Timpanogos Cave National Monument Replace/Relocate Unsafe/Unhealthy/ Unsustainable Visitor Facility
TICA 152836
116919
A&E Project #15040
April 28, 2017
TICA – 152836
030916
TABLE OF CONTENTS – VOLUME 2 – Page 1
VOLUME 2 - TABLE OF CONTENTS
The following listed documents comprise the Project Manual for Replace / Relocate Unsafe / Unhealthy /
Unsustainable Visitor Center, Timpanogos Cave National Monument, TICA - 152836. Numbering of Divisions conforms to CSI Format for Building Specifications; Divisions and Sections not appearing are not applicable.
PROJECT MANUAL
TABLE OF CONTENTS
TECHNICAL SPECIFICATIONS
DIVISION 22 – PLUMBING
220000 PLUMBING GENERAL REQUIREMENTS
220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
220518 ESCUTCHEONS FOR PLUMBING PIPING
220519 METERS AND GAGES FOR PLUMBING PIPING
220523.12 BALL VALVES FOR PLUMBING PIPING
220523.14 CHECK VALVES FOR PLUMBING PIPING
220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
220548.13 VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
220719 PLUMBING PIPING INSULATION
221116 DOMESTIC WATER PIPING
221119 DOMESTIC WATER PIPING SPECIALTIES
221123 DOMESTIC WATER PUMPS
221316 SANITARY WASTE AND VENT PIPING
221319 SANITARY WASTE PIPING SPECIALTIES
223300 ELECTRIC, DOMESTIC - WATER HEATERS
224213.13 COMMERCIAL WATER CLOSETS
224213.16 COMMERCIAL URINALS
224216.13 COMMERCIAL LAVATORIES
224713 DRINKING FOUNTAINS
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING
230000 MECHANICAL GENERAL REQUIREMENTS
230130.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING
230500 COMMON WORK RESULTS FOR HVAC
230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
230518 ESCUTCHEONS FOR HVAC PIPING
230519 METERS AND GAGES FOR HVAC PIPING
230523.12 BALL VALVES FOR HVAC PIPING
230523.14 CHECK VALVES FOR HVAC PIPING
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230548.13 VIBRATION CONTROLS FOR HVAC
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 DUCT INSULATION
230719 HVAC PIPING INSULATION
230923.12 CONTROL DAMPERS
TICA – 152836
030916
TABLE OF CONTENTS – VOLUME 2 – Page 2
232300 REFRIGERANT PIPING
233113 METAL DUCTS
233300 AIR DUCT ACCESSORIES
233713 DIFFUSERS, REGISTERS, AND GRILLES
DIVISION 26 – ELECTRICAL
260000 ELECTRICAL GENERAL REQUIREMENTS
260519 LOW-VOLTGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
260548 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
260573 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
262416 PANELBOARDS
262713 UNDERGROUND ELECTRIC SERVICE
262726 WIRING DEVICES
262813 FUSES
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
265100 INTERIOR LIGHTING
265600 EXTERIOR LIGHTING
271500 VOICE AND DATA WIRING SYSTEMS
DIVISION 31 – EARTHWORK
310000 EARTHWORK
311100 CLEARING AND GRUBBING
312700 AGGREGATE COURSE
313100 ROCKFALL BARRIER
314833 MICROPILES
DIVISION 32 – EXTERIOR IMPROVEMENTS
320113 ASPHALT CONCRETE
320631 SOIL NAIL RETAINING WALL
321723 PAVEMENT MARKINGS
323100 GATES
329000 LANDSCAPING
329220 SEEDING
DIVISION 33 - UTILITIEWS
331000 WATER UTILITIES
331212 TRACER WIRE
331216 SANITARY SEWER UTILITIES
334000 STORM DRAINAGE UTILITIES
347113 GUARDRAIL
END OF TABLE OF CONTENTS
TICA – 152836 220000 - 1
050216 PLUMBING GENERAL REQUIREMENTS
SECTION 220000 - PLUMBING GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 PLUMBING REQUIREMENTS
The plumbing requirements are supplemental to the General Requirements of these
Specifications. The Plumbing Sections shall apply to phases of the work specified, shown on the Drawings, or required to provide for the complete installation of Plumbing Systems for this project.
The work shall include all items, articles, materials, operations and methods listed, mentioned, or scheduled in these specifications and the accompanying drawings. All material, equipment, and labor shall be furnished together with all incidental items required by good practice to provide the complete systems described.
Examine and refer to all Architectural, Civil, Structural, Electrical, Utility, Landscape and
Plumbing drawings and specifications for construction conditions which may affect the plumbing work. Inspect the building site and existing facilities for verification of present conditions. Make proper provisions for these conditions in performance of the work and cost thereof.
See general requirements for listed Alternate Bids. Note alternates listed and include any changes in work and price required to meet the requirements of the respective alternate.
1.2 CODES AND STANDARDS
Work shall meet the requirements of the plans and specifications and shall not be less than the minimum requirements of applicable sections of the latest Codes and Standards of the following
Organizations:
1. American Society of Mechanical Engineers (ASME)
2. American Water Works Association (AWWA)
3. National Electrical Code (NEC)
4. National Electrical Manufacturers Association (NEMA)
5. National Fire Protection Association (NFPA)
6. International Plumbing Code
7. Occupational Safety & Health Act (OSHA)
8. Plastic Pipe Institute (PPI)
9. Sheet Metal and Air Conditioning Contractors National Association (SMACNA)
10. International Plumbing Code (IPC)
11. International Building Code (IBC)
12. Requirements of the Serving Utility Company
13. Local and State Codes and Ordinances
14. SMACNA Seismic Manual
TICA – 152836 220000 - 2
1.3 FEES AND PERMITS
The Plumbing Contractor shall pay all fees and arrange for all permits required for work done under his contract and under his supervision by subcontract.
All usage contracts between the Contracting Officer and the serving utilities company, such as membership and usage charges or fees, etc., for the purpose of obtaining the services for the utility company shall be applied for and paid for by the Contracting Officer.
All permits and fees for connection to the utility, including inspection and staking costs imposed by the utility company or required for proper installation, and all necessary manholes, encasements, valves, service boxes, meters, meter housings or vaults complete as required by the utility company of jurisdictional agency, shall be applied for and paid by the Plumbing
Contractor.
Exception: The gas service from the main to and including the gas meter will be furnished and installed by the gas company and paid for by the Contracting Officer.
1.4 MATERIALS AND EQUIPMENT
Manufacturers trade names and catalog numbers listed are intended to indicate the quality of equipment or materials desired. Manufacturers not listed must have prior approval. Written prior approval must be obtained from the Architect/Engineer ten (10) days prior to bid opening.
Requests are to be submitted sufficiently ahead of the deadline to give ample time for examination. The items approved will be listed in an addendum and only this list of equipment will be accepted in lieu of specified products. Submittals must indicate the specific item or items to be furnished in lieu of those specified, together with complete technical and comparative data on specified items and proposed items. See list of prior approved manufacturers at end of this section.
Plumbing equipment may be installed with manufacturer’s standard finish and color except where specific color, finish or choice is indicated. If the manufacturer has no standard finish, equipment shall have a prime coat and two finish coats of gray enamel.
This Contractor shall be responsible for materials and equipment installed under this contract.
Contractor shall also be responsible for the protection of materials and equipment of others from damage as a result of his work.
Manufactured material and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by manufacturer unless herein specified to the contrary.
This Contractor shall make the required arrangement with General Contractor for the introduction into the building of equipment too large to pass through finished openings.
Store materials and equipment indoors at the job site or, if this is not possible, store on raised platforms and protect from the weather by means of waterproof covers. Coverings shall permit circulation of air around the materials to prevent condensation of moisture. Screen or cap openings in equipment to prevent the entry of vermin.
TICA – 152836 220000 - 3
1.5 INTENT OF DRAWINGS
The drawings are partly diagrammatic and do not necessarily show exact location of piping and ductwork unless specifically dimensioned. Riser and other diagrams are schematic and do not necessarily show the physical arrangement of the equipment. They shall not be used for obtaining lineal runs of piping or ductwork, nor shall they be used for shop drawings for piping and ductwork fabrication or ordering. Discrepancies shown on different plans, or between plans and actual field conditions shall be brought to the attention of the Professional Engineer for resolution.
1.6 RESPONSIBILITY
The Plumbing Contractor shall be responsible for the installation of a satisfactory and complete system in accordance with the intent of the drawing and specifications. Provide, at no extra cost, all incidental items required for completion of the work even though they are not specifically mentioned or indicated on the drawings or in the specifications.
The drawings do not attempt to show complete details of the building construction which affect the plumbing installation; and reference is therefore required to the Architectural, Civil, Structural, Landscape and Electrical drawings and specifications and to shop drawings of all trades for additional details which affect the installation of the work covered under this Division of the Contract.
Location of plumbing system components shall be checked for conflicts with openings, structural members and components of other systems having fixed locations. In the event of any conflicts, the Engineer shall be consulted and his decision shall govern. Necessary changes shall be made at the Contractor’s expense.
Determine, and be responsible for, the proper location and character of inserts for hangers, chases, sleeves, and other openings in the construction required for the work, and obtain this information well in advance of the construction progress so work will not be delayed.
Final location of inserts, hangers, etc., required for each installation, must be coordinated with facilities required for other installations to prevent interference.
Take extreme caution not to install work that connects to equipment until such time as complete
Shop Drawings of such equipment have been approved by the Engineer. Any work installed by the Contractor, prior to approval of Shop Drawings, will be at the Contractor's risk.
At all times during the performance of this Contract, properly protect work from damage and protect the Contracting Officer 's property from injury of loss. Make good any damage, injury or loss, except such as may be directly due to errors in the Bidding Documents or caused by
Agents or Employees of the Contracting Officer. Adequately protect adjacent property as provided by law and the Bidding Documents. Provide and maintain passageways, guard fences, lights and other facilities for protection required by Public Authority or Local conditions.
The Contractor shall be responsible for damages due to the work of their Contractors, to the building or its contents, people, etc.
TICA – 152836 220000 - 4
1.7 REVIEW
All work and material is subject to review at any time by the Engineer or his representative. If the Engineer or his representative finds material that does not conform with these specifications or that is not properly installed or finished, correct the deficiencies in a manner satisfactory to the Engineer at the Contractor’s expense.
1.8 WORKMANSHIP
GENERAL
1. Work under this contract shall be performed by workmen skilled in the particular trade, including work necessary to properly complete the installation in a workmanlike manner to present a neat and finished appearance.
EXCAVATION AND BACKFILL
1. Provide all excavating and backfilling as required, with backfilling only after approval of the Contracting Officer. Backfill to be free of all debris and decayable matter. See
Excavation and Backfill requirements in SECTION 312000 – EARTH MOVING.
CUTTING, PATCHING, AND FRAMING
1. Obtain Engineer's approval before performing any cutting on structural members or patching of building surfaces. Any damage to the building or equipment by this
Contractor shall be the responsibility of this Contractor and shall be repaired by skilled craftsmen of the trades involved at the Contractor’s expense.
2. Chases, openings, sleeves, hangers, anchors, recesses, equipment pads, framing for equipment, provided by others only if so noted on the drawings. Otherwise, they will be provided by this Contractor for his work. Whether chases, etc., are provided by this
Contractor or others, this Contractor is responsible for correct size and locations.
1.9 COORDINATION
This Contractor shall plan his work to proceed with a minimum interference with other trades and it shall be his responsibility to inform the General Contractor of all openings required in the building structure for installation of work, and to provide sleeves as required. Dimensions of equipment installed and/or provided by others shall be checked in order that correct clearances and connections may be made.
1.10 CLEAN UP
Keep the premises free from accumulation of waste material or rubbish caused by his work or employees.
Upon completion of work, remove materials, scraps and debris relative to his work and leave the premises, including tunnels, crawl spaces, and pipe chases in clean and orderly condition.
Remove all dirt and debris from the interior and exterior of all devices and equipment. After construction is completed, wash all plumbing equipment.
TICA – 152836 220000 - 5
1.11 DUST PROTECTION
Contractor will provide suitable dust protection for all existing areas prior to beginning of cutting or demolition. Contractor will obtain approval of partition from Contracting Officer before proceeding with work involved in these rooms.
1.12 TEMPORARY FACILITIES
OFFICES
1. Contractor may provide a temporary office for himself and for the periodic use by the
Contracting Officer.
REMOVAL
1. Contractor shall completely remove his temporary installations when no longer needed and the premises shall be completely clean, disinfected, patched, and refinished to match adjacent areas.
LADDERS AND SCAFFOLDS
1. The Contractor shall provide their own ladders, scaffolds, etc. of substantial construction for access to their work in various portions of the building as may be required. When no longer needed, they shall be removed by the Contractor.
PROTECTION DEVICES
1. The Contractor shall provide and maintain his own necessary barricades, fences, signal lights, etc., required by all governing authorities or shown on the drawings. When no longer needed, they shall be removed by the Contractor. The Contractor shall assume all responsibility for which the Contracting Officer may be held responsible because of lack of above items.
TEMPORARY WATER
1. The Contractor shall provide all water required by his trade for construction. Temporary drinking water shall be provided by Contractor from a proven safe source dispensed by single service containers, until such time as the construction water outlet has been installed, disinfected, and approved for drinking purposes.
TEMPORARY FIRE PROTECTION
1. The Contractor shall provide all necessary first-aid hand fire extinguishers for Class A, B, C and special hazards as may exist in his own work area only in accordance with good and safe practice and as required by jurisdictional safety authority. The Contractor shall provide general area fire extinguishers only.
TICA – 152836 220000 - 6
1.13 SHOP DRAWINGS
Provide eight PDF Electronic Submittals of manufacturer's literature and/or certified prints as soon as possible but within thirty (30) days after awarding of Contract, for items of materials, equipment, or systems where called for in specifications. Shop drawings and literature complete showing item used, size, dimensions, capacity, rough-in, etc., as required for complete check and installation. Manufacturers literature showing more than one item shall be clearly marked as to which item is being furnished or it will be rejected and returned without review.
Each copy of each item submitted must be clearly marked as follows for purposes of identification and record. Submittals not marked (typewritten only) as described below will be rejected and returned without review.
Date:
Name of Project:
Branch of Work:
Submitted by:
Specification or Plan Reference:
Prior to their submission, each submittal shall be thoroughly checked by the Contractor for compliance with the Contract Document requirements, accuracy of dimensions, relationship to the work of other trades, and conformance with sound, safe practices as to erection and installation. Each submittal shall then bear a stamp evidencing such checking and shall show corrections made, if any. Submittals requiring extensive corrections shall be revised before submission. Each submittal not stamped and signed by the Contractor evidencing such checking will be rejected and returned without review.
All submittals will be examined when submitted in proper form for compliance. Such review shall not relieve the Contractor of responsibility for errors, for deviation from the contract
Documents, nor for violation of sound safety practices.
The Contractor shall keep in the field office one print of each submittal which has been reviewed and stamped by the Contracting Officer.
Submittals will be required for each item of material and equipment furnished as noted in specifications.
Submittals which are incomplete relative to quality requirements, capacity, engineering data, dimensional data or detailed list of specialty or control equipment will be rejected. Lists shall include descriptive coding as specified or shown on drawings.
THE ENGINEER WILL PERFORM SHOP DRAWING REVIEW OF EACH
ITEM; HOWEVER, SUBSEQUENT REVIEW OF ITEMS PREVIOUSLY
REJECTED WILL BE BILLED TO THE CONTRACTOR AT A RATE OF $100
PER HOUR.
Schedule of Shop Drawings.
1. Piping
2. Valves
3. Pumps
4. Insulation
5. Plumbing Specialties
TICA – 152836 220000 - 7
6. Plumbing fixtures
7. Medical Gas Equipment
8. Water Treatment Equipment
9. Backflow Preventers
1.14 OPERATION AND MAINTENANCE MANUALS
At the time orders are placed for any item of equipment requiring service or operating maintenance, the Contractor shall request the manufacturer furnish three (3) copies of
OPERATION AND MAINTENANCE INSTRUCTIONS for each piece of equipment. These shall be included in the brochure of equipment.
1.15 BROCHURE OF EQUIPMENT
Upon completion of work, prepare three copies of "Brochure of Equipment" containing data pertinent to equipment and systems on job. Binders containing materials shall be one or more three ring binders of sufficient number to hold all literature. Contained in binders shall be:
Installation, maintenance, and operating instructions for each piece of equipment; parts lists;
wiring diagrams; one copy of each shop drawing and literature submittal; record drawings, etc.
All literature shall be clean, unused and filed under divider headings corresponding to the specifications.
These brochures shall be submitted to the Contracting Officer and approved by him before authorization of final payment.
1.16 AS-BUILT DRAWINGS
The Contractor shall furnish to the Contracting Officer and Engineer a marked print showing the location of all concealed or underground pipe or conduit runs and other equipment installed other than as shown on the drawings. Dimension underground lines from established building lines. Indicate all installed pull boxes in conduit runs.
The Contractor shall furnish to the Contracting Officer a marked print showing the location of all plumbing equipment, plumbing fixtures, piping, etc. The location of any item which deviates from the bid documents shall be accurately drawn and dimensioned.
All underground piping shall be dimensioned from nearest column and/or exterior walls. The location of all maintenance related items such as duct access doors, fire dampers, isolation valves, filters, etc., shall be highlighted on as built drawing.
1.17 PLACING SYSTEMS IN OPERATION
At the completion of the work and at such time as the Contracting Officer shall direct, prior to final acceptance, the Contractor performing this work shall put into satisfactory operation the various systems installed under the specifications. At no additional cost to the Contracting
Officer, furnish the services of a person completely familiar with the installations performed under this specification, to instruct the Contracting Officer’s operating personnel in the proper
TICA – 152836 220000 - 8
operation and servicing of the equipment and systems. These services shall be available for a period of no less than one (1) day.
1.18 WARRANTY
The Contractor shall guarantee that all materials and labor installed are new and of first quality and that any material or labor found defective shall be replaced without cost to the Contracting
Officer within one (1) year after substantial completion of the Contract or one (1) full season of heating and cooling operation, whichever is the greater. The guarantee shall list the date of the beginning of the one (1) year period, which shall be the date that the Substantial Completion
Certificate is issued.
Any damage to the building, caused by defective work or material of the Contractor within the above-mentioned period, shall be satisfactorily repaired without cost to the Contracting Officer.
The guarantee does not include maintenance of equipment. The Contracting Officer shall accept full responsibility for proper operation and maintenance of equipment immediately upon substantial completion and occupancy of the building.
Final acceptance by the Contracting Officer will not occur until all operating instructions are mounted in Equipment Rooms and Operating Personnel thoroughly indoctrinated in the operation of all plumbing equipment by the Contractor.
END OF SECTION 220000
TICA – 152836 220517 - 1
050216 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
SECTION 220517 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Sleeves.
2. Sleeve-seal systems.
3. Grout.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
PART 2 - PRODUCTS
2.1 SLEEVES
A. Cast-Iron Wall Pipes: Cast or fabricated of cast or ductile iron and equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop unless otherwise indicated.
B. Galvanized-Steel Wall Pipes: ASTM A 53/A 53M, Schedule 40, with plain ends and welded steel collar; zinc coated.
C. Galvanized-Steel-Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, zinc coated, with plain ends.
D. PVC-Pipe Sleeves: ASTM D 1785, Schedule 40.
E. Galvanized-Steel-Sheet Sleeves: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.
2.2 SLEEVE-SEAL SYSTEMS
A. Sleeve-seal systems in this article are used for piping penetrations in slabs-on-grade and below grade in exterior walls. These systems are available for NPS 1/2 to NPS 48 (DN 15 to DN 1200) piping.
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Advance Products & Systems, Inc.
2. CALPICO, Inc.
http://www.specagent.com/Lookup?ulid=1677 http://www.specagent.com/Lookup?uid=123456804938 http://www.specagent.com/Lookup?uid=123456804939
TICA – 152836 220517 - 2
3. Metraflex Company (The).
4. Pipeline Seal and Insulator, Inc.
5. Proco Products, Inc.
C. Description: Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve.
1. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.
2. Pressure Plates: Stainless steel.
3. Connecting Bolts and Nuts: Stainless steel of length required to secure pressure plates to sealing elements.
2.3 GROUT
A. Standard: ASTM C 1107/C 1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.
B. Characteristics: Nonshrink; recommended for interior and exterior applications.
C. Design Mix: 5000-psi, 28-day compressive strength.
D. Packaging: Premixed and factory packaged.
PART 3 - EXECUTION
3.1 SLEEVE INSTALLATION
A. Install sleeves for piping passing through penetrations in floors, partitions, roofs, and walls.
B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1-inch annular clear space between piping and concrete slabs and walls.
1. Sleeves are not required for core-drilled holes.
C. Install sleeves in concrete floors, concrete roof slabs, and concrete walls as new slabs and walls are constructed.
1. Cut sleeves to length for mounting flush with both surfaces.
a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level.
2. Using grout, seal the space outside of sleeves in slabs and walls without sleeve-seal system.
D. Install sleeves for pipes passing through interior partitions.
1. Cut sleeves to length for mounting flush with both surfaces.
http://www.specagent.com/Lookup?uid=123456804940 http://www.specagent.com/Lookup?uid=123456804941 http://www.specagent.com/Lookup?uid=123456804942
TICA – 152836 220517 - 3
2. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation.
3. Seal annular space between sleeve and piping or piping insulation; use joint sealants appropriate for size, depth, and location of joint. Comply with requirements for sealants specified in Section 079200 "Joint Sealants."
E. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements for firestopping specified in Section 078413 "Penetration Firestopping."
3.2 SLEEVE-SEAL-SYSTEM INSTALLATION
A. Install sleeve-seal systems in sleeves in exterior concrete walls and slabs-on-grade at service piping entries into building.
B. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Position piping in center of sleeve. Center piping in penetration, assemble sleeve-seal system components, and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.
3.3 SLEEVE AND SLEEVE-SEAL SCHEDULE
A. Use sleeves and sleeve seals for the following piping-penetration applications:
1. Exterior Concrete Walls above Grade:
a. Piping Smaller Than NPS 6: Cast-iron wall sleeves.
b. Piping NPS 6 and Larger: Cast-iron wall sleeves.
2. Exterior Concrete Walls below Grade:
a. Piping Smaller Than NPS 6: Cast-iron wall sleeves with sleeve-seal system.
1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.
b. Piping NPS 6 and Larger: Galvanized-steel wall sleeves with sleeve-seal system.
1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.
3. Concrete Slabs-on-Grade:
a. Piping Smaller Than NPS 6: Cast-iron wall sleeves with sleeve-seal system.
1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.
b. Piping NPS 6 and Larger: Cast-iron wall sleeves with sleeve-seal system.
TICA – 152836 220517 - 4
1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.
4. Concrete Slabs above Grade:
a. Piping Smaller Than NPS 6: PVC-pipe sleeves.
b. Piping NPS 6 and Larger: PVC-pipe sleeves.
END OF SECTION 220517
TICA – 152836 220518 - 1
050216 ESCUTCHEONS FOR PLUMBING PIPING
SECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Escutcheons.
2. Floor plates.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
PART 2 - PRODUCTS
2.1 ESCUTCHEONS
A. One-Piece, Cast-Brass Type: With polished, chrome-plated finish and setscrew fastener.
B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass with chrome-plated finish and spring-clip fasteners.
C. One-Piece, Stamped-Steel Type: With chrome-plated finish and spring-clip fasteners.
2.2 FLOOR PLATES
A. One-Piece Floor Plates: Cast-iron flange with holes for fasteners.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install escutcheons for piping penetrations of walls, ceilings, and finished floors.
B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of piping and with
OD that completely covers opening.
1. Escutcheons for New Piping:
a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type.
TICA – 152836 220518 - 2
050216 ESCUTCHEONS FOR PLUMBING PIPING
b. Chrome-Plated Piping: One-piece, cast-brass type with polished, chrome-plated finish.
c. Insulated Piping: One-piece, stamped-steel type.
d. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast-brass type with polished, chrome-plated finish.
e. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, stamped-steel type.
f. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, cast-brass type with polished, chrome-plated finish.
g. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, stamped-steel type.
h. Bare Piping in Unfinished Service Spaces: One-piece, cast-brass type with polished, chrome-plated finish.
i. Bare Piping in Unfinished Service Spaces: One-piece, stamped-steel type.
j. Bare Piping in Equipment Rooms: One-piece, cast-brass type with polished, chrome-plated finish.
k. Bare Piping in Equipment Rooms: One-piece, stamped-steel type.
C. Install floor plates for piping penetrations of equipment-room floors.
D. Install floor plates with ID to closely fit around pipe, tube, and insulation of piping and with OD that completely covers opening.
1. New Piping: One-piece, floor-plate type.
3.2 FIELD QUALITY CONTROL
A. Replace broken and damaged escutcheons and floor plates using new materials.
END OF SECTION 220518
TICA – 152836 220519 - 1
050216 METERS AND GAGES FOR PLUMBING PIPING
SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Bimetallic-actuated thermometers.
2. Liquid-in-glass thermometers.
3. Thermowells.
4. Dial-type pressure gages.
5. Gage attachments.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.3 INFORMATIONAL SUBMITTALS
A. Product certificates.
1.4 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
PART 2 - PRODUCTS
2.1 BIMETALLIC-ACTUATED THERMOMETERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Ashcroft Inc.
2. Ernst Flow Industries.
3. Marsh Bellofram.
4. Miljoco Corporation.
5. Nanmac Corporation.
6. Noshok.
7. Palmer Wahl Instrumentation Group.
8. REOTEMP Instrument Corporation.
9. Tel-Tru Manufacturing Company.
10. Trerice, H. O. Co.
11. Watts; a Watts Water Technologies company.
http://www.specagent.com/Lookup?ulid=1681 http://www.specagent.com/Lookup?uid=123456804943 http://www.specagent.com/Lookup?uid=123456804944 http://www.specagent.com/Lookup?uid=123456804945 http://www.specagent.com/Lookup?uid=123456804946 http://www.specagent.com/Lookup?uid=123456804947 http://www.specagent.com/Lookup?uid=123456804948 http://www.specagent.com/Lookup?uid=123456804949 http://www.specagent.com/Lookup?uid=123456804950 http://www.specagent.com/Lookup?uid=123456804951 http://www.specagent.com/Lookup?uid=123456808012 http://www.specagent.com/Lookup?uid=123456819902
TICA – 152836 220519 - 2
12. Weiss Instruments, Inc.
13. Weksler Glass Thermometer Corp.
14. WIKA Instrument Corporation.
15. Winters Instruments - U.S.
B. Standard: ASME B40.200.
C. Case: Liquid-filled and sealed type(s); stainless steel with 3-inch nominal diameter.
D. Dial: Nonreflective aluminum with permanently etched scale markings and scales in deg F.
E. Connector Type(s): Union joint, rigid, back and rigid, bottom, with unified-inch screw threads.
F. Connector Size: 1/2 inch, with ASME B1.1 screw threads.
G. Stem: 0.25 or 0.375 inch in diameter; stainless steel.
H. Window: Plain glass.
I. Ring: Stainless steel.
J. Element: Bimetal coil.
K. Pointer: Dark-colored metal.
L. Accuracy: Plus or minus 1 percent of scale range.
2.2 LIQUID-IN-GLASS THERMOMETERS
A. Metal-Case, Industrial-Style, Liquid-in-Glass Thermometers:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Flo Fab inc.
b. Miljoco Corporation.
c. Palmer Wahl Instrumentation Group.
d. Tel-Tru Manufacturing Company.
e. Trerice, H. O. Co.
f. Weiss Instruments, Inc.
g. Weksler Glass Thermometer Corp.
h. Winters Instruments - U.S.
2. Standard: ASME B40.200.
3. Case: Cast aluminum; 7-inch nominal size unless otherwise indicated.
4. Case Form: Adjustable angle unless otherwise indicated.
5. Tube: Glass with magnifying lens and blue or red organic liquid.
6. Tube Background: Nonreflective aluminum with permanently etched scale markings graduated in deg F.
7. Window: Glass.
8. Stem: Aluminum and of length to suit installation.
http://www.specagent.com/Lookup?uid=123456804952 http://www.specagent.com/Lookup?uid=123456893711 http://www.specagent.com/Lookup?uid=123456804953 http://www.specagent.com/Lookup?uid=123456804954 http://www.specagent.com/Lookup?ulid=1690 http://www.specagent.com/Lookup?uid=123456804955 http://www.specagent.com/Lookup?uid=123456804956 http://www.specagent.com/Lookup?uid=123456804957 http://www.specagent.com/Lookup?uid=123456804958 http://www.specagent.com/Lookup?uid=123456808048 http://www.specagent.com/Lookup?uid=123456804959 http://www.specagent.com/Lookup?uid=123456893710 http://www.specagent.com/Lookup?uid=123456804960
TICA – 152836 220519 - 3
a. Design for Thermowell Installation: Bare stem.
9. Connector: 1-1/4 inches, with ASME B1.1 screw threads.
10. Accuracy: Plus or minus 1 percent of scale range or one scale division, to a maximum of
1.5 percent of scale range.
2.3 THERMOWELLS
A. Thermowells:
1. Standard: ASME B40.200.
2. Description: Pressure-tight, socket-type fitting made for insertion into piping tee fitting.
3. Material for Use with Copper Tubing: CNR or CUNI.
4. Material for Use with Steel Piping: CRES.
5. Type: Stepped shank unless straight or tapered shank is indicated.
6. External Threads: NPS 1/2, NPS 3/4, or NPS 1, ASME B1.20.1 pipe threads.
7. Internal Threads: 1/2, 3/4, and 1 inch, with ASME B1.1 screw threads.
8. Bore: Diameter required to match thermometer bulb or stem.
9. Insertion Length: Length required to match thermometer bulb or stem.
10. Lagging Extension: Include on thermowells for insulated piping and tubing.
11. Bushings: For converting size of thermowell's internal screw thread to size of thermometer connection.
B. Heat-Transfer Medium: Mixture of graphite and glycerin.
2.4 PRESSURE GAGES
A. Direct-Mounted and remote mounted, Metal-Case, Dial-Type Pressure Gages:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. AMETEK, Inc.
b. Ashcroft Inc.
c. Ernst Flow Industries.
d. Flo Fab inc.
e. Marsh Bellofram.
f. Miljoco Corporation.
g. Noshok.
h. Palmer Wahl Instrumentation Group.
i. REOTEMP Instrument Corporation.
j. Tel-Tru Manufacturing Company.
k. Trerice, H. O. Co.
l. Watts; a Watts Water Technologies company.
m. Weiss Instruments, Inc.
n. Weksler Glass Thermometer Corp.
o. WIKA Instrument Corporation.
p. Winters Instruments - U.S.
http://www.specagent.com/Lookup?ulid=1695 http://www.specagent.com/Lookup?uid=123456819904 http://www.specagent.com/Lookup?uid=123456804968 http://www.specagent.com/Lookup?uid=123456804969 http://www.specagent.com/Lookup?uid=123456804970 http://www.specagent.com/Lookup?uid=123456804971 http://www.specagent.com/Lookup?uid=123456804972 http://www.specagent.com/Lookup?uid=123456804973 http://www.specagent.com/Lookup?uid=123456804974 http://www.specagent.com/Lookup?uid=123456804975 http://www.specagent.com/Lookup?uid=123456804976 http://www.specagent.com/Lookup?uid=123456808076 http://www.specagent.com/Lookup?uid=123456819905 http://www.specagent.com/Lookup?uid=123456804977 http://www.specagent.com/Lookup?uid=123456893714 http://www.specagent.com/Lookup?uid=123456804978 http://www.specagent.com/Lookup?uid=123456804979
TICA – 152836 220519 - 4
2. Standard: ASME B40.100.
3. Case: Liquid-filled type(s); cast aluminum or drawn steel; 4-1/2-inch nominal diameter.
4. Pressure-Element Assembly: Bourdon tube unless otherwise indicated.
5. Pressure Connection: Brass, with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and bottom-outlet type unless back-outlet type is indicated.
6. Movement: Mechanical, with link to pressure element and connection to pointer.
7. Dial: Nonreflective aluminum with permanently etched scale markings graduated in psi.
8. Pointer: Dark-colored metal.
9. Window: Glass.
10. Ring: Metal.
11. Accuracy: Grade B, plus or minus 2 percent of middle half of scale range.
2.5 GAGE ATTACHMENTS
A. Snubbers: ASME B40.100, brass; with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and piston-type surge-dampening device. Include extension for use on insulated piping.
B. Valves: Brass ball, with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install thermowells with socket extending one-third of pipe diameter and in vertical position in piping tees.
B. Install thermowells of sizes required to match thermometer connectors. Include bushings if required to match sizes.
C. Install thermowells with extension on insulated piping.
D. Fill thermowells with heat-transfer medium.
E. Install direct-mounted thermometers in thermowells and adjust vertical and tilted positions.
F. Install remote-mounted thermometer bulbs in thermowells and install cases on panels; connect cases with tubing and support tubing to prevent kinks. Use minimum tubing length.
G. Install direct-mounted pressure gages in piping tees with pressure gage located on pipe at the most readable position.
H. Install remote-mounted pressure gages on panel.
I. Install valve and snubber in piping for each pressure gage for fluids.
J. Install thermometers in the following locations:
1. Inlet and outlet of each water heater.
2. Inlets and outlets of each domestic water heat exchanger.
TICA – 152836 220519 - 5
3. Inlet and outlet of each domestic hot-water storage tank.
4. Inlet and outlet of each remote domestic water chiller.
K. Install pressure gages in the following locations:
1. Building water service entrance into building.
2. Inlet and outlet of each pressure-reducing valve.
3. Suction and discharge of each domestic water pump.
L. Install meters and gages adjacent to machines and equipment to allow service and maintenance of meters, gages, machines, and equipment.
M. Adjust faces of meters and gages to proper angle for best visibility.
3.2 THERMOMETER SCHEDULE
A. Thermometers at inlet and outlet of each domestic water heater shall be the following:
1. Industrial-style, liquid-in-glass type.
B. Thermometers at inlets and outlets of each domestic water heat exchanger shall be the following:
1. Industrial-style, liquid-in-glass type.
C. Thermometers at inlet and outlet of each domestic hot-water storage tank shall be the following:
1. Industrial-style, liquid-in-glass type.
D. Thermometers at inlet and outlet of each remote domestic water chiller shall be the following:
1. Industrial-style, liquid-in-glass type.
E. Thermometer stems shall be of length to match thermowell insertion length.
3.3 THERMOMETER SCALE-RANGE SCHEDULE
A. Scale Range for Domestic Cold-Water Piping: 0 to 100 deg F.
B. Scale Range for Domestic Hot-Water Piping: 20 to 240 deg F.
C. Scale Range for Domestic Cooled-Water Piping: 0 to 100 deg F.
3.4 PRESSURE-GAGE SCHEDULE
A. Pressure gages at discharge of each water service into building shall be the following:
1. Liquid-filled, direct-mounted, metal case.
TICA – 152836 220519 - 6
B. Pressure gages at inlet and outlet of each water pressure-reducing valve shall be the following:
1. Liquid-filled, direct-mounted, metal case.
C. Pressure gages at suction and discharge of each domestic water pump shall be the following:
1. Liquid-filled, direct-mounted, metal case.
3.5 PRESSURE-GAGE SCALE-RANGE SCHEDULE
A. Scale Range for Water Service Piping: 0 to 100 psi.
B. Scale Range for Domestic Water Piping: 0 to 100 psi.
END OF SECTION 220519
TICA – 152836 220523.12 - 1
050216 BALL VALVES FOR PLUMBING PIPING
SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Brass ball valves.
2. Bronze ball valves.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of valve.
1. Certification that products comply with NSF 61.
PART 2 - PRODUCTS
2.1 GENERAL REQUIREMENTS FOR VALVES
A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.
B. All piping, valves, and equipment for domestic water use shall comply with the reduction of lead in Drinking Water Act of 2011 which will be enforced January 4, 2014.
C. ASME Compliance:
1. ASME B1.20.1 for threads for threaded end valves.
2. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.
3. ASME B16.18 for solder-joint connections.
4. ASME B31.9 for building services piping valves.
D. NSF Compliance: NSF 61 for valve materials for potable-water service.
E. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.
F. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.
G. Valve Sizes: Same as upstream piping unless otherwise indicated.
H. Valve Actuator Types:
TICA – 152836 220523.12 - 2
1. Gear Actuator: For quarter-turn valves NPS 4 and larger.
2. Handlever: For quarter-turn valves smaller than NPS 4.
I. Valves in Insulated Piping:
1. Include 2-inch stem extensions.
2. Extended operating handles of nonthermal-conductive material and protective sleeves that allow operation of valves without breaking vapor seals or disturbing insulation.
3. Memory stops that are fully adjustable after insulation is applied.
2.2 BRASS BALL VALVES
A. One-Piece, Brass Ball Valves:
1. Manufacturers: Subject to compliance with requirements, provide products by the following:
a. KITZ Corporation.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 400 psig.
c. Body Design: One piece.
d. Body Material: Forged brass or bronze.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Brass or stainless steel.
h. Ball: Chrome-plated brass or stainless steel.
i. Port: Reduced.
B. Two-Piece, Brass Ball Valves with Full Port and Brass Trim:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. American Valve, Inc.
b. Conbraco Industries, Inc.
c. Crane; Crane Energy Flow Solutions.
d. DynaQuip Controls.
e. Hammond Valve.
f. Jomar Valve.
g. KITZ Corporation.
h. Legend Valve.
i. Marwin Valve; Richards Industries.
j. Milwaukee Valve Company.
k. NIBCO INC.
l. Red-White Valve Corporation.
m. Stockham; Crane Energy Flow Solutions.
n. Watts; a Watts Water Technologies company.
http://www.specagent.com/Lookup?ulid=9490 http://www.specagent.com/Lookup?uid=123456934992 http://www.specagent.com/Lookup?ulid=9491 http://www.specagent.com/Lookup?uid=123456934993 http://www.specagent.com/Lookup?uid=123456934994 http://www.specagent.com/Lookup?uid=123456934996 http://www.specagent.com/Lookup?uid=123456934997 http://www.specagent.com/Lookup?uid=123456934998 http://www.specagent.com/Lookup?uid=123456934999 http://www.specagent.com/Lookup?uid=123456935000 http://www.specagent.com/Lookup?uid=123456935001 http://www.specagent.com/Lookup?uid=123456935002 http://www.specagent.com/Lookup?uid=123456935003 http://www.specagent.com/Lookup?uid=123456935004 http://www.specagent.com/Lookup?uid=123456935005 http://www.specagent.com/Lookup?uid=123456934995 http://www.specagent.com/Lookup?uid=123456935006
TICA – 152836 220523.12 - 3
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Forged brass.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Brass.
h. Ball: Chrome-plated brass.
i. Port: Full.
C. Two-Piece, Brass Ball Valves with Regular Port and Brass Trim:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Hammond Valve.
b. Legend Valve.
c. Milwaukee Valve Company.
d. NIBCO INC.
e. Watts; a Watts Water Technologies company.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Forged brass.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Brass.
h. Ball: Chrome-plated brass.
i. Port: Regular.
2.3 BRONZE BALL VALVES
A. One-Piece, Bronze Ball Valves:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Conbraco Industries, Inc.
b. NIBCO INC.
c. Watts; a Watts Water Technologies company.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 400 psig.
http://www.specagent.com/Lookup?ulid=9493 http://www.specagent.com/Lookup?uid=123456935010 http://www.specagent.com/Lookup?uid=123456935011 http://www.specagent.com/Lookup?uid=123456935012 http://www.specagent.com/Lookup?uid=123456935013 http://www.specagent.com/Lookup?uid=123456935014 http://www.specagent.com/Lookup?ulid=9497 http://www.specagent.com/Lookup?uid=123456935020 http://www.specagent.com/Lookup?uid=123456935021 http://www.specagent.com/Lookup?uid=123456935022
TICA – 152836 220523.12 - 4
c. Body Design: One piece.
d. Body Material: Bronze.
e. Ends: Threaded.
f. Seats: PTFE.
g. Stem: Bronze.
h. Ball: Chrome-plated brass.
i. Port: Reduced.
B. Two-Piece, Bronze Ball Valves with Full Port, and Bronze or Brass Trim:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Conbraco Industries, Inc.
b. Crane; Crane Energy Flow Solutions.
c. Hammond Valve.
d. Lance Valves.
e. Milwaukee Valve Company.
f. NIBCO INC.
g. Watts; a Watts Water Technologies company.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Bronze.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Bronze or brass.
h. Ball: Chrome-plated brass.
i. Port: Full.
C. Two-Piece, Bronze Ball Valves with Regular Port and Bronze or Brass Trim:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Conbraco Industries, Inc.
b. DynaQuip Controls.
c. Hammond Valve.
d. Milwaukee Valve Company.
e. NIBCO INC.
f. Watts; a Watts Water Technologies company.
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Bronze.
http://www.specagent.com/Lookup?ulid=9499 http://www.specagent.com/Lookup?uid=123456935026 http://www.specagent.com/Lookup?uid=123456935027 http://www.specagent.com/Lookup?uid=123456935028 http://www.specagent.com/Lookup?uid=123456935029 http://www.specagent.com/Lookup?uid=123456935030 http://www.specagent.com/Lookup?uid=123456935031 http://www.specagent.com/Lookup?uid=123456935032 http://www.specagent.com/Lookup?ulid=9501 http://www.specagent.com/Lookup?uid=123456935040 http://www.specagent.com/Lookup?uid=123456935041 http://www.specagent.com/Lookup?uid=123456935042 http://www.specagent.com/Lookup?uid=123456935043 http://www.specagent.com/Lookup?uid=123456935044 http://www.specagent.com/Lookup?uid=123456935045
TICA – 152836 220523.12 - 5
e. Ends: Threaded.
f. Seats: PTFE.
g. Stem: Bronze or brass.
h. Ball: Chrome-plated brass.
i. Port: Regular.
PART 3 - EXECUTION
3.1 VALVE INSTALLATION
A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
B. Locate valves for easy access and provide separate support where necessary.
C. Install valves in horizontal piping with stem at or above center of pipe.
D. Install valves in position to allow full stem movement.
E. Locate valves above accessible ceilings. If this is not possible, provide
3.2 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS
A. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.
B. Select valves with the following end connections:
1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve-end option is indicated in valve schedules below.
2. For Steel Piping, NPS 2 and Smaller: Threaded ends.
3.3 LOW-PRESSURE, COMPRESSED-AIR VALVE SCHEDULE (150 PSIG OR LESS)
A. Pipe NPS 2 and Smaller:
1. Bronze and Brass Valves: May be provided with solder-joint ends instead of threaded ends.
2. One piece, brass ball valve.
3. One piece, bronze ball valve with bronze trim.
4. Two-piece, brass ball valves with full port and brass trim.
5. Two-piece, bronze ball valves with full port and bronze or brass trim.
3.4 HIGH-PRESSURE, COMPRESSED-AIR VALVE SCHEDULE (150 TO 200 PSIG)
A. Pipe NPS 2 and Smaller:
TICA – 152836 220523.12 - 6
1. Bronze and Brass Valves: May be provided with solder-joint ends instead of threaded ends.
2. One piece, brass ball valve.
3. One piece, bronze ball valve with bronze trim.
4. Two-piece, brass ball valves with full port and brass trim.
5. Two-piece, bronze ball valves with full port and bronze or brass trim.
3.5 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE
A. Pipe NPS 2 and Smaller:
1. Bronze and Brass Valves: May be provided with solder-joint ends instead of threaded ends.
2. One piece, brass ball valve.
3. One piece, bronze ball valve with bronze trim.
4. Two-piece, brass ball valves with full port and brass trim.
5. Two-piece, bronze ball valves with full port and bronze or brass trim.
END…