Terracon Consultants, Inc. 1392 13th Avenue SW Great Falls, Montana 59404
P [406] 453 5400 F [406] 761 6655 terracon.com
August 5, 2016
A&E Architects
222 N. Higgins
Missoula, MT 59802
Attn: Mr. Jim McDonald, AIA
Re: NPS Task Order P15PD01216
Additional Geotechnical Investigation Report
Timpanogos Cave Visitor Facility
American Fork, Utah
IDIQ Contract P14PC00007
Terracon Project No. C4155339
Dear Mr. McDonald:
This letter report is to present the results of our recent drilling investigation in the slope behind the existing Visitor Center. This work has been conducted in accordance with the referenced
NPS Task Order and our associated discussions and correspondence. This additional investigation was conducted in order to provide basic characterization of the slope, the toe of which is to be excavated to allow construction of a retention structure and rockfall barrier per the current project Plan. The investigation data is to assist in validating, or appropriately adjusting, the design concept and to provide prospective contractors with information regarding drilling conditions for use in project planning.
The drilling was completed over the three-day period of July 20 through July 21, 2016 and consisted of two sub-horizontal borings made from positions in front of the existing small retaining wall behind the Visitor Facility (See Site Location Map, Exhibit A-2, and photographs of the drilling, Exhibits A-5 through A-8, attached). The drilling was conducted by our subcontractor, Nicholson Construction Company of Salt Lake City using a limited access, crawler drill rig (Comacchio MC 8D with reticulating frame for difficult access) to advance borings into the slope for lengths of about 41 to 57 feet. The drilling was accomplished via
ODEX casing advance methods, which is a rotary-percussion, compressed air system similar to that expected for construction of the wall and rockfall retention features.
The borings were logged by our project geotechnical engineer based on cuttings return and drilling difficulty encountered. Since the drilling method cuts and pulverizes the materials encountered, only fine cuttings were returned to the surface for review. Therefore, drilling ease or difficulty, in conjunction with these cutting returns, was used to prepare the attached Logs of
SITE LOCATION
Timpanogos Cave National Monument Rockfall Mitigation
Alpine Loop Road
American Fork, UT
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: TIMPANOGOS CAVE, UT (1/1/1998).
1392 13th Ave SW
Great Falls, MT 59404-3155
C4155339 Project Manager:
Drawn by:
Checked by:
Approved by:
MDH
GAQ
MDH
1”=2,000’
8/5/2016
Project No.
Scale:
File Name:
Date:
A-1
Exhibit
GAQ
SITE
EXPLORATION PLAN
Timpanogos Cave National Monument Rockfall Mitigation
Alpine Loop Road American Fork, UT
1392 13th Ave SW
Great Falls, MT 59404-3155
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
C4155339
AERIAL PHOTOGRAPHY PROVIDED
BY MICROSOFT BING MAPS
MDH
GAQ
MDH
AS SHOWN
8/5/2016
Scale:
A-2
Exhibit Project Manager:
Drawn by:
Checked by:
Approved by:
Project No.
File Name:
Date:
GAQ
7.0
57.0
FILL - SILTY SAND WITH GRAVEL (SM), with cobbles, brown, medium dense to dense, retaining wall fill, moist, loose near surface, subround to subangular, with cobbles
SILTY GRAVEL WITH ROCK FRAGMENTS (GM), with cobbles and boulders, light gray to light brown, dense to very dense, quartzite fragments in cuttings, matrix predominantly gravel with sand and silt, little air return from ODEX system casing bound up in boring, advanced beyond this point with center rod only, limited air return in this material more action of hammer at 33.5' to end of boring, but reacting like still in matrix not formation
Boring Terminated at 57 Feet
Logged by M. Hoffmann Stratification lines are approximate. In-situ, the transition may be gradual.
Horizontal Boring advanced at an inclination of 14.4 degrees below horizontal at a bearing of 16 degrees East of South
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P
A N
O G
O S
.G P
J T
E R
R A
C O
N
.G
D T
8/
5/
Timpanogos Cave National Monument American Fork, Utah
SITE:
Advancement Method:
ODEX Casing Advance - 5.5" O.D.
Abandonment Method:
1392 13th Ave SW Great Falls, MT
Notes:
Project No.: C4155339
Drill Rig: Comacchio MC 8D
Boring Started: 7/20/2016
BORING LOG NO. HD-1
A&E ArchitectsCLIENT:
Missoula, Montana
Driller: Nicholson/B. Mott
Boring Completed: 7/20/2016
Exhibit:
Mr. Jim McDonald, AIA
A-3
PROJECT: Rockfall Mitigation - Timpanogos Cave National Monument
T E
S T
T Y
P E
C O
M P
R E
S S
IV
E
S T
R E
N G
T H
(p sf
S T
R A
IN
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
STRENGTH TEST
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
LOCATION
Latitude: 40.443722° Longitude: -111.705589°
See Exhibit A-2
WATER LEVEL OBSERVATIONS
No free water observed
26.3
41.3
TALUS ROCK FRAGMENTS WITH SAND AND SILT,
light tan to whitish pink, dense to very dense, quartzite fragments in cuttings, limited air return from ODEX system to drill head, lots of dust eminating from talus slope during drilling, larger cobbles and some silt very limited hammer action at 11.3 to 16.3 feet
QUARTZITE, white to pink, some oxidation, very difficult drilling, lots of hammer action to advance 5 foot sections, advancement rate decreased from 1.67 ft/min to 0.31 ft/min advanced inner rod only for remaining 5 foot distance at a rate of 0.22 ft/min
Boring Terminated at 41.3 Feet
Logged by M. Hoffmann Stratification lines are approximate. In-situ, the transition may be gradual.
Horizontal Boring advanced at an inclination of 7.2 degrees below horizontal at a bearing of 7 degrees West of South
G R
A P
H
IC
L O
G
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E
LL
C
T
IM
P
A N
O G
O S
.G P
J T
E R
R A
C O
N
.G
D T
8/
5/
Timpanogos Cave National Monument American Fork, Utah
SITE:
Advancement Method:
ODEX Casing Advance - 5.5" O.D.
Abandonment Method:
1392 13th Ave SW Great Falls, MT
Notes:
Project No.: C4155339
Drill Rig: Comacchio MC 8D
Boring Started: 7/21/2016
BORING LOG NO. HD-2
A&E ArchitectsCLIENT:
Missoula, Montana
Driller: Nicholson/B. Mott
Boring Completed: 7/21/2016
Exhibit:
Mr. Jim McDonald, AIA
A-4
PROJECT: Rockfall Mitigation - Timpanogos Cave National Monument
T E
S T
T Y
P E
C O
M P
R E
S S
IV
E
S T
R E
N G
T H
(p sf
S T
R A
IN
P E
R C
E N
T F
IN
E
S
W A
T E
R C
O N
T E
N T
D R
Y U
N
IT
W E
IG
H
T pc f)
ATTERBERG
LIMITS
LL-PL-PI
S A
M P
LE
T
Y P
E
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S
D E
P T
H
F t.)
STRENGTH TEST
F
IE
LD
T
E S
T R
E S
U
LT
S
DEPTH
LOCATION
Latitude: 40.443466° Longitude: -111.705341°
See Exhibit A-2
WATER LEVEL OBSERVATIONS
No free water observed
1392 13th Ave SW Great Falls, Montana 59404
PH. (406) 453-5400 FAX. (406) 761-6655
A-5
ExhibitPHOTOGRAPHY LOG
Timpanogos Cave National Monument
Rockafall Mitigation American Fork, UT
Project Manager:
Drawn by:
Checked by:
Approved by:
GAQ
MDH
GAQ
GAQ
Project No.
Scale:
File Name:
Date:
C4155339
N.T.S
Photo 3: View of HD-1 location prior to drilling
A-6
ExhibitPHOTOGRAPHY LOG
Timpanogos Cave National Monument
Rockafall Mitigation American Fork, UT
Project Manager:
Drawn by:
Checked by:
Approved by:
GAQ
MDH
GAQ
GAQ
Project No.
Scale:
File Name:
Date:
C4155339
N.T.S
Photo 2: HD-2 approach, drill negotiating the "two trees" point
A-7
ExhibitPHOTOGRAPHY LOG
Timpanogos Cave National Monument
Rockafall Mitigation American Fork, UT
Project Manager:
Drawn by:
Checked by:
Approved by:
GAQ
MDH
GAQ
GAQ
Project No.
Scale:
File Name:
Date:
C4155339
N.T.S
Photo 3: View of HD-2 location prior to drilling
A-8
ExhibitPHOTOGRAPHY LOG
Timpanogos Cave National Monument
Rockafall Mitigation American Fork, UT
Project Manager:
Drawn by:
Checked by:
Approved by:
GAQ
MDH
GAQ
GAQ
Project No.
Scale:
File Name:
Date: