Seed_Project_Estimated_Quantities_Spreadsheet_0006.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Demolition Multiple Award Contract (Demo-MAC)
- Solicitation number
- 140A1626R0011
About this file
This is a Hazardous Materials (Hazmat) Quantities Spreadsheet documenting the estimated quantities of asbestos-containing materials (ACM) and lead-containing paint (LCP) identified at five federal buildings under the Department of the Interior's jurisdiction. The spreadsheet provides detailed inventory data across multiple facilities, including Buildings 273, 274, 406, 435, and T354, organized by location (interior and exterior) and material type for abatement planning purposes.
The data identifies significant quantities of ACM in various forms, including vinyl tile, roof materials, wall plaster, ceiling tiles, wall panels, adhesives, caulking, and roofing felt, with estimated quantities ranging from 24 linear feet to 3,450 square feet depending on material type. Several materials contain confirmed asbestos content, including Gray Floor Tile at 18.2% Chrysotile and Joint Compound at 3.25% Chrysotile in Building 435. The spreadsheet cross-references findings to hazmat reports dated January 2025 and August 2025, indicating that ACM data is documented in corresponding analytical tables. While the spreadsheet includes columns for LCP results and related analysis tables, no specific lead paint percentages or test results are populated in the provided document excerpt. This inventory data directly supports the Department of the Interior Bureau of Indian Affairs' Demolition Multiple Award Contract (Demo-MAC, Solicitation 140A1626R0011) by providing quantified baseline information necessary for cost estimation and scope definition of demolition and hazmat abatement services.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hazmat Quantites
| Asbestos Data (ACM) | Lead Data (LCP) | ||||||||||||||||
| Name | Unit/ | ||||||||||||||||
| Location | Sample Location | Description of Material | Percent and Type of Asbestos | Estimated Quantity | Sample Location | Substrate and Component | Color | Result | |||||||||
| (% by weight) | Notes | ||||||||||||||||
| Amount | Units | ||||||||||||||||
| 1 | Building 273 | FBF | Interior | Vinyl Tile | Assumed | 900 | SF | - | - | - | - | Not included in Hazmat Report | pg# | Part I (January 2025) | |||
| Exterior | Asphaltic Roof | Assumed | 900 | SF | |||||||||||||
| 2 | Building 274 | FBF | Interior | Vinyl Tile | Assumed | 200 | SF | - | - | - | - | Not included in Hazmat Report | 10 | Table 2-1 Estimated Quantites of ACM | |||
| Exterior | Asphaltic Roof | Assumed | 200 | SF | |||||||||||||
| 3 | Building 406 | FOWA | Interior | White/Brown Wall Plaster | Assumed | 3,450 | SF | - | - | - | - | Included in Part II (August 2025). ACM info found on Table 3-1 Updated ACM Quantites. No LCP mentioned on Table 4-1 Paint Chip Analytical Results. | 14 | Table 3-1 Paint Chip Analytical Results | |||
| Interior | 2" x 4" White Ceiling Tile | Assumed | 550 | SF | - | - | - | - | 15 | Table 4-1 PCB Analytical Results | |||||||
| Interior | Wall Panel Adhesive | Assumed | 450 | SF | - | - | - | - | |||||||||
| Interior | Textured Ceiling | Assumed | 280 | SF | - | - | - | - | Part II (August 2025) | ||||||||
| Exterior | Window Caulking | Assumed | 160 | LF | - | - | - | - | 113 | Table 2-1 Estimated Quantites of ACM | |||||||
| Exterior | Waterproofing Felt | Assumed | 3,400 | SF | - | - | - | - | 114 | Table 3-1 Updated ACM Quantites | |||||||
| Exterior | Shingles | Assumed | 1,260 | SF | - | - | - | - | 119 | Table 4-1 Paint Chip Analytical Results | |||||||
| Exterior | Door Caulking | Assumed | 36 | LF | - | - | - | - | |||||||||
| Exterior | Chimney Materials | Assumed | 100 | SF | - | - | - | - | |||||||||
| 4 | Building 435 | FOWA | Interior | Gray Floor Tile* (Under Olive Floor Tile) | 18.2% Chrysotile | 85 | SF | - | - | - | - | Included in Part II (August 2025). ACM info found on Table 3-1 Updated ACM Quantites. No LCP mentioned on Table 4-1 Paint Chip Analytical Results. | |||||
| Interior | Joint Compound* | 3.25% Chrysotile | 300 | SF | - | - | - | - | |||||||||
| Interior | 12" x 12" Floor Tile* | Assumed | 1800 | SF | - | - | - | - | |||||||||
| Interior | 12" x 12" Floor Tile Mastic* | Assumed | 1800 | SF | - | - | - | - | |||||||||
| Interior | Ceramic Wall Tile | Assumed | 65 | SF | - | - | - | - | |||||||||
| Exterior | Tar Roof Mastic | Assumed | 1900 | SF | - | - | - | - | |||||||||
| Exterior | Tar Roof Felt Paper | Assumed | 1900 | SF | - | - | - | - | |||||||||
| Exterior | Hot Tar Roof* | Assumed | 1900 | LF | - | - | - | - | |||||||||
| Exterior | Window Frame Caulk | Assumed | 188 | LF | - | - | - | - | |||||||||
| Exterior | Door Frame Caulk | Assumed | 24 | LF | - | - | - | - | |||||||||
| Exterior | Brick Mortar | Assumed | 1400 | SF | - | - | - | - | |||||||||
| 5 | Building T354 | FOWA | - | - | - | - | - | Front Room | Gypsum Wall Paint | Blue | <0.0026% | Included in Part I (January 2025). No ACM info found on Table 2-1 Estimated Quantites of ACM. LCP info included on Table 3-1 Paint Chip Analytical Results. PCB info included on Table 4-1 PCB Analytical Results but state all materials shown None Detected. | |||||
| - | - | - | - | - | Reception | Gypsum Wall Paint | White | <0.0054% | |||||||||
| - | - | - | - | - | Exterior Main Entry | Metal Door Paint | Brown | 0.00% | |||||||||
| 6 | Ranger Trailer | Great Kills | - | - | - | - | - | Exterior Right Staircase | Wood Railing Paint | Red | <0.0025% | Included in Part I (January 2025). No ACM info found on Table 2-1 Estimated Quantites of ACM. LCP info included on Table 3-1 Paint Chip Analytical Results. PCB info included on Table 4-1 PCB Analytical Results but state all materials shown None Detected. | |||||
| - | - | - | - | - | Exterior | Metal Fence Paint | Black | <0.0035% | |||||||||
| - | - | - | - | - | Exterior Left Staircase | Metal Door Paint | Brown | <0.0031% | |||||||||
| - | - | - | - | - | Exterior | Metal Panel Paint | White | 0.00029 % | |||||||||
| 7 | Building #3 | MIFI | Interior | Carpet Mastic | Assumed | 230 | SF | - | - | - | - | Included in Part II (August 2025). ACM info found on Table 3-1 Updated ACM Quantites. No LCP mentioned on Table 4-1 Paint Chip Analytical Results. | |||||
| Interior | 2' x 4' Fissured Ceiling Tile | Assumed | 230 | SF | - | - | - | - | |||||||||
| Exterior | White Foundation Caulking | Assumed | 60 | LF | - | - | - | - | |||||||||
| Exterior | Gray Black Tar Paper* | 21.6% Chrysotile | 1,600 | SF | - | - | - | - | |||||||||
| Exterior | Caulking Around Eaves* | 1.6% Chrysotile | 180 | LF | - | - | - | - | |||||||||
| Exterior | Roof Membrane* | Assumed | 1,300 | SF | - | - | - | - | |||||||||
| 8 | Building #4 | MIFI | Interior | Gray Epoxy Flooring | Assumed | 960 | SF | - | - | - | - | Included in Part II (August 2025). ACM info found on Table 3-1 Updated ACM Quantites. No LCP mentioned on Table 4-1 Paint Chip Analytical Results. | |||||
| Interior | 4" Gray Cove Base | Assumed | 15 | LF | - | - | - | - | |||||||||
| Interior | 4" Gray Cove Base Mastic | Assumed | 15 | LF | - | - | - | - | |||||||||
| Exterior | Slate Shingles | Assumed | 1150 | SF | - | - | - | - | |||||||||
| Exterior | Roof Felt Paper | Assumed | 1150 | SF | - | - | - | - | |||||||||
| Exterior | Vent Pipe Tar | Assumed | 4 | SF | - | - | - | - | |||||||||
| Exterior | Transite Siding* | 10.3% Chrysotile | 1488 | SF | - | - | - | - | |||||||||
| 9 | Building #5 | MIFI | Exterior Wall | Transite Siding Gray Panel | 3.3% Chrysotile | 1500 | SF | Right Door | Wooden Door Frame Paint | Brown | 0.23% | Included in Part I (January 2025). ACM info found on Table 2-1 Estimated Quantites of ACM. LCP info included on Table 3-1 Paint Chip Analytical Results. PCB sample included on Table 4-1 PCB Analytical Results but state None Detected. | |||||
| Exterior (North) | Window Frame White Caulking | <0.3% Chrysotile* | 80 | LF | Left Door | Wooden Siding Paint | White | 0.48% | |||||||||
| Exterior (South) | Garage Door Frame Gray Caulking | Anthophyllite (Trace)* | 100 | LF | - | - | - | - | |||||||||
| 10 | Building #7 | MIFI | Samples collected, but no ACM identified. | Interior | Metal Tank | Gray | 1.50% | Included in Part II (August 2025). ACM info found on Table 2-1 Estimated Quantites of ACM. LCP mentioned on Table 4-1 Paint Chip Analytical Results. |