This document contains bid forms for the demolition of buildings at Crab Orchard National Wildlife Refuge in Illinois under solicitation number 140FC223R0007 issued by the Department of the Interior Fish and Wildlife Service. The bid forms provide pricing for the demolition of multiple buildings containing asbestos, PCBs, and explosive materials including RDX and TNT. Pricing is requested for the base bid, along with add alternates to address additional potential PCB transformer work, asbestos testing and removal, and the full demolition of one additional large production building. Medium to high risks are associated with explosive materials detected in air ducts and other areas of several buildings requiring abatement. Bidders are advised to evaluate additional buildings to provide pricing should explosives be present.

View the file

Other files

File Type Posted
Attachment_1_-(07112023)_2023_Crab_Orchard_NWR_Schedule_of_Work_for_Area_2_D_Demo_Project_-_Remediation_0001.xlsx XLSX spreadsheet
Sol_140FC223R0007_Amd_0001.pdf PDF
PPQ.docx DOCX document
Construction_Contract_Administration.docx DOCX document
B03-Wage_Determination.pdf PDF
Sol_140FC223R0007.pdf PDF
BidBond__Form_SF24.pdf PDF
Attachment_4.pdf PDF
Bid_Form.xlsx XLSX spreadsheet
Attachment_1.xlsx XLSX spreadsheet
Scope_of_Work.docx DOCX document
CPARS_Notice.pdf PDF
Pre-bid_Solicitation_Notification.docx DOCX document
Attachment_2.docx DOCX document
Attachment_3.pdf PDF
Safety_Checklist.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos

AREA 2D TO BE DEMOLISHEDPhoto - AsbestosPhoto- ExplosiveAsbestos
10068303BLDG LAB, AREA-D, BLDG 1-4 (GD)vacant production buildingYesYes2088SQFTFlourescent Tubes, PCB Ballast, HG/Sodium LightWindow Glazing, Wiring with Asbestos, Gasket in Lights
10068304BLDG LAB, AREA-D, BLDG 1-8 (GD)vacant production buildingYesYes8453SQFTFlourescent Tubes, PCB Ballast, HG/Sodium LightTransite Cement Siding, Tile, Window Glazing, Window Caulk, Wiring with Asbestos, Gasket in Lights, Gasket Blast Doors
D-1-93Metal Storage BuildingNo Asbestos

10068301 BLDG LAB, AREA-D, BLDG 1-11 (GD) vacant production building Yes Yes 2001 SQFT Flourescent Tubes, PCB Ballast Wiring inside original metal conduit w/white paint

ExplosiveRisk
10068304BLDG LAB, AREA-D, BLDG 1-8 (GD)Explosive positive in air duct, duct will require decontamination. TNT. Air duct must be removed to determine whether more than trace amount of energetic material is present.Medium/High
10068301BLDG LAB, AREA-D, BLDG 1-11 (GD)Air shower tested positive for Nitrate Salts. Air Shower will require teardown to determine whether more than trace amount of energetic material is present.Medium/High
Additional Explosive Work
10068291BLDG LAB, AREA-D, BLDG 1-6 (GD)vacant production buildingYesYes11808SQFTFlourescent Tubes, PCB Ballast, HG/Sodium LightAir exchange in center of building tested postive for explosive. RDX. Air duct must be removed to determine whether more than trace amount of energetic material is present.Medium/High
10068290BLDG LAB, AREA-D, BLDG 1-9 (GD)Metal Storage BldgNoYes565SQFTDuct work could not be tested. D-I-1-6 leads into D-I-1-9. Air duct must be removed to determine whether more than a trace amount of energetic material is present.Medium/High
SM MIX HOUSES/Misc Bldgs AREA-D12000SQFT
AREA-D, Building D-17Vacant StorageNoYesFlourescent Tubes, PCB BallastPositive test on floor, sump requires draining the test for energetic material.Medium/High
AREA-D, Building D-25Need to be evaluated and provide price to abate if explosvie presentunknown
AREA-D, Building D-27Need to be evaluated and provide price to abate if explosvie presentunknown
AREA-D, Building D-43E. Mix HouseNoNoHG/Sodium LightNeed to be evaluated and provide price to abate if explosvie presentunknown
AREA-D, Building D-44Trace amount of energetic material. No accumulaton of energetic material present.Low
AREA-D, Building D-46Trace amount of energetic material. No accumulaton of energetic material present.Low
AREA-D, Building D-49Trace amount of energetic material. No accumulaton of energetic material present.Low
AREA-D, Building D-57Trace amount of energetic material. No accumulaton of energetic material present.Low
AREA-D, Building D-58Mix HouseNoYesFlourescent Tubes, PCB BallastTrace positive test on Fan Blower, Duct, Wall, Floor. Air duct must be removed to determine whether more than trace amount of energetic material is present.Medium/High
AREA-D, Building D-68Mix HouseNoNoFlourescent Tubes, PCB BallastNeed to be evaluated and provide price to abate if explosvie presentunknown
AREA-D, Building D-97NoYesExplosives positive in air duct, duct will require decontamination. Nitrate Salts detected. Air duct must be removed to determine whether more than trace amount of energetic material is present.Medium/High

BASE BID $__________

Add Alternate #1:
Potential PCB Transformer Pole Work45
Outside of FenceVacant Storage BuildingYesYes186SQFTFlourescent Tubes, PCB BallastRemoval and proper disposal of Transformer
Additional Asbestos Work and testing
AREA-D, Building D-25Possible PACM Lights
AREA-D, Building D-27Possible PACM Lights
AREA-D, Building D-53Possible PACM Lights
AREA-D, Building D-46Mix HouseNoYesPossible PACM Lights
AREA-D, Building D-97NoYesPossible PACM Lights
Add Alternate #1$__________
Add Alternate #2:
10068291BLDG LAB, AREA-D, BLDG 1-6 (GD)vacant production buildingYesYes11808SQFTFlourescent Tubes, PCB Ballast, HG/Sodium LightTransite Cement Siding, Tile, Window Glazing, Window Caulk, Wiring with Asbestos, Gasket in Lights, Gasket Blast Doors, Flourescent Tubes, PCB Ballast, HG/Sodium Light
Add Alternate #2$__________