Bid_Form.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- IL-CRAB ORCHARD NWR-DEMOLITION AND TESTI
- Solicitation number
- 140FC223R0007
About this file
This document contains a bid form for the demolition and abatement of buildings at the Crab Orchard National Wildlife Refuge in Illinois. The bid form lists multiple buildings to be demolished and abated, with details on asbestos and other hazardous materials present. It also notes the potential presence of explosive materials that require further testing and removal. The bid form includes a base bid line and two alternate bid line items, one for additional abatement work and potential PCB transformer removal, and another for further abatement of an additional building. The related federal contract opportunity is solicitation number 140FC223R0007 from the Department of the Interior Fish and Wildlife Service for demolition and testing at the Crab Orchard National Wildlife Refuge in Illinois. Bids appear to be due by a certain date, with award likely to occur shortly thereafter.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-(07112023)_2023_Crab_Orchard_NWR_Schedule_of_Work_for_Area_2_D_Demo_Project_-_Remediation_0001.xlsx | XLSX spreadsheet | |
| 3__Bid_Form_(07112023)_2023_Crab_Orchard_NWR_2D__Demo_Project_-_Remediation_-_Version_2__dated_20230706_0001.xlsx | XLSX spreadsheet | |
| Sol_140FC223R0007_Amd_0001.pdf | ||
| PPQ.docx | DOCX document | |
| Construction_Contract_Administration.docx | DOCX document | |
| B03-Wage_Determination.pdf | ||
| Sol_140FC223R0007.pdf | ||
| BidBond__Form_SF24.pdf | ||
| Attachment_4.pdf | ||
| Attachment_1.xlsx | XLSX spreadsheet | |
| Scope_of_Work.docx | DOCX document | |
| CPARS_Notice.pdf | ||
| Pre-bid_Solicitation_Notification.docx | DOCX document | |
| Attachment_2.docx | DOCX document | |
| Attachment_3.pdf | ||
| Safety_Checklist.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos
| AREA 2D TO BE DEMOLISHED | Photo - Asbestos | Photo- Explosive | Asbestos | |||||
| 10068303 | BLDG LAB, AREA-D, BLDG 1-4 (GD) | vacant production building | Yes | Yes | 2088 | SQFT | Flourescent Tubes, PCB Ballast, HG/Sodium Light | Window Glazing, Wiring with Asbestos, Gasket in Lights |
| 10068304 | BLDG LAB, AREA-D, BLDG 1-8 (GD) | vacant production building | Yes | Yes | 8453 | SQFT | Flourescent Tubes, PCB Ballast, HG/Sodium Light | Transite Cement Siding, Tile, Window Glazing, Window Caulk, Wiring with Asbestos, Gasket in Lights, Gasket Blast Doors |
| D-1-93 | Metal Storage Building | No Asbestos |
10068301 BLDG LAB, AREA-D, BLDG 1-11 (GD) vacant production building Yes Yes 2001 SQFT Flourescent Tubes, PCB Ballast Wiring inside original metal conduit w/white paint
| Explosive | Risk | ||
| 10068304 | BLDG LAB, AREA-D, BLDG 1-8 (GD) | Explosive positive in air duct, duct will require decontamination. TNT. Air duct must be removed to determine whether more than trace amount of energetic material is present. | Medium/High |
10068301 BLDG LAB, AREA-D, BLDG 1-11 (GD) Air shower tested positive for Nitrate Salts. Air Shower will require teardown to determine whether more than trace amount of energetic material is present. Medium/High
| AREA 2D TO BE ABATED | Additional Explosive Work | ||||||||
| 10068291 | BLDG LAB, AREA-D, BLDG 1-6 (GD) | vacant production building | Yes | Yes | 11808 | SQFT | Flourescent Tubes, PCB Ballast, HG/Sodium Light | Air exchange in center of building tested postive for explosive. RDX. Air duct must be removed to determine whether more than trace amount of energetic material is present. | Medium/High |
| 10068290 | BLDG LAB, AREA-D, BLDG 1-9 (GD) | Metal Storage Bldg | No | Yes | 565 | SQFT | Duct work could not be tested. D-I-1-6 leads into D-I-1-9. Air duct must be removed to determine whether more than a trace amount of energetic material is present. | Medium/High |
| SM MIX HOUSES/Misc Bldgs AREA-D | 12000 | SQFT | |||||||
| AREA-D, Building D-17 | Vacant Storage | No | Yes | Flourescent Tubes, PCB Ballast | Positive test on floor, sump requires draining the test for energetic material. | Medium/High | |||
| AREA-D, Building D-43 | E. Mix House | No | No | HG/Sodium Light | Need to be evaluated | ||||
| AREA-D, Building D-44 | Trace amount of energetic material. No accumulaton of energetic material present. | Low | |||||||
| AREA-D, Building D-46 | Trace amount of energetic material. No accumulaton of energetic material present. | Low | |||||||
| AREA-D, Building D-49 | Trace amount of energetic material. No accumulaton of energetic material present. | Low | |||||||
| AREA-D, Building D-57 | Trace amount of energetic material. No accumulaton of energetic material present. | Low | |||||||
| AREA-D, Building D-58 | Mix House | No | Yes | Flourescent Tubes, PCB Ballast | Trace positive test on Fan Blower, Duct, Wall, Floor. Air duct must be removed to determine whether more than trace amount of energetic material is present. | Medium/High | |||
| AREA-D, Building D-68 | Mix House | No | No | Flourescent Tubes, PCB Ballast | Need to be evaluated | ||||
| AREA-D, Building D-97 | No | Yes | Explosives positive in air duct, duct will require decontamination. Nitrate Salts detected. Air duct must be removed to determine whether more than trace amount of energetic material is present. | Medium/High |
BASE BID $__________
| Add Alternate #1: | ||||||||
| Potential PCB Transformer Pole Work | ||||||||
| Outside of Fence | Vacant Storage Building | Yes | Yes | 186 | SQFT | Flourescent Tubes, PCB Ballast | Removal and proper disposal of Transformer | |
| Additional testing/abatement/demo | ||||||||
| AREA-D, Building D-46 | Mix House | No | Yes | Need to be inspected - Possible PACM Lights | ||||
| AREA-D, Building D-97 | No | Yes | Need to be inspected - Possible PACM Lights | |||||
| AREA-D, Building D-25 | No | No | Need to be inspected/tested for haz mat & explosives w/ potential abatement | |||||
| AREA-D, Building D-27 | No | No | Need to be inspected/tested for haz mat & explosives w/ potential abatement | |||||
| AREA-D, Building D-53 | No | No | Need to be inspected/tested for haz mat & explosives w/ potential abatement | |||||
| AREA-D, railing west of Bldg D-11 | No | No | Remove yellow railing/abate yellow (lead) paint | |||||
| Add Alternate #1 | $__________ |
| Add Alternate #2: | |||||||||
| Additional abatement | |||||||||
| 10068291 | BLDG LAB, AREA-D, BLDG 1-6 (GD) | vacant production building | Yes | Yes | 11808 | SQFT | Flourescent Tubes, PCB Ballast, HG/Sodium Light | Transite Cement Siding, Tile, Window Glazing, Window Caulk, Wiring with Asbestos, Gasket in Lights, Gasket Blast Doors | |
| Add Alternate #2 | $__________ |
File details come from the government source that posted it. Updated .