Sol_140F0620R0017_Amd_0004.pdf
PDF 88 KB Posted
- Attached to
- MADISON WMD SHOP BUILDING Federal contract opportunity
- Solicitation number
- 140F0620R0017
About this file
This amendment modifies a solicitation for the construction of a maintenance shop building and electrical system. The Fish and Wildlife Service seeks a contractor to construct a 55' x 80' pre-engineered metal building to serve as the new maintenance shop for the Madison Wetland Management District. The existing shop will be deconstructed and materials reused where possible. The new shop will be located in roughly the same footprint. The contractor will also install the electrical service, secondary wiring, exterior disconnect, and grounding system. The response due date is extended to July 8, 2020 at 7:00 PM local time. The point of contact is the contracting officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0620R0017_Amd_0007.pdf | ||
| Sol_140F0620R0017_Amd_0006.pdf | ||
| Sol_140F0620R0017_Amd_0005.pdf | ||
| Sol_140F0620R0017_Amd_0003.pdf | ||
| Sol_140F0620R0017_Amd_0002.pdf | ||
| Sol_140F0620R0017_Amd_0001.pdf | ||
| Atch 3 Madison Shop Submittals.pdf | ||
| Atch 4 Madison Shop Davis Bacon Wage Det.pdf | ||
| Atch 5 Madison Shop Past Perf Quest.doc | DOC document | |
| Sol_140F0620R0017.pdf | ||
| Atch 2 Madison Shop Drawings Rev 1.pdf | ||
| Atch 1 Madison Shop Specs 2020-0401.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0620R0017 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F06
Lakewood CO 80228-1807
134 UNION BOULEVARD
LAKE PLAZA NORTH
FWS, DIVISION OF CONTRACTING AND GE
2019-01906/30/20200004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/22/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. The purpose of this amendment is to extend the proposal due date.
B. The response due date and time is extended to Wednesday, 8 Jul 2020 at 1900 hours local mountain time. Change block 13 date of SF 1442 to read 8 Jul 2020. Please provide acknowledgement of this amendment.
C. All other terms and conditions remain unchanged.
Legacy Doc #: FWS
Delivery: 08/20/2021
Delivery Location Code: 0008350210
FWS MADISON WMD
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Timothy Officer
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140F0620R0017/0004
23520 SW Hwy 19
MADISON SD 57042-0048 US
Period of Performance: 08/21/2020 to 08/20/2021
Change Item 00010 to read as follows(amount shown is the obligated amount):
00010 Contractor will provide all materials, labor,equipment and supervision to Construct a
Shop Building: the building is to be a 55 ft. x
80 ft. pre-engineered metal building. The building is to be used as the Maintenance Shop for the Madison WMD. The new shop is to be placed in roughly the same footprint as the existing building. The existing building is to be deconstructed and recycled as much as possible:
NOTE the items to be reused in the new shop, namely the 4-post vehicle lift. All work will be in accordance with the attached, specifications and drawings, and standard business practices for
South Dakota.
Product/Service Code: Y1EB
Product/Service Description: CONSTRUCTION OF
MAINTENANCE BUILDINGS
Change Item 00020 to read as follows(amount shown is the obligated amount):
00020 Contractor will provide all materials, labor, equipment and supervision to construct electrical system; site electrical work shall consist of providing secondary electrical service from the meter board to the circuit breaker panel in the building, including underground conduit, cable, and the installation of exterior main building disconnect and grounding system. All work will be in accordance with the attached, specifications and drawings, and standard business practices for
South Dakota.
Product/Service Code: Y1NZ
Product/Service Description: CONSTRUCTION OF
OTHER UTILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .