F [406] 761 6655 terracon.com
A&E Architects
222 N. Higgins
Missoula, MT 59802
Attn: Mr. Jim McDonald, AIA
Re: Geotechnical Design Report
Rockfall Mitigation and Relocate UT-92
Timpanogos Cave National Monument, Uinta National Forest
American Fork, Utah
IDIQ Contract P14PC00007
Terracon Project No. C4155339 / 61159192
Mr. McDonald:
Terracon Consultants, Inc. (Terracon) has completed the field exploration, laboratory testing, and engineering analysis necessary to develop geotechnical design recommendations for the referenced project and the National Park Service (NPS) Task Order. This work focused on rockfall mitigation for the Timpanogos Cave Trailhead Visitor Center located in the American
Fork Canyon along UT-92 (Alpine Loop Road) shown on the attached Exhibit 1. The Task
Order also involved necessary design for the relocation of UT-92 and provision for additional parking at the Visitor Center. These services were performed in general accordance with our proposal number C4155339 dated October 29, 2015. This report presents results of the field exploration, laboratory testing, and engineering analysis along with recommendations for the primary geotechnical project components.
We appreciate the opportunity to be of service to you on this project.
Sincerely, Terracon Consultants, Inc.
Gary A. Quinn, P.E. Rick L. Chesnut, P.E., P.G.
Senior Geotechnical Engineer, Principal Principal
Charles Molthen
Senior Staff Geotechnical Engineer
TABLE OF CONTENTS
Page
INTRODUCTION ............................................................................................................. 1 1.0
FIELD EXPLORATION ................................................................................................... 2 2.0
2.1 Soil Profile
2.2 Groundwater
LABORATORY TESTING ............................................................................................... 4 3.0
3.1 Test Results
GEOTECHNICAL DESIGN CONSIDERATIONS AND RECOMMENDATIONS .............. 6 4.0
4.1 Rockfall Mitigation
4.2 Retaining Wall
SUBSURFACE CONDITION REVIEW – BUILDING SITES ............................................ 9 5.0
5.1 Visitor Center
5.2 Inter-Agency Center
PAVEMENT SECTION UT-92 ...................................................................................... 10 6.0
GENERAL COMMENTS ............................................................................................... 10 7.0
APPENDIX A – FIELD EXPLORATION
Exhibit 1 Site Location Maps
Exhibit 2 Exploration Plans
Exhibits 3 to 11 Boring Logs
General Notes
Unified Soil Classification System
APPENDIX B – LABORATORY TESTING
Exhibit 12 Atterberg Limits Test Results
Exhibit 13 to 14 Direct Shear Test Results
Soil Chemistry Test Results
APPENDIX C – SUPPORTING DOCUMENTS / CALCULATIONS
Pages 1 to 14 Rockfall Barrier Summary Calculations
Pages 15 to 25 Retaining Wall Summary Calculations
Geotechnical Design Report Rockfall Mitigation Project – Timpanogos Cave National Monument American Fork, Utah ■ IDIQ Contract No. P14PC00007 February 26, 2016 ■ Terracon Project No. C4155339
Responsive ■ Resourceful ■ Reliable 1
DRAFT
Rockfall Mitigation Project
Timpanogos Cave National Monument
American Fork, Utah IDIQ Contract No. P14PC00007
Terracon Project No. C4155339
INTRODUCTION 1.0
The Visitor Center site is located in the narrow American Fork Creek Canyon along UT-92
(Alpine Loop Road) approximately 10 miles east of the interchange with I-15. Approximate coordinates of the site are N40º26’38”, W111º42’,19”, with a general elevation of 5635 feet. The primary geotechnical project elements include approximately 215 lineal feet of rockfall barrier and about 250 lineal feet of retaining structure across the toe area of the talus slope that rises above the site to the south.
This report presents the results of the Terracon geotechnical investigation and design conducted for the rockfall mitigation proposed in conjunction with the construction of a new
Visitor Center at the Timpanogos Cave National Monument. The rockfall mitigation elements have been designed in substantial accordance with recommendations in the July 2013
Geotechnical Design Report prepared by the Central Federal Lands Highway Division (CFLHD), Geotechnical Services Branch. A geotechnical investigation was also previously conducted by
Kleinfelder West, Inc. in 2011 for the original design of the Visitor Center building, pavements, and site development. In this report, some concern and initial input were provided relative to rockfall.
The CFLHD report provided recommendations for location, size, and energy rating of a rockfall barrier to be located near the toe of the talus slope. In association with the barrier, the project includes a new retaining structure that is required to gain additional parking for the facility; the proposed wall location will necessitate substantial cutting into the talus slope and will require slope stabilization measures for both construction and long-term service of the wall-barrier system. This report provides recommendations for design of soil nail support for the wall and a micropile foundation system for the rockfall barrier. The successful construction of these closely inter-related structures will require careful planning and execution by specialty contractors. The project also involves the relocation and reconstruction of UT-92 through the Visitor Center area to facilitate the planned improvements.
Responsive ■ Resourceful ■ Reliable 2
The following report describes the Terracon field exploration, laboratory testing, and geotechnical analysis conducted for the project elements outlined above. This report also includes subsurface information for two borings conducted at the USFS-NFS Inter-Agency
Center site located west of the canyon mouth. These discussions along with the supporting data in Appendices A and B plus the summary calculations included in Appendix C provide the basis for the geotechnical design recommendations presented herein.
FIELD EXPLORATION 2.0
Seven soil borings, designated B-1 to B-7, were completed at the Visitor Center site as part of our field exploration program; boring depths ranged from 11½ feet to 26½ feet below existing site grade. Borings B-8 and B-9 were completed to depths of 20 ½ feet at the NPS-USFS Inter-Agency complex west of the canyon entrance. Locations of the borings are indicated on the attached
Exploration Plans for each site in Appendix A. Boring locations were determined in the field during a meeting with the client, National Park Service and Terracon personnel. Final boring locations were adjusted to avoid utility conflicts following Blue Stakes of Utah and private utility locate services. The locations of the borings should be considered accurate only to the degree implied by the means and methods used to define them.
The drilling was conducted with a truck-mounted rotary rig using an air rotary/ODEX method to advance the borings. Samples of the soil encountered in the borings were obtained using the split barrel sampling procedures.
In the split-barrel sampling procedure, the number of blows required to advance a standard 2-inch
O.D. split-barrel sampler the last 12 inches of the typical total 18-inch penetration by means of a
140-pound hammer with a free fall of 30 inches, is the standard penetration resistance value
(SPT-N). This value is used to estimate the in-situ relative density of cohesionless soils and consistency of cohesive soils.
An automatic hammer was used to advance the split-barrel sampler in the borings performed on this site. A significantly greater efficiency is achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. This higher efficiency has an appreciable effect on the SPT-N value. The effect of the hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report.
The soil samples were tagged for identification, sealed to reduce moisture loss, and taken to our
Bluffdale, Utah laboratory for further examination, testing, and classification. Information provided on the boring logs attached to this report includes soil descriptions, consistency evaluations, boring depths, sampling intervals, and groundwater conditions. The borings were backfilled with cuttings prior to the drill crew leaving the site.
Responsive ■ Resourceful ■ Reliable 3
A field log of each boring was prepared by a Terracon field engineer. These logs included visual classifications of the materials encountered during drilling as well as the driller’s interpretation of the subsurface conditions between samples. Final boring logs included with this report represent the engineer's interpretation of the field logs and include modifications based on laboratory observation and tests of the samples.
2.1 Soil Profile
Based on the results of the seven soil borings, subsurface conditions at the Visitor Center site can be generalized as follows:
Timpanogos Cave Visitor Center
Stratum
Approximate Depth to
Bottom of Stratum
(feet)
Material Description Consistency/
Density
1 4 ½ - 14 ½ (1)
Fill – Silty Gravel with Sand (GM) Loose to Medium
Dense
2 26 ½ (2)
Silty Gravel with Sand (GM) with cobbles and possibly boulders, and interbedded layers of Silty Sand with Gravel, and Silty
Sand.
Medium Dense to
Dense
1. Encountered in borings B-2, B-3, and B-7
2. Maximum depth explored
NPS-USFS/Inter-Agency Complex
Stratum
Approximate Depth to
Bottom of Stratum
(feet)
Material Description Consistency/
Density
1 1 Silty Clay (CL-ML) with gravel, some cobbles and boulders
2 20 ½ (3)
Silty Gravel (GM) with cobbles and possibly boulders, and interbedded layers of Silty
Sand with Gravel
Very Dense
3. Maximum depth explored
Conditions encountered at each boring location are indicated on the attached individual boring logs, Exhibits 3 to 11 in Appendix A of this letter. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in situ, the transition between materials may be gradual.
Responsive ■ Resourceful ■ Reliable 4
2.2 Groundwater
Groundwater was not encountered within the depths explored at the time of field exploration.
These observations represent groundwater conditions at the time of the field exploration and may not be indicative of other times, or at other locations. Conditions can change with varying seasonal and weather conditions resulting in increased surface infiltration and slope seepage as well as rising groundwater levels in the valley floor alluvium. Site drainage and development changes can also affect groundwater conditions.
LABORATORY TESTING 3.0
Samples retrieved during the field exploration were taken to our laboratory for testing and further observation. At that time, the field descriptions were confirmed or modified as necessary and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials.
Laboratory tests were performed in general accordance with the applicable ASTM, local or other accepted standards. Selected soil samples were tested for the following engineering properties:
Direct shear pH
Atterberg Limits Minus 200
In-situ Water Content Resistivity
Soluble Sulfates Soluble Chlorides
Results of the laboratory tests are summarized herein and on the attached boring logs and exhibits.
3.1 Test Results
Results from analytical testing are summarized below:
TEST RESULTS
Sample Location
TEST RESULTS
pH Resistivity
(ohm-cm)
Sulfate
(ppm)
Chloride
(ppm)
B-1 @ 5 ft. 9.22 4,060 <5.16 13.0
B-2 @ 10 ft. 9.18 4,440 10.3 10.3
B-3 @ 2.5 ft. 9.89 484 6.73 439
B-3 @ 7.5 & 15 ft. 9.14 405 16.7 71.5
Responsive ■ Resourceful ■ Reliable 5
Sample Location
TEST RESULTS
pH Resistivity
(ohm-cm)
Sulfate
(ppm)
Chloride
(ppm)
B-4 @ 7.5 ft. 9.79 448 <5.07 563
B-4 @ 12.5 ft. 9.78 577 <5.13 424
B-6 @ 7.5 ft. 9.62 484 21.0 444
B-7 @ 7.5 ft. 8.74 803 13.0 305
B-8 @ 12.5 ft. 8.86 8,450 <5.15 <5.15
B-9 @ 7.5 8.66 7,700 <5.18 <5.18
Based on the test results, sulfate exposure for concrete appears to be low. However, the high chloride contents found for samples from Borings B-3 through B-7 could be corrosive to reinforcing steel.
An aggressive subsurface environment where corrosion can deteriorate buried steel over its design life can generally be identified by soil resistivity, pH, and chloride tests. Resistivity and values vary across the site and range widely between 405 to 4,440 ohm-cm; chloride contents vary similarly between less than 5 and more than 500 ppm. Resistivity values less than 2,000 ohm-cm indicate strongly corrosive conditions for buried metal, while resistivity values over 5,000 ohm-cm indicate little corrosion potential. Chloride concentrations exceeding about 200 ppm are considered deleterious.
Terracon Borings B-1 and B-2 are located in the southerly portion of the site below the slope near the existing Visitors Center and have high resistivity/low chloride values associated with generally low corrosivity. A higher resistivity of over 5,000 ohm-cm was reported by Kleinfelder for a sample also taken from a boring in the south portion of the site in 2013. However, the recent low resistivity – high chloride samples were taken from the 2015 Terracon borings along the edge of
UT-92. Based on these results, it appears that such widely divergent results in similar sand-gravel alluvial soils across the site must be due to an external influence, such as roadway salting and the possible effects of snow storage in existing parking areas along the roadway.
These test results are provided to assist in determining the type and degree of corrosion protection that may be required. Although the widely divergent resistivity pattern at the site can be reasonably explained as discussed above, the study has not been comprehensive. The geotechnical recommendations for the rockfall barrier and retaining structure on the southern edge of the site have included moderate corrosion protection precautions for steel elements to be in contact with the ground. This appears to be a prudent approach, but some further consideration/research accompanied by possible testing prior to (and/or during) construction is recommended for the barrier-wall area to solidify the resolution of this matter. It is recommended
Responsive ■ Resourceful ■ Reliable 6 that in-ground steel elements along the highway be designed for a high-corrosivity environment, and it may be necessary to retain a corrosion engineer to provide additional corrosion protection recommendations.
GEOTECHNICAL DESIGN CONSIDERATIONS AND 4.0
RECOMMENDATIONS
4.1 Rockfall Mitigation
The basis for the rockfall mitigation design has been provided in the July 2013 Geotechnical
Design Report prepared by the Central Federal Lands Highway Division (CFLHD), Geotechnical
Services Branch. In this report, mitigation of the Visitor Center building and parking areas was recommended to consist of a rockfall fence with a height of 10 feet and a minimum energy rating of
500 kJ. The location of the fence was provided in a preliminary plan set accompanying that report.
These design recommendations have been incorporated into the current project planning and design as directed by the NPS. The geotechnical design conducted for the Task Order has involved selection of a rockfall fence/barrier system consistent with the CFLHD report and developing recommendations for system foundations.
In consideration of the marginally stable talus slope above the site and the proposed location of the rockfall barrier, it has been considered expedient and generally less difficult to specify a rigid-post system that does not require upslope anchoring. Based on the current plan configuration of retaining structure and rockfall fence, difficult upslope access is a certainty, and drilling of upslope anchors would potentially necessitate the crane-setting of portable drills for anchor work.
Therefore, the Geobrugg GBE-500A-R (or equal) system with10-foot height rigid posts and 500kJ energy rating has been recommended. With the absence of upslope ropes, rockfall impact on the system does, however, produce significant force and moment reactions that must be resisted by the posts and transferred to the foundation system. Geobrugg provides these reactions for the post base plate per field measurement of prototype systems and recommends that a factor safety of FS = 1.3 be applied for design. Based on this information, the foundation loading applied for design was determined to be approximately as follows:
Vertical Compressive Force: 100,000 pounds
Overturning Moment: 120,000 foot-pounds
Lateral Force: 38,000 pounds.
Since the foundations are to be located in a talus material that is presumed marginally stable based on its geologic origins, and since the foundation loads are relatively large, a micropile foundation system has been recommended for the rockfall barrier. A multiple-micropile configuration was selected primarily in consideration of moment resistance requirements and the stabilizing benefits that could be realized using coupled micropiles. The micropile configuration
Responsive ■ Resourceful ■ Reliable 7 ultimately consisted of one upslope and two downslope elements for each foundation with a separation distance of 4 feet in the slope direction. To provide necessary bending and combined stress resistance in the zone immediately below the foundation blocks, a composite micropile section was selected with the upper 10± feet cased (including 1 foot of footing embedment) around a centralized reinforcing bar extending to a depth of 25 feet below the foundation. Due to the potentially open gradation of the talus material, it has been assumed that little grout-ground bond will be available around the casing, and the casing will function primarily to stiffen the micropile section versus bending and shear near the base of the foundation. A presumptive allowable bond stress for the bar of 15 psi for the lower reaches of the talus and sand-gravel colluvium beneath the talus; this presumptive value is currently believed to provide a bond factor of safety on the expected order of FS=1.5-2.0. The bond or geotechnical capacity is to be evaluated by proof testing during the micropile installation. Calculations based on the foregoing design assumptions resulted in a micropile section recommended as follows with calculation documentation provided in
Appendix B:
API N-80 casing, 5.5-inch diameter extending to a minimum permanent depth of 9 feet below foundation base; greater casing depth (either permanent or temporary) may be required for drill hole stability and contract provisions should be made for such payment as warranted.
No. 11, Grade 75 reinforcing bar centralized within the casing and extending to minimum depth of 25 feet below foundation base. Additional bar length could be required if field observations indicate a sound bond length of at least 15 feet below the casing has not been achieved. Contract provisions should be in place for warranted additional payment if geotechnical conditions are responsible.
It is possible to consider alternate micropile sections that may be more compatible with driller equipment and experience with similar site conditions. The contract should allow latitude for alternate design proposals with design engineer review and concurrence required.
Corrosion was considered in the analysis of the foregoing micropile section components by reducing diameter of the casing and bar by nominal amounts of approximately 0.15-inch consistent with FHWA recommendations for moderately aggressive environments. This treatment was considered valid based on the foregoing discussion of resistivity test data. With the corrosion reduced sections, load capacity and moment resistance were checked. Moment resistance was reviewed under combined load-moment conditions using the program AllPile7 and found acceptable for the corrosion-reduced section; fixity was determined to occur at approximately 6 feet below the base of the footing.
It is expected that the rockfall barriers will be constructed after the excavation and retention for the new parking lot retaining wall have been completed. This will facilitate access, presumably from below/adjacent the wall, for drilling via an excavator-mounted drill mast, or to allow setting
Responsive ■ Resourceful ■ Reliable 8 of drill equipment on-slope. Some difficulty should be anticipated during the installation of the micropiles due to the talus conditions and the uncertain presence of larger size rockfall inclusions. Due to random openness in the talus slope, the design has assumed that perimeter grouting of the casing will be incomplete, and this axial resistance has been ignored in favor of development with an increased length of grouted reinforcing bar below the casing tip.
Advancement of the casing to the full micropile depth, or some depth below the recommended final casing tip elevation, will likely be required for hole stabilization and bar grouting; a grout sock may be also be required for the bar installation.
4.2 Retaining Wall
The new parking lot addition along the south (slope) side of the site is currently expected to require advancement of approximately 20 feet laterally into the hillside behind the existing Visitor Center buildings. This excavation will be made into the talus slope and will result in cut (wall) heights in a general range of 10 to 20 feet. Excavating at the toe of the slope presents stability concerns as the talus is typically considered as a marginally stable slope material. In order to provide both adequate construction safety as toe support is removed and long-term stability for the finished slope/wall above the parking lot, an appropriate retention plan will be required. After consideration of various options such as sheet piling, drilled shafts, and soldier pile-lagging systems, it is believed that a soil nail wall is well-suited for the project needs and environment. A soil nail wall could be installed in a top-down, benched, staged manner to maintain slope stability as the construction occurs progressively. Slope opening will most likely need to be limited along the wall line as the nailing advances in order to manage stability issues; specifications should address such potential sensitivity and require appropriate contractor planning and contingency. The wall will have a shotcrete facing that could be adapted to provide necessary retention for the slope and accommodate decorative facing panels as desired.
The soil nail wall (as would any wall at this location) requires retention of the talus slope at an adequate factor of safety. There is no substantive information available regarding slope composition other than from surficial observation. These observations indicate the slope to have a relatively uniform cover of angular quartzite talus with an estimated 6 to 12-inch average size and an inclination in a maximum range of 30º to 34º. It is assumed that the underlying material consists of variable, poorly-graded colluvium ranging from relatively fine granular materials to varying gradations of talus, plus some larger rockfall inclusions, that have been deposited in a layered fan below the weathering rock wall above the site. It is also assumed that the colluvium ultimately transitions to alluvial sands and gravels near the valley floor elevation as encountered in Boring
B-1. Based on this limited information, it has been assumed for stability analysis that the slope material is a layered granular mixture with an overall friction angle of approximately Ø = 32º.
Stability analysis for the nailing geotechnical design has been conducted using a 2-D, limiting equilibrium computer program (GSTABL7) for static and seismic conditions of global/compound stability. For these analyses, factors of safety at FS=1.3 and 1.0 have been considered acceptable
Responsive ■ Resourceful ■ Reliable 9 for static and seismic cases respectively. For seismic analysis, a pseudo-static approach has been used based on a horizontal seismic coefficient taken as 50% of the peak horizontal ground acceleration (PGA) for a 975-year return event per the USGS Earthquake Hazards Program probabilistic estimate, which indicates a PGA = 0.247g for the site exclusive of any site specific geologic adjustment. Program output has been used to check nail lengths to ascertain adequate development length in resisting zones and acceptable factors of safety per the above criteria at three sections along the wall with retained height varying from 10 to 18 feet. An allowable bond stress of 15 psi was used as per the micropile design, and the bar diameter was similarly reduced to allow for moderate corrosion. Based on the foregoing parameters, the following nail design is recommended:
No. 8, Grade 60 bar with lengths ranging from 10 to 32 feet as provided with the calculations in Appendix C.
Nominal inclination of 15º below horizontal
Nail spacing of 4 feet vertical x 4 feet horizontal in a staggered pattern.
SUBSURFACE CONDITION REVIEW – BUILDING SITES 5.0
5.1 Visitor Center
Soils at the Visitor Center/Canyon Site were found to consist typically of medium dense to dense silty to poorly-graded sands and gravels as described above in Section 1.1. In the recent subsurface investigation, Boring B-6 is located adjacent the north side of the building footprint per Exhibit 2. This boring logged medium dense to dense sand-gravel soils consistent with the
Kleinfelder findings. It should be noted that the recommended foundation preparation called for a 1-foot layer of structural fill over stable native subgrade material. When foundation excavations are made, it is recommended that Kleinfelder review conditions to ascertain that subgrade materials and preparation are in accordance with their design assumptions and recommendations.
5.2 Inter-Agency Center
Borings B-8 and B-9 were performed at the staked locations at the Inter-Agency Site shown on
Exhibits 1A and 2A in Appendix A; coordinates of these locations are noted on the Boring Logs attached in Appendix A as Exhibits 10 and 11. Subsurface conditions encountered consisted predominantly of very dense silty gravel with sand, cobbles, and some boulders. These conditions are in substantial accord with those reported by Kleinfelder in their 2011 report. It should be noted that the recommended foundation preparation called for a 10-inch layer of structural fill over stable native subgrade material. When foundation excavations are made, it is
Responsive ■ Resourceful ■ Reliable 10 recommended that Kleinfelder review conditions to ascertain that subgrade materials and preparation are in accordance with their design assumptions and recommendations.
PAVEMENT SECTION UT-92 6.0
Existing pavement thickness along UT-92 consists of five inches of Hot Mix Asphalt (HMA) over an unspecified thickness of aggregate base. Pavement sections in the parking lot areas consisted of approximately ¼ inch of asphaltic surfacing over native soil or fill in the north lot (Borings B-5 to
B-7) to 2 inches of HMA over aggregate base in the south lot (Borings B-1 and B-2). Pavement condition in the north parking lot was very poor to failing with significant deformation, cracking and settlement.
The UT-92 replacement pavement section near the Timpanogos Cave Visitor’s Center will be designed internally by UDOT and that the pavement section will be on the order of five inches of
HMA over eight inches Untreated Base Course (UTBC) over compacted subgrade. Final design will be provided by UDOT. Pavement sections in parking lots should consist of a minimum of 3 inches of HMA over 6 inches of UTBC based on a controlling subgrade profile of silty clay grading to silty sand as encountered below the existing paved areas.
GENERAL COMMENTS 7.0
The data presented in this report is based upon the information obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and appropriate supplemental data can be provided.
The scope of services for this project does not include, either specifically or by implication, any environmental or biological assessment of the site or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.
This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either expressed or implied, are intended or made. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the information and conclusions contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing.
APPENDIX A
FIELD EXPLORATION
TOPOGRAPHIC MAP IMAGE COURTESY OF
THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: TIMPANOGOS
CAVE, UT (1/1/1998).
SITE LOCATION
Timpanogos Cave National Monument Rockfall Mitigation
SR-92
American Fork, UT
14850 Pony Express Rd, Ste 150N
Bluffdale, UT 84065
61159192
DIAGRAM IS FOR GENERAL LOCATION ONLY,
AND IS NOT INTENDED FOR CONSTRUCTION
PURPOSES
Project Manager:
Drawn by:
Checked by:
Approved by:
CMA
RLC
RLC
RLC
NA
12/16/2015
Project No.
File Name:
Date:
Exhibit
1”=24,000 SF
Scale:
EXPLORATION PLAN
14850 Pony Express Rd, Ste 150N
Bluffdale, UT 84065
61159192
AERIAL PHOTOGRAPHY PROVIDED BY
MICROSOFT BING MAPS
Timpanogos Cave National Monument Rockfall Mitigation
SR-92
American Fork, UT
DIAGRAM IS FOR GENERAL LOCATION ONLY,
AND IS NOT INTENDED FOR CONSTRUCTION
PURPOSES
Project Manager:
Drawn by:
Checked by:
Approved by:
CMA
RLC
RLC
RLC
NA
12/16/2015
Scale:
Project No.
File Name:
Date:
AS SHOWN
Exhibit
TOPOGRAPHIC MAP IMAGE COURTESY OF
THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: LEHI, UT
(1/1/1998) and TIMPANOGOS CAVE, UT
(1/1/1998).
SITE LOCATION
Timpanogos Cave National Monument Rockfall
Mitigation – NPS-USFS Complex SR-92 Highland Hwy
Highland, UT
6949 South High Tech Dr. Ste. 100 Midvale, UT 84047
61159192
DIAGRAM IS FOR GENERAL LOCATION ONLY,
AND IS NOT INTENDED FOR CONSTRUCTION
PURPOSES
Project Manager:
Drawn by:
Checked by:
Approved by:
CMA
RLC
RLC
RLC
NA
2/19/2016
Project No.
File Name:
Date:
1A
Exhibit
1”=2,000’ Scale:
EXPLORATION PLAN
6949 South High Tech Dr. Ste. 100 Midvale, UT 84047
61159192AERIAL PHOTOGRAPHY PROVIDED BY
MICROSOFT BING MAPS
Timpanogos Cave National Monument Rockfall Mitigation – NPS-USFS Complex
SR-92 Highland Hwy Highland, UT
DIAGRAM IS FOR GENERAL LOCATION ONLY,
AND IS NOT INTENDED FOR CONSTRUCTION
PURPOSES
Project Manager:
Drawn by:
Checked by:
Approved by:
CMA
RLC
RLC
RLC
NA
2/19/2016
Scale:
Project No.
File Name:
Date:
AS SHOWN
Exhibit
2A pH, resistivity, sulfate, and chloride analysis completed on soil sample collected at 5' Soil Direct Shear performed on sample collected at 20'
Asphalt, 2 inches thick SILTY SAND WITH GRAVEL (SM), with cobbles, gray, dense to very dense light brown gray
SILTY GRAVEL WITH SAND (GM), with cobbles, brown to gray, medium dense to very dense
Boring Terminated at 21.5 Feet
NP
10 46
10-18-30 N=48
50/5"
20-18-26 N=44
50/5"
7-17-23 N=40
17-24-50/3"
3-5-5 N=10
0.2
14.5
21.5
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P A
N O
G O
S C
A V
E N
A T
IO
N
A L
M O
N U
M E
N T
R O
C K
F A
LL
M
IT
IG
A T
IO
N
.G P
J T
E R
R A
C O
N
.G
D T
/2
/1
SITE:
Advancement Method:
Odex
Abandonment Method:
Backfilled with soil cuttings upon completion.
6949 S. High Tech Drive Midvale, Utah
Notes:
Project No.: 61159192
Drill Rig: Mobile B-80
Boring Started: 10/16/2015
BORING LOG NO. B-1
A&E Architects PCCLIENT:
Missoula, MT
Driller: Earthcore
Boring Completed: 10/16/2015
Exhibit: No.-3
SR-92
American Fork, Utah
PROJECT: Timpanogos Cave National Monument Rockfall Mitigation
C oh es io n (p sf
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R E
C O
V E
R Y
In
F ric tio n
A ng le
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
Latitude: 40.44367° Longitude: -111.70591°
LOCATION See Exhibit A-2
Groundwater not encountered
WATER LEVEL OBSERVATIONS
sample collected at 10' Soil Direct Shear performed on sample collected at 10'
Asphalt, 2 inches thick FILL - SILTY GRAVEL WITH SAND (GM), brown
SILTY GRAVEL WITH SAND (GM), with cobbles, brown, medium dense brown to gray
SILTY GRAVEL (GM), with cobbles, brown, medium dense to very dense
Boring Terminated at 21.5 Feet
NP
3-2-3 N=5
9-9-9 N=18
10-9-11 N=20
10-10-10 N=20
7-7-6 N=13
11-10-7 N=17
8-19-36 N=55
0.2
4.5
14.5
21.5
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P A
N O
G O
S C
A V
E N
A T
IO
N
A L
M O
N U
M E
N T
R O
C K
F A
LL
M
IT
IG
A T
IO
N
.G P
J T
E R
R A
C O
N
.G
D T
/2
/1
SITE:
Advancement Method:
Odex
Abandonment Method:
Backfilled with soil cuttings upon completion.
6949 S. High Tech Drive Midvale, Utah
Notes:
Project No.: 61159192
Drill Rig: Mobile B-80
Boring Started: 10/16/2015
BORING LOG NO. B-2
A&E Architects PCCLIENT:
Missoula, MT
Driller: Earthcore
Boring Completed: 10/16/2015
Exhibit: No.-4
SR-92
American Fork, Utah
PROJECT: Timpanogos Cave National Monument Rockfall Mitigation
C oh es io n (p sf
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R E
C O
V E
R Y
In
F ric tio n
A ng le
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
Latitude: 40.44372° Longitude: -111.70519°
LOCATION See Exhibit A-2 sample collected at 7.5' and 15'
Asphalt, 5 inches thick FILL - SILTY GRAVEL WITH SAND (GM), brown grayish-brown, rock in shoe
SILTY GRAVEL WITH SAND (GM), with cobbles, brown to grayish-brown, dense to very dense broken spoon head
Sampler Refusal at 26.25 Feet
1 NP
5-7-8 N=15
2-3-4 N=7
3-3-4 N=7
3-4-7 N=11
5-9-13 N=22
24-20-21 N=41
16-32-19 N=51
5-15-50/3"
0.4
14.5
26.3
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P A
N O
G O
S C
A V
E N
A T
IO
N
A L
M O
N U
M E
N T
R O
C K
F A
LL
M
IT
IG
A T
IO
N
.G P
J T
E R
R A
C O
N
.G
D T
/2
/1
SITE:
Advancement Method:
Odex
Abandonment Method:
Backfilled with soil cuttings upon completion.
6949 S. High Tech Drive Midvale, Utah
Notes:
Project No.: 61159192
Drill Rig: Mobile B-80
Boring Started: 10/17/2015
BORING LOG NO. B-3
A&E Architects PCCLIENT:
Missoula, MT
Driller: Earthcore
Boring Completed: 10/17/2015
Exhibit: No.-5
SR-92
American Fork, Utah
PROJECT: Timpanogos Cave National Monument Rockfall Mitigation
C oh es io n (p sf
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R E
C O
V E
R Y
In
F ric tio n
A ng le
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
Latitude: 40.44391° Longitude: -111.70615°
LOCATION See Exhibit A-2 sample collected at 12.5'
Asphalt, 5 inches thick SILTY GRAVEL WITH SAND (GM), with cobbles, brown, loose to medium dense gray to brown, dense brown, medium dense light brown, dense brown, medium dense very dense, gravel up to 3" in diameter
Boring Terminated at 26.5 Feet
5-4-3 N=7
3-4-4
15-24-24 N=48
12-11-9
7-16-28 N=44
24-19-39
12-15-2 N=17
0.4
26.5
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P A
N O
G O
S C
A V
E N
A T
IO
N
A L
M O
N U
M E
N T
R O
C K
F A
LL
M
IT
IG
A T
IO
N
.G P
J T
E R
R A
C O
N
.G
D T
/2
/1
SITE:
Advancement Method:
Odex
Abandonment Method:
Backfilled with soil cuttings upon completion.
6949 S. High Tech Drive Midvale, Utah
Notes:
Project No.: 61159192
Drill Rig: Mobile B-80
Boring Started: 10/17/2015
BORING LOG NO. B-4
A&E Architects PCCLIENT:
Missoula, MT
Driller: Earthcore
Boring Completed: 10/17/2015
Exhibit: No.-6
SR-92
American Fork, Utah
PROJECT: Timpanogos Cave National Monument Rockfall Mitigation
C oh es io n (p sf
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R E
C O
V E
R Y
In
F ric tio n
A ng le
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
Latitude: 40.44393° Longitude: -111.70578°
LOCATION See Exhibit A-2
Asphalt, 1/4 inch thick SILTY GRAVEL WITH SAND (GM), with cobbles, brown
SILTY SAND (SM), dark brown, loose
SILTY GRAVEL WITH SAND (GM), with cobbles, brown to gray, medium dense to very dense
Boring Terminated at 11.5 Feet
5 NP
4-4-3 N=7
50/1"
11-13-8 N=21
11-17-14 N=31
0.0
1.5
4.5
11.5
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P A
N O
G O
S C
A V
E N
A T
IO
N
A L
M O
N U
M E
N T
R O
C K
F A
LL
M
IT
IG
A T
IO
N
.G P
J T
E R
R A
C O
N
.G
D T
/2
/1
SITE:
Advancement Method:
Odex
Abandonment Method:
Backfilled with soil cuttings upon completion.
6949 S. High Tech Drive Midvale, Utah
Notes:
Project No.: 61159192
Drill Rig: Mobile B-80
Boring Started: 10/17/2015
BORING LOG NO. B-5
A&E Architects PCCLIENT:
Missoula, MT
Driller: Earthcore
Boring Completed: 10/17/2015
Exhibit: No.-7
SR-92
American Fork, Utah
PROJECT: Timpanogos Cave National Monument Rockfall Mitigation
C oh es io n (p sf
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R
E C
O V
E R
Y
In
F ric tio n
A ng le
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
Latitude: 40.44402° Longitude: -111.70521°
LOCATION See Exhibit A-2
Asphalt, 1/4 inch thick SILTY SAND WITH GRAVEL (SM), brown, medium dense to dense
SILTY GRAVEL WITH SAND (GM), with cobbles, brown, very dense
Boring Terminated at 11.5 Feet
NP
8-14-16 N=30
12-15-17 N=32
11-11-14 N=25
21-33-36 N=69
0.0
9.0
11.5
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P A
N O
G O
S C
A V
E N
A T
IO
N
A L
M O
N U
M E
N T
R O
C K
F A
LL
M
IT
IG
A T
IO
N
.G P
J T
E R
R A
C O
N
.G
D T
/2
/1
SITE:
Advancement Method:
Odex
Abandonment Method:
Backfilled with soil cuttings upon completion.
6949 S. High Tech Drive Midvale, Utah
Notes:
Project No.: 61159192
Drill Rig: Mobile B-80
Boring Started: 10/16/2015
BORING LOG NO. B-6
A&E Architects PCCLIENT:
Missoula, MT
Driller: Earthcore
Boring Completed: 10/16/2015
Exhibit: No.-8
SR-92
American Fork, Utah
PROJECT: Timpanogos Cave National Monument Rockfall Mitigation
C oh es io n (p sf
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R
E C
O V
E R
Y
In
F ric tio n
A ng le
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
Latitude: 40.444° Longitude: -111.70498°
LOCATION See Exhibit A-2 sample collected at 7.5'
Asphalt, 1/4 inch thick FILL - SILTY GRAVEL WITH SAND (GM), brown to dark brown
SILTY SAND (SM), dark brown, loose to medium dense
SILTY GRAVEL (GM), with cobbles, brown, medium dense
Boring Terminated at 11.5 Feet
5-4-3 N=7
5-6-9 N=15
8-5-4 N=9
4-6-7 N=13
0.0
8.5
10.0
11.5
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P A
N O
G O
S C
A V
E N
A T
IO
N
A L
M O
N U
M E
N T
R O
C K
F A
LL
M
IT
IG
A T
IO
N
.G P
J T
E R
R A
C O
N
.G
D T
/2
/1
SITE:
Advancement Method:
Odex
Abandonment Method:
Backfilled with soil cuttings upon completion.
6949 S. High Tech Drive Midvale, Utah
Notes:
Project No.: 61159192
Drill Rig: Mobile B-80
Boring Started: 10/16/2015
BORING LOG NO. B-7
A&E Architects PCCLIENT:
Missoula, MT
Driller: Earthcore
Boring Completed: 10/16/2015
Exhibit: No.-9
SR-92
American Fork, Utah
PROJECT: Timpanogos Cave National Monument Rockfall Mitigation
C oh es io n (p sf
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R
E C
O V
E R
Y
In
F ric tio n
A ng le
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
Latitude: 40.44402° Longitude: -111.70444°
LOCATION See Exhibit A-2
Direct shear test completed on soil sample collected at 5' sample collected at 12.5'
SILTY CLAY (CL-ML), dark brown, some gravel, cobbles, and boulders SILTY GRAVEL (GM), light brown, very dense, cobbles, possibly boulders oxidation stains fractured rocks trace clay, increasing fines content, oxidation stains brown to gray
Sampler Refusal at 20.6 Feet
NP
16-50/4"
50/5"
49-50/5"
50/5"
13-50/1"
36-42-50/5"
48-50/1"
1.0
20.6
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P A
N O
G O
S C
A V
E N
A T
IO
N
A L
M O
N U
M E
N T
R O
C K
F A
LL
M
IT
IG
A T
IO
N
.G P
J T
E R
R A
C O
N
.G
D T
/2
/1
SITE:
Advancement Method:
Odex
Abandonment Method:
Backfilled with soil cuttings upon completion.
6949 S. High Tech Drive Midvale, Utah
Notes:
Project No.: 61159192
Drill Rig: Mobile B-80
Boring Started: 12/4/2015
BORING LOG NO. B-8
A&E Architects PCCLIENT:
Missoula, MT
Driller: Earthcore
Boring Completed: 12/4/2015
Exhibit: No.-10
SR-92
American Fork, Utah
PROJECT: Timpanogos Cave National Monument Rockfall Mitigation
C oh es io n (p sf
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R E
C O
V E
R Y
In
F ric tio n
A ng le
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
Latitude: 40.43156° Longitude: -111.7685°
LOCATION See Exhibit A-2
Direct shear test completed on soil sample collected at 5' sample collected at 7.5'
SILTY CLAY (CL-ML), dark brown, some gravel, cobbles and boulders SILTY GRAVEL (GM), brown, very dense
SILTY SAND WITH GRAVEL (SM), light brown, very dense
SILTY GRAVEL (GM), light brown, very dense, fractured rocks, cobbles, possibly boulders
Difficult drilling 17 to 20' fractured rocks, cobbles, possibly boulders
Sampler Refusal at 20.7 Feet
50/5"
50/5"
48-50/2"
50/5"
50/5"
50/3"
34-50/2"
1.0
5.0
6.5
20.7
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P A
N O
G O
S C
A V
E N
A T
IO
N
A L
M O
N U
M E
N T
R O
C K
F A
LL
M
IT
IG
A T
IO
N
.G P
J T
E R
R A
C O
N
.G
D T
/2
/1
SITE:
Advancement Method:
Odex
Abandonment Method:
Backfilled with soil cuttings upon completion.
6949 S. High Tech Drive Midvale, Utah
Notes:
Project No.: 61159192
Drill Rig: Mobile B-80
Boring Started: 12/4/2015
BORING LOG NO. B-9
A&E Architects PCCLIENT:
Missoula, MT
Driller: Earthcore
Boring Completed: 12/4/2015
Exhibit: No.-11
SR-92
American Fork, Utah
PROJECT: Timpanogos Cave National Monument Rockfall Mitigation
C oh es io n (p sf
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
R E
C O
V E
R Y
In
F ric tio n
A ng le
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
Latitude: 40.43114° Longitude: -111.76658°
LOCATION See Exhibit A-2
GENERAL NOTES
DRILLING & SAMPLING SYMBOLS:
SSS: Split Spoon - 1-3/8" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger LSS: Split Spoon - 2.42" I.D., 3" O.D., unless otherwise noted PA: Power Auger ST: Thin-Walled Tube – 2.875" O.D., unless otherwise noted HA: Hand Auger RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted RB: Rock Bit SK: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary
The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SSS) the last 12 inches of the total 18-inch penetration with a 140-pound hammer falling 30 inches is considered the “Standard Penetration” or “N-value”.
Water levels indicated on the boring logs are the levels measured in the borings at the times indicated.
Groundwater levels at other times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations.
DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System.
Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
CONSISTENCY OF FINE-GRAINED SOILS RELATIVE DENSITY OF COARSE-GRAINED SOILS
Unconfined Compressive
Strength, Qu, psf
Standard Penetration or
N-value Blows/Ft.
Consistency
Standard Penetration or N-value (SS)
Blows/Ft.
Relative Density < 500 0 - 1 Very Soft 0 – 3 Very Loose 500 – 1,000 2 - 4 Soft 4 – 9 Loose 1,000 – 2,000 4 - 8 Firm 10 – 29 Medium Dense 2,000 – 4,000 8 - 15 Stiff 30 – 49 Dense 4,000 – 8,000 15 - 30 Very Stiff > 50 Very Dense 8,000+ > 30 Hard
RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY
Descriptive Term(s) of other constituents
Percent of Dry Weight
Major Component of Sample Particle Size
Trace < 15 Boulders Over 12 in. (300mm) With 15 – 29 Cobbles 12 in. to 3 in. (300mm to 75 mm)
Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
RELATIVE PROPORTIONS OF FINES
Sand Silt or Clay
#4 to #200 sieve (4.75mm to 0.075mm) Passing #200 Sieve (0.075mm)
Descriptive Term(s) of other constituents
Percent of Dry Weight
PLASTICITY DESCRIPTION
Term Plasticity Index
Trace With
Modifiers
< 5 5 – 12 > 12
Non-plastic Low
Medium High
1-10 11-30 > 30
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification
Group Symbol
Group Name B
Coarse Grained Soils:
More than 50% retained on No. 200 sieve
Gravels:
More than 50% of coarse fraction retained on No. 4 sieve
Clean Gravels:
Less than 5% fines C
Cu ≥ 4 and 1 ≤ Cc ≤ 3 E GW Well-graded gravel F
Cu < 4 and/or 1 > Cc > 3 E GP Poorly graded gravel F
Gravels with Fines:
More than 12% fines C
Fines classify as ML or MH GM Silty gravel F,G, H
Fines classify as CL or CH GC Clayey gravel F,G,H
Sands:
50% or more of coarse fraction passes No. 4 sieve
Clean Sands:
Less than 5% fines D
Cu ≥ 6 and 1 ≤ Cc ≤ 3 E SW Well-graded sand I
Cu < 6 and/or 1 > Cc > 3 E SP Poorly graded sand I
Sands with Fines:
More than 12% fines D
Fines classify as ML or MH SM Silty sand G,H,I
Fines Classify as CL or CH SC Clayey sand G,H,I
Fine-Grained Soils:
50% or more passes the No. 200 sieve
Silts and Clays:
Liquid limit less than 50
Inorganic:
PI > 7 and plots on or above “A” line J CL Lean clay K,L,M
PI < 4 or plots below “A” line J ML Silt K,L,M
Organic:
Liquid limit - oven dried
< 0.75 OL
Organic clay K,L,M,N
Liquid limit - not dried Organic silt K,L,M,O
Silts and Clays:
Liquid limit 50 or more
Inorganic:
PI plots on or above “A” line CH Fat clay K,L,M
PI plots below “A” line MH Elastic Silt K,L,M
Organic:
Liquid limit - oven dried
< 0.75 OH
Organic clay K,L,M,P
Liquid limit - not dried Organic silt K,L,M,Q
Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
DxD
)(D
F If soil contains ≥ 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains ≥ 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant.
L If soil contains ≥ 30% plus No. 200 predominantly sand, add “sandy” to group name.
M If soil contains ≥ 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ≥ 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
APPENDIX B
LABORATORY TESTING
0 20 40 60 80 100
CH
o r
OH
CL
o r
O L
ML or OL
MH or OH
PL PIBoring ID Depth Description
SILTY SANDSM
Fines
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
"U " L ine
"A " L ine
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
LL USCS
B-1
B-2
B-3
B-5
B-6
B-8
ATTERBERG LIMITS RESULTS
ASTM D4318
7.5 - 9
12.5 - 14
20 - 21.5
7.5 - 9
5 - 6.5
5 - 5.4
6949 S. High Tech Drive Midvale, Utah
PROJECT NUMBER: 61159192
PROJECT: Timpanogos Cave National
Monument Rockfall Mitigation
SITE: SR-92
American Fork, Utah
CLIENT: A&E Architects PC Missoula, MT
EXHIBIT: No.-12
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R T
A
T T
E R
B E
R G
L
IM
IT
S
C
_T
IM
P
A N
O G
O S
C A
V E
N A
T
IO
N A
L M
O N
U M
E N
T R
O C
K F
A
LL
M
IT
IG
A
T
IO
N .G
P J
T E
R R
A C
O N
.G D
T
/2
/1
CL-ML
Test
Sample
Lab ID
Depth
(ft)
Normal
(psf)
Height
(in)
Density
(pcf)
Height
(in)
Moisture
1 A 20 498.7 1.00 123.4 1.01 11.8
2 B 20 997.1 1.00 123.5 1.01 11.7