Sol_140M0124R0006_Amd_0005.pdf
PDF 88 KB Posted
- Attached to
- Geological Interpretive Tools (GIT) Technology Federal contract opportunity
- Solicitation number
- 140M0124R0006
About this file
This document is an Amendment to a Request for Proposal (RFP) for Geological Interpretive Tools (GIT) Technology. Amendment 5 makes minor changes to the proposal submission instructions and evaluation procedures, and extends the proposal due date to October 24, 2024. Key changes include: updates to the Advisory Down-Select estimated dates, revised Deadline for Submission of Proposal to October 23, 2024, clarification that certain documents are excluded from the 50-page Technical Proposal limit, and a revision to the Price Evaluation factor. The solicitation is an IDIQ for the Department of the Interior's Bureau of Ocean Energy Management. Offerors that have already submitted proposals do not need to resubmit unless changes are made to their original submissions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 47_0005.pdf | ||
| 54_0005.pdf | ||
| 65_0005.pdf | ||
| 64_0005.pdf | ||
| 46_0005.pdf | ||
| 48_0005.pdf | ||
| Sol_140M0124R0006_Amd_0004.pdf | ||
| Sol_140M0124R0006_Amd_0003.pdf | ||
| Sol_140M0124R0006_Amd_0002.pdf | ||
| Sol_140M0124R0006_Amd_0001.pdf | ||
| B08_Attachment_1_-_Past_Performance_Form.docx | DOCX document | |
| B08_Attachment_3_-_Technology_Checklist.docx | DOCX document | |
| Sol_140M0124R0006.pdf | ||
| B08_Attachment_2_-_FAR_52_212-3.docx | DOCX document | |
| B08_140M0124R0006_-_GIT_Technology_RFP_Final.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140M0124R0006 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
M10
Sterling VA 20166-9216 45600 Woodland Road, VAE-AMD
BOEM-HQ
09/18/20240005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/18/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AMENDMENT 5 to Combined Synopsis/Solicitation (Request for Proposal) for Geological
Interpretive Tools (GIT) Technology and Subsurface Interpretation Technology
Amendment 5 makes minor changes to the proposal submission instructions (Section L) and evaluation procedures (Section M) and extends the proposal due date to October 24, 2024, at
12pm, Eastern Daylight Time. Offerors that have already submitted proposals do NOT need to resubmit their proposals if there are no changes to the submissions.
The following changes are made to the RFP:
- Sect. L.3 - The Advisory Down-Select estimated dates are updated.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Caroline Laikin-Credno
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 8
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140M0124R0006/0005
- Sect. L.5 - The Deadline for Submission of
Proposal date is changed to October 23, 2024.
- Sect. L.6.1 - Phase 1 Submission Instructions is revised to add that the following documents are excluded from the 50-page Technical Proposal limit, as they were never intended to be included but were inadvertently omitted from the list:
past performance evaluation forms, the technology checklist, and any system requirements and guides.
- Sect. L.9 - The Pricing Proposal Section
(Factor G) is revised to state that the general business portion of the price proposal shall either include the signed Amendments OR a statement stating that you acknowledge all
Amendments. (Note that the signed Amendments do not need to be submitted until Phase 3 but can be submitted earlier.)
- Sect. M.4.2.6 - The Factor F: Software
Performance evaluation factor is revised to state that this factor will include not only the testing of the software but also the use of the guides.
- Sect. M.5 - Price Evaluation, is revised to correct typographical errors.
RFP Replacement pages 46, 47, 48, 54, 64 and 65 are revised to reflect the above changes, and are attached to this Amendment.
No other changes are being made.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .