Sol_140F0620R0017_Amd_0005.pdf

PDF 162 KB Posted

Attached to
MADISON WMD SHOP BUILDING Federal contract opportunity
Solicitation number
140F0620R0017
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This amendment to solicitation 140F0620R0017 provides responses to contractor questions and extends the proposal due date for the construction of a shop building for the Madison Fish and Wildlife Service. The pre-engineered metal building is to be 55 feet by 80 feet and used as a maintenance shop, relocating some existing equipment. Reinforcement is required for both the building slab and site concrete, including a minimum 6x6 #10 wire mesh for walkways and #3 rebar at 12 inches on center for vehicular areas. In response to questions, confirmation is provided that rebar is needed for the building slab design and that site concrete must also be reinforced. The new proposal due date is extended to July 9, 2020 at 7:00 PM local time.

View the file

Other files for this federal contract opportunity

Other files attached to MADISON WMD SHOP BUILDING, newest first.
File Type Posted
Sol_140F0620R0017_Amd_0007.pdf PDF
Sol_140F0620R0017_Amd_0006.pdf PDF
Sol_140F0620R0017_Amd_0004.pdf PDF
Sol_140F0620R0017_Amd_0003.pdf PDF
Sol_140F0620R0017_Amd_0002.pdf PDF
Sol_140F0620R0017_Amd_0001.pdf PDF
Atch 4 Madison Shop Davis Bacon Wage Det.pdf PDF
Atch 5 Madison Shop Past Perf Quest.doc DOC document
Sol_140F0620R0017.pdf PDF
Atch 2 Madison Shop Drawings Rev 1.pdf PDF
Atch 3 Madison Shop Submittals.pdf PDF
Atch 1 Madison Shop Specs 2020-0401.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140F0620R0017 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F06

Lakewood CO 80228-1807

134 UNION BOULEVARD

LAKE PLAZA NORTH

FWS, DIVISION OF CONTRACTING AND GE

2019-01907/02/20200005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/22/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Legacy Doc #: FWS

Period of Performance: 08/21/2020 to 08/20/2021

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Timothy Officer

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation Amendment

Document 140F0620R0017-0005

Document Title CONSTRUCT SHOP BUILDING, MADISON WMD Page 2 of 2

A. The purpose of this amendment is to respond to contractor questions and extend the proposal due date.

B. The following is provided in response to contractor questions:

CONTRACTOR: 1) Is rebar required in the building slab? I see something that appears to be rebar in the floor slab, but can’t find any other information.

GOVERNMENT RESPONSE: Yes, there is to be reinforcement in the concrete slab as per the structural drawings. The contractor is to have the final design for the reinforcement provided by the metal building manufacturer's engineers for their given building design.

CONTRACTOR: 2) Is rebar or any time of reinforcement required in the site concrete?

GOVERNMENT RESPONSE: Yes, the site concrete is to be reinforced. Walkways are to have a 6x6 #10 WWF at a minimum. Concrete slabs that will have vehicular traffic to have #3's at 12" O.C. each way minimum.

C. The response due date and time is extended Thursday, 9 Jul 2020 at 1900 hours local mountain time.

Please provide acknowledgement of this amendment.

D. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .