RFP_VOL_1_pkg.pdf

PDF 137 KB Posted

Attached to
Replace / Relocate Unsafe / Unhealthy / Unsustainable Visitor Center
Solicitation number
140P2018R0001
Issued by

About this file

RFP VOL 1

View the file

Other files

File Type Posted
Amendment_No._6_SF_30.pdf PDF
Final_Geotechnical_Design_Report4rev.pdf PDF
Amendment_No._6_-_Revised_Report.pdf PDF
Geotechnical_Investigation_Proposed_Trailhead_Visitor_Center_Timpanog_Jan_2011.pdf PDF
Timpanogos_Cave_National_Monument,_Rockfall_Mitigation_Measures_July_2013.pdf PDF
Amendment_No._5_-_Responses_to_Questions_Received.pdf PDF
Additional_Geotechnical_Investigation_Report,_Timpanogos_Aug_2016.pdf PDF
Amendment_No._5_SF_30.pdf PDF
Geotechnical_Design_Report_Rockfall_Mitigation_Project_Timpanogos_Feb_2016.pdf PDF
Amendment_No._4_SF_30.pdf PDF
Amendment_No._4_-_Responses_to_Questions_Received.pdf PDF
Amendment_3.pdf PDF
TICA_Prebid_Sign-in_Sheet.pdf PDF
Questions_Received_for_Timpanogos_Cave_1.pdf PDF
SF30_Amendment_2.pdf PDF
PPT_Pre-Proposal_Slidessamples.ppt PPT presentation
E09_Prebid_SignIn.doc DOC document
Amendment__1_TICA.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B03_DOL_Wage_Deter_UT108.pdf PDF
TICA_152836_-_FINAL_ContractPriceSchedule_BLANK.xls XLS spreadsheet
A06_Specs-Dwgs_1._TICA_152836_04-27-17_Drawings_Combined_Part1.pdf PDF
A06_Specs-Dwgs_1._TICA_152836_04-27-17_Drawings_Combined_Part4.pdf PDF
A06_Specs-Dwgs_1._TICA_152836_04-27-17_Drawings_Combined_Part2.pdf PDF
A06_Dwgs_Specs_2A._TICA_152836_-_Specifications_Volume_1_-_4-28-17.pdf PDF
A06_Dwgs_Specs_2B._TICA_152836_-_Specifications_Volume_2_-_4-28-17.pdf PDF
A06_Specs-Dwgs_1._TICA_152836_04-27-17_Drawings_Combined_Part3.pdf PDF
B03_DOL_Wage_Deter_UT68.pdf PDF
RFP_VOL_2.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
B08_Solit_SF_1442_and_clauses.pdf PDF
B03_DOL_Wage_Deter_UT30.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TIMPANOGOS CAVE NATIONAL MONUMENT

SOLICITATION NO. 140P2018R0001

REPLACE/RELOCATE

UNSAFE/UNHEALTHY/UNSUSTAINABLE/VISI

TOR CENTER

TICA-152836

TECHNICAL PROPOSAL

REQUEST FOR PROPOSAL

(RFP)

Proposal Submission Package

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

Revise the list below per the specific solicitation’s sections L and M.

For Technical Volume I:

(Include the following questionnaires if they are specifically required by section L or M of the solicitation)

1. Subcontractor Reference

2. Key Personnel Qualifications

3. Past Performance Questionnaire

For Business & Price Volume II:

1. SF 24 Bid Bond (include for competitive solicitations)

2. Contract Price Schedule (should match the price schedule shown in section “B” of the solicitation)

3. General References (include if needed for check of contractor responsibility)

4. Proposed Equals (include if project specifications lists products as brand name or equal)

5. Hazardous Materials Identification Listing

6. Small Business Subcontracting Plan (Include for Full and Open solicitations)

7. Report on Limitation on Subcontracting (Include for socio-economic sole source and set-aside solicitations)

Subcontractor Reference READ CAREFULLY: The purpose of this form is for the offeror to list certain subcontractors identified in the Instructions, Conditions, and Notices to Offerors (Section L) who are considered critical to the successful accomplishment of the project. Use as many sheets as necessary. These subcontractor references should include additional relevant projects similar to the work described in the plans and specifications. Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly.

SUB CONTRACTOR (PROPOSED):

ADDRESS:

TELEPHONE NUMBER: ( )

# PROJECT NAME:

Name of Owner:

Location:

Prime Contractor Telephone Number:

Subcontract $ Value:

Dates of Construction:

Reference Name and Telephone Number: ( ) .

Dates of Construction:

DESCRIPTION & SCOPE OF WORK

SPECIFIC AREAS OF EXPERIENCE (SEE INSTRUCTIONS FOR THE SUBMISSION OF OFFERS AND OTHER

INFORMATION – CAPABILITY CRITERIA):

Key Personnel Qualifications READ CAREFULLY: The purpose of this form is for the Offeror to list the qualifications of all key personnel as described in the Instructions, Conditions, and Notices to Offerors (Section L). Use additional sheets as needed.

Experience and qualifications include those job-related training courses; certificates and licenses; honors;

performance awards; and specialty skills that are relevant to the proposed project. Provide dates, but do not send documents.

Provide the state in which registration or license is held and the registration or license number. Fill in the information by typing or printing legibly.

NAME OF CONTRACTOR/OFFEROR:

PERSONNEL INFORMATION:

Name:

Job Title:

Years of Experience With This Firm: Years of Experience With Other Firms:

EDUCATION AND PROFESSIONAL REGISTRATION:

Top Educational Level Obtained: Year:

Area of Specialization:

Professional Registrations:

Area of Specialization:

EXPERIENCE AND QUALIFICATIONS

PAST PERFORMANCE QUESTIONNAIRE

INSTRUCTIONS: Offeror to complete Sections I and II and transmit questionnaire to reference listed in Section II Reference to complete Sections III and IV and transmit back to Contracting Officer (see contact information at bottom of form)

I. CONTRACT IDENTIFICATION

CONTRACTOR NAME: CONTRACT NO:

CONTRACTOR ADDRESS:

CONTRACT TYPE:

[ ] FIRM-FIXED-PRICE

[ ] COST REIMBURSEMENT

[ ] OTHER____________________________

[ ] ACTIVE [ ] COMPLETED

[ ] ROUTINE [ ] COMPLEX

DATES OF PERFORMANCE: AWARD AMOUNT $___________________

TOTAL WITH MODS $___________________

PROJECT DESCRIPTION:

II. AGENCY (CUSTOMER) IDENTIFICATION

AGENCY/CLIENT (CUSTOMER) NAME:

TITLE/PHONE:

III. PAST PERFORMANCE RATING

Rating Scale: E = Excellent. Considerably surpassed requirements/expectations.

G = Good. Surpassed requirements/expectations.

S = Satisfactory. Met requirements/expectations

M = Marginal. Met some requirements/expectations

U = Unsatisfactory. Did not meet requirements/expectations

1. QUALITY: (Circle applicable rating)

a. Conformance with contract requirements E G S M U

b. Quality of workmanship (including subcontractors) E G S M U

c. General oversight by project manager and superintendent E G S M U

d. Coordination with and control of subcontractors E G S M U

e. Compliance with Davis-Bacon wage rate and labor usage requirements

E G S M U

f. Avoidance of accidents/safety violations E G S M U

g. Ability to work in remote locations, if applicable E G S M U

2. TIMELINESS:

a. Adherence to project delivery schedules E G S M U

b. Submission of change proposals E G S M U

c. Response to technical direction and change orders E G S M U

d. Response to correction of identified problems E G S M U

e. Submission of timely/accurate/complete billings E G S M U

f. Ability to meet project schedule milestones E G S M U

g. Submission of materials/other submittals E G S M U

3. BUSINESS RELATIONS:

a. Flexibility and cooperativeness in resolving problems E G S M U

b. Tenacity and innovativeness in resolving problems E G S M U

c. Relationships with subcontractors, including prompt payment E G S M U

National Park Service/ Denver Service Center Contact Information:

Contracting Officer: Dane Johnson Contract Specialist: Joy Ewalt

MAILING ADDRESS: National Park Service / Denver Service Center (DSC-CS) ATTN: Dane Johnson 12795 West Alameda Parkway Lakewood, CO 80228

OR EMAIL FORM TO: dane_johnson@nps.gov and joy_ewalt@nps.gov

d. Relationships with owner’s representative E G S M U

e. End user was satisfied with services performed E G S M U

IV. COMMENTS

Provide any additional comments for items in Section III

Item No. Comment

POC SIGNATURE/DATE:

Please provide contact information where you may be reached during normal business hours:

B08_Solit_PSP_Cover
B08_Solit_PSP_Vol_I_Exp
B08_Solit_PSP_Vol_I_SubRef
B08_Solit_PSP_Vol_I_KeyPers
B08_Solit_PSP_Vol_I_PastPerf

File details come from the government source that posted it.